CN106180346B - A kind of low pressure thermal forming device - Google Patents

A kind of low pressure thermal forming device Download PDF

Info

Publication number
CN106180346B
CN106180346B CN201610568064.0A CN201610568064A CN106180346B CN 106180346 B CN106180346 B CN 106180346B CN 201610568064 A CN201610568064 A CN 201610568064A CN 106180346 B CN106180346 B CN 106180346B
Authority
CN
China
Prior art keywords
electrode
sealing punch
mold
pipe
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610568064.0A
Other languages
Chinese (zh)
Other versions
CN106180346A (en
Inventor
王成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan run Hua mould Co., Ltd.
Original Assignee
Zhongshan Run Hua Mould Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Run Hua Mould Co Ltd filed Critical Zhongshan Run Hua Mould Co Ltd
Priority to CN201610568064.0A priority Critical patent/CN106180346B/en
Publication of CN106180346A publication Critical patent/CN106180346A/en
Application granted granted Critical
Publication of CN106180346B publication Critical patent/CN106180346B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/041Means for controlling fluid parameters, e.g. pressure or temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/045Closing or sealing means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/047Mould construction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/16Heating or cooling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Mounting, Exchange, And Manufacturing Of Dies (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

The present invention relates to a kind of low pressure thermal forming devices.Its technical solution is:It is connect including left electrode, left sealing punch, mold, right electrode, right sealing punch and lower mold, mold with upper table, lower mold is connect with lower table;Left sealing punch is connect, while connect by check valve, pressure reducing valve and air inlet switch with extraneous gas medium source by Filled Dielectrics channel and cooling medium switch with outside cooling medium source;Right sealing punch is provided with pressure release passage and is connect with relief valve;Left electrode and right electrode are connect by conducting wire and power switch with power supply;Advantageous effect is:When solving existing apparatus and process forming high intensity or inductile hollow unit, resistance of deformation is big, and drip molding evenness of wall thickness difference and d type precision be not high, easily ruptures, efficiency it is low with can not synchronize be heat-treated the problem of.

Description

A kind of low pressure thermal forming device
Technical field
The present invention relates to machinery production field, more particularly to a kind of low pressure thermal forming device.
Background technology
Due to hollow section component high composite bending modulus and modulus of rigidity, it is considered to be realize structure lightened best knot Configuration formula.It is widely used in the industries such as Aeronautics and Astronautics, automobile and bicycle.Fluid internal pressure forming is to process the elder generation of such component Into forming technique.The technical principle of fluid internal pressure forming is to apply high pressure medium to initial blank inside to make blank section all Length increases and shapes the hollow member of different cross section form.Its essence deformed is parison swell deformation.But this kind of distorted pattern Formula has limitation, it is impossible to be used in intensity is higher or the forming of the relatively low material of plasticity, reason show as following several respects:
One, for needing the material of phase transformation strengthening that can not realize heat treatment in forming process.
Secondly, since internal pressure is unique deformation driving force, be likely to drive tubing complete when only pressure reaches very high Forming, it is therefore necessary to be equipped with dedicated high-power booster, while by superhigh pressure sealing technology restriction, form high strength or low modeling It is difficult during property material hollow unit.In addition, to provide enough mold clamping forces, it is necessary to using large-tonnage equipment.The above problem The engineer application of the technology is hindered significantly.
Third, since fluid internal pressure forming mainly produces required odd-shaped cross section by dilatancy, and expand and become Shape pattern belongs to double tensile stress states, for the relatively low material of plasticity, easily ruptures, is accordingly used in skill during Al alloys andMg alloys There is very big defect in art.
Fourth, its elasticity modulus is generally relatively low for Materials with High Strength, elasticity restores violent during forming, room temperature fluid internal pressure into The form accuracy of shape it is difficult to ensure that.
There is scholar to propose hot interior pressing formation, although this method solves the problems, such as forming limit, but exacerbate wall thickness not The problem of equal, and the limitation of heated medium booster and the restriction of high pressure gas safety problem, it is unsuitable for engineer application.
For these reasons, switch to be bent into primary deformable pattern, change fluid internal pressure forming to be expanded to unique change The drawbacks of shape pattern, and internal pressure caused by member section variation in high temperature volumetric expansion and forming process is made full use of to increase certainly Characteristic provides driving force for deformation, avoids under traditional handicraft to the depending on unduly of booster, drip molding springback capacity is big, form accuracy The problem of low and evenness of wall thickness is poor reduces technology difficulty, widens the technique scope of application, improves the original that forming quality is the present invention Power.
Invention content
The purpose of the present invention provides a kind of low pressure thermal forming device aiming at drawbacks described above of the existing technology, When mainly solving existing apparatus and process forming high intensity or inductile hollow unit, resistance of deformation is big, drip molding uniform wall thickness Property difference and d type precision be not high, easily ruptures, efficiency it is low with can not synchronize be heat-treated the problem of.
A kind of low pressure thermal forming device that the present invention mentions, technical solution are:Including left electrode(2), left sealing punch (3), mold(15), right electrode(16), right sealing punch(17)With lower mold(21), the mold(15)With upper work Platform(11)Connection, lower mold(21)With lower table(1)Connection;Left sealing punch(3)Pass through Filled Dielectrics channel(5)And cooling Medium switchs(4)Medium source is cooled down with outside(6)Connection, while pass through check valve(7), pressure reducing valve(8)And air inlet switch(10) With extraneous gas medium source(9)Connection;Right sealing punch(17)It is provided with pressure release passage(19)And and relief valve(18)Connection;Left electricity Pole(2)With right electrode(16)Pass through conducting wire(12)And power switch(13)With power supply(14)Connection;
Pass through left sealing punch(3)With right sealing punch(17)To initial pipe(20)End part seal, and move on to specific bit It puts;Left electrode(2)With right electrode(16)It moves to and initial pipe(20)Contact, and left electrode(2)It is arranged on left sealing punch(3) Right side, and right electrode(16)It is arranged on right sealing punch(17)Left side;
The initial pipe(20)Section girth be equal to 0.5-1.5 times of whole drip molding perimeter of section;
The power switch(13)It is closed, and the pipe for sealing energization is integrally quickly moved into lower mold(21)Cavity In, wherein, traveling time is no more than 60 seconds.
A kind of hot formed method of low pressure that the present invention mentions, includes the following steps:
Step 1:Mold prepares, and designs corresponding left electrode according to Components Shape first(2), left sealing punch(3), on Mold(15), right electrode(16), right sealing punch(17)With lower mold(21), the mold(15)With upper table(11) Connection, lower mold(21)With lower table(1)Connection;Left sealing punch(3)Pass through Filled Dielectrics channel(5)It is opened with cooling medium It closes(4)Medium source is cooled down with outside(6)Connection, while pass through check valve(7), pressure reducing valve(8)And air inlet switch(10)With outside Gas medium source(9)Connection;Right sealing punch(17)It is provided with pressure release passage(19)And and relief valve(18)Connection;Left electrode(2) With right electrode(16)Pass through conducting wire(12)And power switch(13)With power supply(14)Connection;
Step 2:Initial pipe prepares, and selects the suitably initial pipe of size, wherein, the section girth of initial pipe Equal to 0.5-1.5 times of whole drip molding perimeter of section, and initial pipe length is more than part length;
Step 3:Left sealing punch(3)With right sealing punch(17)Blank end is sealed, then moves on to specific bit together It puts;
Step 4:Left electrode(2)With right electrode(16)It moves to and is contacted with initial pipe, wherein, left electrode is arranged on left close The right side of punch is sealed, and right electrode is arranged on the left side of right sealing punch;
Step 5:Adjust pressure reducing valve(8), pressure is reduced into concrete technology desired value, then opens air inlet switch(10)To Pipe internal ventilation body medium;
Step 6:Power switch(13)It is closed, the pipe for sealing energization is integrally moved into lower mold(21)Cavity in, and Traveling time is no more than 60 seconds;
Step 7:Mold(15)Downlink, compression pipe bring it about flexural deformation, and pipe sectional area reduces therewith, interior Portion's pressure further increases, and pipe is promoted further to shape, and passes through relief valve in whole process(18)Air pressure inside is controlled, until Mold is closed;
Step 8:Pressurize continues to pipe to shape;
Step 9:Power switch(13)It disconnects, opens cooling medium switch(4), lead to cooling medium, pressure to pipe inside Relief valve unlatching is increased to, while gas flow and ventilation duration meet the requirement of drip molding cooling technique;
Step 10:Close cooling medium switch(4), left sealing punch(3), right sealing punch(17), left electrode(2)And the right side Electrode(16)It retreats to drip molding taking-up is not influenced, opens mold, take out drip molding(22).
Preferably, in above-mentioned step five, 0 ~ 50MPa is reduced to for Materials with High Strength pressure, inductile material pressure reduces to 0 ~40MPa。
Preferably, above-mentioned power supply is pulse current power supply.
Preferably, the designated position in step 3 is lower mold(21)Or convenient for connection electrode region.
Preferably, above-mentioned initial pipe(20)Using high-strength material or inductile material.
Preferably, above-mentioned cooling medium source(6)For cryogenic gas or liquid;Gas medium is room temperature air or low temperature gas Body.
The beneficial effects of the invention are as follows:
First, internal pressure increase is as deformation caused by making full use of the temperature raising being had by oneself in technical process and volume change Driving force, without optional equipment booster, simple process and low cost;
Second, directly being quenched in mold cavity to component using the cooling medium with certain pressure, be conducive to Ensure the geometric accuracy of drip molding, and improve process efficiency;
Third, since the deformation pattern of the technique is based on flexural deformation, avoiding hardenability value under high temperature reduces not Profit influences, and drip molding evenness of wall thickness is good, technique strong applicability;
Fourth, quenched out of hollow section member cavity by cooling down medium, since medium and component are in direct contact, Cooling velocity is fast and uniform, and performance is unanimously good;
Fifth, flexible deformation is extremely low under hot forming, drip molding is easily guaranteed that almost without rebound, drip molding form accuracy;
Sixth, by large power supply directly to heating of pipe blank, rate is fast, and thermal losses is low, overcomes traditional thermal state fluid Internal pressure forming efficiency is low, it is impossible to the shortcomings that meeting engineer application;
Reasonable design of the present invention, reliable operation, significant effect have stronger promotional value.
Description of the drawings
Fig. 1 is the structure diagram of the mold of the present invention;
Fig. 2 is the A-A structure charts of the mold of the present invention;
Fig. 3 is mold clamping and quenching principle schematic diagram;
Fig. 4 is the B-B structure charts of Fig. 3;
In upper figure:Lower table 1, left electrode 2, left sealing punch 3, cooling medium switch 4, Filled Dielectrics channel 5, cooling Medium source 6, check valve 7, pressure reducing valve 8, gas medium source 9, air inlet switch 10, upper table 11, conducting wire 12, power switch 13, Power supply 14, mold 15, right electrode 16, right sealing punch 17, relief valve 18, pressure release passage 19, initial pipe 20, lower mold 21st, drip molding 22.
Specific embodiment
With reference to attached drawing 1-2, the invention will be further described:
A kind of low pressure thermal forming device that the present invention mentions, including left electrode 2, left sealing punch 3, mold 15, right electricity Pole 16, right sealing punch 17 and lower mold 21, it is characterized in that:The mold 15 is connect with upper table 11, lower mold 21 It is connect with lower table 1;Left sealing punch 3 passes through Filled Dielectrics channel 5 and cooling medium switch 4 and external cooling medium source 6 Connection, while connect by check valve 7, pressure reducing valve 8 and air inlet switch 10 with extraneous gas medium source 9;Right sealing punch 17 is opened There is pressure release passage 19 and connect with relief valve 18;Left electrode 2 and right electrode 16 pass through conducting wire 12 and power switch 13 and power supply 14 Connection;
By left sealing punch 3 and right sealing punch 17 to initial 20 end part seal of pipe, and move on to designated position;Left electricity Pole 2 and right electrode 16 are moved to be contacted with initial pipe 20, and left electrode 2 is arranged on the right side of left sealing punch 3, and right electrode 16 It is arranged on the left side of right sealing punch 17.
The section girth of above-mentioned initial pipe 20 is equal to 0.5-1.5 times of whole drip molding perimeter of section.
Above-mentioned power switch 13 is closed, and quickly integrally moves to the pipe for sealing energization in the cavity of lower mold 21, Wherein, traveling time is no more than 60 seconds.
Above-mentioned mold 15 brings it about flexural deformation by setting curve downlink, compression pipe, and pipe sectional area is therewith Reduce, internal pressure raising promotes pipe to shape, air pressure inside is controlled by relief valve 18 in whole process.
With reference to attached drawing 3-4, the present invention a kind of high intensity mentioned or the hot formed side of inductile material hollow unit low pressure Method includes the following steps:
Step 1:Mold prepares, and designs corresponding left electrode 2, left sealing punch 3, mold according to Components Shape first 15th, right electrode 16, right sealing punch 17 and lower mold 21, above-mentioned same as the prior art, this is not repeated.Mold 15 and upper work Make platform 11 to connect, lower mold 21 is connect with lower table 1.Left sealing punch 3 is switched by Filled Dielectrics channel 5 and cooling medium 4 connect, while connected by check valve 7, pressure reducing valve 8 and air inlet switch 10 with extraneous gas medium source 9 with outside cooling medium source 6 It connects.Right sealing punch 17 is provided with pressure release passage 19 and is connect with relief valve 18.Left electrode 2 and right electrode 16 pass through conducting wire 12 and electricity Source switch 13 is connect with power supply 14.
Step 2:Initial pipe prepares, and selects the suitably initial pipe of size, cross section week of the main points for initial pipe Long close with the section girth of whole drip molding, the section girth of general initial pipe should be equal to whole drip molding perimeter of section 0.5-1.5 times.Initial pipe length should be greater than part length, and guarantee has enough sealing areas and electrode contact region.
Step 3:Left sealing punch 3 and right sealing punch 17 seal blank end, then move on to designated position together. Sealing means are same as the prior art, this is not repeated.
Step 4:Left electrode 2 and right electrode 16 are moved to and are contacted with pipe, and main points should be in left sealing punch for left electrode Right side, and right electrode should ensure in the left side of right sealing punchl a It is less thanl b
Step 5:Pressure reducing valve 8 is adjusted, pressure is reduced into concrete technology desired value, then opens air inlet switch 10 to pipe Internal ventilation body medium.Generally to reduce to 0 ~ 50MPa for Materials with High Strength pressure, inductile material pressure generally reduces to its main points 0~40MPa。
Step 6:Power switch 13 is closed, and quickly integrally moves to the pipe for sealing energization in the cavity of lower mold 21, Its main points is no more than 60 seconds for traveling time.With the progress of energization, blank temperature constantly increases, under the flow stress of material Drop, elongation percentage improves, while pipe internal gas expanded by heating, air pressure constantly increase.
Step 7:Mold 15 presses technique initialization curve downlink, and compression pipe brings it about flexural deformation, pipe sectional area Reduce therewith, internal pressure further increases, and pipe is promoted further to shape, and inside is controlled by relief valve 18 in whole process Air pressure maximum value is in concrete technology claimed range, until mold is closed.
Step 8:Pressurize certain time, main points continue to pipe to shape for pressurize.
Step 9:Power switch 13 disconnects, and opens cooling medium switch 4, leads to cooling medium, and continue one to pipe inside It fixes time, main points increase to relief valve for pressure and open simultaneously, while gas flow and ventilation duration meet drip molding cooling technique It is required that.
Step 10:It closes and cools down medium switch 4, after left sealing punch 3, right sealing punch 17, left electrode 2 and right electrode 16 Retreating to does not influence drip molding taking-up, opens mold, takes out drip molding 22.
Wherein, the power supply mentioned of the present invention is large power supply, and large power supply is current range 0-5000000A, voltage The power supply of range 0-36V, power supply be pulse current power supply, pulse frequency 0-10000Hz, amplitude 0-100000A, voltage range 0- The power supply of 100000V.
Designated position in step 3 for lower mold 21 or just with connection electrode region;Under designated position in step 3 is The interior cavity of mold 21;Designated position in step 3 is for ease of connection electrode region;
The high-strength material or inductile material that initial pipe uses, high-strength material are high-strength steel or titanium alloy, high-strength Steel is 22MnB5, titanium alloy TC4;Inductile material is aluminium alloy or magnesium alloy, and aluminium alloy is 2000 systems, 5000 be 6000 systems Or 7000 line aluminium alloy;
It is cryogenic gas or liquid to cool down medium, and gas medium is room temperature air or cryogenic gas, and gas medium is low temperature Gas.

Claims (1)

1. a kind of hollow unit low pressure thermal forming device, including left electrode(2), left sealing punch(3), mold(15), right electricity Pole(16), right sealing punch(17)With lower mold(21), it is characterized in that:The mold(15)With upper table(11)Even It connects, lower mold(21)With lower table(1)Connection;Left sealing punch(3)Pass through Filled Dielectrics channel(5)With cooling medium switch (4)Medium source is cooled down with outside(6)Connection, while pass through check valve(7), pressure reducing valve(8)And air inlet switch(10)With external gas Body medium source(9)Connection;Right sealing punch(17)It is provided with pressure release passage(19)And and relief valve(18)Connection;Left electrode(2)With Right electrode(16)Pass through conducting wire(12)And power switch(13)With power supply(14)Connection;
Pass through left sealing punch(3)With right sealing punch(17)To initial pipe(20)End part seal, and move on to designated position;It is left Electrode(2)With right electrode(16)It moves to and initial pipe(20)Contact, and left electrode(2)It is arranged on left sealing punch(3)The right side Side, and right electrode(16)It is arranged on right sealing punch(17)Left side;
The initial pipe(20)Section girth be equal to 0.5-1.5 times of whole drip molding perimeter of section;
The power switch(13)It is closed, and the pipe for sealing energization is integrally quickly moved into lower mold(21)Cavity in, Wherein, traveling time is no more than 60 seconds;
The application method of the hollow unit low pressure thermal forming device, includes the following steps:
Step 1:Mold prepares, and designs corresponding left electrode according to Components Shape first(2), left sealing punch(3), mold (15), right electrode(16), right sealing punch(17)With lower mold(21), the mold(15)With upper table(11)Even It connects, lower mold(21)With lower table(1)Connection;Left sealing punch(3)Pass through Filled Dielectrics channel(5)With cooling medium switch (4)Medium source is cooled down with outside(6)Connection, while pass through check valve(7), pressure reducing valve(8)And air inlet switch(10)With external gas Body medium source(9)Connection;Right sealing punch(17)It is provided with pressure release passage(19)And and relief valve(18)Connection;Left electrode(2)With Right electrode(16)Pass through conducting wire(12)And power switch(13)With power supply(14)Connection;
Step 2:Initial pipe prepares, and selects the suitably initial pipe of size, wherein, the section girth of initial pipe is equal to 0.5-1.5 times of whole drip molding perimeter of section, and initial pipe length is more than part length;
Step 3:Left sealing punch(3)With right sealing punch(17)Blank end is sealed, then moves on to designated position together;
Step 4:Left electrode(2)With right electrode(16)It moves to and is contacted with initial pipe, wherein, left electrode is arranged on left sealing punching The right side of head, and right electrode is arranged on the left side of right sealing punch;
Step 5:Adjust pressure reducing valve(8), pressure is reduced into concrete technology desired value, then opens air inlet switch(10)To pipe Internal ventilation body medium;
Step 6:Power switch(13)It is closed, the pipe for sealing energization is integrally moved into lower mold(21)Cavity in, it is and mobile Time is no more than 60 seconds;
Step 7:Mold(15)Downlink, compression pipe bring it about flexural deformation, and pipe sectional area reduces therewith, inside pressure Power further increases, and pipe is promoted further to shape, and passes through relief valve in whole process(18)Air pressure inside is controlled, until mold It is closed;
Step 8:Pressurize continues to pipe to shape;
Step 9:Power switch(13)It disconnects, opens cooling medium switch(4), lead to cooling medium to pipe inside, pressure increases to Relief valve is opened, while gas flow and ventilation duration meet the requirement of drip molding cooling technique;
Step 10:Close cooling medium switch(4), left sealing punch(3), right sealing punch(17), left electrode(2)With right electrode (16)It retreats to drip molding taking-up is not influenced, opens mold, take out drip molding(22);
The high-strength material or inductile material that initial pipe uses, high-strength material is high-strength steel or titanium alloy, and high-strength steel is 22MnB5, titanium alloy TC4;Inductile material is magnesium alloy.
CN201610568064.0A 2014-07-11 2014-07-11 A kind of low pressure thermal forming device Expired - Fee Related CN106180346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610568064.0A CN106180346B (en) 2014-07-11 2014-07-11 A kind of low pressure thermal forming device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610568064.0A CN106180346B (en) 2014-07-11 2014-07-11 A kind of low pressure thermal forming device
CN201410329790.8A CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410329790.8A Division CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method

Publications (2)

Publication Number Publication Date
CN106180346A CN106180346A (en) 2016-12-07
CN106180346B true CN106180346B (en) 2018-06-12

Family

ID=51907026

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201610568082.9A Pending CN106180347A (en) 2014-07-11 2014-07-11 A kind of hollow unit low pressure thermal forming device
CN201610549347.0A Expired - Fee Related CN106180345B (en) 2014-07-11 2014-07-11 A kind of high intensity or the hot formed method of inductile material hollow unit low pressure
CN201410329790.8A Active CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method
CN201610568064.0A Expired - Fee Related CN106180346B (en) 2014-07-11 2014-07-11 A kind of low pressure thermal forming device

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201610568082.9A Pending CN106180347A (en) 2014-07-11 2014-07-11 A kind of hollow unit low pressure thermal forming device
CN201610549347.0A Expired - Fee Related CN106180345B (en) 2014-07-11 2014-07-11 A kind of high intensity or the hot formed method of inductile material hollow unit low pressure
CN201410329790.8A Active CN104162948B (en) 2014-07-11 2014-07-11 A kind of high intensity or inductile material hollow unit low pressure thermal forming device and method

Country Status (1)

Country Link
CN (4) CN106180347A (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104525746B (en) * 2015-01-06 2016-11-02 哈尔滨工业大学(威海) A kind of quickly heating and forming integrated device and method
CN106311857B (en) * 2015-12-21 2017-11-07 青岛世冠装备科技有限公司 A kind of swollen manufacturing process of complex section hollow member low pressure upsetting
CN106623577B (en) * 2016-09-27 2018-08-17 贺州学院 A kind of wave hydraulic loaded method
CA3058115A1 (en) * 2017-03-30 2018-10-04 Sumitomo Heavy Industries, Ltd. Forming apparatus
CA3049630A1 (en) * 2017-03-30 2018-10-04 Sumitomo Heavy Industries, Ltd. Forming system
CN107597966B (en) * 2017-10-11 2019-04-12 南京工程学院 A kind of pneumatic hot forming process for quenching of unimach complex component
CN107597944A (en) * 2017-10-23 2018-01-19 江苏界达特异新材料股份有限公司 The hydroforming sealing device of steel pipe
CN107671165A (en) * 2017-10-25 2018-02-09 江苏界达特异新材料股份有限公司 The bulging device of internal high pressure forming pipe fitting
CN109926486B (en) 2017-12-18 2020-02-07 哈尔滨工业大学 Ti2Method for hot-state air pressure forming and heat treatment of AlNb-based alloy hollow thin-wall component
DE102017223374A1 (en) 2017-12-20 2019-06-27 Bayerische Motoren Werke Aktiengesellschaft Method for producing a profile component and profile component
CN108787846B (en) * 2018-05-31 2020-06-02 安徽扬子职业技术学院 Accurate forming device of high strength vehicle chassis spare part
CN109175061B (en) * 2018-07-25 2020-02-21 南京航空航天大学 Electric auxiliary heating forming device and method for dissimilar material pipe fitting with complex section
CN112739472B (en) * 2018-10-01 2023-05-09 住友重机械工业株式会社 Expansion forming device
CN109465322A (en) * 2018-11-09 2019-03-15 南京航空航天大学 A kind of pulse current pulsating heating gas pressure compacting device and method of less-deformable alloy pipe fitting
CN110586684B (en) * 2019-10-25 2020-09-22 大连理工大学 Large-size thin-wall annular shell inflation hot-press bending forming device and method
CN113510176B (en) * 2020-04-10 2024-01-19 初冠南 Pressurizing upsetting forming device
CN111438254B (en) * 2020-04-10 2021-09-17 哈尔滨工业大学 Hot air expansion-active air cooling forming device and forming method for closed-section integral pipe fitting
CN111451351B (en) * 2020-04-30 2022-08-09 初冠南 Forming and integrating method for tubular part
CN111957808A (en) * 2020-06-24 2020-11-20 上海凌云工业科技有限公司凌云汽车技术分公司 Cavity pipe fitting bending forming method and shape pasting bending die
CN112051144B (en) * 2020-08-13 2021-05-07 北京航空航天大学 Pure electro-plasticity auxiliary thermal forming process for hard-material-state high-strength aluminum alloy
CN112172099A (en) * 2020-10-14 2021-01-05 朱辉 Cavity material pipe plastic former
CN113020391B (en) * 2021-03-04 2022-05-03 北京航空航天大学 Ultrahigh-pressure forming method and device for high-temperature alloy fluid medium
CN114192602B (en) * 2021-12-14 2022-09-13 大连理工大学 Overlapping progressive forming method for high-performance multi-element NiAl-based alloy pipe fitting
CN114653806B (en) * 2022-03-01 2023-12-22 哈尔滨工业大学(威海) Preforming method for high-strength steel reducing tubular part
CN115301835B (en) * 2022-08-24 2023-08-29 凌云吉恩斯科技有限公司 Hot stamping manufacturing method of tubular part

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01166919A (en) * 1987-12-23 1989-06-30 Fuji Heavy Ind Ltd Manufacture of turbular composite material
JP4461626B2 (en) * 2001-03-15 2010-05-12 Jfeスチール株式会社 Manufacturing method of steel pipe for hydroforming having strain aging
KR100616750B1 (en) * 2004-02-24 2006-08-28 주식회사 성우하이텍 A warm hydro-forming device
KR100907225B1 (en) * 2007-05-23 2009-07-10 주식회사화신 Hot forming apparatus and hot forming method
JP2009220141A (en) * 2008-03-14 2009-10-01 Marujun Co Ltd Method and apparatus for manufacturing pipe product
CN101767461A (en) * 2008-12-30 2010-07-07 陈占聪 Inner and outer heating forming process for composition material tubing
TW201208849A (en) * 2010-08-17 2012-03-01 Chaun Choung Technology Corp Method for manufacturing a pressed heat pipe
CN102228932B (en) * 2011-04-22 2013-02-13 哈尔滨工业大学 Forming method for improving stepped hollow reducing pipe wall thickness uniformity
CN103521588B (en) * 2013-10-28 2015-04-22 哈尔滨工业大学 Current-assisted titanium alloy bellows hot-forming tool and method

Also Published As

Publication number Publication date
CN106180345B (en) 2018-07-20
CN104162948B (en) 2016-08-24
CN106180345A (en) 2016-12-07
CN104162948A (en) 2014-11-26
CN106180347A (en) 2016-12-07
CN106180346A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106180346B (en) A kind of low pressure thermal forming device
CN102248056B (en) Method for improving sheet forming limit
CN102284588B (en) Device for improving forming limit of plate
CN101219451B (en) Method for forming long tube part with partial convexity
CN108085632B (en) A kind of Plastic Forming and toughening process and its device based on ultrasonic vibration
CN102588734B (en) Manufacturing process of metal bottle with air-tight seal
CN102632125B (en) Plate differential temperature hydroforming device capable of realizing radial pressurizing and hydraulic blank pressing
CN106311857B (en) A kind of swollen manufacturing process of complex section hollow member low pressure upsetting
CN108856441A (en) A kind of tubing thermal medium internal pressure manufacturing process based on molten glass
CA2946088C (en) Molding apparatus
CN105921584A (en) Air pressure bulging method of ultrahigh-strength steel hollow component
CN102513440B (en) Method and device for forming magnesium alloy formed parts with excellent high-temperature mechanical property
CN107639172A (en) It is a kind of while realize manufacturing process and device that pipe end shrink mouth thickens
JP5869158B1 (en) Blow molding die for producing flanged aluminum pipe, flanged aluminum pipe device having the die, and method for producing flanged aluminum pipe
CN102641936A (en) Tubing bulging device and method using internal heating and pressing
CN102645375B (en) Material mechanical property testing method under three-dimensional stress state
CN105855336A (en) Thermal forming method for aluminum alloy car-body special-shaped variable-section pipe structural members
CN104525746A (en) Rapid heating and forming integrated device and method
CN107000023A (en) Shaped device and forming method
CN106048478A (en) Forming and strengthening method for aluminum lithium alloy plate, strengthened aluminum lithium alloy component and die
CN201353623Y (en) Ultra high strength steel hot stamping forming die
CN106623580B (en) A kind of hot extrusion and the method for expansive forming composite manufacturing bathroom faucet branch pipe
CN104551545A (en) Strain-induced semi-solid forming device and process for fine-grained bearing pad
CN104493440A (en) Manufacturing process of bellows expansion joint
CN204545086U (en) The gases at high pressure bulging hot forming segmentation strengthening mould of boron steel steel pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Chenglong

Inventor before: The inventor has waived the right to be mentioned

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180509

Address after: 528467 E, 1 Yuehua Road, Tanzhou Town, Zhongshan, Guangdong, 1

Applicant after: Zhongshan run Hua mould Co., Ltd.

Address before: No. 329, Dongying District, Dongying City, Shandong Province, 257091

Applicant before: Han Yutong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

Termination date: 20190711