CN106149564B - A kind of installation method of three stride continuous steel bridge - Google Patents

A kind of installation method of three stride continuous steel bridge Download PDF

Info

Publication number
CN106149564B
CN106149564B CN201510203255.2A CN201510203255A CN106149564B CN 106149564 B CN106149564 B CN 106149564B CN 201510203255 A CN201510203255 A CN 201510203255A CN 106149564 B CN106149564 B CN 106149564B
Authority
CN
China
Prior art keywords
steel bridge
steel
segmentation
sides
river
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510203255.2A
Other languages
Chinese (zh)
Other versions
CN106149564A (en
Inventor
唐香君
蔡蕾
杨建明
巫明杰
孙珍杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201510203255.2A priority Critical patent/CN106149564B/en
Publication of CN106149564A publication Critical patent/CN106149564A/en
Application granted granted Critical
Publication of CN106149564B publication Critical patent/CN106149564B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of installation method of three stride continuous steel bridge, comprise the following steps:(1) by steel bridge equitable subsection, planning arrangement crane track route and Standing position of a crane;(2) temporary support is arranged;(3) two sides steel bridge bearing embedded part and steel column embedded section are installed;(4) girder steel between two sides steel column and steel column is installed;(5) in each steel bridge segmentation of installation on ground;(6) steel bridge segmentation in two sides is installed, and is welded and fixed;(7) cross a river steel bridge segmentation on river is installed, and is welded and fixed.Steel bridge is divided into some segmentations by the present invention, and before lifting is segmented, parts are spliced into each segmentation on the ground, solve the problems, such as lifting is difficult, steel bridge can not highway transportation, reduce overhead welding operation, greatly improve the efficiency, and reduce risk.

Description

A kind of installation method of three stride continuous steel bridge
Technical field
The present invention relates to a kind of installation method of three stride continuous steel bridge.
Background technology
Three stride continuous steel bridge goes back the highway of crossing river channel two sides in addition to crossing river channel, when mounted Xu Kua highways cross a river Construct in road.In the installation of this long-span bridge, the main problems are as follows:
(1)Steel bridge periphery is river, highway, landscape planting etc., and except the landholding taken over for use temporarily, remaining must not be destroyed. Landscape River is more narrow and small, and piling ship cannot be introduced into, and not allow piling construction in Landscape River.Therefore, steel bridge is installed, only It can consider to lift on river two sides, lifting radius is big.
(2)Steel bridge is large-span truss structure, and various informative, the section of steel bridge pontic is larger, can not be in factory process system Pass through highway transportation to scene after work.
(3)Traditional high altitude bulk and overhead welding inefficiency, it is difficult to ensure that the installation accuracy of steel bridge, while installing During, steel bridge parts are continually lifted, add security risk
The content of the invention
It is an object of the present invention to solve the deficiency of the existing technology and provide a kind of installation method of three stride continuous steel bridge.
In order to realize the above object the present invention relates to a kind of installation method of three stride continuous steel bridge, comprise the following steps:
(1)By steel bridge equitable subsection, planning arrangement crane track route and Standing position of a crane;
(2)Arrange temporary support;
(3)Two sides steel bridge bearing embedded part and steel column embedded section are installed;
(4)Girder steel between two sides steel column and steel column is installed;
(5)In each steel bridge segmentation of installation on ground;
(6)Steel bridge segmentation in two sides is installed, and is welded and fixed;
(7)Cross a river steel bridge segmentation on river is installed, and is welded and fixed.
Carry out step(5)When, roadbed paving plate.Step(5)Comprise the following steps:
(a)Base area sample erects moulding bed column;
(b)By the upper moulding bed of lower boom lifting of steel bridge segmentation, and position fixation;
(c)Contact rod piece between lower boom is installed, and positions fixation;
(d)Steel bridge segmentation both sides vertical web rod, diagonal web member are installed, and position fixation, then is installed on it and chord member and positions fixation;
(e)Temporary support is installed between top boom;
(f)Complete welding.
Step(6)Specially:During installation, aid in installing using temporary support, and fix steel bridge with cable wind rope and be segmented, welding After the completion of loose hook again.
Steel bridge is divided into some segmentations by the present invention, solves the problems, such as that lifting radius is big.Before lifting is segmented, on ground On parts are spliced into each segmentation, can not highway transportation so solving steel bridge due to being to splice steel bridge segmentation at the scene Problem, and accordingly reduce cost of transportation.In addition, the splicing of steel bridge segmentation is completed on ground, therefore reduce overhead welding Operation, greatly improves the efficiency, and reduces risk.
Brief description of the drawings
Fig. 1 is the flow chart of the present invention.
Embodiment
(Embodiment 1)
The present invention relates to a kind of installation method of three stride continuous steel bridge, comprise the following steps:
1st, by steel bridge equitable subsection, planning arrangement crane track route and Standing position of a crane.
For the ease of installation, steel bridge is divided into some segmentations.After steel bridge Holistic modeling, according to mount scheme and combine interim The position of support and crane machinery rated weight ability, carry out steel bridge main body steel construction preliminary segmentation division.According to The position of centre of gravity of the segmentation of Preliminary division calculates analysis crane lifting radius, and is adjusted at any time to lifting requirements are met, really Fixed final lifting segmentation position.
2nd, temporary support is arranged
Steel bridge is installed as segmental hoisting, before stress is reached, needs temporary support Auxiliary support, river both sides it is interim Support as the combined support of dual-gripper composition.
The 3rd, two sides steel bridge bearing embedded part and steel column embedded section are installed.
The 4th, girder steel between two sides steel column and steel column is installed.
5th, for the ease of communications and transportation and reduction working at height, assembled each steel bridge segmentation, comprises the following steps on the ground:
(a)Base area sample erects moulding bed column;
(b)By the upper moulding bed of lower boom lifting of steel bridge segmentation, and position fixation;
(c)Contact rod piece between lower boom is installed, and positions fixation;
(d)Steel bridge segmentation both sides vertical web rod, diagonal web member are installed, and position fixation, then is installed on it and chord member and positions fixation;
(e)Temporary support is installed between top boom, is deformed with ensureing that segmentation is reduced in hoisting process;
(f)Complete welding.
On-site consolidation place mainly utilizes periphery highway, in order to ensure the precision of component assembling, prevents component from assembling During caused due to the differential settlement of moulding bed assembly error, and for highway safety road surface it is without damage, in public affairs Base board is laid with road.
The 6th, steel bridge segmentation in two sides is installed, and be welded and fixed.Partial segments are segmented for tiltedly overhanging, therefore use " dorsal funciculus overturn-preventing " Method, aid in installing using temporary support, be fixed with cable wind rope, can loose hook after the completion of welding.
The 7th, cross a river steel bridge segmentation on river is installed, and be welded and fixed.
The present embodiment is only illustrative of the invention and is not intended to limit the scope of the invention, after the present invention has been read, Modification of the those skilled in the art to the various equivalent forms of the present invention falls within the model that the application appended claims are limited Enclose.

Claims (1)

1. a kind of installation method of three stride continuous steel bridge, comprises the following steps:
(1)By steel bridge equitable subsection, planning arrangement crane track route and Standing position of a crane;
(2)Arrange temporary support;
(3)Two sides steel bridge bearing embedded part and steel column embedded section are installed;
(4)Girder steel between two sides steel column and steel column is installed;
(5)In each steel bridge segmentation of installation on ground;
(6)Steel bridge segmentation in two sides is installed, and is welded and fixed;
(7)Cross a river steel bridge segmentation on river is installed, and is welded and fixed;
It is characterized in that, carry out step(5)When, roadbed paving plate;Step(5)Comprise the following steps:
(a)Base area sample erects moulding bed column;
(b)By the upper moulding bed of lower boom lifting of steel bridge segmentation, and position fixation;
(c)Contact rod piece between lower boom is installed, and positions fixation;
(d)Steel bridge segmentation both sides vertical web rod, diagonal web member are installed, and position fixation, then is installed on it and chord member and positions fixation;
(e)Temporary support is installed between top boom;
(f)Complete welding;
Step(6)Specially:During installation, aid in installing using temporary support, and fix steel bridge with cable wind rope and be segmented, welding is completed Loose hook again afterwards.
CN201510203255.2A 2015-04-24 2015-04-24 A kind of installation method of three stride continuous steel bridge Active CN106149564B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510203255.2A CN106149564B (en) 2015-04-24 2015-04-24 A kind of installation method of three stride continuous steel bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510203255.2A CN106149564B (en) 2015-04-24 2015-04-24 A kind of installation method of three stride continuous steel bridge

Publications (2)

Publication Number Publication Date
CN106149564A CN106149564A (en) 2016-11-23
CN106149564B true CN106149564B (en) 2018-05-15

Family

ID=57347391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510203255.2A Active CN106149564B (en) 2015-04-24 2015-04-24 A kind of installation method of three stride continuous steel bridge

Country Status (1)

Country Link
CN (1) CN106149564B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592864B (en) * 2016-12-30 2019-03-12 江苏沪宁钢机股份有限公司 A kind of steel structural roof beam string segmentation installation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435182A (en) * 2008-12-30 2009-05-20 中铁大桥局股份有限公司 Steel bridge folding temporary locking method
CN101619562A (en) * 2009-07-21 2010-01-06 中交第二公路勘察设计研究院有限公司 Open web type continuous steel bridge structure and buckling, hanging and pouring method of cantilever
CN101871198A (en) * 2010-07-16 2010-10-27 上海同济宝冶建设机器人有限公司 Vertical turning lifting installation method for steel bridge arch ribs
CN102433841A (en) * 2011-12-28 2012-05-02 中铁二局股份有限公司 Method for installing abnormal-shape curve steel box girder

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265417A (en) * 1999-03-12 2000-09-26 Kawaju Koji Kk Moving timbering construction method for bridge floor slab overhang section

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435182A (en) * 2008-12-30 2009-05-20 中铁大桥局股份有限公司 Steel bridge folding temporary locking method
CN101619562A (en) * 2009-07-21 2010-01-06 中交第二公路勘察设计研究院有限公司 Open web type continuous steel bridge structure and buckling, hanging and pouring method of cantilever
CN101871198A (en) * 2010-07-16 2010-10-27 上海同济宝冶建设机器人有限公司 Vertical turning lifting installation method for steel bridge arch ribs
CN102433841A (en) * 2011-12-28 2012-05-02 中铁二局股份有限公司 Method for installing abnormal-shape curve steel box girder

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"浅谈钢构人行便桥安装";谢如金;《江苏水利》;20081028(第10期);第16页第2-3节 *

Also Published As

Publication number Publication date
CN106149564A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN104060544B (en) The construction technology that a kind of pipeline suspension crossing bridge body of a bridge is installed
CN106012864B (en) A kind of method of the overall erection & lift of bridge arch rib
CN109972517B (en) Construction method of main beam of cable-stayed bridge with steel-concrete composite beam
CN104612058B (en) A kind of construction method of buckstay flexible arch bridge
CN109138446A (en) A kind of Node In Large-span Pipe Truss hanging method
CN111945891B (en) Ring truss high-altitude in-situ splicing construction method
CN103806377B (en) The overall positive replacement structure of the many pile foundations of a kind of bridge large-tonnage and support and change method
CN104695715A (en) Construction method of beam string structure of roof
CN103821075B (en) Long span oblique pull assembly type steel bridge on highway
CN103882801A (en) Segment assembled type combined highway and railway cable-stayed bridge with inconsistent bridge deck widths of highway and railway
CN102720137B (en) Prefabrication construction method for trough girder sections of track traffic high-level bridge
CN106978777A (en) A kind of make-shift bridge device
CN108979664A (en) Existing subway tunnel based on mobile casting platform protects steel structure pouring construction method
CN106149564B (en) A kind of installation method of three stride continuous steel bridge
CN203716044U (en) Low bearing or middle bearing cable arch combined structural bridge
CN102635061B (en) Mountain stream river-crossing cable-stayed chain trestle and hoisting method thereof
CN205242437U (en) A redundant formula vertical braces structure for protection of 220kV cable normal position
CN109056738A (en) Excavation method below high-speed railway
CN206337555U (en) Steel reinforcement cage support and steel reinforcement cage erecting device
CN109537912A (en) A kind of safe and stable type Provincial Rink and its construction technology
CN205531393U (en) Pier stud construction system
CN114162735A (en) Floor hoisting method
CN113629647A (en) Large-span ultrahigh-voltage power pipe trench suspension device and method in subway station foundation pit
CN209854536U (en) Concrete large cantilever bridge pier structure
CN202401386U (en) Cable bridge for frame bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant