CN106156949A - A kind of rainwater based on waterlogging risk assessment is low affects development project method - Google Patents

A kind of rainwater based on waterlogging risk assessment is low affects development project method Download PDF

Info

Publication number
CN106156949A
CN106156949A CN201610513218.6A CN201610513218A CN106156949A CN 106156949 A CN106156949 A CN 106156949A CN 201610513218 A CN201610513218 A CN 201610513218A CN 106156949 A CN106156949 A CN 106156949A
Authority
CN
China
Prior art keywords
planning region
planning
region
waterlogging
low impact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610513218.6A
Other languages
Chinese (zh)
Inventor
周倩倩
许明华
许苗苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201610513218.6A priority Critical patent/CN106156949A/en
Publication of CN106156949A publication Critical patent/CN106156949A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Educational Administration (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses that a kind of rainwater based on waterlogging risk assessment is low affects development project method, comprise the steps: the waterlogging risk of S1: rapid evaluation planning region;S2: determine the priority utility function equation of planning region according to region hydrological characteristics, underlying surface character, available space, urban planning scheme, mining inetesity specification and the waterlogging risk of planning region, determine the low impact exploitation cloth setting priority of planning region, and then the suitability laying low impact is ranked up and passes judgment on;S3: develop priority level according to described low impact and planning region is divided into some blocks of cells, the general objective that planning region runoff coefficient controls is assigned to each described blocks of cells, until the total runoff coefficient determined is adjusted in the weighting of each unit block meets the general objective that planning region runoff coefficient controls;S4: draw planning region runoff coefficient and control space layout figure, provide decision support for low impact development project.

Description

A kind of rainwater based on waterlogging risk assessment is low affects development project method
Technical field
The present invention relates to Planning of rainwater project technical field, particularly relate to a kind of low shadow of rainwater based on waterlogging risk assessment Ring development project method.
Background technology
At present, both at home and abroad low impact exploitation is controlled to target and has different regulations, mainly comprise to annual flow total amount, Quantum of rainfall and the control etc. of comprehensive runoff coefficient.About the low development project method that affects of rainwater, Chinese patent literary composition 201510563320.2 planning method and devices disclosing rainwater low impact exploitation, it is mainly by adding rain to planning region Water arrange with change plot year rainfall runoff coefficient and planning region in runoff peak value to realize, rainwater is low affects development project, Its process is loaded down with trivial details and spends substantial amounts of cost and manpower and materials, and planning region is not carried out any block lay planning and Risk assessment.
And lack the measures, i.e. planning process such as planning region is carried out block laying planning and risk assessment and do not have or less ginseng Examine the indexs of correlation such as study area land character, hydrologic condition, mining inetesity specification, land surface condition and waterlogging space risk, from And lack the description on low impact exploitation stormwater facility cloth setting priority, implementation process easily causes " urban agglomeration plan, group Lay " unchecked construction problem, cause inefficiency or the wasting of resources.
Summary of the invention
The technical problem to be solved in the present invention is the region hydrology in order to overcome the city reality that has no basis in prior art The indexs such as condition, underlying surface character, available space, mining inetesity specification and waterlogging space risk lay low impact exploitation rain The planning problem of drainage facility, improves the unchecked construction problem easily causing " urban agglomeration plan, group lay " in implementation process, for LID in city scope implements offer and effectively lays guidance.
A kind of rainwater based on waterlogging risk assessment is low affects development project method, comprises the steps:
The waterlogging risk of S1: rapid evaluation planning region;
S2: strong according to the region hydrological characteristics of planning region, underlying surface character, available space, urban planning scheme, exploitation Metric model and waterlogging risk determine the priority utility function equation of planning region, determine that the low impact exploitation of planning region is laid preferential Level, and then the suitability of low impact laying is ranked up and passes judgment on;
S3: planning region is divided into some blocks of cells, by planning region runoff system according to described low impact exploitation priority level The general objective of numerical control is assigned to each described blocks of cells, until the weighting of each unit block is adjusted the total runoff coefficient determined and met The general objective that planning region runoff coefficient controls;
S4: draw planning region runoff coefficient and control space layout figure, provide decision support for low impact development project.
Preferably, step S1 includes:
S11, employing grid hydrology modeling, by GIS-Geographic Information System operating platform, use lattice structure and vector quantization Data, the earth's surface that digital elevation model carries out planning region flows to analyze and basin identification;
S12, in GIS-Geographic Information System, use the hydrological characteristics of the method simulation planning region of simplification, thus to planning region Waterlogging Flood inducing factors carries out risk analysis;
S13, the primary GIS-Geographic Information System of employing or electronic map data carry out vulnerability to the main supporting body of planning region Grade analysis;
S14, combine described risk analysis and described vulnerability class and analyze dual indexes, carry out space exposure analysis, Calculate the waterlogging risk rating scheme of planning region, identify planning region effectiveness factors area serious, that easily send out, complete rapid evaluation planning The waterlogging risk in district.
Preferably, in step S4, also including the functional and Con trolling index according to different described low impact exploitations, it is right to complete Planning region is embodied as planning and the setting of measure.
Preferably, or two during described hydrological characteristics includes the low-lying easy flood point of footpath circulation flow path, city;Described electronics It is one or more that map datum includes in land-use style, land used grade and land used spatial distribution;Described supporting body includes resident One or more in district, public building, industrial occupancy, means of transportation and shopping centre.
Compared with prior art, the invention has the beneficial effects as follows: the planning side that the present invention analyzes based on waterlogging risk indicator Case is intended to improve the low impact in city and lays science and the effectiveness of planning, controls catalogue with low impact exploitation and is designated as foundation, combines Closing multiple affects attribute, completes to lay low impact exploitation the evaluation of relative importance value, reaches to give top priority to what is the most important, the principle for the treatment of in accordance with local conditions, Make urban planning more reasonable, thus save municipal investment.
Accompanying drawing explanation
Fig. 1 is the second embodiment of the invention low stream affecting development project method of a kind of rainwater based on waterlogging risk assessment Cheng Tu.
Fig. 2 is second embodiment of the invention planning region Flood inducing factors danger and the input data of supporting body vulnerability and comments Estimate result figure.
Fig. 3 is waterlogging risk class and the signal of present situation waterlogging point calculating acquisition in second embodiment of the invention planning region Figure.
Fig. 4 a is that second embodiment of the invention is in comprehensive consideration waterlogging risk indicator, existing land-use style, available space And on the basis of urban planning, according to footpath flow control general objective and the runoff coefficient index of different planned land use, in Ge Zi district The low impact suggestion controlling value schematic diagram that block is assigned.
Fig. 4 b be second embodiment of the invention on the basis of proposed projects, in the park green land allocation plan of planning region In, for dissimilar park green lands such as Comprehensive Park, park belonging to a category, Community Parks, Rain Garden, vegetation grass ditch, stagnant is proposed Stay the construction suggestion schematic diagram of the pool, delaying basin.
Detailed description of the invention
Technical scheme is further illustrated below in conjunction with specific embodiment.
A kind of rainwater based on waterlogging risk assessment is low affects development project method, comprises the steps:
The waterlogging risk of S1: rapid evaluation planning region;
S2: strong according to the region hydrological characteristics of planning region, underlying surface character, available space, urban planning scheme, exploitation Metric model and waterlogging risk determine the priority utility function equation of planning region, determine that the low impact exploitation of planning region is laid preferential Level, and then the suitability of low impact laying is ranked up and passes judgment on;
S3: planning region is divided into some blocks of cells, by planning region runoff system according to described low impact exploitation priority level The general objective of numerical control is assigned to each described blocks of cells, until the weighting of each unit block is adjusted the total runoff coefficient determined and met The general objective that planning region runoff coefficient controls;
S4: draw planning region runoff coefficient and control space layout figure, provide decision support for low impact development project.
Preferably, step S1 includes:
S11, employing grid hydrology modeling, by GIS-Geographic Information System operating platform, use lattice structure and vector quantization Data, the earth's surface that digital elevation model carries out planning region flows to analyze and basin identification;
S12, in GIS-Geographic Information System, use the hydrological characteristics of the method simulation planning region of simplification, thus to planning region Waterlogging Flood inducing factors carries out risk analysis;
S13, the primary GIS-Geographic Information System of employing or electronic map data carry out vulnerability to the main supporting body of planning region Grade analysis;
S14, combine described risk analysis and described vulnerability class and analyze dual indexes, carry out space exposure analysis, Calculate the waterlogging risk rating scheme of planning region, identify planning region effectiveness factors area serious, that easily send out, complete rapid evaluation planning The waterlogging risk in district.
Preferably, in step S4, also including the functional and Con trolling index according to different described low impact exploitations, it is right to complete Planning region is embodied as planning and the setting of measure.
Preferably, or two during described hydrological characteristics includes the low-lying easy flood point of footpath circulation flow path, city;Described electronics It is one or more that map datum includes in land-use style, land used grade and land used spatial distribution;Described supporting body includes resident One or more in district, public building, industrial occupancy, means of transportation and shopping centre.
Technical solution of the present invention and principle comprise two main body modules: planning region waterlogging risk rapid evaluation module and low punching Hit exploitation and lay priority assessment module.Waterlogging risk module Main Basis planning region digital elevation model and land used information, Space based on GIS-Geographic Information System hydrological analysis and vulnerability analysis method, rapid evaluation is big chi under Severe rainstorm weather condition The waterlogging risk in degree space;The waterlogging risk sky that priority assessment module draws is laid in low impact exploitation based on waterlogging risk module Between characterize, consider the actual region hydrologic condition in city, underlying surface character, available space and urban planning scheme etc. many Heavily lay condition, in conjunction with importance and the weight analysis of above-mentioned influence factor, set up based on the multiple priority effect affecting attribute With functional equation, determine the relative importance value spatial description of planning region sub-block, pass judgment on for the suitability that low impact is laid And sequence.The Con trolling index controlling target and different measure according to low exploitation describes, and the master control target of study area is carried out district Block decomposes, and is finally completed region cloth setting priority and the segmentation of target sub-block controlled quentity controlled variable.
Embodiment one
A kind of rainwater based on waterlogging risk assessment is low affects development project method, comprises the steps:
The waterlogging risk of S1: rapid evaluation planning region.Particularly as follows: use the grid hydrology modeling rapid evaluation rule of GIS The waterlogging risk of partition.
It concretely comprises the following steps:
1. by GIS operating platform, use lattice structure and vector quantization data, digital elevation model is carried out ground, planning region Surface low is to analyzing and basin identification.
2. in GIS, the hydrological characteristics in the basin, method approximate simulation planning region of simplification is used, such as: footpath circulation flow path, city The low-lying easy flood point in city etc., thus obtain the substantially description dangerous to waterlogging Flood inducing factors.
3. vulnerability assessment Main Basis primary GIS of planning region supporting body or electronic map data, such as: land-use style With grade, spatial distribution etc., to main supporting body, such as: residential block, public building, industrial occupancy, means of transportation, shopping centre etc. Carry out vulnerability class description.
Finally combine planning region danger and vulnerability dual indexes, carry out space exposure analysis, calculate the interior of planning region Flood risk rating scheme, Study of recognition district effectiveness factors area serious, that easily send out.
S2: strong according to the region hydrological characteristics of planning region, underlying surface character, available space, urban planning scheme, exploitation Metric model and waterlogging risk determine the priority utility function equation of planning region, determine that the low impact exploitation of planning region is laid preferential Level, and then the suitability of low impact laying is ranked up and passes judgment on.
S3: planning region is divided into some blocks of cells, by planning region runoff system according to described low impact exploitation priority level The general objective of numerical control is assigned to each described blocks of cells, until the weighting of each unit block is adjusted the total runoff coefficient determined and met The general objective that planning region runoff coefficient controls;That is: on the basis of LID priority level spatial description, according to the land used of planning region Character and mining inetesity specification, be assigned to constitute each unit block of planning region by the general objective that study area runoff coefficient controls, Until the total runoff coefficient determined is adjusted in the weighting of each block meets the requirement of regulation.Specifically include following steps: (1) is according to planning The indexs such as district's land-use projects character, mining inetesity, the corresponding runoff coefficient of forward and backward each sub-block and run-off thereof are developed in estimation Difference.Wherein land-use projects character, mining inetesity are as decision variable parameter.(2) Runoff coefficient and the rule of planning region are obtained The general objective that partition runoff coefficient controls, the master control amount of the required abatement in planning region is i.e. as the target letter of multi-objective genetic algorithm Number.(3) Multipurpose Optimal Method constraints is that LID lays the flow comprehensive runoff coefficient target in Hou Gai district less than or equal to pre- If value.(4) result of a relative optimization can be obtained by Multipurpose Optimal Method.
S4: draw planning region runoff coefficient and control space layout figure, provide decision support for low impact development project.With Time, can complete planning region is embodied as the planning of measure according to the functional and Con trolling index of different low impact development stimulation And setting.
Embodiment two
A kind of low development project method that affects of rainwater based on waterlogging risk assessment, uses the grid hydrology modeling of GIS The waterlogging risk of rapid evaluation H planning region.This planning region Flood inducing factors is dangerous and the input data of supporting body vulnerability and commenting Estimate result and see that Fig. 2, assessment result are by the danger of Flood inducing factors and the actual numerical value of supporting body vulnerability are carried out data Standardization or normalized, thus obtain the division of five standardized scale.
1, calculate the waterlogging risk class obtained and see Fig. 3 a, for showing that the space of this high, medium and low risk area of district's waterlogging is divided Cloth situation.It is higher by the probability of effectiveness factors and the most disaster-stricken for the high Regional Representative of waterlogging risk class, causes damage The biggest.From risk map, the study area waterlogging risk in massif and water system region is minimum, and risk is concentrated mainly on physical features relatively Smooth, the region (the inner ring labelling see in figure) of building comparatively dense.
2, by the comprehensive runoff coefficient goal decomposition of H planning region to each sub-block;Planning region is divided into 24 sub-block altogether, From the angle of low impact exploitation rainwater comprehensive utilization, the land-use style of sub-block is divided into nine groups, the comprehensive footpath of each class Stream coefficient is identical.The control target of rainfall runoff is by the master control amount according to the required abatement of planning, according to H planning region land-use projects The index such as character, mining inetesity, the corresponding runoff coefficient (being specifically shown in table 1 below) of forward and backward each sub-block and footpath thereof are developed in estimation Flow difference.The comprehensive runoff coefficient in H planning region development & construction stage is 0.7, and the application of LID is to propose for this development phase , it is desirable to LID lays the flow comprehensive runoff coefficient target in Hou Gai district less than or equal to 0.55.
Table 1: the rainfall runoff coefficient that planning region different land use type is corresponding
4, low impact is laid needs to set, according to risk class, the priority that low impact exploitation stormwater facility is laid.Fig. 4 a exhibition Show on the basis of comprehensive consideration waterlogging risk indicator, existing land-use style, available space and urban planning, according to footpath Flow control general objective and the runoff coefficient index of different planned land use, in the low impact suggestion controlling value that each sub-block is assigned.
5, through statistical computation, after planningization low impact exploitation is laid, its comprehensive runoff coefficient reaches the desired value of 0.55, full The low impact exploitation requirement of Zu Gai district.And it can be seen that the laying of LID substantially conforms to the space layout of waterlogging risk class, to runoff Management with strong points, efficiency is high.Fig. 4 b shows on the basis of proposed projects, in the park green land allocation plan of study area In, for dissimilar park green lands such as Comprehensive Park, park belonging to a category, Community Parks, Rain Garden, vegetation grass ditch, stagnant is proposed Stay the construction suggestion of the pool, delaying basin.
For a person skilled in the art, can technical scheme as described above and design, make other each Plant corresponding change and deformation, and all these changes and deforms the protection model that all should belong to the claims in the present invention Within enclosing.

Claims (4)

1. a rainwater based on waterlogging risk assessment is low affects development project method, it is characterised in that: comprise the steps:
The waterlogging risk of S1: rapid evaluation planning region;
S2: according to the region hydrological characteristics of planning region, underlying surface character, available space, urban planning scheme, mining inetesity rule Model and waterlogging risk determine the priority utility function equation of planning region, determine the low impact exploitation cloth setting priority of planning region, And then the suitability of low impact laying is ranked up and passes judgment on;
S3: planning region is divided into some blocks of cells, by planning region runoff coefficient control according to described low impact exploitation priority level The general objective of system is assigned to each described blocks of cells, until the weighting of each unit block is adjusted the total runoff coefficient determined and met planning The general objective that district's runoff coefficient controls;
S4: draw planning region runoff coefficient and control space layout figure, provide decision support for low impact development project.
A kind of rainwater based on waterlogging risk assessment the most according to claim 1 is low affects development project method, its feature It is: step S1 includes:
S11, employing grid hydrology modeling, by GIS-Geographic Information System operating platform, use lattice structure and vector quantization data, The earth's surface that digital elevation model carries out planning region flows to analyze and basin identification;
S12, in GIS-Geographic Information System, use the hydrological characteristics of the method simulation planning region of simplification, thus the waterlogging to planning region Flood inducing factors carries out risk analysis;
S13, the primary GIS-Geographic Information System of employing or electronic map data carry out vulnerability class to the main supporting body of planning region Analyze;
S14, combine described risk analysis and described vulnerability class and analyze dual indexes, carry out space exposure analysis, calculate The waterlogging risk rating scheme of planning region, identifies planning region effectiveness factors area serious, that easily send out, completes rapid evaluation planning region Waterlogging risk.
A kind of rainwater based on waterlogging risk assessment the most according to claim 2 is low affects development project method, its feature It is: in step S4, also includes the functional and Con trolling index according to different described low impact exploitations, complete planning region concrete The planning of implementing measure and setting.
A kind of rainwater based on waterlogging risk assessment the most according to claim 2 is low affects development project method, its feature It is: described hydrological characteristics includes or two in the low-lying easy flood point of footpath circulation flow path, city;Described electronic map data bag Include in land-use style, land used grade and land used spatial distribution is one or more;Described supporting body includes residential block, public builds Build, industrial occupancy, one or more in means of transportation and shopping centre.
CN201610513218.6A 2016-06-30 2016-06-30 A kind of rainwater based on waterlogging risk assessment is low affects development project method Pending CN106156949A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610513218.6A CN106156949A (en) 2016-06-30 2016-06-30 A kind of rainwater based on waterlogging risk assessment is low affects development project method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610513218.6A CN106156949A (en) 2016-06-30 2016-06-30 A kind of rainwater based on waterlogging risk assessment is low affects development project method

Publications (1)

Publication Number Publication Date
CN106156949A true CN106156949A (en) 2016-11-23

Family

ID=57350904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610513218.6A Pending CN106156949A (en) 2016-06-30 2016-06-30 A kind of rainwater based on waterlogging risk assessment is low affects development project method

Country Status (1)

Country Link
CN (1) CN106156949A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107239910A (en) * 2017-06-27 2017-10-10 中国科学院城市环境研究所 The urban waterlogging risk assessment index for coupling population and POI points is built
CN108062631A (en) * 2017-12-29 2018-05-22 广东工业大学 Urban waterlogging methods of risk assessment, device and terminal
CN109886537A (en) * 2019-01-09 2019-06-14 天津市市政工程设计研究院 A kind of judgment method of the road waterlogging risk of town site expansion
CN110135722A (en) * 2019-05-09 2019-08-16 苏州嘉奕晟中小企业科技咨询有限公司 Smart city flood processing system based on geographical integrated information
CN110543660A (en) * 2019-07-17 2019-12-06 广东工业大学 low-impact development simulation method, system and related device
CN111275266A (en) * 2020-02-25 2020-06-12 华南师范大学 Rapid optimization method for spatial layout of impervious ground surface for urban rainstorm and waterlogging prevention and control

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107239910A (en) * 2017-06-27 2017-10-10 中国科学院城市环境研究所 The urban waterlogging risk assessment index for coupling population and POI points is built
CN108062631A (en) * 2017-12-29 2018-05-22 广东工业大学 Urban waterlogging methods of risk assessment, device and terminal
CN109886537A (en) * 2019-01-09 2019-06-14 天津市市政工程设计研究院 A kind of judgment method of the road waterlogging risk of town site expansion
CN109886537B (en) * 2019-01-09 2023-04-11 天津市政工程设计研究总院有限公司 Method for judging road waterlogging risk of urban construction land expansion
CN110135722A (en) * 2019-05-09 2019-08-16 苏州嘉奕晟中小企业科技咨询有限公司 Smart city flood processing system based on geographical integrated information
CN110543660A (en) * 2019-07-17 2019-12-06 广东工业大学 low-impact development simulation method, system and related device
CN110543660B (en) * 2019-07-17 2023-05-09 广东工业大学 Low-impact development simulation method, system and related device
CN111275266A (en) * 2020-02-25 2020-06-12 华南师范大学 Rapid optimization method for spatial layout of impervious ground surface for urban rainstorm and waterlogging prevention and control

Similar Documents

Publication Publication Date Title
Jia et al. Planning of LID–BMPs for urban runoff control: The case of Beijing Olympic Village
CN106156949A (en) A kind of rainwater based on waterlogging risk assessment is low affects development project method
CN106708944B (en) The urban area sub-basin Automated Partition Method of more elements is modeled and taken into account towards SWMM
CN109740562B (en) System and method for building appropriate area in ecological sponge type city
CN106884405B (en) Inrush type mountain flood assay method for a kind of Cross Some Region Without Data
CN103955565B (en) GIS (Geographic Information System) platform-based urban water system construction planning method
CN108287950B (en) Water quality simulation method based on water environment quality target management of control unit
Rodríguez-Sinobas et al. Techniques and criteria for sustainable urban stormwater management. The case study of Valdebebas (Madrid, Spain)
CN109948866A (en) A kind of northern coastal region sponge urban planning method based on SWWM simulation
CN107704592A (en) A kind of flood forecasting service construction method based on WebGIS
Akter et al. Possibilities of urban flood reduction through distributed-scale rainwater harvesting
CN111062125B (en) Hydrological effect evaluation method for sponge type comprehensive pipe gallery
CN110543984A (en) Urban water surface rate planning method based on water safety
CN110188323B (en) Water surface rate value range measuring and calculating method suitable for urban water ecological protection
CN115391712A (en) Urban flood risk prediction method
Yang et al. Optimal designs of LID based on LID experiments and SWMM for a small-scale community in Tianjin, north China
CN104915575B (en) A kind of evaluation method of the ecological index in the sponge city based on level matter element extension method
CN112052561A (en) Method for formulating waterlogging prevention emergency plan of drainage system
CN112242003B (en) City sub-catchment area division method considering land type and flow direction
CN109033589B (en) A kind of pollutants removal rate calculation method considering LID catharsis based on SWMM model
CN114139258A (en) Urban inland inundation modeling evaluation method and system and computer readable storage medium
CN114676473A (en) Green infrastructure spatial layout optimization method based on artificial intelligence algorithm
Arvand et al. Evaluating the impact of LID-BMPs on urban runoff reduction in an urban sub-catchment
Gao et al. Designing water-saving-ecological check dam sites by a system optimization model in a region of the loess plateau, Northwest China
Zhang et al. Simulation of urban rainstorm waterlogging and pipeline network drainage process based on SWMM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123