CN106149682A - A kind of double reinforcement cage structure of poured pile base - Google Patents

A kind of double reinforcement cage structure of poured pile base Download PDF

Info

Publication number
CN106149682A
CN106149682A CN201610775708.3A CN201610775708A CN106149682A CN 106149682 A CN106149682 A CN 106149682A CN 201610775708 A CN201610775708 A CN 201610775708A CN 106149682 A CN106149682 A CN 106149682A
Authority
CN
China
Prior art keywords
bar
vertical main
outer row
row
stirrup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610775708.3A
Other languages
Chinese (zh)
Inventor
周贞勇
刘松忠
孔庆永
杨波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201610775708.3A priority Critical patent/CN106149682A/en
Publication of CN106149682A publication Critical patent/CN106149682A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of double reinforcement cage structure of poured pile base, the double reinforcement cage structure of this poured pile base is connected formed by outer row's vertical main-bar, tie hoop, put more energy into stirrup and interior row's vertical main-bar, it is parallel to each other and is the most vertically distributed between outer row's vertical main-bar and outer row's vertical main-bar and surround a column structure on same circumference, tie hoop helically spirals in the outside of the column structure surrounded by outer row's vertical main-bar, and tie hoop is welded to connect with outer row's vertical main-bar;Be welded with circular stirrup of putting more energy in the inner side of the column structure surrounded by outer row's vertical main-bar, interior row's vertical main-bar and outer row's vertical main-bar are welded in parallel to each other puts more energy on stirrup.The present invention can not only better ensure that construction quality, the most also has easy construction, efficiency of construction is high, the advantage that can effectively prevent stake holes from caving in, and the present invention can also cost-effective, good economic benefit and social benefit can be brought for enterprise.

Description

A kind of double reinforcement cage structure of poured pile base
Technical field
The present invention relates to a kind of double reinforcement cage structure of poured pile base, belong to for industry and civil buildings, railway or public affairs The steel reinforcement cage technical field of road poured pile base.
Background technology
In foundation engineering ultra-deep and large diameter filling pile cage of reinforcement layout design, reinforcing bar main muscle radical all compares many, uses It is the least that monolayer steel reinforcement cage cannot be carried out spacing between arrangement or reinforcing bar, can not meet the requirement of minimum spacing, is typically arranged to The inside and outside two-layer steel reinforcement cage of cage, outer cage and interior cage separately lifting in cage, segmentation connect installs, and hoisting engineering amount is big, hangs reinforcing bar Overlong time during cage.Due to interior cage narrow space, it is unfavorable for that conduit carries out underwater concrete and waters and smash.And engineering pile steel reinforcement cage Internal and external cycle reinforcing bar radical is too much, and spacing is less, stops concrete diffusion, it is difficult to ensure cast-in-place pile concrete construction molding quality. Therefore, the steel reinforcement cage of existing poured pile base or not ideal enough, it is impossible to meet the needs used.
Summary of the invention
It is an object of the present invention to provide a kind of easy construction, the perfusion that efficiency of construction is high, cost-effective, construction quality is good The double reinforcement cage structure of pile foundation, to overcome the deficiencies in the prior art.
The technical scheme is that and be achieved in that:
The double reinforcement cage structure of a kind of poured pile base of the present invention is, the double reinforcement cage structure of this poured pile base is vertical main by outer row Muscle, tie hoop, put more energy into stirrup and interior row's vertical main-bar connection composition, be parallel to each other also between outer row's vertical main-bar and outer row's vertical main-bar The most vertically being distributed in and surround a column structure on same circumference, tie hoop helically spirals vertical main by outer row The outside of the column structure that muscle surrounds, and tie hoop is welded to connect with outer row's vertical main-bar;Surrounded by outer row's vertical main-bar The inner side of column structure is welded with circular stirrup of putting more energy into, and interior row's vertical main-bar is welded in parallel to each other with outer row's vertical main-bar and adds On strength stirrup.
In the double reinforcement cage structure of above-mentioned poured pile base, outside every, the inner side of row's vertical main-bar is all arranged with a root bead in parallel It is connected on the interior row's vertical main-bar putting more energy on stirrup.
In the double reinforcement cage structure of above-mentioned poured pile base, outside every, the inner side of row's vertical main-bar is all arranged with one in parallel It is welded on the interior row's vertical main-bar putting more energy on stirrup, and vertical with this outer row's vertical main-bar and this interior row main by the center of circle of stirrup of putting more energy into The straight line that the reinforcing steel bar center line of muscle is vertical is same straight line.
Owing to have employed technique scheme, the double reinforcement cage structure of a kind of poured pile base of the present invention is in implementation process There are following main performance features:
1, main for Internal and external cycle steel reinforcement cage muscle spot welding is linked to be entirety by stirrup of putting more energy into by the present invention, and the integral rigidity of steel reinforcement cage obtains Strengthen, reduce the deformation in reinforcement cage hoisting installation process;
2, the present invention uses this double reinforcement cage structure, reduces the lifting installation workload of steel reinforcement cage, it is to avoid hang for a long time Putting increases stake holes during steel reinforcement cage and collapses the risk of wall;
3, the present invention uses this double reinforcement cage structure, can maximize the spacing increasing the main muscle of steel reinforcement cage, and beneficially conduit is carried out The diffusion of concrete during underwater concrete construction, water and smash;
Using through test and prove, the present invention solves: the problem of ultra-deep and large diameter cast-in-place pile concrete construction molding quality;Use This double reinforcement cage structure improves steel reinforcement cage integral rigidity, reduces the deformation in reinforcement cage hoisting installation process;Reduce steel The lifting installation workload of muscle cage, it is to avoid increase stake holes during hanging steel reinforcement cage for a long time and collapse the risk of wall.
Therefore, compared with prior art, the present invention can not only better ensure that construction quality to the present invention, the most also has and executes Work is convenient, efficiency of construction high, can effectively prevent the advantage that stake holes caves in, and the present invention can also cost-effective, can carry for enterprise Come good economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is present invention structural representation when vertically standing up;
Fig. 2 is the plan structure schematic diagram of Fig. 1;
Description of reference numerals: arrange vertical main-bar, 2-tie hoop outside 1-, 3-puts more energy into stirrup, row's vertical main-bar in 4-.
Detailed description of the invention
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings.
Embodiments of the invention: the double reinforcement cage structure of a kind of poured pile base of the present invention, as depicted in figs. 1 and 2, this filling The note double reinforcement cage structure of pile foundation is connected formed, outward by outer row's vertical main-bar 1, tie hoop 2, put more energy into stirrup 3 and interior row's vertical main-bar 4 It is parallel to each other and is the most vertically distributed between row's vertical main-bar 1 and outer row's vertical main-bar 1 and surround a column on same circumference Structure, tie hoop 2 helically spirals in the outside of the column structure surrounded by outer row's vertical main-bar 1, and tie hoop 2 with Outer row's vertical main-bar 1 is welded to connect;It is welded with circular stirrup of putting more energy in the inner side of the column structure surrounded by outer row's vertical main-bar 1 3, interior row's vertical main-bar 4 is welded in parallel to each other with outer row's vertical main-bar 1 and puts more energy on stirrup 3.
In the above-mentioned double reinforcement cage structure of poured pile base, outside every, the inner side of row's vertical main-bar 1 is all arranged with in parallel One root bead is connected on the interior row's vertical main-bar 4 putting more energy on stirrup 3;In order to reach optimum efficiency, in the inner side by arranging vertical main-bar 1 outside every When the root bead that all be arranged in parallel is connected on the interior row's vertical main-bar 4 putting more energy on stirrup 3, make the center of circle by stirrup 3 of putting more energy into and this outer row The straight line that vertical main-bar 1 is vertical with the reinforcing steel bar center line of this interior row's vertical main-bar 4 is same straight line, the most preferably by this outer row's vertical main-bar 1 It is all disposed within its reinforcing steel bar center line to the same vertical line putting more energy into stirrup 3 center of circle with the reinforcing steel bar center line of this interior row's vertical main-bar 4 ?.
Outer row's vertical main-bar 1, tie hoop 2, put more energy into stirrup 3 and interior row's vertical main-bar 4 all uses commonly used in the prior art building Building reinforcement fabrication, the diameter of its reinforcing bar can determine the most according to requirements.
During Specific construction, the present invention also can implement according to the following steps:
(1) first lay the outer row's vertical main-bar 1 on jig, it is ensured that must not there be space joint, connected by tie hoop 2 solid Fixed outer row's vertical main-bar 1, forms outer placing of reinforcement cage;
(2) lay stirrup 3 of putting more energy in placing of reinforcement cage outside, and outer row's vertical main-bar 1 is carried out partial dot with stirrup 3 pointwise of putting more energy into Weldering, with fixed position;
(3) lay interior row's vertical main-bar 4 of cranse 3 internal layer of putting more energy into, corresponding interior row's vertical main-bar 4 is fixed with 3 stirrup spot welding of putting more energy into ?.

Claims (3)

1. the double reinforcement cage structure of poured pile base, it is characterised in that: the double reinforcement cage structure of this poured pile base is indulged by outer row Main muscle (1), tie hoop (2), stirrup of putting more energy into (3) and interior row's vertical main-bar (4) connect composition, and outer row's vertical main-bar (1) is indulged with outer row It is parallel to each other and is the most vertically distributed between main muscle (1) and surround a column structure on same circumference, tie hoop (2) Helically spiral in the outside of the column structure surrounded by outer row's vertical main-bar (1), and tie hoop (2) and outer row's vertical main-bar (1) it is welded to connect;Circular stirrup of putting more energy into (3) it is welded with in the inner side of the column structure surrounded by outer row's vertical main-bar (1), interior Row's vertical main-bar (4) and outer row's vertical main-bar (1) are welded on stirrup of putting more energy into (3) in parallel to each other.
The double reinforcement cage structure of poured pile base the most according to claim 1, it is characterised in that: outside every, arrange vertical main-bar (1) inner side is all arranged with interior row's vertical main-bar (4) that a root bead is connected on stirrup of putting more energy into (3) in parallel.
The double reinforcement cage structure of poured pile base the most according to claim 2, it is characterised in that: outside every, arrange vertical main-bar (1) inner side is all arranged with interior row's vertical main-bar (4) that a root bead is connected on stirrup of putting more energy into (3) in parallel, and by stirrup of putting more energy into (3) the center of circle straight line vertical with the reinforcing steel bar center line of this outer row's vertical main-bar (1) and this interior row's vertical main-bar (4) is same straight line.
CN201610775708.3A 2016-08-31 2016-08-31 A kind of double reinforcement cage structure of poured pile base Pending CN106149682A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610775708.3A CN106149682A (en) 2016-08-31 2016-08-31 A kind of double reinforcement cage structure of poured pile base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610775708.3A CN106149682A (en) 2016-08-31 2016-08-31 A kind of double reinforcement cage structure of poured pile base

Publications (1)

Publication Number Publication Date
CN106149682A true CN106149682A (en) 2016-11-23

Family

ID=57344993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610775708.3A Pending CN106149682A (en) 2016-08-31 2016-08-31 A kind of double reinforcement cage structure of poured pile base

Country Status (1)

Country Link
CN (1) CN106149682A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111761003A (en) * 2020-07-09 2020-10-13 中建四局第一建筑工程有限公司 Super-large-diameter cast-in-place pile double-layer reinforcement cage with embedded pipe and manufacturing method thereof
CN112012196A (en) * 2020-07-16 2020-12-01 中铁二局第一工程有限公司 Round pile reinforcement cage sleeve with high reinforcement ratio and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102166788A (en) * 2011-01-26 2011-08-31 江苏建华管桩有限公司 Production method of pretensioning prestressed concrete dynamic load piles
CN103132506A (en) * 2011-11-29 2013-06-05 上海市基础工程有限公司 Processing and manufacturing method for bored pile double-layer strengthened hoop steel bar cage
CN203238621U (en) * 2013-04-16 2013-10-16 山东同圆设计集团有限公司 Grouting pile provided with double layers of tensile bars
JP2015187373A (en) * 2014-03-14 2015-10-29 大亜ソイル株式会社 Method for reinforcing hole wall for construction of cast-in-place concrete pile
CN206034426U (en) * 2016-08-31 2017-03-22 中建四局第一建筑工程有限公司 Pour into double reinforcement cage structure of pile foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102166788A (en) * 2011-01-26 2011-08-31 江苏建华管桩有限公司 Production method of pretensioning prestressed concrete dynamic load piles
CN103132506A (en) * 2011-11-29 2013-06-05 上海市基础工程有限公司 Processing and manufacturing method for bored pile double-layer strengthened hoop steel bar cage
CN203238621U (en) * 2013-04-16 2013-10-16 山东同圆设计集团有限公司 Grouting pile provided with double layers of tensile bars
JP2015187373A (en) * 2014-03-14 2015-10-29 大亜ソイル株式会社 Method for reinforcing hole wall for construction of cast-in-place concrete pile
CN206034426U (en) * 2016-08-31 2017-03-22 中建四局第一建筑工程有限公司 Pour into double reinforcement cage structure of pile foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111761003A (en) * 2020-07-09 2020-10-13 中建四局第一建筑工程有限公司 Super-large-diameter cast-in-place pile double-layer reinforcement cage with embedded pipe and manufacturing method thereof
CN112012196A (en) * 2020-07-16 2020-12-01 中铁二局第一工程有限公司 Round pile reinforcement cage sleeve with high reinforcement ratio and construction method thereof

Similar Documents

Publication Publication Date Title
CN102191777B (en) Steel sheet pile coefferdam structure and topdown construction method thereof
CN101302760A (en) Ultralong overweight concrete filling pile reinforcement type reinforcing steel bar caging
CN206233102U (en) A kind of packaged type faces side operation work platform
CN206034426U (en) Pour into double reinforcement cage structure of pile foundation
CN209958499U (en) Connecting joint for steel pipe concrete column and multi-layer reinforced concrete beam
CN208219631U (en) A kind of borehole filling pile cage of reinforcement protection structure
CN110144885A (en) A kind of three-stage large diameter bored pile structure
CN204626662U (en) The syndeton of a kind of steel pipe cylinder and concrete beam
CN203429648U (en) Large steel cylinder cofferdam structure
CN106149682A (en) A kind of double reinforcement cage structure of poured pile base
CN109853569A (en) A kind of method and device of Soft Clay pouring pile hole steel pile casting anti-settling deviation
CN108277817B (en) Construction method of high-pile bearing platform tower crane foundation reinforcing structure
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN114657977B (en) Prestressed concrete pipe pile end crack reinforcing device
CN204139694U (en) Inner wall belt strengthens the steel pipe king-post of structure
CN204098024U (en) A kind of secondary grouting concrete pipe pile construction device
CN211113669U (en) Prestressed reinforced concrete breast wall pile
CN105297758B (en) Prestress square pile and the integrated column of steel lattice column
CN210004859U (en) natural draft cooling tower and reinforced steel pipe concrete X-pillar thereof
CN211057778U (en) Reinforcing steel bar cage for anti-slide pile
CN204780892U (en) Tubular pile crack reinforcement structure of high strength
CN209958498U (en) Connecting joint for steel pipe concrete column and reinforced concrete beam with single-layer reinforcing bars
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN202519790U (en) Beam-column joint structure for steel pipe column and ring beam
CN201212146Y (en) Reinforcement reinforced bar caging of ultralong and overweight concrete filling pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123

RJ01 Rejection of invention patent application after publication