CN106166525A - A kind of automobile component fully-automatic coating production line - Google Patents

A kind of automobile component fully-automatic coating production line Download PDF

Info

Publication number
CN106166525A
CN106166525A CN201610289053.9A CN201610289053A CN106166525A CN 106166525 A CN106166525 A CN 106166525A CN 201610289053 A CN201610289053 A CN 201610289053A CN 106166525 A CN106166525 A CN 106166525A
Authority
CN
China
Prior art keywords
room
paint
varnish
spray booth
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610289053.9A
Other languages
Chinese (zh)
Inventor
付艺涛
陈能胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Minhui Automotive Parts Co Ltd
Original Assignee
Jiaxing Minhui Automotive Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Minhui Automotive Parts Co Ltd filed Critical Jiaxing Minhui Automotive Parts Co Ltd
Priority to CN201610289053.9A priority Critical patent/CN106166525A/en
Publication of CN106166525A publication Critical patent/CN106166525A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D1/00Processes for applying liquids or other fluent materials
    • B05D1/36Successively applying liquids or other fluent materials, e.g. without intermediate treatment
    • B05D1/38Successively applying liquids or other fluent materials, e.g. without intermediate treatment with intermediate treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/002Pretreatement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/007After-treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/02Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by baking
    • B05D3/0254After-treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/12Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by mechanical means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention belongs to automobile component processing technique field, provide a kind of automobile component fully-automatic coating production line, this paint line is divided into three layer regions, it is respectively ground floor region, second layer region and third layer region, in third layer region, be disposed with circulation conveyor track diatom, described circulation conveyor track diatom can along ground floor region, second layer region and the circulation of third layer region carry out carrying the product treating application.It is an advantage of the current invention that to use automatic spraying, solidification, substitute manual operation, improve the working environment of workman, the use of coating also reduce further the infringement to workman and environment, reduce work working strength, reduce unstable factor, decrease the loss time, and complete in a closed dust-free space, it is ensured that the quality of product painting.

Description

A kind of automobile component fully-automatic coating production line
Technical field
The invention belongs to automobile component processing technique field, relate to a kind of automobile component fully-automatic coating production line.
Background technology
The coating process of traditional automobile component also exists a lot owing to using more original hand spray mode Shortcoming: one is that coating quality is poor, and paint film adhesion is bad, and each batch products quality is uneven;Two is that existing coating equipment is raw Product efficiency is low, and automaticity is the highest, and spraying process can not realize continuous prodution, and labor strength is big;Three is building ring Border is poor, paints droplet splashes during work, the organic substance volatilization in coating, also exists bigger to human body and surrounding Threaten.
Summary of the invention
The technical problem to be solved is the present situation for prior art, and provides a kind of automaticity high, Safety and environmental protection and the higher automobile component fully-automatic coating production line of automaticity.
The present invention solves the technical scheme that above-mentioned technical problem used: a kind of automobile component fully-automatic coating produces Line, it is characterised in that this paint line is divided into three layer regions, respectively ground floor region, second layer region and third layer Region, be disposed with in third layer region circulation conveyor track diatom, described circulation conveyor track diatom can along ground floor region, Second layer region and the circulation of third layer region carry out carrying the product treating application, in the right side layout in described ground floor region Part region 5, manually wiping room and the first elevator device room 7, the left side in described ground floor region is respectively disposed with down Part region, the strong cold house of varnish and the 6th elevator device room, described second layer region is respectively disposed with the second lifting electricity Ladder device room, cover tool room, electrostatic precipitation room, priming paint process island, colored paint process island, varnish process island and the 3rd elevator dress Putting room, described third layer region is respectively disposed with the 4th elevator device room, varnish baking-curing process island and the 5th Elevator device room, treats that the product of application is placed on circulation conveyor track diatom by upper part region and is transported to manually wipe by it Try to be risen to after room carries out surface pretreatment wiping second elevator in second layer region by the first elevator device room Device room, then circulation delivery track tape product enter into cover tool room product is positioned, via electrostatic precipitation room pair Product carry out electrostatic precipitation step after sequentially enter priming paint process island, colored paint process island, varnish process island are respectively completed priming paint Processing step, colored paint processing step and varnish processing step, then rise to third layer district by the 3rd elevator device room The 4th elevator device room in territory, then circulation delivery track tape product enter varnish baking-curing process island dry Roasting curing schedule, drops to the 6th elevator dress in ground floor region again by the 5th elevator device room after baking-curing Putting room, then circulation delivery track tape product and is entered into the strong cold house of varnish and carry out after cooling step and final from lower part region Lower part.
The measure taked for optimizing such scheme specifically includes:
In above-mentioned a kind of automobile component fully-automatic coating production line, described priming paint technique district includes that priming paint sprays respectively Paint room and priming paint levelling room, be provided with primer spray robot in described priming paint paint spray booth, described colored paint process island is respectively Including colored paint paint spray booth and colored paint levelling room, in described colored paint paint spray booth, it is provided with color spray paint robot, described varnish Process island includes varnish paint spray booth and varnish levelling room respectively, is provided with spray varnish robot in described varnish paint spray booth.
In above-mentioned a kind of automobile component fully-automatic coating production line, described colored paint levelling indoor are additionally provided with levelling Loop buffer passage.If directly using linear fashion not can fully ensure that the time of colored paint levelling here, therefore levelling is set The Main Function of loop buffer passage is to ensure that the abundant of colored paint flow time.
In above-mentioned a kind of automobile component fully-automatic coating production line, there also is provided respectively in described ground floor region Priming paint spray booth tank, priming paint painting room, colored paint spray booth tank, colored paint painting room, varnish spray booth tank and varnish painting room, institute Priming paint spray booth tank, colored paint spray booth tank and the varnish spray booth tank stated, described priming paint spray booth tank and priming paint paint spray booth Communicate and for producing water smoke in priming paint paint spray booth, described priming paint painting room communicates with primer spray robot and for providing Priming paint, described colored paint spray booth tank communicates with colored paint paint spray booth and for producing water smoke, described color in colored paint paint spray booth Paint painting room communicates and for providing colored paint with color spray paint robot, and described varnish spray booth tank communicates also with varnish paint spray booth For producing water smoke in varnish paint spray booth, described varnish painting room communicates and for providing varnish with spray varnish robot.
In above-mentioned a kind of automobile component fully-automatic coating production line, described priming paint spray booth tank, colored paint spray booth water Groove and the uniform Waste Water Treatment of varnish spray booth tank are connected.
In above-mentioned a kind of automobile component fully-automatic coating production line, described electrostatic precipitation room is divided into artificial electrostatic to remove Dirt room and automatic electrostatic dust collection room, the electrostatic precipitation that described artificial electrostatic precipitation room is thick before product surface application, from The electrostatic precipitation that sound electric precipitation room is thin before product surface application.
In above-mentioned a kind of automobile component fully-automatic coating production line, described ground floor region is at lower part region It is additionally provided with inspection area, described inspection area is provided with double-deck PVC conveyer belt, by inspection area, be provided with polishing area and group is vertical District.
In above-mentioned a kind of automobile component fully-automatic coating production line, described varnish baking-curing process island is provided with Varnish curing stove, described solidification temperature controls at 70-90 DEG C, and hardening time is 50min.
Compared with prior art, it is an advantage of the current invention that to use automatic spraying, solidification, substitute manual operation, improve The working environment of workman, the use of coating also reduce further the infringement to workman and environment, reduces work work strong Degree, reduces unstable factor, decreases the loss time, and complete in a closed dust-free space, it is ensured that product painting Quality.
Accompanying drawing explanation
Fig. 1 is the arrangement schematic diagram in this automobile component fully-automatic coating production line ground floor region;
Fig. 2 is the arrangement schematic diagram in this automobile component fully-automatic coating production line second layer region;
Fig. 3 is the arrangement schematic diagram in this automobile component fully-automatic coating production line third layer region.
Detailed description of the invention
The following is the specific embodiment of the present invention and combine accompanying drawing, technical scheme is further described, But the present invention is not limited to these embodiments.
In figure, ground floor region 1;Second layer region 2;Third layer region 3;Circulation conveyor track diatom 4;Upper part region 5;People Work wipes room 6;First elevator device room 7;Second elevator device room 8;Cover tool room 9;Artificial electrostatic precipitation room 10;From Sound electric precipitation room 11;Priming paint paint spray booth 12;Priming paint levelling room 13;Primer spray robot 14;Colored paint paint spray booth 15;Colored paint levelling Room 16;Color spray paint robot 17;Varnish paint spray booth 18;Varnish levelling room 19;Spray varnish robot 20;3rd elevator device Room 21;4th elevator device room 22;Varnish curing stove 23;5th elevator device room 24;6th elevator device Room 25;The strong cold house of varnish 26;Lower part region 27;Inspection area 28;Polishing area 29;Zu Li district 30;Priming paint spray booth tank 31;Priming paint supplies Paint room 32;Colored paint spray booth tank 33;Colored paint painting room 34;Varnish spray booth tank 35;Varnish painting room 36;Levelling loop buffer leads to Road 37.
As shown in Figure 1, Figure 2 and shown in Fig. 3, this automobile component fully-automatic coating production line, this paint line is divided into three layers Region, respectively ground floor region 1, second layer region 2 and third layer region 3, be disposed with circulation defeated in third layer region 3 Send railway line 4, circulation conveyor track diatom 4 can along ground floor region 1, second layer region 2 and third layer region 3 circulation carry out The product of application is treated in conveying, and the right side in ground floor region 1 is arranged upper part region 5, manually wiped room 6 and the first elevator dress Putting room 7, the left side in ground floor region 1 is respectively disposed with lower part region 27, the strong cold house of varnish 26 and the 6th elevator device Room 25, second layer region 2 be respectively disposed with the second elevator device room 8, cover tool room 9, electrostatic precipitation room, priming paint process island, Colored paint process island, varnish process island and the 3rd elevator device room 21, third layer region 3 is respectively disposed with the 4th lifting electricity Ladder device room 22, varnish baking-curing process island and the 5th elevator device room 24, treat that the product of application is by upper part region 5 It is placed on circulation conveyor track diatom 4 and is transported to manually wipe after room 6 carries out surface pretreatment wiping by it and pass through first liter Fall lift appliance room 7 rises to the second elevator device room 8 in second layer region 2, and then circulation conveyor track diatom 4 is with product Product enter into cover tool room 9 and position product, enter successively after product being carried out electrostatic precipitation step via electrostatic precipitation room Enter priming paint process island, colored paint process island, varnish process island are respectively completed priming paint processing step, colored paint processing step and varnish work Skill step, then risen to the 4th elevator device room 22 in third layer region 3 by the 3rd elevator device room 21, then Circulation conveyor track diatom 4 enters varnish baking-curing process island with product and carries out baking-curing step, leads to after baking-curing again Cross the 5th elevator device room 24 and drop to the 6th elevator device room 25 in ground floor region 1, then circulate conveyor track Diatom 4 enters into after the strong cold house of varnish 26 carries out cooling step and finally from lower part region 27 lower part with product.
Electrostatic precipitation room is divided into artificial electrostatic precipitation room 10 and automatic electrostatic dust collection room 11, artificial electrostatic precipitation room 10 to use Electrostatic precipitation thick before product surface application, the electrostatic precipitation that automatic electrostatic dust collection room 11 is thin before product surface application, So quality of the product in face of guarantee coating paint, preventing impurity from bringing into affects painting process, and specifically, priming paint technique is distinguished Do not include priming paint paint spray booth 12 and priming paint levelling room 13, in priming paint paint spray booth 12, be provided with primer spray robot 14, colored paint work Skill district includes colored paint paint spray booth 15 and colored paint levelling room 16 respectively, is provided with color spray paint robot 17 in colored paint paint spray booth 15, Varnish process island includes varnish paint spray booth 18 and varnish levelling room 19 respectively, is provided with spray varnish machine in varnish paint spray booth 18 People 20, there also is provided priming paint spray booth tank 31, priming paint painting room 32, colored paint spray booth tank 33, colored paint in ground floor region 1 respectively Painting room 34, varnish spray booth tank 35 and varnish painting room 36, priming paint spray booth tank 31, colored paint spray booth tank 33 and varnish Spray booth tank 35, priming paint spray booth tank 31 communicates with priming paint paint spray booth 12 and for producing water smoke, the end in priming paint paint spray booth 12 Paint painting room 32 communicates with primer spray robot 14 and for providing priming paint, and colored paint spray booth tank 33 communicates with colored paint paint spray booth 15 And for generation water smoke colored paint paint spray booth 15 in, colored paint painting room 34 communicates and for providing color with color spray paint robot 17 Paint, varnish spray booth tank 35 communicates with varnish paint spray booth 18 and for producing water smoke, varnish painting room in varnish paint spray booth 18 36 communicate and for providing varnish with spray varnish robot 20, and wherein the flow time of priming paint is 6min, in colored paint levelling room 16 It is additionally provided with levelling loop buffer passage 37.If directly use here linear fashion not can fully ensure that colored paint levelling time Between, the Main Function therefore arranging levelling loop buffer passage 37 is to ensure that the abundant of colored paint flow time, colored paint levelling time Between be 10min, the flow time of varnish is 12min, and levelling Main Function is to be painted after workpiece painted, airtight, clear here Running in clean, to have certain air velocity tunnel, referred to as levelling, main purpose is by the solvent Volatile Gas of wet paint surface of the work Body vapors away within a certain period of time, and while volatilization gas volatilization, wet paint film is also able to levelling, thus ensure that the smooth of paint film Degree and glossiness.
Here it is collected processing to the waste water produced in production process, decreases application to air and the pollution of water, the end Paint spray booth tank 31, colored paint spray booth tank 33 and the uniform Waste Water Treatment of varnish spray booth tank 35 are connected, and varnish baking is solid Metallization processes district is provided with varnish curing stove 23, and solidification temperature controls at 70-90 DEG C, and hardening time is 50min, ground floor region 1 At lower part region 27, it is additionally provided with inspection area 28, inspection area 28 is provided with double-deck PVC conveyer belt, set on inspection area 28 side It is equipped with district 30, polishing area 29 and Zu Li, here directly by testing at double-deck PVC conveyer belt after lower part, is transported to after inspection Polishing area 29 and Zu Li district 30 carries out product polishing operation and group is vertical, completes whole product automation production process.
Specific embodiment described herein is only to present invention spirit explanation for example.Technology neck belonging to the present invention Described specific embodiment can be made various amendment or supplements or use similar mode to replace by the technical staff in territory Generation, but without departing from the defined scope of spirit of the present invention.

Claims (8)

1. an automobile component fully-automatic coating production line, it is characterised in that this paint line is divided into three layer regions, is respectively Ground floor region, second layer region and third layer region, be disposed with circulation conveyor track diatom in third layer region, described Circulation conveyor track diatom can along ground floor region, second layer region and third layer region circulation carry out carrying the product treating application Product, the right side in described ground floor region is arranged upper part region 5, is manually wiped room and the first elevator device room 7, described The left side in ground floor region be respectively disposed with lower part region, the strong cold house of varnish and the 6th elevator device room, described Second layer region is respectively disposed with the second elevator device room, cover tool room, electrostatic precipitation room, priming paint process island, colored paint technique District, varnish process island and the 3rd elevator device room, described third layer region is respectively disposed with the 4th elevator dress Put room, varnish baking-curing process island and the 5th elevator device room, treat that the product of application is placed into by upper part region and follow It is transported to pass through the first elevator device after manually the room of wiping carries out surface pretreatment wiping on ring conveyor track diatom and by it Room rises to the second elevator device room in second layer region, and then circulation delivery track tape product and entered into cover tool room Product is positioned, after product being carried out electrostatic precipitation step via electrostatic precipitation room, sequentially enters priming paint process island, color Lacquer craftwork district, varnish process island are respectively completed priming paint processing step, colored paint processing step and varnish processing step, then by the Three elevator device rooms rise to the 4th elevator device room in third layer region, and then circulation delivery track tape product Product enter varnish baking-curing process island and carry out baking-curing step, again by under the 5th elevator device room after baking-curing Dropping to the 6th elevator device room in ground floor region, then circulation delivery track tape product and is entered into the strong cold house of varnish After carrying out cooling step and finally from lower part region lower part.
A kind of automobile component fully-automatic coating production line the most according to claim 1, it is characterised in that described primer Skill district includes priming paint paint spray booth and priming paint levelling room respectively, is provided with primer spray robot, institute in described priming paint paint spray booth The colored paint process island stated includes colored paint paint spray booth and colored paint levelling room respectively, is provided with color spray paint in described colored paint paint spray booth Robot, described varnish process island includes varnish paint spray booth and varnish levelling room respectively, sets in described varnish paint spray booth It is equipped with spray varnish robot.
A kind of automobile component fully-automatic coating production line the most according to claim 2, it is characterised in that described colored paint stream Flat indoor are additionally provided with levelling loop buffer passage.If directly using linear fashion not can fully ensure that colored paint levelling here Time, the Main Function therefore arranging levelling loop buffer passage is to ensure that the abundant of colored paint flow time.
A kind of automobile component fully-automatic coating production line the most according to claim 3, it is characterised in that described ground floor Priming paint spray booth tank, priming paint painting room, colored paint spray booth tank, colored paint painting room, varnish spray booth water is there also is provided respectively in region Groove and varnish painting room, described priming paint spray booth tank, colored paint spray booth tank and varnish spray booth tank, described priming paint spray Room tank communicates with priming paint paint spray booth and for producing water smoke, described priming paint painting room and primer spray machine in priming paint paint spray booth Device people communicates and for providing priming paint, and described colored paint spray booth tank communicates with colored paint paint spray booth and in colored paint paint spray booth Producing water smoke, described colored paint painting room communicates and for providing colored paint with color spray paint robot, described varnish spray booth tank Communicate with varnish paint spray booth and for producing water smoke in varnish paint spray booth, described varnish painting room and spray varnish robot phase Lead to and be used for providing varnish.
A kind of automobile component fully-automatic coating production line the most according to claim 4, it is characterised in that described priming paint spray Room tank, colored paint spray booth tank and the uniform Waste Water Treatment of varnish spray booth tank are connected.
A kind of automobile component fully-automatic coating production line the most according to claim 5, it is characterised in that described electrostatic removes Dirt room is divided into artificial electrostatic precipitation room and automatic electrostatic dust collection room, and described artificial electrostatic precipitation room is used for product surface application Front thick electrostatic precipitation, the electrostatic precipitation that automatic electrostatic dust collection room is thin before product surface application.
A kind of automobile component fully-automatic coating production line the most according to claim 6, it is characterised in that described ground floor Region is additionally provided with inspection area at lower part region, described inspection area is provided with double-deck PVC conveyer belt, by inspection area It is provided with polishing area and Zu Li district.
A kind of automobile component fully-automatic coating production line the most according to claim 7, it is characterised in that described varnish dries Roasting curing process district is provided with varnish curing stove, and described solidification temperature controls at 70-90 DEG C, and hardening time is 50min.
CN201610289053.9A 2016-05-04 2016-05-04 A kind of automobile component fully-automatic coating production line Pending CN106166525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610289053.9A CN106166525A (en) 2016-05-04 2016-05-04 A kind of automobile component fully-automatic coating production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610289053.9A CN106166525A (en) 2016-05-04 2016-05-04 A kind of automobile component fully-automatic coating production line

Publications (1)

Publication Number Publication Date
CN106166525A true CN106166525A (en) 2016-11-30

Family

ID=57359087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610289053.9A Pending CN106166525A (en) 2016-05-04 2016-05-04 A kind of automobile component fully-automatic coating production line

Country Status (1)

Country Link
CN (1) CN106166525A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107866349A (en) * 2017-11-18 2018-04-03 江苏长虹智能装备集团有限公司 A kind of automobile coating production line
CN109317383A (en) * 2018-10-25 2019-02-12 佛山市顺德区东亚汽车部件有限公司 A kind of high-effect spraying production technology and its system for the processing of moulding surface
CN109718982A (en) * 2018-12-17 2019-05-07 嘉兴敏惠汽车零部件有限公司 A kind of half full-automatic off line coating production line of auto parts and components
CN109926247A (en) * 2017-12-18 2019-06-25 江苏醉开心酒业有限公司 A kind of bottle paint finishing
CN112238026A (en) * 2020-09-18 2021-01-19 江苏长虹智能装备股份有限公司 Novel exterior trimming part spraying production line
CN112733346A (en) * 2020-12-31 2021-04-30 博迈科海洋工程股份有限公司 Method for planning delightful area in electrical operation room

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2936925A1 (en) * 1979-09-12 1981-03-19 Hans Weigel GmbH & Co KG, 8500 Nürnberg Large scale hot dip zinc coating line - uses workpiece handling system which includes gripper tongs on hoists attached to trolleys on conveyor rails
JPH11319655A (en) * 1998-05-11 1999-11-24 Mitsubishi Heavy Ind Ltd Small member coating line equipment
JP2000043769A (en) * 1998-07-30 2000-02-15 Trinity Ind Corp Work carrier system for paint line and constituting device thereof
CN101020167A (en) * 2006-12-11 2007-08-22 俞银德 Lacquer spraying booth capable of eliminating lacquer mist
CN101670332A (en) * 2008-09-10 2010-03-17 沈阳名华模塑科技有限公司 Oil paint coating line-based process for coating water paint in two layers on automotive plastic exterior trimming part
CN201586614U (en) * 2009-11-06 2010-09-22 长江润发机械股份有限公司 Automatic elevator guide rail cleaning, painting and oiling system
CN201930885U (en) * 2010-12-29 2011-08-17 嘉兴敏胜汽车零部件有限公司 Production system for seamless connection of coating production line and coating piece cleaning production line
CN103008178A (en) * 2012-12-29 2013-04-03 天津市久跃科技有限公司 Ground rack spraying production line
CN103008198A (en) * 2012-12-29 2013-04-03 天津市欣跃涂料有限公司 Waterborne coating production line of automobile parts
CN203030469U (en) * 2012-12-29 2013-07-03 天津市久跃科技有限公司 Rail spraying production line
CN204685374U (en) * 2015-05-22 2015-10-07 陆永健 Novel two stage cascade spray booth
CN105013685A (en) * 2015-08-12 2015-11-04 芜湖国风塑胶科技有限公司 Automobile bumper spraying process
CN204842066U (en) * 2015-06-12 2015-12-09 湖南梓先新材料有限公司 Water -curtain -type paint spray booth with high -efficient defogging ability
CN105312183A (en) * 2015-11-30 2016-02-10 重庆市贵荣塑胶制品有限公司 Computer keyboard UV paint spraying production line

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2936925A1 (en) * 1979-09-12 1981-03-19 Hans Weigel GmbH & Co KG, 8500 Nürnberg Large scale hot dip zinc coating line - uses workpiece handling system which includes gripper tongs on hoists attached to trolleys on conveyor rails
JPH11319655A (en) * 1998-05-11 1999-11-24 Mitsubishi Heavy Ind Ltd Small member coating line equipment
JP2000043769A (en) * 1998-07-30 2000-02-15 Trinity Ind Corp Work carrier system for paint line and constituting device thereof
CN101020167A (en) * 2006-12-11 2007-08-22 俞银德 Lacquer spraying booth capable of eliminating lacquer mist
CN101670332A (en) * 2008-09-10 2010-03-17 沈阳名华模塑科技有限公司 Oil paint coating line-based process for coating water paint in two layers on automotive plastic exterior trimming part
CN201586614U (en) * 2009-11-06 2010-09-22 长江润发机械股份有限公司 Automatic elevator guide rail cleaning, painting and oiling system
CN201930885U (en) * 2010-12-29 2011-08-17 嘉兴敏胜汽车零部件有限公司 Production system for seamless connection of coating production line and coating piece cleaning production line
CN103008178A (en) * 2012-12-29 2013-04-03 天津市久跃科技有限公司 Ground rack spraying production line
CN103008198A (en) * 2012-12-29 2013-04-03 天津市欣跃涂料有限公司 Waterborne coating production line of automobile parts
CN203030469U (en) * 2012-12-29 2013-07-03 天津市久跃科技有限公司 Rail spraying production line
CN204685374U (en) * 2015-05-22 2015-10-07 陆永健 Novel two stage cascade spray booth
CN204842066U (en) * 2015-06-12 2015-12-09 湖南梓先新材料有限公司 Water -curtain -type paint spray booth with high -efficient defogging ability
CN105013685A (en) * 2015-08-12 2015-11-04 芜湖国风塑胶科技有限公司 Automobile bumper spraying process
CN105312183A (en) * 2015-11-30 2016-02-10 重庆市贵荣塑胶制品有限公司 Computer keyboard UV paint spraying production line

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107866349A (en) * 2017-11-18 2018-04-03 江苏长虹智能装备集团有限公司 A kind of automobile coating production line
CN109926247A (en) * 2017-12-18 2019-06-25 江苏醉开心酒业有限公司 A kind of bottle paint finishing
CN109317383A (en) * 2018-10-25 2019-02-12 佛山市顺德区东亚汽车部件有限公司 A kind of high-effect spraying production technology and its system for the processing of moulding surface
CN109317383B (en) * 2018-10-25 2021-07-16 佛山市顺德区东亚汽车部件有限公司 High-efficiency spraying production process and system for surface machining of injection molding part
CN109718982A (en) * 2018-12-17 2019-05-07 嘉兴敏惠汽车零部件有限公司 A kind of half full-automatic off line coating production line of auto parts and components
CN112238026A (en) * 2020-09-18 2021-01-19 江苏长虹智能装备股份有限公司 Novel exterior trimming part spraying production line
CN112733346A (en) * 2020-12-31 2021-04-30 博迈科海洋工程股份有限公司 Method for planning delightful area in electrical operation room
CN112733346B (en) * 2020-12-31 2022-08-09 博迈科海洋工程股份有限公司 Method for planning delightful area in electrical operation room

Similar Documents

Publication Publication Date Title
CN106166525A (en) A kind of automobile component fully-automatic coating production line
CN103182353B (en) A kind of automatic reciprocating spraying coating line
CN103008198A (en) Waterborne coating production line of automobile parts
CN209476555U (en) A kind of double-speed chain conveying paint line
CN205074157U (en) Intelligent automobile baking finish integration robot that sprays paint
CN105457820B (en) A kind of intelligent streamline of Shift speed segmentally and flexible docking spraying
CN107486353A (en) A kind of paint line for wheel and axletree
CN109967297A (en) A kind of Furniture panel Full-automatic paint spraying production line
CN201140159Y (en) Automatic paint-spraying and drying device
CN104998786B (en) Large-scale workpiece paint finishing
CN205493730U (en) Rotorcraft building outer wall washs and paint spraying machine ware people
CN204448395U (en) A kind of continous way paint line
CN207805871U (en) A kind of Furniture panel Full-automatic paint spraying production line
CN108787293A (en) A kind of robot tracking spraying automatic assembly line
CN201572727U (en) Automatic spray coating system
CN202316213U (en) Mobile passing-type polishing and painting device
EP2978539A1 (en) System for powder coating for elements to be coated of considerable length
CN109317383A (en) A kind of high-effect spraying production technology and its system for the processing of moulding surface
CN112281101A (en) Full-automatic hot-dip galvanizing production line and production process
CN115889059A (en) Workpiece water-based paint coating production line and process
CN108273701B (en) Process of automatic production line equipment for processing paint on outer surface of radiator
CN206153041U (en) Full -automatic coating line of car parts
CN206464141U (en) Low-cost and high-performance automatic spraying line
CN206075126U (en) The control system of flexible paint line
CN204892214U (en) Large -scale work piece paint finishing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161130