CN206034426U - Pour into double reinforcement cage structure of pile foundation - Google Patents

Pour into double reinforcement cage structure of pile foundation Download PDF

Info

Publication number
CN206034426U
CN206034426U CN201621002314.6U CN201621002314U CN206034426U CN 206034426 U CN206034426 U CN 206034426U CN 201621002314 U CN201621002314 U CN 201621002314U CN 206034426 U CN206034426 U CN 206034426U
Authority
CN
China
Prior art keywords
bar
vertical main
stirrup
energy
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621002314.6U
Other languages
Chinese (zh)
Inventor
周贞勇
刘松忠
孔庆永
杨波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201621002314.6U priority Critical patent/CN206034426U/en
Application granted granted Critical
Publication of CN206034426U publication Critical patent/CN206034426U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pour into double reinforcement cage structure of pile foundation, this pour into double reinforcement cage structure of pile foundation by outer row indulge main muscle, wire spiral, put more energy into stirrup and interior row indulge main muscle and connect to form, outer arrange indulge main muscle with outer arrange indulge be parallel to each other between the main muscle and equidistant ground vertical distribution on same circumference and enclose into a columnar structure, spiral to the wire spiral heliciform by the outer row outside of the columnar structure that encloses of main muscle from north to south to wire spiral indulges main muscle welded connection with outer arranging, have an annular stirrup of putting more energy into of circle in the inboard welding of being indulged the columnar structure that main muscle encloses by outer row, interior row indulges main muscle and indulges main muscle and weld in parallel to each other on the stirrup of putting more energy into with outer arranging. The utility model discloses can not only guarantee the engineering quality better, still have simultaneously construction convenience, efficiency of construction high, can effectively prevent the advantage that a hole collapses, moreover the utility model discloses the cost be can also practice thrift, can good economic benefits and social be brought for the enterprise.

Description

A kind of double reinforcement cage structure of poured pile base
Technical field
This utility model is related to a kind of double reinforcement cage structure of poured pile base, belongs to for industry and civil buildings, railway Or the steel reinforcement cage technical field of highway poured pile base.
Background technology
In foundation engineering ultra-deep and large diameter filling pile cage of reinforcement layout design, reinforcing bar cage bar radical all compares many, adopts Monolayer steel reinforcement cage cannot be arranged or reinforcing bar between spacing it is too little, can not meet the requirement of minimum spacing, be typically arranged to The inside and outside two-layer steel reinforcement cage of cage in cage, outer cage and interior cage are separately lifted by crane, are segmented connection installation, and hoisting engineering amount is big, hangs reinforcing bar Overlong time during cage.Due to interior cage narrow space, it is unfavorable for that conduit carries out underwater concrete and pour smashing.And engineering pile cages Internal and external cycle reinforcing bar radical is excessive, and spacing is less, stops concrete diffusion, it is difficult to ensure cast-in-place pile concrete construction molding quality. Therefore, the steel reinforcement cage of existing poured pile base or not ideal enough, it is impossible to the needs that satisfaction is used.
The content of the invention
The purpose of this utility model is to provide that a kind of easy construction, efficiency of construction be high, cost-effective, construction quality is good The double reinforcement cage structure of poured pile base, to overcome the deficiencies in the prior art.
What the technical solution of the utility model was realized in:
A kind of double reinforcement cage structure of poured pile base of the present utility model is that the double reinforcement cage structure of the poured pile base is by outer Row vertical main-bar, tie hoop, put more energy into stirrup and interior row's vertical main-bar connection composition, between outer row's vertical main-bar and outer row's vertical main-bar mutually Parallel and be equally spacedly vertically distributed on same circumference and surround a column structure, tie hoop helically spirals by outer The outside of the column structure that vertical main-bar is surrounded is arranged, and tie hoop is welded to connect with outer row's vertical main-bar;By outer row's vertical main-bar The stirrup of putting more energy into of annular shape is welded with the inside of the column structure for surrounding, interior row's vertical main-bar is welded in parallel to each other with outer row's vertical main-bar It is connected on and puts more energy on stirrup.
In the double reinforcement cage structure of above-mentioned poured pile base, the inner side that vertical main-bar is arranged outside per root is all arranged with a root bead in parallel It is connected on the interior row's vertical main-bar put more energy on stirrup.
In the double reinforcement cage structure of above-mentioned poured pile base, the inner side that vertical main-bar is arranged outside per root is all arranged with one in parallel It is welded on the interior row's vertical main-bar put more energy on stirrup, and the center of circle by stirrup of putting more energy into and outer row's vertical main-bar and the vertical master of the interior row The straight line that the reinforcing steel bar center line of muscle is vertical is same straight line.
As a result of above-mentioned technical proposal, a kind of double reinforcement cage structure of poured pile base of the present utility model was being implemented There are following some main performance features in journey:
1st, Internal and external cycle steel reinforcement cage cage bar spot welding is linked to be entirety by stirrup of putting more energy into by this utility model, and the entirety of steel reinforcement cage is just Degree is strengthened, and reduces the deformation in reinforcement cage hoisting installation process;
2nd, this utility model adopts this double reinforcement cage structure, reduces the lifting installation workload of steel reinforcement cage, it is to avoid Long-time hangs and increases stake holes during steel reinforcement cage and collapse the risk of wall;
3rd, this utility model adopts this double reinforcement cage structure, and can maximize increases the spacing of steel reinforcement cage cage bar, is beneficial to The diffusion of concrete when conduit carries out underwater concrete construction, pour and smash;
Using proof, this utility model is solved for Jing tests:Ultra-deep and large diameter cast-in-place pile concrete construction molding quality Problem;Steel reinforcement cage integral rigidity is improve using this double reinforcement cage structure, the change in reinforcement cage hoisting installation process is reduced Shape;Reduce the lifting installation workload of steel reinforcement cage, it is to avoid hanging in long-time increases stake holes during steel reinforcement cage and collapse the risk of wall.
Therefore, compared with prior art, this utility model can not only better ensure that construction quality to this utility model, while Also there is easy construction, efficiency of construction is high, can effectively prevent stake holes from caving in, and this utility model can also be saved into Originally, good economic benefit and social benefit can be brought for enterprise.
Description of the drawings
Fig. 1 is structural representation when this utility model vertically stands up;
Overlooking the structure diagrams of the Fig. 2 for Fig. 1;
Description of reference numerals:Arrange vertical main-bar, 2- tie hoops outside 1-, 3- puts more energy into stirrup, row's vertical main-bar in 4-.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further described.
Embodiment of the present utility model:A kind of double reinforcement cage structure of poured pile base of the present utility model, such as Fig. 1 and Fig. 2 It is shown, the double reinforcement cage structure of the poured pile base by outer row's vertical main-bar 1, tie hoop 2, put more energy into stirrup 3 and interior row's vertical main-bar 4 connects Composition is connect, is parallel to each other between outer row's vertical main-bar 1 and outer row's vertical main-bar 1 and is equally spacedly vertically distributed on same circumference and encloses Into a column structure, tie hoop 2 helically spirals in the outside of the column structure surrounded by outer row's vertical main-bar 1, and spiral shell Rotation stirrup 2 is welded to connect with outer row's vertical main-bar 1;Annular shape is welded with the inside of the column structure surrounded by outer row's vertical main-bar 1 Stirrup 3 of putting more energy into, interior row's vertical main-bar 4 is welded on outer row's vertical main-bar 1 in parallel to each other and put more energy on stirrup 3.
In the above-mentioned double reinforcement cage structure of poured pile base, the inner side that vertical main-bar 1 is arranged outside per root is all arranged with parallel One root bead is connected on the interior row's vertical main-bar 4 put more energy on stirrup 3;In order to reach optimum efficiency, in the inner side by vertical main-bar 1 is arranged outside per root When the root bead that all be arranged in parallel is connected on the interior row's vertical main-bar 4 put more energy on stirrup 3, make by the center of circle of stirrup 3 of putting more energy into and the outer row The straight line vertical with the reinforcing steel bar center line of interior row's vertical main-bar 4 of vertical main-bar 1 is same straight line, i.e., preferably by outer row's vertical main-bar 1 Its reinforcing steel bar center line is all disposed within to the same vertical line for putting more energy into 3 center of circle of stirrup with the reinforcing steel bar center line of interior row's vertical main-bar 4 .
Outer row's vertical main-bar 1, tie hoop 2, put more energy into stirrup 3 and interior row's vertical main-bar 4 is built using commonly used in the prior art Reinforcement fabrication is built, the diameter of its reinforcing bar can be determined in a conventional way according to requirements.
During Specific construction, this utility model can also be implemented according to the following steps:
(1)Outer row's vertical main-bar 1 on jig is laid first, it is ensured that joint there must not be space, connect by tie hoop 2 Fixed outer row's vertical main-bar 1 is connect, outer placing of reinforcement cage is formed;
(2)Stirrup 3 of putting more energy into is laid in outer placing of reinforcement cage, and outer row's vertical main-bar 1 is carried out into part with 3 pointwise of stirrup of putting more energy into Spot welding, with fixed position;
(3)Placement is put more energy into interior row's vertical main-bar 4 of 3 internal layer of cranse, and corresponding interior row's vertical main-bar 4 and 3 is put more energy into stirrup spot welding Fix.

Claims (3)

1. the double reinforcement cage structure of a kind of poured pile base, it is characterised in that:The double reinforcement cage structure of the poured pile base is indulged by outer row Cage bar(1), tie hoop(2), stirrup of putting more energy into(3)With interior row's vertical main-bar(4)Connection composition, outer row's vertical main-bar(1)It is vertical with outer row Cage bar(1)Between be parallel to each other and be equally spacedly vertically distributed on same circumference and surround a column structure, tie hoop(2) Helically spiral by outer row's vertical main-bar(1)The outside of the column structure for surrounding, and tie hoop(2)With outer row's vertical main-bar (1)It is welded to connect;By outer row's vertical main-bar(1)The stirrup of putting more energy into of annular shape is welded with the inside of the column structure for surrounding(3), it is interior Row's vertical main-bar(4)With outer row's vertical main-bar(1)Stirrup of putting more energy into is welded in parallel to each other(3)On.
2. the double reinforcement cage structure of poured pile base according to claim 1, it is characterised in that:Vertical main-bar is arranged outside per root (1)Inner side be all arranged with a root bead in parallel and be connected on stirrup of putting more energy into(3)On interior row's vertical main-bar(4).
3. the double reinforcement cage structure of poured pile base according to claim 2, it is characterised in that:Vertical main-bar is arranged outside per root (1)Inner side be all arranged with a root bead in parallel and be connected on stirrup of putting more energy into(3)On interior row's vertical main-bar(4), and by stirrup of putting more energy into (3)The center of circle and outer row's vertical main-bar(1)With interior row's vertical main-bar(4)The vertical straight line of reinforcing steel bar center line be same straight line.
CN201621002314.6U 2016-08-31 2016-08-31 Pour into double reinforcement cage structure of pile foundation Active CN206034426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621002314.6U CN206034426U (en) 2016-08-31 2016-08-31 Pour into double reinforcement cage structure of pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621002314.6U CN206034426U (en) 2016-08-31 2016-08-31 Pour into double reinforcement cage structure of pile foundation

Publications (1)

Publication Number Publication Date
CN206034426U true CN206034426U (en) 2017-03-22

Family

ID=58299714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621002314.6U Active CN206034426U (en) 2016-08-31 2016-08-31 Pour into double reinforcement cage structure of pile foundation

Country Status (1)

Country Link
CN (1) CN206034426U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149682A (en) * 2016-08-31 2016-11-23 中建四局第建筑工程有限公司 A kind of double reinforcement cage structure of poured pile base
CN109550874A (en) * 2018-11-27 2019-04-02 中交第四公路工程局有限公司 A kind of mould for the processing of the double-deck main reinforcement steel reinforcement cage
CN114197757A (en) * 2021-12-29 2022-03-18 中建八局第二建设有限公司 Tree-shaped column node steel bar arrangement structure based on BIM and construction method
CN114718106A (en) * 2022-05-23 2022-07-08 中建二局第二建筑工程有限公司 Construction method for crossing subway line

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149682A (en) * 2016-08-31 2016-11-23 中建四局第建筑工程有限公司 A kind of double reinforcement cage structure of poured pile base
CN109550874A (en) * 2018-11-27 2019-04-02 中交第四公路工程局有限公司 A kind of mould for the processing of the double-deck main reinforcement steel reinforcement cage
CN114197757A (en) * 2021-12-29 2022-03-18 中建八局第二建设有限公司 Tree-shaped column node steel bar arrangement structure based on BIM and construction method
CN114718106A (en) * 2022-05-23 2022-07-08 中建二局第二建筑工程有限公司 Construction method for crossing subway line

Similar Documents

Publication Publication Date Title
CN206034426U (en) Pour into double reinforcement cage structure of pile foundation
CN104251066B (en) Steel tube tower column with reinforcing structures on inner wall and manufacturing method thereof
CN103243961B (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN204052739U (en) Make the adjustable locator of major diameter bridge pile foundation steel reinforcement cage
CN205936981U (en) A a frame construction and a tower section of thick bamboo for a tower section of thick bamboo
CN203429648U (en) Large steel cylinder cofferdam structure
CN204139694U (en) Inner wall belt strengthens the steel pipe king-post of structure
CN106149682A (en) A kind of double reinforcement cage structure of poured pile base
CN104727331B (en) A kind of round end type steel sheet pile cofferdam structure with arch effect and its construction method
CN108277817B (en) Construction method of high-pile bearing platform tower crane foundation reinforcing structure
CN206457829U (en) A kind of combination pilework of pattern foundation pit supporting structure
CN206110123U (en) Steel bar cage positioning device
CN105297758B (en) Prestress square pile and the integrated column of steel lattice column
CN105133646A (en) Underground steel and concrete structure pipeline and manufacturing method thereof
CN206346399U (en) Vertical reinforcement locator for slding form operation
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN209958498U (en) Connecting joint for steel pipe concrete column and reinforced concrete beam with single-layer reinforcing bars
CN210004859U (en) natural draft cooling tower and reinforced steel pipe concrete X-pillar thereof
CN203755781U (en) Subsection central upright pillar
CN203613856U (en) Top construction platform for large-diameter silo
CN208151871U (en) A kind of bush type filling sand cored steel tubing string
CN206607951U (en) Double-round formula erects circle cement electric pole
CN203113349U (en) Foundation trench shoring lattice type end structure
CN207109839U (en) New low pile cap foundation structure
CN201212146Y (en) Reinforcement reinforced bar caging of ultralong and overweight concrete filling pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant