CN106592864B - A kind of steel structural roof beam string segmentation installation method - Google Patents

A kind of steel structural roof beam string segmentation installation method Download PDF

Info

Publication number
CN106592864B
CN106592864B CN201611252926.5A CN201611252926A CN106592864B CN 106592864 B CN106592864 B CN 106592864B CN 201611252926 A CN201611252926 A CN 201611252926A CN 106592864 B CN106592864 B CN 106592864B
Authority
CN
China
Prior art keywords
drag
beam string
line
string
steel structural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611252926.5A
Other languages
Chinese (zh)
Other versions
CN106592864A (en
Inventor
唐香君
丁剑强
巫明杰
谈超
潘杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201611252926.5A priority Critical patent/CN106592864B/en
Publication of CN106592864A publication Critical patent/CN106592864A/en
Application granted granted Critical
Publication of CN106592864B publication Critical patent/CN106592864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/10Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal prestressed

Abstract

The present invention provides a kind of steel structural roof beam string segmentation installation method, and entire roof system tension string beam structure is segmented by computer simulation technique, by being then assembled into entirety after segmentation installation;A kind of steel structural roof beam string segmentation installation method provided by the invention uses a kind of temporary support structure, and movable sway brace is provided in temporary support, which meets beam string segmentation simultaneously and install with drag-line.Solve the problems, such as that the segmentation installation backstay installation of roof system beam string is difficult.The method of the invention strong operability, high-altitude installation effectiveness is high, while improving the installation positioning accuracy of roof system beam string segmentation, reduces error rate, improves the quality of construction steel structure, reduces the installation risk of steel construction.

Description

A kind of steel structural roof beam string segmentation installation method
Technical field
The present invention relates to a kind of construction method of steel member, especially a kind of construction party of roof system beam string segmentation installation Method.
Background technique
Currently, steel construction is in civil engineering work technical field using more and more extensive.But with the roofing of large span Structure is by more and more applications, and due to the sharply increasing of its self weight, overall structure is faced using function, design rationality and economy The contradiction that index mutually restricts in order to meet the use function of structure, while reducing dead load, improving the rigidity of structure, is furnished with The prestressing force beam string structure structure of drag-line is increasingly used in large-scale steel building.Pass through prestressed drag-line and support The arrangement of bar, the bearing capacity and stiffness of the spatial steel structure of large span have very big improvement.Tension string beam structure can by stress To be divided into Plane Beam String Structure and Spatial Beam String Structure;Plane Beam String Structure refers to that its structural elements is generally aligned in the same plane It is interior, and the tension string beam structure based on stress in plane.Plane Beam String Structure can be divided into three according to the shape of upper chord member Kind citation form: linear type beam string, arch beam string, chevron shaped tension string beam structure.
Nowadays, for various venue steel structure engineerings, typical structure therein is more, especially the field of roof system tension string beam structure Shop is the novel moulding occurred in recent years.
Cause roof system beam string segmentation installation backstay difficult to install with traditional installation method, operating difficulties, installation Inefficiency, meanwhile, installation positioning accuracy is not accurate enough, and installation risk is higher.
Therefore, it is based on problem above, needs to design a kind of new installation method.
Summary of the invention
Above-mentioned to solve the problems, such as, the purpose of the present invention is to provide a kind of segmentations of steel structural roof beam string to install Entire roof system tension string beam structure is segmented by method by computer simulation technique, whole by being then assembled into after segmentation installation Body solves the problems, such as that the segmentation installation backstay installation of roof system beam string is difficult.
In order to achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of steel structural roof beam string segmentation installation method, including the following steps:
(1) according to the lifting performance of the lifting machine of project structure form and situ configuration, beam string entire for roof system Structure is segmented after carrying out stretching force calculating and analogue simulation analysis;Guarantee that segmentation weight can satisfy the principal characteristic of lifting machine Can, and contain 20% lifting surplus;
(2) according to computer simulation technique, the three-dimensional dimension and each node, end pair of roof system beam string segmental structure are recalled The D coordinates value at connection interface center is segmented installation control theory value in this, as roof system beam string.And according to its CAD 3D mould Type finds out position of centre of gravity when segment space position, so that it is determined that the lifting hoisting point position for installing the segmentation of roof system beam string; Concrete column and temporary support structure are set on this basis, and draws and has set cable wind rope;
(3) beam string segmental structure is lifted from two sides to centre, it, will after beam string segmental structure leaves ground 1.5m Drag-line strut is assembled into beam string segmental structure bottom, then sling beam string segmental structure and with concrete column and temporary support structure It is fixed, and beam string segmental structure is subjected to segmented welding, form an entirety;
(4) it is projected, drag-line is unfolded along its projected position, drag-line is using 3 points of liftings, by rope according to drag-line spatial position After disk is in place, drag-line is slowly unfolded along its projected position using hoist engine, gently increase drag-line;In drag-line uphill process In, laterally movable tie-rod each of on temporary support structure need to open laterally movable tie-rod before reaching to drag-line, logical to drag-line Later, replacement and fixation therewith is needed accordingly;Also, because drag-line need to must not keep a close eye on and be collided across temporary support structure Temporary support structure;
(5) according to the structure type of beam string, installment work riding track and cord clip, gangway is according to the structure shape of beam string Formula two sides are to be obliquely installed, and intermediate position is horizontally disposed, after gangway installs, install cord clip from centre to two sides;It is drawing In rope lifting process, drag-line middle section is first contacted with cord clip.Last drag-line both ends are contacted with beam string end rope stationary nodes.It will Drag-line both ends penetrate node holes and tentatively fix, and carry out drag-line to two sides from centre and connect with cord clip;Then, imitative according to overall process True calculated result divides 2 grades to carry out tensioning to structure, and the 1st grade is stretched to the 70% of design tensioning value, tension string beam structure under the state It is basic to be detached from moulding bed, the 2nd grade then is carried out to beam string and is stretched to the 105% of design tensioning value;
(6) temporary support structure, gangway and cable wind rope auxiliary mould structure are removed, beam string segmental structure peace is completed Dress.
Further, entire tension string beam structure described in step (1) can be divided into several segments.
Further, concrete column described in step (2) is located at the lower section of entire tension string beam structure end, and step is faced described in (2) When support construction be located at the lower section of entire tension string beam structure medial section interface.
Further, beam string segmental structure bottom described in step (3) is provided with several drag-line struts.
Further, concrete column upper end described in step (3) is provided with the node holes penetrated convenient for drag-line described in step (4).
Further, temporary support structure described in step (3) is made of support single chip architecture and laterally movable tie-rod Lattice support construction.
Further, drag-line described in step (4) by rope disk, hold rope disk and hoist engine work generate.
In addition, the support single chip architecture includes upright bar and web member.
The beneficial effects of the present invention are:
The present invention provides a kind of steel structural roof beam string segmentation installation method, and entire roof system tension string beam structure is passed through meter Calculation machine emulation technology is segmented, by being then assembled into entirety after segmentation installation;A kind of steel structural roof provided by the invention String beam is segmented installation method and uses a kind of temporary support structure, and movable sway brace, the support knot are provided in temporary support Structure meets beam string segmentation simultaneously and installs with drag-line.Solve the problems, such as that the segmentation installation backstay installation of roof system beam string is difficult.This Invention the method strong operability, high-altitude installation effectiveness is high, while improving the installation positioning accuracy of roof system beam string segmentation, Error rate is reduced, the quality of construction steel structure is improved, reduces the installation risk of steel construction.
Detailed description of the invention
Fig. 1 is that a kind of steel structural roof beam string provided in the embodiment of the present invention is segmented roof system beam string in installation method Overall structure diagram;
Fig. 2 is temporary support structure schematic diagram and partial enlargement diagram described in the embodiment of the present invention;
Fig. 3 is that a kind of steel structural roof beam string provided in the embodiment of the present invention is segmented the installation procedure in installation method Schematic diagram one;
Fig. 4 is that a kind of steel structural roof beam string provided in the embodiment of the present invention is segmented the installation procedure in installation method Schematic diagram two;
Fig. 5 is that a kind of steel structural roof beam string provided in the embodiment of the present invention is segmented the installation procedure in installation method Schematic diagram three;
Fig. 6 is that a kind of steel structural roof beam string provided in the embodiment of the present invention is segmented the installation procedure in installation method Schematic diagram four;
Fig. 7 is that a kind of steel structural roof beam string provided in the embodiment of the present invention is segmented the installation procedure in installation method Schematic diagram five;
Wherein, 1 is beam string segmental structure one, and 2 be beam string segmental structure two, and 3 be beam string segmental structure three, and 4 are Concrete column, 5 be drag-line, and 6 be cord clip, and 7 be temporary support structure, and 8 is support single chip architecture, and 9 be laterally movable tie-rod, and 10 be vertical Bar, 11 be web member, and 12 be cable wind rope, and 13 be drag-line strut, and 14 be rope disk, and 15 be hoist engine, and 16 is hold rope disk, and 17 be work horse Road.
Specific embodiment
Below by the technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative labor belongs to what the present invention protected Range.
Referring to FIG. 1 to FIG. 7, a kind of steel structural roof beam string segmentation installation method, including the following steps:
(1) according to the lifting performance of the lifting machine of project structure form and situ configuration, beam string entire for roof system Structure is segmented after carrying out stretching force calculating and analogue simulation analysis;Guarantee that segmentation weight can satisfy the principal characteristic of lifting machine Can, and contain 20% lifting surplus;
(2) according to computer simulation technique, roof system beam string segmental structure 1, beam string segmental structure 22 is recalled and is opened The three-dimensional dimension and each node of string beam segmental structure 33, end mating interface center D coordinates value, in this, as roof system String beam segmentation installation control theory value.And according to its CAD 3D model, position of centre of gravity when segment space position is found out, thus Determine the lifting hoisting point position for installing the segmentation of roof system beam string;Concrete column 4 and temporary support structure 7 are set on this basis, And it draws and has set cable wind rope 12;
(3) by beam string segmental structure 1, beam string segmental structure 22 and beam string segmental structure 33 respectively by two sides It is lifted to centre, leaves ground to beam string segmental structure 1, beam string segmental structure 22 and beam string segmental structure 33 After 1.5m, drag-line strut 13 is assembled into beam string segmental structure 1, beam string segmental structure 22 and beam string respectively and is segmented Then beam string segmental structure 1, beam string segmental structure 22 and beam string segmental structure 33 are sling in the bottom of structure 33 And it is fixed with concrete column 4 and temporary support structure 7, and by beam string segmental structure 1, beam string segmental structure 22 and beam string Segmental structure 33 carries out segmented welding, forms an entirety;
(4) it is projected according to 5 spatial position of drag-line, drag-line 5 is unfolded along its projected position, drag-line 5, will using 3 points of liftings After rope disk 14 is in place, drag-line 5 is slowly unfolded using hoist engine 15 along its projected position, gently increase drag-line 5;In drag-line 5 In uphill process, laterally movable tie-rod 9 each of on temporary support structure 7 need to open laterally movable system before reaching to drag-line 5 Bar 9 needs accordingly replacement and fixation therewith after drag-line 5 passes through;Also, because drag-line 5 is needed close across temporary support structure 7 Temporary support structure 7 must not be collided by cutting attention;
(5) according to the structure type of beam string, installment work riding track 17 and cord clip 6, gangway 17 is according to beam string Structure type two sides are to be obliquely installed, and intermediate position is horizontally disposed, after gangway 17 installs, install rope from centre to two sides Folder 6;In 5 lifting process of drag-line, 5 middle section of drag-line is first contacted with cord clip 6.Last 5 both ends of drag-line and beam string end Suo Gu Determine node contact.5 both ends of drag-line are penetrated into node holes and are tentatively fixed, drag-line 5 is carried out to two sides from centre and is connect with cord clip 6; Then, according to whole process simulation calculated result, 2 grades are divided to carry out tensioning to structure, the 1st grade is stretched to the 70% of design tensioning value, should Tension string beam structure is detached from moulding bed substantially under state, then carries out the 2nd grade to beam string and is stretched to design tensioning value 105%;
(6) temporary support structure 7,12 auxiliary mould structure of gangway 17 and cable wind rope are removed, beam string segmentation is completed Structure installation.
Further, entire tension string beam structure described in step (1) can be divided into 3 sections.
Further, concrete column 4 described in step (2) is located at the lower section of entire tension string beam structure end, and step is faced described in (2) When support construction 7 be located at the lower section of entire tension string beam structure medial section interface.
Further, beam string segmental structure 1 described in step (3), beam string segmental structure 22 and beam string segmentation knot 33 bottom of structure is provided with several drag-line struts 13.
Further, 4 upper end of concrete column described in step (3) is provided with the node penetrated convenient for drag-line 5 described in step (4) Hole.
Further, temporary support structure 7 described in step (3) is to be made of support single chip architecture 8 and laterally movable tie-rod 9 Lattice support construction.
Further, drag-line 5 described in step (4) by rope disk 14, hold rope disk 16 and hoist engine 15 work generate.
In addition, the support single chip architecture 8 includes upright bar 10 and web member 11.
The present invention provides a kind of steel structural roof beam string segmentation installation method, and entire roof system tension string beam structure is passed through meter Calculation machine emulation technology is segmented, by being then assembled into entirety after segmentation installation;A kind of steel structural roof provided by the invention String beam is segmented installation method and uses a kind of temporary support structure, and movable sway brace, the support knot are provided in temporary support Structure meets beam string segmentation simultaneously and installs with double ropes.Solve the problems, such as that the segmentation installation backstay installation of roof system beam string is difficult.This Invention the method strong operability, high-altitude installation effectiveness is high, while improving the installation positioning accuracy of roof system beam string segmentation, Error rate is reduced, the quality of construction steel structure is improved, reduces the installation risk of steel construction.
It should be noted that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting.Although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to the technology of invention Scheme is modified or replaced equivalently, and without departing from the range of technical solution of the present invention, should all be covered in power of the invention In sharp claimed range.

Claims (8)

1. a kind of steel structural roof beam string is segmented installation method, which is characterized in that including the following steps:
(1) according to the lifting performance of the lifting machine of project structure form and situ configuration, tension string beam structure entire for roof system It is segmented after carrying out stretching force calculating and analogue simulation analysis;
(2) according to computer simulation technique, the three-dimensional dimension and each node, end for recalling roof system beam string segmental structure are connect The D coordinates value at mouth center, and according to its CAD 3D model, position of centre of gravity when segment space position is found out, so that it is determined that For installing the lifting hoisting point position of roof system beam string segmentation, concrete column and temporary support structure are set on this basis, and draw and set Good cable wind rope;
(3) beam string segmental structure is lifted from two sides to centre, after beam string segmental structure leaves ground, by drag-line strut It is assembled into the bottom of beam string segmental structure respectively, then slings beam string segmental structure and concrete column and temporary support structure is solid It is fixed, and beam string segmental structure is subjected to segmented welding;
(4) it is projected, drag-line is unfolded along its projected position, drag-line is using 3 points of liftings, just by rope disk according to drag-line spatial position Behind position, drag-line is unfolded along its projected position using hoist engine, increase drag-line;In drag-line uphill process, temporary support knot Laterally movable tie-rod each of on structure need to open laterally movable tie-rod before reaching to drag-line, laterally movable after drag-line passes through Tie-rod needs accordingly replacement and fixation therewith;And when drag-line passes through temporary support structure, temporary support structure must not be collided;
(5) according to the structure type of beam string, installment work riding track and cord clip, gangway is according to the structure type two of beam string Side is to be obliquely installed, and intermediate position is horizontally disposed, after gangway installs, installs cord clip from centre to two sides, mentions in drag-line During rising, drag-line middle section is first contacted with cord clip, and last drag-line both ends are contacted with beam string end rope stationary nodes, by drag-line Both ends penetrate node holes and tentatively fix, and carry out drag-line to two sides from centre and connect with cord clip;Then, according to whole process simulation meter It calculates as a result, dividing 2 grades to carry out tensioning to structure, the 1st grade is stretched to the 70% of design tensioning value, and tension string beam structure is basic under the state It is detached from moulding bed, the 2nd grade then is carried out to beam string and is stretched to the 105% of design tensioning value;
(6) temporary support structure, gangway and cable wind rope auxiliary mould structure are removed, the installation of beam string segmental structure is completed.
2. a kind of steel structural roof beam string according to claim 1 is segmented installation method, which is characterized in that step (1) Described in entire tension string beam structure can be divided into several segments.
3. a kind of steel structural roof beam string according to claim 1 is segmented installation method, which is characterized in that step (2) Described in concrete column be located at the lower section of entire tension string beam structure end, temporary support structure described in step (2) is located at entire Zhang Xian The lower section of girder construction medial section interface.
4. a kind of steel structural roof beam string according to claim 1 is segmented installation method, which is characterized in that step (3) Described in beam string segmental structure bottom be provided with several drag-line struts.
5. a kind of steel structural roof beam string according to claim 1 is segmented installation method, which is characterized in that step (3) Described in concrete column upper end be provided with the node holes penetrated convenient for drag-line described in step (4).
6. a kind of steel structural roof beam string according to claim 1 is segmented installation method, which is characterized in that step (3) Described in temporary support structure be the lattice support construction being made of support single chip architecture and laterally movable tie-rod.
7. a kind of steel structural roof beam string according to claim 1 is segmented installation method, which is characterized in that step (4) Described in drag-line by rope disk, hold rope disk and hoist engine work generate.
8. a kind of steel structural roof beam string according to claim 6 is segmented installation method, which is characterized in that the support Single chip architecture includes upright bar and web member.
CN201611252926.5A 2016-12-30 2016-12-30 A kind of steel structural roof beam string segmentation installation method Active CN106592864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611252926.5A CN106592864B (en) 2016-12-30 2016-12-30 A kind of steel structural roof beam string segmentation installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611252926.5A CN106592864B (en) 2016-12-30 2016-12-30 A kind of steel structural roof beam string segmentation installation method

Publications (2)

Publication Number Publication Date
CN106592864A CN106592864A (en) 2017-04-26
CN106592864B true CN106592864B (en) 2019-03-12

Family

ID=58605240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611252926.5A Active CN106592864B (en) 2016-12-30 2016-12-30 A kind of steel structural roof beam string segmentation installation method

Country Status (1)

Country Link
CN (1) CN106592864B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512877A (en) * 2019-08-30 2019-11-29 中国二十二冶集团有限公司 Beam string installation detection control method
CN110886423B (en) * 2019-11-12 2022-03-22 成都容正软件有限公司 BIM technology-based steel structure tension beam roof construction method
CN111042540A (en) * 2019-12-18 2020-04-21 徐州中煤百甲重钢科技股份有限公司 Construction method for aerial butt joint of ground suspension cables of super-large-span prestressed pipe truss

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0210276A4 (en) * 1985-01-23 1987-05-13 Bayashi Gumi Ltd Openable dome roof and method of constructing same.
CN104234200A (en) * 2014-09-24 2014-12-24 东南大学 Ring-by-ring lifting mounting method for suspendome cable-bar system
CN104453091A (en) * 2014-10-22 2015-03-25 浙江精工钢结构集团有限公司 Construction method of large-scale parallel flexible lower-cord combined trusses
CN104847017A (en) * 2015-05-25 2015-08-19 中国航空规划建设发展有限公司 Novel prestress industrial stockyard canopy structure and method for constructing same
CN105569187A (en) * 2016-01-18 2016-05-11 江苏沪宁钢机股份有限公司 Inverted arch beam string structure roof of large-span steel structure and construction method thereof
CN106149564A (en) * 2015-04-24 2016-11-23 江苏沪宁钢机股份有限公司 A kind of installation method of three stride continuous steel bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0210276A4 (en) * 1985-01-23 1987-05-13 Bayashi Gumi Ltd Openable dome roof and method of constructing same.
CN104234200A (en) * 2014-09-24 2014-12-24 东南大学 Ring-by-ring lifting mounting method for suspendome cable-bar system
CN104453091A (en) * 2014-10-22 2015-03-25 浙江精工钢结构集团有限公司 Construction method of large-scale parallel flexible lower-cord combined trusses
CN106149564A (en) * 2015-04-24 2016-11-23 江苏沪宁钢机股份有限公司 A kind of installation method of three stride continuous steel bridge
CN104847017A (en) * 2015-05-25 2015-08-19 中国航空规划建设发展有限公司 Novel prestress industrial stockyard canopy structure and method for constructing same
CN105569187A (en) * 2016-01-18 2016-05-11 江苏沪宁钢机股份有限公司 Inverted arch beam string structure roof of large-span steel structure and construction method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
120m跨钢屋盖桁架吊装技术;陆汉时、周善传;《江苏建材》;20160228;第36-39页
双层弦张弦梁的施工吊装研究;张子伟;《四川建材》;20111008;第178-180页
杭州国际博览中心大跨度钢桁架吊装施工过程仿真分析;葛杰,王玉岭,王桂玲,张晓勇;《钢结构》;20130922;第64-67页
长沙国际会展中心大跨度""字形反拱张弦梁施工关键技术;陈德洋,张海军,孙波,李方为,佟立夫;《建筑施工》;20160625;第730-732页

Also Published As

Publication number Publication date
CN106592864A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN106592864B (en) A kind of steel structural roof beam string segmentation installation method
CN106677543A (en) Supporting structure for mounting of roof beam string segments
CN101793010B (en) Arch-included integral pushing method for large-tonnage multi-span combined arch bridge
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN105569187A (en) Inverted arch beam string structure roof of large-span steel structure and construction method thereof
CN103821075B (en) Long span oblique pull assembly type steel bridge on highway
CN102808373B (en) Quick assembled type truss string structure People's Bank of China steel bridge
CN106702909B (en) A kind of double width steel box-girder entirety swivel structure and construction method
CN104695715A (en) Construction method of beam string structure of roof
CN203923882U (en) One-sided dorsal funciculus steel work cable stayed bridge
CN103628416B (en) Stiffening girder of suspension bridge is to pulling type pier side bracket
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN205653069U (en) Steady gantry crane rises
CN105752855A (en) Windproof stable gantry crane
CN102277999B (en) Large-section portal steel structure holding pole
CN205653070U (en) Tensile gantry crane can monitor
CN205557290U (en) Monolithic purlin formula annular passenger footbridge
CN112524334B (en) Construction method for large-scale cable crossing of oil and gas pipeline and tower dynamic stabilization process thereof
CN205653068U (en) Reinforcement type gantry crane
CN112182689B (en) Method and system for monitoring internal force of main material of power transmission tower
CN203452393U (en) Rhombic truss supporting jig frame
CN203626106U (en) Space ultra-large type opening/closing roof track system
CN105752843A (en) Anti-shake gantry crane
CN207630238U (en) A kind of prefabricated case beam square steel tube core model
CN203729206U (en) Suspension bridge stiffening beam oppositely-pulling type pier-side bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 214200 Baijia village, Zhangzhu Town, Yixing City, Wuxi City, Jiangsu Province

Patentee after: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

Address before: 214200 Zhang Zhu Zhen Bai Jia Cun, Yixing City, Wuxi City, Jiangsu Province

Patentee before: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

CP02 Change in the address of a patent holder