CN106180346A - A kind of low pressure thermal forming device - Google Patents

A kind of low pressure thermal forming device Download PDF

Info

Publication number
CN106180346A
CN106180346A CN201610568064.0A CN201610568064A CN106180346A CN 106180346 A CN106180346 A CN 106180346A CN 201610568064 A CN201610568064 A CN 201610568064A CN 106180346 A CN106180346 A CN 106180346A
Authority
CN
China
Prior art keywords
electrode
sealing punch
switch
mold
punch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610568064.0A
Other languages
Chinese (zh)
Other versions
CN106180346B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Run Hua Mould Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610568064.0A priority Critical patent/CN106180346B/en
Publication of CN106180346A publication Critical patent/CN106180346A/en
Application granted granted Critical
Publication of CN106180346B publication Critical patent/CN106180346B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/041Means for controlling fluid parameters, e.g. pressure or temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/045Closing or sealing means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/047Mould construction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/16Heating or cooling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Mounting, Exchange, And Manufacturing Of Dies (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

The present invention relates to a kind of low pressure thermal forming device.Its technical scheme is: including left electrode, left sealing punch, mold, right electrode, right sealing punch and lower mold, mould is connected with upper table, and lower mold is connected with lower table;Left sealing punch is connected with outside cooling medium source by Filled Dielectrics passage and cooling medium switch, is connected with extraneous gas medium source by check valve, air relief valve and air inlet switch simultaneously;Right sealing punch has pressure release passage and is connected with relief valve;Left electrode and right electrode are connected with power supply by wire and on and off switch;Providing the benefit that: when solving existing apparatus and process forming high intensity or inductile hollow unit, resistance of deformation is big, and drip molding evenness of wall thickness difference and d type precision are the highest, easily rupture, and efficiency is low with the problem that cannot synchronize to carry out heat treatment.

Description

A kind of low pressure thermal forming device
Technical field
The present invention relates to machinery production field, particularly to a kind of low pressure thermal forming device.
Background technology
The composite bending modulus high due to hollow section component and modulus of rigidity are it is considered to be realize structure lightened optimal knot Configuration formula.It is widely used in the industries such as Aeronautics and Astronautics, automobile and bicycle.Fluid internal pressure shapes the elder generation being to process this class A of geometric unitA Enter forming technique.The know-why that fluid internal pressure shapes is initial blank inside to apply high pressure medium make blank cross section week Length increases and shapes the hollow member of different cross section form.The essence of its deformation is parison swell deformation.But this kind of distorted pattern Formula has limitation, it is impossible to or the shaping of plasticity relatively low material higher for intensity, and its reason shows as following several respects:
One, for needing the material of phase transformation strengthening cannot realize heat treatment in forming process.
Two, in order uniquely to deform, to be only possible to order about tubing when driving force, only pressure reach the highest complete due to intrinsic pressure Shape, it is therefore necessary to be equipped with special high-power supercharger, simultaneously by superhigh pressure sealing technical limitations, form high strength or low mould During property material hollow unit, difficulty is the biggest.Additionally, for providing enough mold clamping force, it is necessary to use large-tonnage equipment.The problems referred to above Significantly hinder the engineer applied of this technology.
Its three, mainly produce required odd-shaped cross section by dilatancy owing to fluid internal pressure shapes, and expand change Shape pattern belongs to double tensile stress state, for the material that plasticity is relatively low, easily ruptures, this skill when thus be accordingly used in Al alloys andMg alloys There is the biggest defect in art.
Its four, the most relatively low for its elastic modelling quantity of Materials with High Strength, during shaping, elastic return is violent, and room temperature fluid internal pressure becomes The form accuracy of shape it is difficult to ensure that.
There is scholar to propose hot interior pressing formation, although the method solves the problem of forming limit, but exacerbate wall thickness not Equal problem, and the restriction of heated medium supercharger and the restriction of gases at high pressure safety problem, be unsuitable for engineer applied.
For these reasons, transfer being bent into primary deformable pattern to, change fluid internal pressure and shape to be expanded to uniquely become The drawback of shape pattern, and make full use of the intrinsic pressure rising certainly that member section change in high temperature volumetric expansion and forming process causes Characteristic provides driving force for deformation, it is to avoid under traditional handicraft depend on supercharger unduly, drip molding springback capacity is big, form accuracy The problem that low and evenness of wall thickness is poor, reduces technology difficulty, widens the technique scope of application, and improving forming quality is the former of the present invention Power.
Summary of the invention
The purpose of the present invention is aiming at the drawbacks described above that prior art exists, it is provided that a kind of low pressure thermal forming device, its When mainly solving existing apparatus and process forming high intensity or inductile hollow unit, resistance of deformation is big, drip molding uniform wall thickness Property difference and d type precision the highest, easily rupture, efficiency is low with the problem that cannot synchronize to carry out heat treatment.
A kind of low pressure thermal forming device that the present invention mentions, its technical scheme is: include left electrode (2), left sealing punch (3), mold (15), right electrode (16), right sealing punch (17) and lower mold (21), described mold (15) and upper work Platform (11) connects, and lower mold (21) is connected with lower table (1);Left sealing punch (3) is by Filled Dielectrics passage (5) and cooling Medium switch (4) is connected with outside cooling medium source (6), simultaneously by check valve (7), air relief valve (8) and air inlet switch (10) It is connected with extraneous gas medium source (9);Right sealing punch (17) has pressure release passage (19) and is connected with relief valve (18);Left electricity Pole (2) and right electrode (16) are connected with power supply (14) by wire (12) and on and off switch (13);
By left sealing punch (3) and right sealing punch (17) to initial pipe (20) end seal, and move on to specify position;Left Electrode (2) moves to right electrode (16) contact with initial pipe (20), and left electrode (2) is arranged on the right side of left sealing punch (3) Side, and right electrode (16) is arranged on the left side of right sealing punch (17);
The section girth of described initial pipe (20) is equal to 0.5-1.5 times of whole drip molding perimeter of section;
Described on and off switch (13) Guan Bi, and quickly the pipe entirety sealing energising is moved in the die cavity of lower mold (21), Wherein, traveling time is less than 60 seconds.
A kind of hot formed method of low pressure that the present invention mentions, comprises the following steps:
Step one: mould prepares, first designs corresponding left electrode (2), left sealing punch (3), mold according to Components Shape (15), right electrode (16), right sealing punch (17) and lower mold (21), described mold (15) and upper table (11) are even Connecing, lower mold (21) is connected with lower table (1);Left sealing punch (3) is switched by Filled Dielectrics passage (5) and cooling medium (4) it is connected with outside cooling medium source (6), simultaneously by check valve (7), air relief valve (8) and air inlet switch (10) and outside gas Body medium source (9) connects;Right sealing punch (17) has pressure release passage (19) and is connected with relief valve (18);Left electrode (2) and Right electrode (16) is connected with power supply (14) by wire (12) and on and off switch (13);
Step 2: initial pipe prepares, selects the suitably initial pipe of size, and wherein, the section girth of initial pipe is equal to 0.5-1.5 times of whole drip molding perimeter of section, and initial pipe length is more than part length;
Step 3: blank end is sealed by left sealing punch (3) and right sealing punch (17), moves on to specify position the most together;
Step 4: left electrode (2) moves to contact with initial pipe with right electrode (16), wherein, left electrode is arranged on left sealing and rushes The right side of head, and right electrode is arranged on the left side of right sealing punch;
Step 5: adjust air relief valve (8), pressure is reduced to concrete technology desired value, then opens air inlet switch (10) to pipe Internal ventilation body medium;
Step 6: on and off switch (13) closes, moves to the pipe entirety sealing energising in the die cavity of lower mold (21), and mobile Time is less than 60 seconds;
Step 7: mold (15) is descending, compression pipe brings it about flexural deformation, and pipe sectional area reduces therewith, internal pressure Power raises further, promotes pipe to shape further, whole during control air pressure inside by relief valve (18), until mould Guan Bi;
Step 8: pressurize, continues to pipe to shape;
Step 9: on and off switch (13) disconnects, opens cooling medium switch (4), and to the internal logical cooling medium of pipe, pressure increases to Relief valve is opened, and gas flow and ventilation duration meet drip molding cooling technological requirement simultaneously;
Step 10: close cooling medium switch (4), left sealing punch (3), right sealing punch (17), left electrode (2) and right electrode (16) retreat to not affecting drip molding taking-up, open mould, take out drip molding (22).
Preferably, in above-mentioned step 5, reducing to 0 ~ 50MPa for Materials with High Strength pressure, inductile material pressure reduces to 0 ~40MPa。
Preferably, above-mentioned power supply is pulse current power supply.
Preferably, the specific bit in step 3 is set to lower mold (21) or is easy to connect electrode zone.
Preferably, above-mentioned initial pipe (20) uses high-strength material or inductile material.
Preferably, above-mentioned cooling medium source (6) is cryogenic gas or liquid;Gas medium is room temperature air or low wet Body.
The invention has the beneficial effects as follows:
One, makes full use of the intrinsic pressure increase that temperature own in technical process raises and change in volume causes and drives as deformation Power, it is not necessary to optional equipment supercharger, technique is simple, low cost;
Its two, use and there is the cooling medium of certain pressure directly in mold cavity, component quenched, advantageously ensure that The geometric accuracy of drip molding, and improve process efficiency;
Its three, owing to the deformation pattern of this technique is based on flexural deformation, it is to avoid the unfavorable shadow that under high temperature, hardenability value reduces Ringing, drip molding evenness of wall thickness is good, and the technique suitability is strong;
Its four, quenched in hollow section member cavity by cooling medium, owing to medium directly contacts with component, cooling Speed is fast and uniform, and performance is the best;
Its five, under hot forming, elastic deformation is extremely low, and drip molding is easily guaranteed that almost without resilience, drip molding form accuracy;
Its six, by large power supply directly to heating of pipe blank, speed is fast, and thermal losses is low, overcomes traditional hot fluid internal pressure Forming efficiency is low, it is impossible to the shortcoming meeting engineer applied;
The present invention is reasonable in design, reliable operation, effect notable, has stronger promotional value.
Accompanying drawing explanation
Fig. 1 is the structural representation of the mould of the present invention;
Fig. 2 is the A-A structure chart of the mould of the present invention;
Fig. 3 is mould matched moulds and quenching principle schematic diagram;
Fig. 4 is the B-B structure chart of Fig. 3;
In upper figure: lower table 1, left electrode 2, left sealing punch 3, cooling medium switch 4, Filled Dielectrics passage 5, cooling medium Source 6, check valve 7, air relief valve 8, gas medium source 9, air inlet switch 10, upper table 11, wire 12, on and off switch 13, power supply 14, mold 15, right electrode 16, right sealing punch 17, relief valve 18, pressure release passage 19, initial pipe 20, lower mold 21, one-tenth Shape part 22.
Detailed description of the invention
1-2 referring to the drawings, the invention will be further described:
A kind of low pressure thermal forming device that the present invention mentions, including left electrode 2, left sealing punch 3, mold 15, right electrode 16, Right sealing punch 17 and lower mold 21, is characterized in that: described mold 15 is connected with upper table 11, lower mold 21 and lower work Station 1 connects;Left sealing punch 3 is connected with outside cooling medium source 6 by Filled Dielectrics passage 5 and cooling medium switch 4, with Time be connected with extraneous gas medium source 9 by check valve 7, air relief valve 8 and air inlet switch 10;Right sealing punch 17 has pressure release and leads to Road 19 is also connected with relief valve 18;Left electrode 2 and right electrode 16 are connected with power supply 14 by wire 12 and on and off switch 13;
By left sealing punch 3 and right sealing punch 17 to initial pipe 20 end seal, and move on to specify position;Left electrode 2 Move to right electrode 16 contact with initial pipe 20, and left electrode 2 is arranged on the right side of left sealing punch 3, and right electrode 16 sets Put the left side at right sealing punch 17.
The section girth of above-mentioned initial pipe 20 is equal to 0.5-1.5 times of whole drip molding perimeter of section.
Above-mentioned on and off switch 13 closes, and quickly the pipe entirety sealing energising is moved in the die cavity of lower mold 21, Wherein, traveling time is less than 60 seconds.
It is descending that above-mentioned mold 15 presses setting curve, and compression pipe brings it about flexural deformation, and pipe sectional area is therewith Reduce, internal pressure raise, promote pipe to shape, whole during pass through relief valve 18 control air pressure inside.
Referring to the drawings 3-4, a kind of high intensity that the present invention mentions or the inductile material hot formed side of hollow unit low pressure Method, comprises the following steps:
Step one: mould prepares, first designs corresponding left electrode 2, left sealing punch 3, mold 15, the right side according to Components Shape Electrode 16, right sealing punch 17 and lower mold 21, above-mentioned same as the prior art, this does not repeats.Mold 15 and upper table 11 connect, and lower mold 21 is connected with lower table 1.Left sealing punch 3 by Filled Dielectrics passage 5 and cooling medium switch 4 with Outside cooling medium source 6 connects, and is connected with extraneous gas medium source 9 by check valve 7, air relief valve 8 and air inlet switch 10 simultaneously. Right sealing punch 17 has pressure release passage 19 and is connected with relief valve 18.Left electrode 2 and right electrode 16 are by wire 12 and power supply Switch 13 is connected with power supply 14.
Step 2: initial pipe prepares, selects the suitably initial pipe of size, and its main points are the cross section week of initial pipe The section girth of long and whole drip molding is close, and the section girth of general initial pipe should be equal to drip molding perimeter of section at end 0.5-1.5 times.Initial pipe length should be greater than part length, it is ensured that has enough sealing areas and electrode contact region.
Step 3: blank end is sealed by left sealing punch 3 and right sealing punch 17, moves on to specify position the most together. Sealing means is same as the prior art, and this does not repeats.
Step 4: left electrode 2 moves to contact with pipe with right electrode 16, its main points are that left electrode should be at left sealing punch Right side, and right electrode i.e. should ensure in the left side of right sealing punchl a It is less thanl b
Step 5: adjust air relief valve 8, pressure is reduced to concrete technology desired value, then opens air inlet switch 10 to pipe Internal ventilation body medium.Its main points are for typically to reduce to 0 ~ 50MPa for Materials with High Strength pressure, and inductile material pressure typically reduces to 0~40MPa。
Step 6: on and off switch 13 closes, and quickly the pipe entirety sealing energising is moved in the die cavity of lower mold 21, Its main points are that traveling time is less than 60 seconds.Along with the carrying out of energising, blank temperature constantly raises, under the flow stress of material Fall, elongation percentage improves, and pipe internal gas expanded by heating simultaneously, air pressure constantly raises.
Step 7: it is descending that mold 15 presses technique initialization curve, compression pipe brings it about flexural deformation, pipe sectional area Reducing therewith, internal pressure raises further, promotes pipe to shape further, whole during control inside by relief valve 18 Air pressure maximum is in concrete technology claimed range, until mould Guan Bi.
Step 8: pressurize certain time, its main points are that pressurize continues to pipe to shape.
Step 9: on and off switch 13 disconnects, opens cooling medium switch 4, to the internal logical cooling medium of pipe, and continues one Fixing time, its main points are that pressure increases to relief valve unlatching also, and gas flow and ventilation duration meet drip molding cooling technique simultaneously Requirement.
Step 10: close cooling medium switch 4, after left sealing punch 3, right sealing punch 17, left electrode 2 and right electrode 16 Retreat to not affect drip molding take out, open mould, take out drip molding 22.
Wherein, the power supply that the present invention mentions is large power supply, and large power supply is current range 0-5000000A, voltage The power supply of scope 0-36V, power supply is pulse current power supply, pulse frequency 0-10000Hz, amplitude 0-100000A, voltage range 0- The power supply of 100000V.
Specific bit in step 3 be set to lower mold 21 or just be connected electrode zone;Specific bit in step 3 is set to down The interior die cavity of mould 21;Specific bit in step 3 is set to be easy to connect electrode zone;
The high-strength material of initial pipe employing or inductile material, high-strength material is high-strength steel or titanium alloy, and high-strength steel is 22MnB5, titanium alloy is TC4;Inductile material is aluminium alloy or magnesium alloy, aluminium alloy be 2000 be, 5000 be 6000 be or 7000 line aluminium alloys;
Cooling medium is cryogenic gas or liquid, and gas medium is room temperature air or cryogenic gas, and gas medium is cryogenic gas.

Claims (1)

1. a low pressure thermal forming device, including left electrode (2), left sealing punch (3), mold (15), right electrode (16), the right side Sealing punch (17) and lower mold (21), is characterized in that: described mold (15) is connected with upper table (11), lower mold (21) it is connected with lower table (1);Left sealing punch (3) is by Filled Dielectrics passage (5) and cooling medium switch (4) and outside Cooling medium source (6) connects, simultaneously by check valve (7), air relief valve (8) and air inlet switch (10) and extraneous gas medium source (9) connect;Right sealing punch (17) has pressure release passage (19) and is connected with relief valve (18);Left electrode (2) and right electrode (16) it is connected with power supply (14) by wire (12) and on and off switch (13);
By left sealing punch (3) and right sealing punch (17) to initial pipe (20) end seal, and move on to specify position;Left Electrode (2) moves to right electrode (16) contact with initial pipe (20), and left electrode (2) is arranged on the right side of left sealing punch (3) Side, and right electrode (16) is arranged on the left side of right sealing punch (17);
The section girth of described initial pipe (20) is equal to 0.5-1.5 times of whole drip molding perimeter of section;
Described on and off switch (13) Guan Bi, and quickly the pipe entirety sealing energising is moved in the die cavity of lower mold (21), Wherein, traveling time is less than 60 seconds.
CN201610568064.0A 2014-07-11 2014-07-11 A kind of low pressure thermal forming device Expired - Fee Related CN106180346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610568064.0A CN106180346B (en) 2014-07-11 2014-07-11 A kind of low pressure thermal forming device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610568064.0A CN106180346B (en) 2014-07-11 2014-07-11 A kind of low pressure thermal forming device
CN201410329790.8A CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410329790.8A Division CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method

Publications (2)

Publication Number Publication Date
CN106180346A true CN106180346A (en) 2016-12-07
CN106180346B CN106180346B (en) 2018-06-12

Family

ID=51907026

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201610568082.9A Pending CN106180347A (en) 2014-07-11 2014-07-11 A kind of hollow unit low pressure thermal forming device
CN201610549347.0A Expired - Fee Related CN106180345B (en) 2014-07-11 2014-07-11 A kind of high intensity or the hot formed method of inductile material hollow unit low pressure
CN201610568064.0A Expired - Fee Related CN106180346B (en) 2014-07-11 2014-07-11 A kind of low pressure thermal forming device
CN201410329790.8A Active CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201610568082.9A Pending CN106180347A (en) 2014-07-11 2014-07-11 A kind of hollow unit low pressure thermal forming device
CN201610549347.0A Expired - Fee Related CN106180345B (en) 2014-07-11 2014-07-11 A kind of high intensity or the hot formed method of inductile material hollow unit low pressure

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201410329790.8A Active CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method

Country Status (1)

Country Link
CN (4) CN106180347A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107597944A (en) * 2017-10-23 2018-01-19 江苏界达特异新材料股份有限公司 The hydroforming sealing device of steel pipe
CN107671165A (en) * 2017-10-25 2018-02-09 江苏界达特异新材料股份有限公司 The bulging device of internal high pressure forming pipe fitting

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104525746B (en) * 2015-01-06 2016-11-02 哈尔滨工业大学(威海) A kind of quickly heating and forming integrated device and method
CN106311857B (en) * 2015-12-21 2017-11-07 青岛世冠装备科技有限公司 A kind of swollen manufacturing process of complex section hollow member low pressure upsetting
CN106623577B (en) * 2016-09-27 2018-08-17 贺州学院 A kind of wave hydraulic loaded method
CA3058115A1 (en) * 2017-03-30 2018-10-04 Sumitomo Heavy Industries, Ltd. Forming apparatus
JP7313279B2 (en) * 2017-03-30 2023-07-24 住友重機械工業株式会社 molding system
CN107597966B (en) * 2017-10-11 2019-04-12 南京工程学院 A kind of pneumatic hot forming process for quenching of unimach complex component
CN109926486B (en) 2017-12-18 2020-02-07 哈尔滨工业大学 Ti2Method for hot-state air pressure forming and heat treatment of AlNb-based alloy hollow thin-wall component
DE102017223374A1 (en) 2017-12-20 2019-06-27 Bayerische Motoren Werke Aktiengesellschaft Method for producing a profile component and profile component
CN108787846B (en) * 2018-05-31 2020-06-02 安徽扬子职业技术学院 Accurate forming device of high strength vehicle chassis spare part
CN109175061B (en) * 2018-07-25 2020-02-21 南京航空航天大学 Electric auxiliary heating forming device and method for dissimilar material pipe fitting with complex section
JP7240411B2 (en) * 2018-10-01 2023-03-15 住友重機械工業株式会社 Expansion molding device
CN109465322A (en) * 2018-11-09 2019-03-15 南京航空航天大学 A kind of pulse current pulsating heating gas pressure compacting device and method of less-deformable alloy pipe fitting
CN110586684B (en) * 2019-10-25 2020-09-22 大连理工大学 Large-size thin-wall annular shell inflation hot-press bending forming device and method
CN111438254B (en) * 2020-04-10 2021-09-17 哈尔滨工业大学 Hot air expansion-active air cooling forming device and forming method for closed-section integral pipe fitting
CN113510176B (en) * 2020-04-10 2024-01-19 初冠南 Pressurizing upsetting forming device
CN111451351B (en) * 2020-04-30 2022-08-09 初冠南 Forming and integrating method for tubular part
CN111957808A (en) * 2020-06-24 2020-11-20 上海凌云工业科技有限公司凌云汽车技术分公司 Cavity pipe fitting bending forming method and shape pasting bending die
CN112051144B (en) * 2020-08-13 2021-05-07 北京航空航天大学 Pure electro-plasticity auxiliary thermal forming process for hard-material-state high-strength aluminum alloy
CN113020391B (en) * 2021-03-04 2022-05-03 北京航空航天大学 Ultrahigh-pressure forming method and device for high-temperature alloy fluid medium
CN114192602B (en) * 2021-12-14 2022-09-13 大连理工大学 Overlapping progressive forming method for high-performance multi-element NiAl-based alloy pipe fitting
CN114653806B (en) * 2022-03-01 2023-12-22 哈尔滨工业大学(威海) Preforming method for high-strength steel reducing tubular part
CN115301835B (en) * 2022-08-24 2023-08-29 凌云吉恩斯科技有限公司 Hot stamping manufacturing method of tubular part

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050186302A1 (en) * 2004-02-24 2005-08-25 Sungwoo Hitech Co., Ltd. Warm hydro-forming device
CN101342559A (en) * 2007-05-23 2009-01-14 株式会社和信 Hot forming apparatus and hot forming method
JP2009220141A (en) * 2008-03-14 2009-10-01 Marujun Co Ltd Method and apparatus for manufacturing pipe product
CN101767461A (en) * 2008-12-30 2010-07-07 陈占聪 Inner and outer heating forming process for composition material tubing
TW201208849A (en) * 2010-08-17 2012-03-01 Chaun Choung Technology Corp Method for manufacturing a pressed heat pipe
CN103521588A (en) * 2013-10-28 2014-01-22 哈尔滨工业大学 Current-assisted titanium alloy bellows hot-forming tool and method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01166919A (en) * 1987-12-23 1989-06-30 Fuji Heavy Ind Ltd Manufacture of turbular composite material
JP4461626B2 (en) * 2001-03-15 2010-05-12 Jfeスチール株式会社 Manufacturing method of steel pipe for hydroforming having strain aging
CN102228932B (en) * 2011-04-22 2013-02-13 哈尔滨工业大学 Forming method for improving stepped hollow reducing pipe wall thickness uniformity

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050186302A1 (en) * 2004-02-24 2005-08-25 Sungwoo Hitech Co., Ltd. Warm hydro-forming device
CN101342559A (en) * 2007-05-23 2009-01-14 株式会社和信 Hot forming apparatus and hot forming method
JP2009220141A (en) * 2008-03-14 2009-10-01 Marujun Co Ltd Method and apparatus for manufacturing pipe product
CN101767461A (en) * 2008-12-30 2010-07-07 陈占聪 Inner and outer heating forming process for composition material tubing
TW201208849A (en) * 2010-08-17 2012-03-01 Chaun Choung Technology Corp Method for manufacturing a pressed heat pipe
CN103521588A (en) * 2013-10-28 2014-01-22 哈尔滨工业大学 Current-assisted titanium alloy bellows hot-forming tool and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107597944A (en) * 2017-10-23 2018-01-19 江苏界达特异新材料股份有限公司 The hydroforming sealing device of steel pipe
CN107671165A (en) * 2017-10-25 2018-02-09 江苏界达特异新材料股份有限公司 The bulging device of internal high pressure forming pipe fitting

Also Published As

Publication number Publication date
CN106180345B (en) 2018-07-20
CN106180347A (en) 2016-12-07
CN106180346B (en) 2018-06-12
CN104162948B (en) 2016-08-24
CN104162948A (en) 2014-11-26
CN106180345A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN104162948B (en) A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method
CN102632125B (en) Plate differential temperature hydroforming device capable of realizing radial pressurizing and hydraulic blank pressing
CN102284588B (en) Device for improving forming limit of plate
CN102248056A (en) Method for improving sheet forming limit
CN108856441B (en) Pipe thermal medium internal pressure forming method based on molten glass
CN103464562B (en) Cavity low-internal-pressure manufacturing process
CN106311857B (en) A kind of swollen manufacturing process of complex section hollow member low pressure upsetting
CN105855336B (en) Car body of aluminum alloy abnormal shape variable cross-section tubing structural member thermo shaping method
CN103753119A (en) Lightweight wall panel superplastic forming production method
CN102641936A (en) Tubing bulging device and method using internal heating and pressing
CN104525676B (en) Gas bulging hot formation segmentation strengthening process of boron steel tube
CN107639172A (en) It is a kind of while realize manufacturing process and device that pipe end shrink mouth thickens
CN101418878A (en) Method for manufacturing titan and titan alloy bellows
CN105921584A (en) Air pressure bulging method of ultrahigh-strength steel hollow component
CN101885031B (en) Die for controlling forming of asymmetric complex-curved rebar forge piece by using movable damping block
CN111451351A (en) Forming and integrating method for tubular part
CN204545086U (en) The gases at high pressure bulging hot forming segmentation strengthening mould of boron steel steel pipe
CN106048478A (en) Forming and strengthening method for aluminum lithium alloy plate, strengthened aluminum lithium alloy component and die
CN209577759U (en) A kind of heat extruder with high extruding precision
CN116140450A (en) Superplastic air-expanding forming die capable of feeding and method
CN105964722A (en) Solution treatment and granular medium cold forming method for high-strength aluminum alloy pipe fitting
CN204470363U (en) A kind of device realizing hollow metal component high-temperature barometric pressure load
CN107262643A (en) A kind of lower blanking type precision forging device and method of high rib pulse current effect of thin plate
US20230278091A1 (en) Preforming method for high-strength steel variable-diameter tubular part
CN109731980A (en) A kind of high temperature air pressure bulging device of the non-closure of high-strength steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Chenglong

Inventor before: The inventor has waived the right to be mentioned

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180509

Address after: 528467 E, 1 Yuehua Road, Tanzhou Town, Zhongshan, Guangdong, 1

Applicant after: Zhongshan run Hua mould Co., Ltd.

Address before: No. 329, Dongying District, Dongying City, Shandong Province, 257091

Applicant before: Han Yutong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

Termination date: 20190711