CN103343551A - 一种采空区输电杆塔基础调节装置 - Google Patents

一种采空区输电杆塔基础调节装置 Download PDF

Info

Publication number
CN103343551A
CN103343551A CN2013102404838A CN201310240483A CN103343551A CN 103343551 A CN103343551 A CN 103343551A CN 2013102404838 A CN2013102404838 A CN 2013102404838A CN 201310240483 A CN201310240483 A CN 201310240483A CN 103343551 A CN103343551 A CN 103343551A
Authority
CN
China
Prior art keywords
transmission tower
plate
adjusting device
goaf
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102404838A
Other languages
English (en)
Inventor
郭立户
李勇
张惠生
郑为民
高向前
张永宏
姚宸
靳键云
周春红
王凯武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI LINFEN ELECTRIC POWER SUPPLY CO Ltd
State Grid Corp of China SGCC
Original Assignee
SHANXI LINFEN ELECTRIC POWER SUPPLY CO Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI LINFEN ELECTRIC POWER SUPPLY CO Ltd, State Grid Corp of China SGCC filed Critical SHANXI LINFEN ELECTRIC POWER SUPPLY CO Ltd
Priority to CN2013102404838A priority Critical patent/CN103343551A/zh
Publication of CN103343551A publication Critical patent/CN103343551A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明一种采空区输电杆塔基础调节装置,属于输电杆塔技术领域;解决的技术问题是:提供一种能够实现采空区输电杆塔安全设置,维护方便的基础调节装置;采用的技术方案是:一种采空区输电杆塔基础调节装置,包括固定板、连接板和调节板三层钢板,所述连接板的下部通过钢板同固定板焊接一起,连接板的上部竖直设置有多根螺杆,所述螺杆的上端穿过调节板,所述调节板通过两侧的调节螺母固定在螺杆上,调节板的上部固定安装有输电杆塔角钢架底座;本发明适用于电力部门。

Description

一种采空区输电杆塔基础调节装置
技术领域
本发明一种采空区输电杆塔基础调节装置,属于输电杆塔技术领域。
背景技术
采空区是由人为挖掘或者天然地质运动在地表下面产生的“空洞”,采空区的存在使得地面上的生产生活面临很大的安全问题,这些问题也深刻影响输电线路输电杆塔的安全,特别是近些年,我国地址灾害频发,更是给输电杆塔提出了严峻的考验,完全的修改线路绕过采空区不现实,经常维护检修代价太大而且需要断电等前提,不实用也不经济。
发明内容
本发明克服现有技术存在的不足,所要解决的技术问题是:提供一种能够实现采空区输电杆塔安全设置,维护方便的基础调节装置。
为解决上述技术问题,本发明所采用的技术方案是:一种采空区输电杆塔基础调节装置,包括固定板、连接板和调节板三层钢板,所述连接板的下部通过钢板同固定板焊接一起,连接板的上部竖直设置有多根螺杆,所述螺杆的上端穿过调节板,所述调节板通过两侧的调节螺母固定在螺杆上,调节板的上部固定安装有输电杆塔角钢架底座。
所述固定板上设置有便于同混凝土底座连接固定的孔。
所述螺杆采用Φ36的螺杆。
所述螺杆有8根。
本发明与现有技术相比具有的有益效果是:本发明通过调节螺栓,能够使得杆塔始终保持垂直,塔身稳定,安全可靠,能够很好的适应采空区的地质条件,整个装置结构简洁,安装、使用、维护方便,实用性强。
附图说明
下面结合附图对本发明做进一步详细的说明:
图1是本发明的结构示意图;
图中:1为固定板、2为连接板、3为调节板、4为螺杆、5为调节螺母、6为输电杆塔角钢架底座、7为混凝土底座。
具体实施方式
如图1所示,本发明一种采空区输电杆塔基础调节装置,包括固定板1、连接板2和调节板3三层钢板,所述连接板2的下部通过钢板同固定板1焊接一起,连接板2的上部竖直设置有多根螺杆4,所述螺杆4的上端穿过调节板3,所述调节板3通过两侧的调节螺母5固定在螺杆4上,调节板3的上部固定安装有输电杆塔角钢架底座6。
所述固定板1上设置有便于同混凝土底座7连接固定的孔,本具体实施方式中,固定板1通过螺栓固定在混凝土底座7上,固定板1也可以通过其他方式固定在混凝土底座7上,例如直接将固定板1封装在混凝土底座7的混凝土结构中。
所述螺杆4采用Φ36的螺杆,所述螺杆4有8根,螺杆4可以抵消杆塔的传递的上拔力,同时通过调节螺杆4上调节板3的高低,也可以平衡杆塔,使其始终保持垂直;本发明在使用的过程中,依据杆塔角钢架的支架多少确定个数,例如有四个支架的杆塔,就在每个支架的底部安装一套本发明所述装置,通过调节四个支架不同调节装置,达到保持杆塔始终垂直,塔身稳定,能够很好的适应采空区的地质条件。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本发明的保护范围。

Claims (4)

1.一种采空区输电杆塔基础调节装置,其特征在于:包括固定板(1)、连接板(2)和调节板(3)三层钢板,所述连接板(2)的下部通过钢板同固定板(1)焊接一起,连接板(2)的上部竖直设置有多根螺杆(4),所述螺杆(4)的上端穿过调节板(3),所述调节板(3)通过两侧的调节螺母(5)固定在螺杆(4)上,调节板(3)的上部固定安装有输电杆塔角钢架底座(6)。
2.根据权利要求1所述的一种采空区输电杆塔基础调节装置,其特征在于:所述固定板(1)上设置有便于同混凝土底座(7)连接固定的孔。
3.根据权利要求2所述的一种采空区输电杆塔基础调节装置,其特征在于:所述螺杆(4)采用Φ36的螺杆。
4.根据权利要求2所述的一种采空区输电杆塔基础调节装置,其特征在于:所述螺杆(4)有8根。
CN2013102404838A 2013-06-18 2013-06-18 一种采空区输电杆塔基础调节装置 Pending CN103343551A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102404838A CN103343551A (zh) 2013-06-18 2013-06-18 一种采空区输电杆塔基础调节装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102404838A CN103343551A (zh) 2013-06-18 2013-06-18 一种采空区输电杆塔基础调节装置

Publications (1)

Publication Number Publication Date
CN103343551A true CN103343551A (zh) 2013-10-09

Family

ID=49278376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102404838A Pending CN103343551A (zh) 2013-06-18 2013-06-18 一种采空区输电杆塔基础调节装置

Country Status (1)

Country Link
CN (1) CN103343551A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040723A (zh) * 2015-07-22 2015-11-11 国家电网公司 一种防砂土回填治理水泥杆上拔结构及其施工方法
CN105220892A (zh) * 2015-10-19 2016-01-06 长春轨道客车股份有限公司 预埋工字梁位置偏差的补救方法
CN106193771A (zh) * 2016-07-15 2016-12-07 江苏迪生建设集团有限公司 一种路灯安装方法
CN108824476A (zh) * 2018-07-05 2018-11-16 贵州电网有限责任公司六盘水供电局 用于山地采空边坡高压输电塔的连续可调抗采空基础
CN110905264A (zh) * 2019-12-10 2020-03-24 国网安徽省电力有限公司淮北供电公司 一种维稳性输电线用杆塔

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08209721A (ja) * 1995-02-03 1996-08-13 Nippon Chuzo Kk 柱脚部の固定構造
CN201339336Y (zh) * 2008-11-24 2009-11-04 梁前晟 输电线路杆塔可调式塔脚板
CN203346922U (zh) * 2013-06-18 2013-12-18 国家电网公司 采空区输电杆塔基础调节装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08209721A (ja) * 1995-02-03 1996-08-13 Nippon Chuzo Kk 柱脚部の固定構造
CN201339336Y (zh) * 2008-11-24 2009-11-04 梁前晟 输电线路杆塔可调式塔脚板
CN203346922U (zh) * 2013-06-18 2013-12-18 国家电网公司 采空区输电杆塔基础调节装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040723A (zh) * 2015-07-22 2015-11-11 国家电网公司 一种防砂土回填治理水泥杆上拔结构及其施工方法
CN105220892A (zh) * 2015-10-19 2016-01-06 长春轨道客车股份有限公司 预埋工字梁位置偏差的补救方法
CN106193771A (zh) * 2016-07-15 2016-12-07 江苏迪生建设集团有限公司 一种路灯安装方法
CN108824476A (zh) * 2018-07-05 2018-11-16 贵州电网有限责任公司六盘水供电局 用于山地采空边坡高压输电塔的连续可调抗采空基础
CN110905264A (zh) * 2019-12-10 2020-03-24 国网安徽省电力有限公司淮北供电公司 一种维稳性输电线用杆塔

Similar Documents

Publication Publication Date Title
CN103343551A (zh) 一种采空区输电杆塔基础调节装置
CN207425529U (zh) 一种可升降的电力变压器安装台架
CN203850679U (zh) 高压开关柜内电流互感器带限位支架的升降拆装平台
CN103175998B (zh) 一种用于输电线路绝缘子串高压性能检测的便捷式试验杆塔
CN204011770U (zh) 一种变电站设备预埋接地装置
CN205132955U (zh) 一种电力行业低空吊装作业用吊装架
CN203346922U (zh) 采空区输电杆塔基础调节装置
CN202298645U (zh) 一种兆瓦级风机基础环安装支撑装置
CN204732751U (zh) 变压器有载调压开关检修工具
CN203640371U (zh) 一种用于输电塔的在线监测系统安装装置
CN204144871U (zh) 一种滑动式电气设备金具
CN203960920U (zh) 煤矿采动区输电铁塔倾斜调整装置
CN202178556U (zh) 铁塔通用型可控避雷针安装支架
CN203701133U (zh) 一种下凸式承台预应力岩石锚杆基础装置
CN204173886U (zh) 多功能撬杠
CN204030448U (zh) 一种带电紧固针式绝缘子螺母工具
CN208753098U (zh) 一种变电站用变压器支架
CN208220976U (zh) 一种风力发电机的安装塔架
CN203071426U (zh) 便于快速找平的配电柜
CN204179566U (zh) 一种双串绝缘子绝缘牵引器
CN201943562U (zh) 柱形钢钎式绝缘独脚梯的梯脚稳固器
CN206153845U (zh) 风电齿轮箱空心轴的装配装置
CN206259672U (zh) 一种建筑电气盒支撑固定装置
CN203445835U (zh) 一种基于太阳能的烤烟动力装置
CN204388834U (zh) 便携式电力杆塔测斜装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131009