CN110135722A - Smart city flood processing system based on geographical integrated information - Google Patents

Smart city flood processing system based on geographical integrated information Download PDF

Info

Publication number
CN110135722A
CN110135722A CN201910385313.6A CN201910385313A CN110135722A CN 110135722 A CN110135722 A CN 110135722A CN 201910385313 A CN201910385313 A CN 201910385313A CN 110135722 A CN110135722 A CN 110135722A
Authority
CN
China
Prior art keywords
module
flood
pipe network
geographical
processing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910385313.6A
Other languages
Chinese (zh)
Inventor
纪学超
高飞飞
顾宝州
张静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Jiayisheng Small And Medium-Sized Enterprises Science And Technology Consulting Co Ltd
Original Assignee
Suzhou Jiayisheng Small And Medium-Sized Enterprises Science And Technology Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Jiayisheng Small And Medium-Sized Enterprises Science And Technology Consulting Co Ltd filed Critical Suzhou Jiayisheng Small And Medium-Sized Enterprises Science And Technology Consulting Co Ltd
Priority to CN201910385313.6A priority Critical patent/CN110135722A/en
Publication of CN110135722A publication Critical patent/CN110135722A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/10Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Databases & Information Systems (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Sewage (AREA)
  • Alarm Systems (AREA)

Abstract

This case is related to a kind of smart city flood processing system based on geographical integrated information, comprising: flood situation data monitoring module, video monitoring module, underground pipe network flow-control module, big data comprehensive management module, command scheduling module, information storage module;The big data comprehensive management module analyzes the flood situation and variation of the monitored each point of flood situation data monitoring module, makes reply in time to monitoring data provided by flood situation data monitoring module, combined data library;The present invention passes through entrance, the exit flowmeter set on each ground or subdrainage pipe network, flow dynamics in each pipe network of real-time monitoring, by the state for reasonably prejudging and deploying each valve and water pump in underground pipe network flow-control module, reach rainfall it is seriously uneven when balance each area sewerage ability, and preferentially guarantee the purpose of vital area draining, anti-flood.

Description

Smart city flood processing system based on geographical integrated information
Technical field
The invention belongs to smart city construction fields, and in particular to a kind of smart city flood based on geographical integrated information Damage caused by waterlogging does harm to processing system.
Background technique
With the gradually quickening of Urbanization in China, the size of population in city is increased significantly, and volume of transport increases, The many factors such as more crypto set that groups of building are built cause temperature in city to be apparently higher than the stabilization in suburb, urbanization process plus It has been directly changed the ecological environment of city region fastly, and then has formed tropical island effect, and urban heat land effect will have a direct impact on Precipitation causes rainfall intensity to increase, meanwhile, because of the rain making for needing constantly to occur of urban development, also to a certain degree On cause rainfall increase, and then increase the generation of Urban Flood Waterlogging.In addition in recent years, extreme weather takes place frequently this to city Every infrastructure in city all causes very big pressure, for example the generation of heavy rainfall directly tests the drainage system in city, than Rainfall intensity and range in such as some cities are more than record high.
Due to China urban planning relatively lag behind with it is unreasonable, underground pipe network arrangement it is unreasonable, Late reformation at This is higher, and the construction time is long, and city flood and waterlogging is caused to become a more serious livelihood issues.
Smart city refers to using various information technologies or innovation idea, the composition system and service in city is integrated, to mention The efficiency of resources untilization, Optimizing City management and service are risen, and improves civil plantation quality.Smart city is generation information Technology is sufficiently used in the urban informationization advanced form of the next-generation innovation of the society of the knowledge based among all trades and professions in city, It realizes information-based, industrialization and urbanization depth integration, helps to alleviate " big city disease ", improve urbanization quality, realize essence Refinement and dynamic manage, and promote city management effect and improve civil plantation quality.The construction of smart city, facilitates city The prevention of flood is administered.
Summary of the invention
The object of the present invention is to provide a kind of wisdom cities that vital area flood can be effectively prevent to occur when flood situation occurs City's flood processing system.
It is a further object to provide one kind based on based on geographical integrated information, can make to flood pre- The flood processing system of alert and quick response processing.
In order to solve the above-mentioned technical problem, the invention discloses a kind of smart city floods based on geographical integrated information Disaster processing system characterized by comprising
Flood situation data monitoring module, rainfall gauge, water-level gauge, flowmeter including being installed on each monitoring point;
Flood situation data monitoring module, public security including selectively calling, part Important Sections provided by traffic department Real-time video and photo;
Underground pipe network flow-control module, including be set to underground pipe network respectively export or node at flow control valve and water Pump;
Big data comprehensive management module, including database module and intelligent analysis module;
Command scheduling module, including real-time flood situation display unit and instruction issue unit, the real-time flood situation display unit For showing the real time content of flood situation data monitoring module, video monitoring module and the analysis knot of big data comprehensive management module Fruit;The manager that described instruction release unit receives the personnel, the distribution of materials that are issued by manager instructs, which is by managing The result that person's content according to real-time flood situation display unit judges;
Information storage module is connect with big data comprehensive management module and command scheduling module, for storing record disaster The information of all the sensors, image, manager's instruction, each participant respond effect when generation;
The flood situation data monitoring module and video monitoring module are connect with the big data comprehensive management module signal, institute Big data comprehensive management module is stated to connect with command scheduling module;The big data comprehensive management module is by supervising flood situation data Monitoring data provided by control module are compared with database module, and analyze the flood situation data by intelligent analysis module The flood situation of the monitored each point of monitoring module predicts the next flood situation variation of each default monitoring point.
Preferably, the intelligent analysis module includes the multimedia terminal equipped with expert system, the database mould Block includes digital city system, satellite remote-sensing image, Hydrology department database, meteorological department's database and flood fighting materials data Library.
Preferably, the rainfall gauge includes the rainfall statistics facility of each weather station, area monitoring point.
Preferably, the water-level gauge is set to each easy flooded point, including low-lying place, entrance, crossroad.
Preferably, the flowmeter is set to the entrance of each underground drainage pipeline networks, exit.
Preferably, the big data comprehensive management module by city it is each area according to the density of population, traffic, landform and Each region is divided into different preferential with reference to the layout and flood occurrence frequency of underground pipe network by geology and social synthesis's factor Grade temporarily ceases or reduces the lower region pipe of priority when isolated storm happens suddenly, and underground pipe network drainage system flow is saturated Net draining, it is preferential to discharge the higher area sewerage of priority.
Preferably, the flowmeter transmits real-time traffic information to big data comprehensive management module, in non-active flow In the case where adjusting, when the flow of certain pipe network or some water inlet becomes smaller suddenly or be significantly less than its due normal stream magnitude When, it is determined as the pipe network or water inlet blocking, staff should be notified to dredge in time.
Preferably, after each flood situation, the information that the intelligent analysis module is recorded according to information storage module, To each data of monitoring point generated in this flood situation, Operation Measures, treatment effect progress finishing analysis are handled, for wherein effect Preferably, the strong processing scheme of enforceability forms the emergency preplan of system, and to the outfit of flood fighting materials, newly-built underground pipe network The construction of optimization layout, communal facility forms reference data.
It preferably, further include the motor-driven drainage car being made of the sprinkling truck for having quick pumping function, by command scheduling Module dominates, the interim pump drainage water for small area draining difficult region.
Smart city flood processing system based on geographical integrated information of the invention, has many advantages, such as:
1, by being set to entrance, the exit flowmeter of each ground or subdrainage pipe network, in each pipe network of real-time monitoring Flow dynamics reach drop by reasonably prejudging and deploying the state of each valve and water pump in underground pipe network flow-control module Rainfall balances each area sewerage ability when seriously uneven, and preferentially guarantees the purpose of vital area draining, anti-flood.
2. by integrating digital city system, satellite remote-sensing image, relevant departments' database and flood situation data monitoring mould The real time data of block, forecast analysis flood situation provide directly in conjunction with the image picture of flood situation data monitoring module for flood control command personnel It sees, rapidly reference, facilitates flood control command personnel and make accurate judgement.
3, the information occurred during information storage module storage flood control, intelligent analysis module is according to information storage module institute The information of record to each data of monitoring point generated in this flood situation, handles Operation Measures, treatment effect progress finishing analysis, Reference, the still outfit of flood fighting materials from now on, newly-built buried pipe of the result of finishing analysis are provided for the deployment of next work of flood prevention The foundation that the optimization layout of net, public facility construction can refer to.
Detailed description of the invention
Fig. 1 is the module diagram of the smart city flood processing system based on geographical integrated information.
Specific embodiment
Below by embodiment, the present invention is described in further detail, to enable those skilled in the art referring to specification Text can be implemented accordingly.
Such as " have " it should be appreciated that used herein, "comprising" and " comprising " term are not precluded one or more The presence or addition of a other elements or combinations thereof.
Embodiment 1
As shown in Figure 1, a kind of smart city flood processing system based on geographical integrated information, feature exist In, comprising:
Flood situation data monitoring module, rainfall gauge, water-level gauge, flowmeter including being installed on each monitoring point;The monitoring point For the flood situation monitoring point for being preset with rainfall gauge, water-level gauge or flowmeter.
Video monitoring module, the public security including selectively calling, part Important Sections provided by traffic department it is real-time Video and photo;
Underground pipe network flow-control module, including be set to underground pipe network respectively export or node at flow control valve and water Pump;
Big data comprehensive management module, including database module and intelligent analysis module;
Command scheduling module, including real-time flood situation display unit and instruction issue unit, the real-time flood situation display unit For showing the real time content of flood situation data monitoring module, video monitoring module and the analysis knot of big data comprehensive management module Fruit;The manager that described instruction release unit receives the personnel, the distribution of materials that are issued by manager instructs, which is by managing The result that person's content according to real-time flood situation display unit judges;
Information storage module is connect with big data comprehensive management module and command scheduling module, for storing record disaster The information of all the sensors, image, manager's instruction, each participant respond effect when generation;
The flood situation data monitoring module and video monitoring module are connect with the big data comprehensive management module signal, institute Big data comprehensive management module is stated to connect with command scheduling module;The big data comprehensive management module is by supervising flood situation data Monitoring data provided by control module are compared with database module, and analyze the flood situation data by intelligent analysis module The flood situation of the monitored each point of monitoring module predicts the next flood situation variation of each default monitoring point.
The intelligent analysis module includes the multimedia terminal equipped with expert system, and the database module includes number City system, satellite remote-sensing image, Hydrology department database, meteorological department's database and flood fighting materials database.
The rainfall gauge includes the rainfall statistics facility of each weather station, area monitoring point.Rainfall gauge keep an eye on and Maintenance carries out rainfall monitoring using the rainfall statistics facility of each weather station, area monitoring point, if it is desired, can be in specific region Order sets rainfall gauge.
The water-level gauge is set to each easy flooded point, including low-lying place, entrance, the low-lying place in crossroad city, entrance, ten Word crossing is when rainfall is larger, easily ponding, throughout sets up the water level statistics facility based on ultrasonic water level gauge, is conducive to Water level information everywhere is grasped at any time and is handled in time, ensures pedestrains safety.
The flowmeter is set to the entrance of each underground drainage pipeline networks, exit.Flowmeter is for statistically descending drainage pipeline networks Real-time traffic, according to the critical value of each underground drainage pipeline networks displacement, to each underground drainage pipeline networks and ground pumping equipment Displacement is regulated and controled.
The big data comprehensive management module by each area in city according to the density of population, traffic, landform and geology and Each region is divided into different priority, in part with reference to the layout and flood occurrence frequency of underground pipe network by social synthesis's factor Heavy rain burst when underground pipe network drainage system flow is saturated, temporarily ceases or reduces the lower region pipe network draining of priority, excellent First discharge the higher area sewerage of priority.When rainfall is big, subdrainage pipe network displacement drain discharge saturation is more in order to guarantee The normal life of number people, the ponding in priority upper zone is first discharged, or in isolated storm, temporarily by neighboring area The drain discharge of subdrainage pipe network is deployed for heavy rain region, is conducive to the flood situation in the rapid recovery region.
The flowmeter transmits real-time traffic information to big data comprehensive management module, the case where non-active flow is adjusted Under, when the flow of certain pipe network or some water inlet becomes smaller suddenly or be significantly less than its due normal stream magnitude, it is determined as The pipe network or water inlet blocking, should notify staff to dredge in time.It is often that water inlet blocking and underground pipe network, which silt up, There is a situation where cannot such as dredge in time, it is possible to lead to large area ponding, perceive the hair of blocking in time by flowmeter It is raw, dredging measure is taken ahead of time, prevents the generation of large area ponding.
After each flood situation, the information that the intelligent analysis module is recorded according to information storage module, to this flood Each data of monitoring point for generating in feelings, processing Operation Measures, treatment effect carry out finishing analysis, preferable for wherein effect, can The strong processing scheme of feasibility forms the emergency preplan of system, and to the optimization cloth of the outfit of flood fighting materials, newly-built underground pipe network The construction of office, communal facility forms reference data.Expert system in intelligent analysis module can be carried out based on artificial intelligence Analytic learning forms the flood prevention regulation reference content of system.
Further include the motor-driven drainage car being made of the sprinkling truck for having quick pumping function, dominated by command scheduling module, Interim pump drainage water for small area draining difficult region.City is in construction due to planning the small of unreasonable inevitable appearance part Area-depth ponding, influences pedestrains safety, by the interim high-power motor-driven drainage car of sprinkling truck composition, is quickly evacuated to ponding and spills In waterwheel, and it is thrown into elsewhere.
Embodiment 2
Certain city burst heavy rain, sets up interim flood control command group, using the present invention is based on the intelligence of geographical integrated information Intelligent Urban Flood Waterlogging processing system is coped with.
The rainfall of local old town is significantly greater than other regions, since the subdrainage pipe network of old town is relatively old, There is apparent waterlogging phenomenon.
There is apparent decline, flood control command suddenly in the data on flows that the discharge outlet flowmeter of certain residential neighborhood is sent Group has sent dredging personnel immediately, and checked causes water inlet to block for the accumulation of a large amount of house refuses, after rubbish is salvaged, It dredges successfully, the small group acknowledge of flood control command enables dredging personnel return after data on flows transmitted by flowmeter restores normal at this.
Since the rainfall of surrounding area is lower, and do not occur obvious waterlogging, the closing week of flood control command group selectivity Branch line drainage pipeline networks is partly descended in border region, concedes partial drainage transport power for the underground pipe network of old town;It opens simultaneously old The water pump of the neighbouring underground pipe network in the key areas such as hospital, school, living area, traffic main artery, government in city, to improve blowdown stream Amount, after 2 hours, the waterlogging phenomenon of old town key area is relieved, when flood situation when heavy rain happens suddenly than before solves Between obviously accelerate.
The motor-driven drainage car that flood control command group also sends the sprinkling truck for having quick pumping function to form is gone on patrol, weight The ponding of the densely populated cell entrance in point reply part.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and embodiment shown and described herein.

Claims (9)

1. a kind of smart city flood processing system based on geographical integrated information characterized by comprising
Flood situation data monitoring module, rainfall gauge, water-level gauge, flowmeter including being installed on each default monitoring point;
Video monitoring module, including the real-time video and photo of the part way called from public security, traffic department;
Underground pipe network flow-control module, including be set to underground pipe network respectively export or node at flow control valve and water pump;
Big data comprehensive management module, including database module and intelligent analysis module;
Command scheduling module, including real-time flood situation display unit and instruction issue unit, the real-time flood situation display unit are used for Show flood situation data monitoring module, the real time content of video monitoring module and the analysis result of big data comprehensive management module;Institute Manager's instruction that instruction issue unit receives the personnel, the distribution of materials that are issued by manager is stated, which is by manager's root The result that content shown by flood situation display unit judges when factually;
Information storage module is connect with big data comprehensive management module and command scheduling module, records disaster for storing When the information of all the sensors, image, manager's instruction, each participant respond effect;
The flood situation data monitoring module and video monitoring module are connect with the big data comprehensive management module signal, described big Aggregation of data management module is connect with command scheduling module;The big data comprehensive management module passes through to flood situation data monitoring mould Monitoring data provided by block are compared with database module, and analyze the flood situation data monitoring by intelligent analysis module The flood situation of the monitored each point of module predicts the next flood situation variation of each default monitoring point.
2. the smart city flood processing system based on geographical integrated information, feature exist as described in claim 1 In the intelligent analysis module includes the multimedia terminal equipped with expert system, and the database module includes digital city System, satellite remote-sensing image, Hydrology department database, meteorological department's database and flood fighting materials database.
3. the smart city flood processing system based on geographical integrated information, feature exist as described in claim 1 In the rainfall gauge includes the rainfall statistics facility of each weather station, area monitoring point.
4. the smart city flood processing system based on geographical integrated information, feature exist as claimed in claim 3 In the water-level gauge is set to each easy flooded point, including low-lying place, entrance, crossroad.
5. the smart city flood processing system based on geographical integrated information, feature exist as claimed in claim 4 In the flowmeter is set to the entrance of each underground drainage pipeline networks, exit.
6. the smart city flood processing system based on geographical integrated information, feature exist as claimed in claim 5 In the big data comprehensive management module is comprehensive according to the density of population, traffic, landform and geology and society by each area in city Each region is divided into different priority with reference to the layout and flood occurrence frequency of underground pipe network by conjunction factor, prominent in isolated storm Hair when underground pipe network drainage system flow is saturated, temporarily ceases or reduces the lower region pipe network draining of priority, preferential to discharge The higher area sewerage of priority.
7. the smart city flood processing system based on geographical integrated information, feature exist as claimed in claim 6 In, the flowmeter transmits real-time traffic information to big data comprehensive management module, in the case where non-active flow is adjusted, when The flow of certain pipe network or some water inlet become smaller suddenly or be significantly less than its due normal stream magnitude when, be determined as the pipe network Or water inlet blocking, staff should be notified to dredge in time.
8. the smart city flood processing system based on geographical integrated information, feature exist as described in claim 1 In, after each flood situation, the information that the intelligent analysis module is recorded according to information storage module, to being produced in this flood situation Raw each data of monitoring point, processing Operation Measures, treatment effect carry out finishing analysis, enforceability preferable for wherein effect Strong processing scheme forms the emergency preplan of system, and is laid out to the optimization of the outfit of flood fighting materials, newly-built underground pipe network, is public The construction of facility forms reference data.
9. the smart city flood processing system based on geographical integrated information, feature exist as described in claim 1 In further including the motor-driven drainage car being made of the sprinkling truck for having quick pumping function, dominated by command scheduling module, for small The interim pump drainage water of area draining difficult region.
CN201910385313.6A 2019-05-09 2019-05-09 Smart city flood processing system based on geographical integrated information Pending CN110135722A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910385313.6A CN110135722A (en) 2019-05-09 2019-05-09 Smart city flood processing system based on geographical integrated information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910385313.6A CN110135722A (en) 2019-05-09 2019-05-09 Smart city flood processing system based on geographical integrated information

Publications (1)

Publication Number Publication Date
CN110135722A true CN110135722A (en) 2019-08-16

Family

ID=67576875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910385313.6A Pending CN110135722A (en) 2019-05-09 2019-05-09 Smart city flood processing system based on geographical integrated information

Country Status (1)

Country Link
CN (1) CN110135722A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111613017A (en) * 2020-04-26 2020-09-01 李海波 Urban flood disaster emergency early warning processing method and system
CN111650875A (en) * 2020-05-12 2020-09-11 广东中林建筑园林工程有限公司 Water conservancy building supervisory systems based on big data
CN112036612A (en) * 2020-08-13 2020-12-04 成都万江港利科技股份有限公司 Urban waterlogging intelligent early warning system
CN112489415A (en) * 2020-12-01 2021-03-12 浙江工业职业技术学院 Sprinkler scheduling system, method and device, electronic equipment and storage medium
CN112987808A (en) * 2021-05-13 2021-06-18 浙江鼎胜环保技术有限公司 Management method of management network and digital network management system
CN113091827A (en) * 2021-04-29 2021-07-09 中铁第四勘察设计院集团有限公司 Intelligent flood automatic monitoring system for urban rail transit underground complex
CN113393110A (en) * 2021-06-07 2021-09-14 广州珠科院工程勘察设计有限公司 Multi-node urban drainage pumping station junction system
CN113888039A (en) * 2021-10-29 2022-01-04 江苏天汇空间信息研究院有限公司 Intelligent water affair comprehensive information management system based on big data
CN114089442A (en) * 2021-11-18 2022-02-25 北京城市系统工程研究中心 Urban infrastructure waterlogging disaster monitoring system and method
CN114448659A (en) * 2021-12-16 2022-05-06 河南大学 Yellow river dam bank monitoring Internet of things access control optimization method based on attribute exploration
CN114877933A (en) * 2022-04-22 2022-08-09 浪潮软件科技有限公司 Urban road accumulated water monitoring and early warning method and system
CN115506402A (en) * 2022-09-23 2022-12-23 上海电器科学研究所(集团)有限公司 Emergency flood control system for underground pipe gallery
CN116682237A (en) * 2023-08-03 2023-09-01 南通午未连海科技有限公司 Intelligent flood prevention early warning method and platform based on artificial intelligence

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090074317A (en) * 2008-01-02 2009-07-07 주식회사 유신테크 Danger management total control system
CN205193543U (en) * 2015-10-29 2016-04-27 上海水顿智能科技有限公司 Intelligence drainage dispatch system
CN106156949A (en) * 2016-06-30 2016-11-23 广东工业大学 A kind of rainwater based on waterlogging risk assessment is low affects development project method
CN107239575A (en) * 2017-06-29 2017-10-10 邯郸市气象局 The risk analysis of urban road waterlogging and early warning intelligence the Internet services system and method
CN109191358A (en) * 2018-10-19 2019-01-11 中电科新型智慧城市研究院有限公司 Urban Flood control prevention waterlogging monitoring commander's operating system
CN110134750A (en) * 2019-05-10 2019-08-16 苏州嘉奕晟中小企业科技咨询有限公司 A kind of information system of underground pipeline

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090074317A (en) * 2008-01-02 2009-07-07 주식회사 유신테크 Danger management total control system
CN205193543U (en) * 2015-10-29 2016-04-27 上海水顿智能科技有限公司 Intelligence drainage dispatch system
CN106156949A (en) * 2016-06-30 2016-11-23 广东工业大学 A kind of rainwater based on waterlogging risk assessment is low affects development project method
CN107239575A (en) * 2017-06-29 2017-10-10 邯郸市气象局 The risk analysis of urban road waterlogging and early warning intelligence the Internet services system and method
CN109191358A (en) * 2018-10-19 2019-01-11 中电科新型智慧城市研究院有限公司 Urban Flood control prevention waterlogging monitoring commander's operating system
CN110134750A (en) * 2019-05-10 2019-08-16 苏州嘉奕晟中小企业科技咨询有限公司 A kind of information system of underground pipeline

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周倩倩;王和平;许苗苗;陈朝彬;: "基于GIS的栅格水文建模法快速评估内涝风险", 中国给水排水, no. 21, pages 3 - 14 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111613017A (en) * 2020-04-26 2020-09-01 李海波 Urban flood disaster emergency early warning processing method and system
CN111650875A (en) * 2020-05-12 2020-09-11 广东中林建筑园林工程有限公司 Water conservancy building supervisory systems based on big data
CN112036612A (en) * 2020-08-13 2020-12-04 成都万江港利科技股份有限公司 Urban waterlogging intelligent early warning system
CN112489415A (en) * 2020-12-01 2021-03-12 浙江工业职业技术学院 Sprinkler scheduling system, method and device, electronic equipment and storage medium
CN113091827A (en) * 2021-04-29 2021-07-09 中铁第四勘察设计院集团有限公司 Intelligent flood automatic monitoring system for urban rail transit underground complex
CN112987808A (en) * 2021-05-13 2021-06-18 浙江鼎胜环保技术有限公司 Management method of management network and digital network management system
CN113393110A (en) * 2021-06-07 2021-09-14 广州珠科院工程勘察设计有限公司 Multi-node urban drainage pumping station junction system
CN113888039A (en) * 2021-10-29 2022-01-04 江苏天汇空间信息研究院有限公司 Intelligent water affair comprehensive information management system based on big data
CN113888039B (en) * 2021-10-29 2022-07-15 江苏天汇空间信息研究院有限公司 Intelligent water affair comprehensive information management system and method based on big data
CN114089442A (en) * 2021-11-18 2022-02-25 北京城市系统工程研究中心 Urban infrastructure waterlogging disaster monitoring system and method
CN114448659A (en) * 2021-12-16 2022-05-06 河南大学 Yellow river dam bank monitoring Internet of things access control optimization method based on attribute exploration
CN114877933A (en) * 2022-04-22 2022-08-09 浪潮软件科技有限公司 Urban road accumulated water monitoring and early warning method and system
CN115506402A (en) * 2022-09-23 2022-12-23 上海电器科学研究所(集团)有限公司 Emergency flood control system for underground pipe gallery
CN116682237A (en) * 2023-08-03 2023-09-01 南通午未连海科技有限公司 Intelligent flood prevention early warning method and platform based on artificial intelligence
CN116682237B (en) * 2023-08-03 2023-10-20 南通午未连海科技有限公司 Intelligent flood prevention early warning method and platform based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN110135722A (en) Smart city flood processing system based on geographical integrated information
Marfai et al. Coastal flood management in Semarang, Indonesia
Rahman et al. Flood risks and reduction approaches in Bangladesh
Miller et al. Rethinking infrastructure in an era of unprecedented weather events
Estrela et al. Sustainable water use in Europe
CN112052561A (en) Method for formulating waterlogging prevention emergency plan of drainage system
CN111898911A (en) Drainage waterlogging prevention emergency scheme design system
Saha et al. Identification of potential sites for water harvesting structures using geospatial techniques and multi-criteria decision analysis
Abdullah et al. A tale of three cities: water disaster policy responses in Bangkok, Kuala Lumpur and Metro Manila
Cheng et al. Estimation of the evacuation clearance time based on dam-break simulation of the Huaxi dam in Southwestern China
CN110080364A (en) Urban waterlogging control system
Noorhashirin et al. Assessing Malaysian disaster preparedness for flood
Mustafa et al. Development of flood hazards policy in the Indus River Basin of Pakistan, 1947–1996
Visessri et al. Flood management in the context of climate and land-use changes and adaptation within the Chao Phraya River basin
Plavšić et al. Floods in the Sava River basin in May 2014
Pandey et al. Flash floods cause and remedial measures for their control in hilly regions
Mamat et al. Safe havens and evacuation routes due to dam disaster
Song et al. Improving urban resilience to rainstorm disasters: A comparative case study of Beijing
La Jeunesse et al. Governance Challenges Facing Hydrometeorological Extreme Events
Orlando et al. The use of GIS as tool to support risk assessment
Symonds Background and history of water management of Okanagan Lake and River
Kim et al. Recent flood disasters and progress of disaster management system in Korea
Díaz et al. Hydrology and hydraulics of the Suquía River Basin
Albu et al. GIS IMPLEMENTATION ON DAM-BREAK FLOOD VULNERABILITY ANALYSIS-A CASE STUDY OF CĂTĂMĂRĂȘTI DAM, BOTOȘANI, ROMANIA.
VIEUX et al. KEEPING EVERYONE ON THE SAME PAGE DURING FLASH FLOOD EMERGENCIES

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination