CN106193771A - 一种路灯安装方法 - Google Patents
一种路灯安装方法 Download PDFInfo
- Publication number
- CN106193771A CN106193771A CN201610560682.0A CN201610560682A CN106193771A CN 106193771 A CN106193771 A CN 106193771A CN 201610560682 A CN201610560682 A CN 201610560682A CN 106193771 A CN106193771 A CN 106193771A
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- street lamp
- stanchion
- fixing
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2207—Sockets or holders for poles or posts not used
- E04H12/2215—Sockets or holders for poles or posts not used driven into the ground
- E04H12/223—Sockets or holders for poles or posts not used driven into the ground with movable anchoring elements; with separately driven anchor rods
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
本发明公开了一种路灯安装方法,属于路灯技术领域。本发明一种路灯安装方法先将基座安装,再通过机械手将灯杆与基座固定安装,灯杆在安装过程中不会晃动,也无需人力辅助固定灯杆,安装安全系数高;安装步骤简单,基座结构稳定,安装过程更为机械化,减少安装人员的工作强度,同时提升安装效率。
Description
技术领域
本发明涉及路灯技术领域,具体地说,尤其涉及一种路灯安装方法。
背景技术
目前,路灯杆的固定安装方法多是先在地面以下根据需要挖一个大小不同的坑,然后在坑内放置路灯底座并用钢筋水泥等进行浇注,用吊车吊起路灯灯杆,安装人员用绳子将灯杆的底部拉至底座上并固定安装,这种路灯安装方式需要时间长、成本高,需要耗费大量的人力,安装效率低。
发明内容
为了解决上述问题,本发明公开了一种路灯安装方法,提供了一种更为机械化的路灯安装方法,省时省力,安装简便。
本发明是通过以下技术方案实现的:
一种路灯安装方法,包括如下步骤:
a、基座安装:将地面土壤整平,将钢筋柱桩和条形钢板用螺母连接固定,用铁锤将钢筋柱桩均匀敲入地下,当钢筋柱桩上端与地面距离剩下5-10cm时停止敲打,将固定法兰盘与钢筋柱桩的顶端通过螺母固定连接;
b、路灯固定:采用高空作业车的机械手将路灯灯杆固定抓住,启动转动轴将灯杆竖起,曲臂运动将路灯灯杆的法兰盘向固定法兰盘靠近,采用S形钩穿过孔A及孔B将灯杆法兰盘与固定法兰盘初步固定,初步固定后移动曲臂将灯杆法兰盘从钢筋柱桩的上端套入,最后采用螺母将灯杆法兰盘固定即完成安装。
所述步骤a中的基座包括两条十字交叉的条形钢板及钢筋柱桩,所述钢筋柱桩的上端设有螺纹,底端为尖头,条形钢板与钢筋柱桩的上端通过螺母连接。
所述固定法兰盘上设有与钢筋柱桩位置对应的安装孔,所述固定法兰盘上设有孔A,所述灯杆法兰盘上设有与钢筋柱桩位置对应的安装孔,所述灯杆法兰盘上设有孔B,所述孔A与孔B位置相应。
所述步骤b中高空作业车的曲臂结构包括机械手、转动轴及曲臂,所述机械手与转动轴固定连接,所述转动轴与曲臂通过轴承连接。
与现有技术相比,本发明的有益效果是:
本发明一种路灯安装方法先将基座安装,再通过机械手将灯杆与基座固定安装,灯杆在安装过程中不会晃动,也无需人力辅助固定灯杆,安装安全系数高;安装步骤简单,基座结构稳定,安装过程更为机械化,减少安装人员的工作强度,同时提升安装效率。
附图说明
图1是本发明路灯杆安装基座结构示意图;
图2是本发明安装基座法兰盘结构示意图;
图3是本发明S形固定钩的结构示意图;
图4是本发明路灯杆及法兰盘结构示意图;
图5是本发明高空作业车曲臂结构示意图。
图1中:1、条形钢板;2、钢筋柱桩;3、固定法兰盘;4、S形钩;5、灯杆;6、灯杆法兰盘;7、孔A;8、孔B;9、曲臂;10、转动轴;11、机械手。
下面结合附图对本发明进一步说明:
一种路灯安装方法,包括如下步骤:
a、基座安装:将地面土壤整平,将钢筋柱桩2和条形钢板1用螺母连接固定,用铁锤将钢筋柱桩2均匀敲入地下,当钢筋柱桩2上端与地面距离剩下5-10cm时停止敲打,将固定法兰盘3与钢筋柱桩2的顶端通过螺母固定连接;
b、路灯固定:采用高空作业车的机械手11将路灯灯杆固定抓住,启动转动轴10将灯杆竖起,曲臂9运动将路灯灯杆的法兰盘向固定法兰盘靠近,采用S形钩4穿过孔A7及孔B8将灯杆法兰盘6与固定法兰盘3初步固定,初步固定后移动曲臂9将灯杆法兰盘6从钢筋柱桩2的上端套入,最后采用螺母将灯杆法兰盘6固定即完成安装。
所述步骤a中的基座包括两条十字交叉的条形钢板1及钢筋柱桩2,所述钢筋柱桩2的上端设有螺纹,底端为尖头,条形钢板1与钢筋柱桩2的上端通过螺母连接。
所述固定法兰盘上3设有与钢筋柱桩2位置对应的安装孔,所述固定法兰盘3上设有孔A7,所述灯杆法兰盘6上设有与钢筋柱桩2位置对应的安装孔,所述灯杆法兰盘上设有孔B8,所述孔A7与孔B8位置相应。
所述步骤b中高空作业车的曲臂结构包括机械手11、转动轴10及曲臂9,所述机械手11与转动轴10固定连接,所述转动轴10与曲臂9通过轴承连接。
如说明书附图图1所示,基座包括两条十字交叉的条形钢板1及钢筋柱桩2,钢筋柱桩2的上端设有螺纹,底端为尖头状,条形钢板1与钢筋柱桩2的上端通过螺母连接。
如说明书附图图2所示,固定法兰盘上3设有与钢筋柱桩2位置对应的安装孔,固定法兰盘3上设有孔A7。
如说明书附图图4所示,灯杆法兰盘6上设有与钢筋柱桩2位置对应的安装孔,灯杆法兰盘上设有孔B8,孔A7与孔B8位置相应,灯杆法兰盘上方设有灯杆5。
如说明书附图图5所示,高空作业车的曲臂结构包括机械手11、转动轴10及曲臂9,两个机械手11与转动轴10固定连接,转动轴10与曲臂9通过轴承连接。
本发明路灯安装过程如下:首先将地面土壤整平,将钢筋柱桩2和条形钢板1用螺母连接固定,用铁锤将钢筋柱桩2均匀敲入地下,当所有钢筋柱桩2上端与地面距离剩下10cm时停止敲打,将固定法兰盘3与钢筋柱桩2的顶端通过螺母固定连接,检查固定法兰盘3是否水平,若不水平则调整为水平状态,采用高空作业车的两个机械手11将路灯灯杆固定抓住,启动转动轴10,转动轴转动将灯杆竖起,曲臂9运动将路灯灯杆的法兰盘向固定法兰盘靠近,采用S形钩4穿过孔A7及孔B8将灯杆法兰盘6与固定法兰盘3初步固定,S形钩同时起到定位的作用,方便调整灯杆法兰盘的位置,初步固定后移动曲臂9将灯杆法兰盘6从钢筋柱桩2的上端套入,移走S型钩,最后采用螺母将灯杆法兰盘6固定即完成安装。
S形钩的整体高度设置为10-12cm,给灯杆法兰盘的调整留有距离。
本发明一种路灯安装方法先将基座安装,再通过机械手将灯杆与基座固定安装,灯杆在安装过程中不会晃动,也无需人力辅助固定灯杆,安装安全系数高;安装步骤简单,基座结构稳定,安装过程更为机械化,减少安装人员的工作强度,同时提升安装效率。
综上所述,仅为本发明的较佳实施例而已,并非用来限定本发明实施的范围,凡依本发明权利要求范围所述的形状、构造、特征及精神所为的均等变化与修饰,均应包括于本发明的权利要求范围内。
Claims (4)
1.一种路灯安装方法,其特征在于:包括如下步骤:
a、基座安装:将地面土壤整平,将钢筋柱桩(2)和条形钢板(1)用螺母连接固定,用铁锤将钢筋柱桩(2)均匀敲入地下,当钢筋柱桩(2)上端与地面距离剩下5-10cm时停止敲打,将固定法兰盘(3)与钢筋柱桩(2)的顶端通过螺母固定连接;
b、路灯固定:采用高空作业车的机械手(11)将路灯灯杆固定抓住,启动转动轴(10)将灯杆竖起,曲臂(9)运动将路灯灯杆的法兰盘向固定法兰盘靠近,采用S形钩(4)穿过孔A(7)及孔B(8)将灯杆法兰盘(6)与固定法兰盘(3)初步固定,初步固定后移动曲臂(9)将灯杆法兰盘(6)从钢筋柱桩(2)的上端套入,最后采用螺母将灯杆法兰盘(6)固定即完成安装。
2.根据权利要求1所述的一种路灯安装方法,其特征在于:所述步骤a中的基座包括两条十字交叉的条形钢板(1)及钢筋柱桩(2),所述钢筋柱桩(2)的上端设有螺纹,底端为尖头,条形钢板(1)与钢筋柱桩(2)的上端通过螺母连接。
3.根据权利要求1所述的一种路灯安装方法,其特征在于:所述固定法兰盘上(3)设有与钢筋柱桩(2)位置对应的安装孔,所述固定法兰盘(3)上设有孔A(7),所述灯杆法兰盘(6)上设有与钢筋柱桩(2)位置对应的安装孔,所述灯杆法兰盘上设有孔B(8),所述孔A(7)与孔B(8)位置相应。
4.根据权利要求1所述的一种路灯安装方法,其特征在于:所述步骤b中高空作业车的曲臂结构包括机械手(11)、转动轴(10)及曲臂(9),所述机械手(11)与转动轴(10)固定连接,所述转动轴(10)与曲臂(9)通过轴承连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610560682.0A CN106193771A (zh) | 2016-07-15 | 2016-07-15 | 一种路灯安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610560682.0A CN106193771A (zh) | 2016-07-15 | 2016-07-15 | 一种路灯安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106193771A true CN106193771A (zh) | 2016-12-07 |
Family
ID=57475096
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610560682.0A Pending CN106193771A (zh) | 2016-07-15 | 2016-07-15 | 一种路灯安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106193771A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108019702A (zh) * | 2017-12-09 | 2018-05-11 | 梧州市国佳节能科技有限公司 | 太阳能路灯的快速安装方法 |
CN108343307A (zh) * | 2018-01-15 | 2018-07-31 | 江苏灵屹成科技有限公司 | 一种路灯安装装置及安装方法 |
CN110104572A (zh) * | 2019-05-27 | 2019-08-09 | 宜兴市宜安电力工具制造有限公司 | 带电检修机器人顶部旋转吊臂 |
CN112032682A (zh) * | 2020-08-28 | 2020-12-04 | 上海宝冶集团有限公司 | 利用叉车安装高杆路灯方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733640A (zh) * | 2012-06-28 | 2012-10-17 | 芜湖中泰新能源有限公司 | 用于路灯杆、电线杆以及高压电线塔固定安装的基座及其安装方法 |
CN102877680A (zh) * | 2012-10-09 | 2013-01-16 | 陕西有色建设有限公司 | 一种预制柱吊装一次就位施工方法 |
CN202731398U (zh) * | 2012-06-28 | 2013-02-13 | 芜湖中泰新能源有限公司 | 用于路灯杆、电线杆以及高压电线塔固定安装的基座 |
CN103343551A (zh) * | 2013-06-18 | 2013-10-09 | 国家电网公司 | 一种采空区输电杆塔基础调节装置 |
CN203856263U (zh) * | 2014-05-26 | 2014-10-01 | 国家电网公司 | 一种输电线路抢修塔底座 |
-
2016
- 2016-07-15 CN CN201610560682.0A patent/CN106193771A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733640A (zh) * | 2012-06-28 | 2012-10-17 | 芜湖中泰新能源有限公司 | 用于路灯杆、电线杆以及高压电线塔固定安装的基座及其安装方法 |
CN202731398U (zh) * | 2012-06-28 | 2013-02-13 | 芜湖中泰新能源有限公司 | 用于路灯杆、电线杆以及高压电线塔固定安装的基座 |
CN102877680A (zh) * | 2012-10-09 | 2013-01-16 | 陕西有色建设有限公司 | 一种预制柱吊装一次就位施工方法 |
CN103343551A (zh) * | 2013-06-18 | 2013-10-09 | 国家电网公司 | 一种采空区输电杆塔基础调节装置 |
CN203856263U (zh) * | 2014-05-26 | 2014-10-01 | 国家电网公司 | 一种输电线路抢修塔底座 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108019702A (zh) * | 2017-12-09 | 2018-05-11 | 梧州市国佳节能科技有限公司 | 太阳能路灯的快速安装方法 |
CN108343307A (zh) * | 2018-01-15 | 2018-07-31 | 江苏灵屹成科技有限公司 | 一种路灯安装装置及安装方法 |
CN110104572A (zh) * | 2019-05-27 | 2019-08-09 | 宜兴市宜安电力工具制造有限公司 | 带电检修机器人顶部旋转吊臂 |
CN110104572B (zh) * | 2019-05-27 | 2024-04-16 | 宜兴市宜安电力工具制造有限公司 | 带电检修机器人顶部旋转吊臂 |
CN112032682A (zh) * | 2020-08-28 | 2020-12-04 | 上海宝冶集团有限公司 | 利用叉车安装高杆路灯方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106193771A (zh) | 一种路灯安装方法 | |
CN105839988A (zh) | 自垂直定位立杆器及其施工方法 | |
CN110027992B (zh) | 一种塔机标准节自动顶升就位装置及方法 | |
CN105421859A (zh) | 一种电力电网电线杆架设装置及施工方法 | |
CN105421860A (zh) | 一种电网电线杆架设装置及施工方法 | |
CN104477788B (zh) | 风力发电塔跨越自爬式平移吊机 | |
CN205979453U (zh) | 一种拼接转向路灯 | |
CN201121413Y (zh) | 筒式电动爬升模板 | |
CN205330693U (zh) | 省力式隧道施工用拱架安装设备 | |
CN206071208U (zh) | 一种电杆立杆装置 | |
CN204922762U (zh) | 一种便于折叠的改进型路灯 | |
CN201133078Y (zh) | 电动提升的筒式模板 | |
CN217678634U (zh) | 一种高大墩柱养护装置 | |
CN208182532U (zh) | 一种自走式电动型多功能作业平台 | |
CN205802854U (zh) | 一种门型汽车升降机 | |
CN202513517U (zh) | 一种托担抱箍 | |
CN104925687A (zh) | 一种电力升降装置及其工作方法 | |
CN214091259U (zh) | 一种可防雷击的钢管输电塔 | |
CN204343778U (zh) | 一种线杆 | |
CN214179775U (zh) | 工程造价展示装置 | |
CN212657672U (zh) | 一种可倾倒式灯杆 | |
CN207582768U (zh) | 横梁钢结构 | |
CN201857249U (zh) | 拔盖装置 | |
CN205973588U (zh) | 简易潜水泵提升装置 | |
CN203547215U (zh) | 电线杆矫正器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161207 |
|
RJ01 | Rejection of invention patent application after publication |