CN106120785A - A kind of pile cover former and Stake head handling and pile cover construction method - Google Patents

A kind of pile cover former and Stake head handling and pile cover construction method Download PDF

Info

Publication number
CN106120785A
CN106120785A CN201610726720.5A CN201610726720A CN106120785A CN 106120785 A CN106120785 A CN 106120785A CN 201610726720 A CN201610726720 A CN 201610726720A CN 106120785 A CN106120785 A CN 106120785A
Authority
CN
China
Prior art keywords
pile
pile cover
construction
concrete
core pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610726720.5A
Other languages
Chinese (zh)
Other versions
CN106120785B (en
Inventor
隋孝民
庄金
敖文
李季宏
李彦民
庄春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Pile Construction Technology Co Ltd
Third Railway Survey and Design Institute Group Corp
Original Assignee
Shaanxi Pile Construction Technology Co Ltd
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Pile Construction Technology Co Ltd, Third Railway Survey and Design Institute Group Corp filed Critical Shaanxi Pile Construction Technology Co Ltd
Priority to CN201610726720.5A priority Critical patent/CN106120785B/en
Publication of CN106120785A publication Critical patent/CN106120785A/en
Application granted granted Critical
Publication of CN106120785B publication Critical patent/CN106120785B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of pile cover former and Stake head handling and pile cover construction method, this pile cover former includes pile cover forming drill and rotating driving device, and rotating driving device is positioned at above pile cover forming drill;Pile cover of need to constructing includes round table-like top pile cover section and circular cone shape bottom pile cover section, and pile cover forming drill includes core pipe and the helical blade being laid on core pipe lateral wall;Core pipe is divided into upper segment and bottom sections, and helical blade is divided into upper blade and lower blade, upper segment and upper blade to form cylindric drill bit, bottom sections and lower blade composition circular cone shape drill bit;This Stake head handling and pile cover construction method, including step: one, Stake head handling;Two, formation pile cover clay model is bored under pile cover former;Three, pile cover filling concrete construction;Four, pile cover molding.The present invention is reasonable in design, easy construction and using effect good, can easy, be rapidly completed pile cover work progress, work progress is easily controllable, and the pile cover quality of construction molding is high.

Description

A kind of pile cover former and Stake head handling and pile cover construction method
Technical field
The invention belongs to piling Technology field, especially relate to a kind of pile cover former and Stake head handling is executed with pile cover Work method.
Background technology
Nowadays, after bored pile piling, generally using manual type to carry out pile cover construction, pile cover is generally concrete knot Structure.If Fig. 1-1 is to shown in Fig. 1-8, when using manual type to carry out pile cover construction, work progress mainly comprises the steps that the After one step, boring 1-1 molding, drilling rod 1-2 limit is upwards carried limit and passes through drilling rod 1-2 concrete perfusion in boring 1-1, refer to figure 1-1;Second step, drilling rod 1-2 is upwards carried to boring 1-1 outside, and in hole to be drilled 1 institute's concrete perfusion solidification after, it is thus achieved that fill Note stake pile body 1-3, for ensureing pile crown quality, the elevation of top of bored concrete pile pile body 1-3 typically will exceed the stake top being pre-designed Absolute altitude, the most above ground level, refer to Fig. 1-2;Outside 3rd step, the sections basseting bored concrete pile pile body 1-3, dregs is carried out Cleaning, refers to Fig. 1-3;The diameter D and height h of the concrete pile follower 1-5 that the 4th step, basis are pre-designed, manually at pile crown Dig out the cylindric clay model 1-4 for the concrete pile follower 1-5 that constructs, the diameter of cylindric clay model 1-4 and the most respectively with in advance The diameter D of the concrete pile follower 1-5 of design is identical with height h, refers to Fig. 1-4;4th step, artificial by bored concrete pile pile body 1-3's Pile crown is cut to concordant with ground, refers to Fig. 1-5;6th step, manually it is truncated to be pre-designed by the pile crown of bored concrete pile pile body 1-3 Stake top mark high, it is thus achieved that the pile body 1-6 of construction molding, refer to Fig. 1-6;7th step, in cylindric clay model 1-4 irrigate coagulation Soil, refers to Fig. 1-7;8th step, until in cylindric clay model 1-4 institute's concrete perfusion solidification after, it is thus achieved that the concrete of construction molding Pile cover 1-5, refers to Fig. 1-8.
It addition, in above-mentioned second step after filling concrete, do not carry out Stake head handling immediately, but after waiting 28 days, institute Concrete perfusion just carries out Stake head handling and constructs with pile cover after solidifying completely.Thus, traditional Stake head handling with pile cover construction is Filling concrete is carried out after completing and carrying out maintenance in 28 days, now the intensity of concrete reached design strength 98%~ 99%, pile crown is very rigid, intractability is big, speed is slow, and the equipment such as excavator, instrument often collides in processing procedure Pile crown, is the rigid body that fragility is big after solidifying due to pile crown, once colliding as easy as rolling off a log fracture.It addition, use artificial cylindric soil During mould 1-4, not only speed is slow, and cylindric clay model 1-4's is in irregular shape.
As shown in the above, use above-mentioned traditional method to carry out Stake head handling and pile cover when constructing, exist following mainly Problem: the first, efficiency of construction is low: can only construct for each person every day 3~5 pile covers;The second, cost is high: pure manual manufacture, people Power cost is high;3rd, construction quality is uncontrollable: because workmen operates lack of standardization, and pile cover construction quality can not effectively be protected Card;4th, work progress is complicated, and labor intensity is high;5th, pile cover construction need to be carried out again after pile concrete solidifies, impact The construction period of bored concrete pile.
Summary of the invention
The technical problem to be solved is for above-mentioned deficiency of the prior art, it is provided that a kind of pile cover shapes Device, its simple in construction, reasonable in design and use easy and simple to handle, using effect good, can easy, be rapidly completed pile cover work progress, Work progress is easily controllable, and the pile cover quality of construction molding is high.
For solving above-mentioned technical problem, the technical solution used in the present invention is: a kind of pile cover former, it is characterised in that: Including pile cover of need to constructing being carried out the pile cover forming drill of drilling construction and driving described pile cover forming drill to rotate continuously Rotating driving device, described rotating driving device is positioned at above described pile cover forming drill, described pile cover forming drill and institute State rotating driving device to be in transmission connection;Described pile cover of need to constructing includes top pile cover section and bottom pile cover section, described top Pile cover section is round table-like, and described bottom pile cover section is circular cone shape, and the diameter of described bottom pile cover section is from top to bottom gradually reduced And its upper end diameter is identical with the diameter of described top pile cover section;The described pile cover that pile cover is bored concrete pile of need to constructing, described perfusion The diameter of stake is identical with the lower end diameter of described bottom pile cover section;
Described pile cover forming drill include can from top to bottom coaxial package core pipe on the pile body of described bored concrete pile and by Being laid in down the helical blade on core pipe lateral wall, the internal diameter of described core pipe is not less than the diameter of pile body;Described core Guan An Being contained on described rotating driving device, described core pipe is in transmission connection with described rotating driving device;
The height of described core pipe is not less than the height of pile cover of need to constructing, the height of described helical blade and pile cover of need to constructing The most identical;Described core pipe is divided into upper segment and is positioned at the bottom sections immediately below described upper segment, described upper segment Connecting as one with described bottom sections, the height of described bottom sections is identical with the height of described bottom pile cover section;Described spiral shell Vane sheet is divided into the upper blade being laid in outside described upper segment and is laid in the lower blade outside the sections of described bottom, Described upper blade connects as one with described lower blade;Described upper segment and described upper blade form cylindric brill Head, the external diameter of described cylindric drill bit is identical with the diameter of described top pile cover section, and the width of described upper blade is from top to bottom The most identical;Described bottom sections and described lower blade composition circular cone shape drill bit, the upper end external diameter of described circular cone shape drill bit Identical with the upper end diameter of described bottom pile cover section, under the lower end external diameter of described circular cone shape drill bit and described bottom pile cover section End diameter is identical, and the width of described lower blade is from top to bottom gradually reduced.
Above-mentioned a kind of pile cover former, is characterized in that: the diameter D1=Φ 600mm~Φ 2000mm of described top pile cover section And its height h1=100mm~500mm, the lower end diameter D2=Φ 400mm~Φ 1000mm of described bottom pile cover section and its height Degree h2=100mm~500mm.
Above-mentioned a kind of pile cover former, is characterized in that: the surface of described core pipe is provided with lower drive shaft, described underdrive Axle is laid in coaxial with core pipe;Be coaxially installed with power transmission shaft on the power output shaft of described rotating driving device, described in upload Moving axis is positioned at below described rotating driving device, and described upper power transmission shaft is positioned at the surface of lower drive shaft and the two is coaxially connected.
Above-mentioned a kind of pile cover former, be is characterized in that: carried out even by lower installation board between described core pipe and lower drive shaft Connecing, described lower installation board and the perpendicular laying of core pipe, the lower outside of described lower drive shaft is provided with multiple tracks reinforcing plate, multiple tracks institute Stating reinforcing plate to be the most uniformly laid in outside lower drive shaft, reinforcing plate described in multiple tracks is modification of right-angled triangle plate and its end Portion is each attached on lower installation board.
Above-mentioned a kind of pile cover former, is characterized in that: by lower adpting flange between described upper power transmission shaft and lower drive shaft It is attached, described lower adpting flange and the perpendicular laying of core pipe;Described rotating driving device top is equipped with upper adpting flange, institute State rotating driving device to be arranged on hanging device by upper adpting flange.
Above-mentioned a kind of pile cover former, is characterized in that: described rotating driving device is laid in coaxial with core pipe, described rotation Driving means is hydraulic motor.
Above-mentioned a kind of pile cover former, is characterized in that: also include that master control set, rotating speed to described pile cover forming drill enter The rotation speed detection unit of row in real time detection and turn to that detects in real time to turn to detector unit described pile cover forming drill, Described rotating driving device is controlled by master control set;Described rotation speed detection unit and turn to detector unit all and master control set Connect.
Meanwhile, the invention also discloses that a kind of method step is simple, reasonable in design and easy construction, filling that using effect is good Note pile head processes and pile cover construction method, it is characterised in that the method comprises the following steps:
Step one, Stake head handling: mix after the pile concrete pouring construction of constructed bored concrete pile completes and being irrigated Before the initial set of solidifying soil, according to the elevation of top of the constructed bored concrete pile pile body being pre-designed, unnecessary by stake holes inside upper part mixes Solidifying soil takes out;After institute's concrete perfusion final set, it is thus achieved that the pile body of construction molding;
The height on described pile body top to ground is h, and wherein h is less than the height of pile cover of need to constructing;
Bore under step 2, pile cover former and form pile cover clay model: by hanging device, described pile cover former is lifted extremely On the stake position of constructed bored concrete pile, it is then turned on described rotating driving device and drives described pile cover forming drill to bore from top to bottom Enter, it is thus achieved that construction molding and the pile cover clay model for described pile cover of need to constructing of constructing;After having crept into, close described rotation and drive Device;
Step 3, pile cover filling concrete are constructed: upwards carried described pile cover former to pile cover soil by hanging device Outside mould, then in pile cover clay model, carry out filling concrete construction, the filling concrete work progress of the pile cover that completes to construct;
Step 4, pile cover molding: after institute's concrete perfusion final set in step 3, it is thus achieved that the pile cover of construction molding, described Pile cover is positioned at the surface of pile body and it pours with pile body and is integrated.
Said method, is characterized in that: before in step one irrigating the pile concrete of constructed bored concrete pile, first to described Stake holes is constructed;Concrete perfusion in described stake holes again, completes the pile concrete pouring construction mistake of constructed bored concrete pile Journey;Afterwards, according to the elevation of top of the constructed bored concrete pile pile body being pre-designed, by the unnecessary coagulation of described stake holes inside upper part Soil takes out;Then, use concrete vibrating device the concrete in described stake holes is vibrated and completes Stake head handling process, Layer protecting film is covered again on pile crown in described stake holes;
After having crept in step 2, the lower end of described pile cover former core pipe is sleeved on outside the upper end of pile body.
Said method, is characterized in that: when constructing described stake holes, use drilling rod creep into from top to bottom until creep into The design hole depth of constructed bored concrete pile, it is thus achieved that the boring of construction molding;It is lifted up drilling rod again, until proposing drilling rod to boring Outside;During being lifted up, synchronize from the bottom to top to carry out filling concrete construction in boring by drilling rod, complete described filling The pile concrete pouring construction process of note stake;Described boring by the described stake holes of construction bored concrete pile;
Hanging device described in step 2 is excavator;Described pile cover former is lifted on below the crane arm of excavator.
The present invention compared with prior art has the advantage that
1, the pile cover former simple in construction used and processing and fabricating are easy, and input cost is relatively low.
2, the pile cover former reasonable in design used, becomes including the pile cover that pile cover of need to constructing carries out drilling construction The rotating driving device that type drill bit and drive pile cover forming drill rotate continuously, rotating driving device is positioned at pile cover molding and bores Above Tou, pile cover forming drill is in transmission connection with described rotating driving device;Pile cover forming drill includes can be from top to bottom Coaxial package core pipe on the pile body of bored concrete pile and the helical blade being from top to bottom laid on core pipe lateral wall, core pipe is divided into Upper segment and bottom sections, helical blade is divided into upper blade and lower blade, upper segment and upper blade composition cylinder Shape drill bit, bottom sections and lower blade composition circular cone shape drill bit;This pile cover former compact conformation.
3, the pile cover former simple installation and the dismounting that are used are convenient, can easy be installed on the crane arm of excavator, And with excavator with the use of, take up room little, use flexible operation mode.Time actually used, this pile cover former also can be pacified Be loaded on the hanging device of other type equipment, and with other type of hanging device with the use of.
4, the pile cover former that used uses easy and simple to handle and using effect good, easy construction, quickly, and work progress is easy In control, and the pile cover quality of construction molding is high, can effectively reduce construction cost, it is achieved pile cover mechanized construction simultaneously, construction Process control is easy, can effectively solve that the efficiency of construction that existing cast-in-situ bored pile pile cover construction method exists is low, cost is high, execute Working medium amount is uncontrollable, work progress is complicated, labor intensity is high, need to carry out pile cover construction, construction again after pile concrete solidifies The problem such as long in time limit.
5, the Stake head handling used and pile cover construction method step be simple, reasonable in design and easy construction, using effect Good, there is following several respects advantage: the first, efficiency of construction is high: wait that the pile concrete pouring construction of constructed bored concrete pile completes After, just can carry out Stake head handling immediately, thus carry out Stake head handling operation when pile crown does not solidifies, now Stake head handling operation Efficiency is high and intractability is low, high treating effect, and Stake head handling process after pile concrete pouring construction completes 2 hours Inside complete to process;Meanwhile, after the pile concrete pouring construction of constructed bored concrete pile completes 28 days, institute's concrete perfusion is complete Solidification, just can carry out pile cover construction;The second, low cost: Fully-mechanized operation, without extra labour cost, integration pile cover shapes Device energy simplicity is contained on a machine and works, it is not necessary to other autonomous device;3rd, by stake holes aperture is cleared up, can be effective Improve inter-pile soil cleaning efficiency, while cleaning stake holes aperture, complete because pile crown is processed, do not basset, therefore excavate Without avoiding pile crown during operation, working performance is high;4th, work progress does not affect pile quality, will stake when pile crown does not solidifies Head has processed, and subsequent job will not impact wreckage pile crown;5th, construction quality is controlled: height and the diameter of pile cover take Certainly in size and the setting of parameter in drilling process, few man's activity, the steady quality of drill bit;6th, pile cover former is used Carry out pile cover clay model construction, it is possible to effectively extrusion soil, make hole wall closely knit, improve the stressed effect of pile cover.
In sum, the present invention is reasonable in design, easy construction and using effect good, can easy, be rapidly completed pile cover construction Process, work progress is easily controllable, and the pile cover quality of construction molding is high.
Below by drawings and Examples, technical scheme is described in further detail.
Accompanying drawing explanation
Fig. 1-1 be existing employing manual type construction pile cover during to boring in concrete perfusion time Construction State show It is intended to.
Fig. 1-2 be existing employing manual type construction pile cover during filling concrete complete after Construction State signal Figure.
Fig. 1-3 is slag outside the sections that bassets bored concrete pile pile body during existing employing manual type construction pile cover Construction State schematic diagram when soil is cleared up.
Fig. 1-4 be existing employing manual type construction pile cover during clay model constructed after Construction State schematic diagram.
Fig. 1-5 be existing employing manual type construction pile cover during pile crown is cut to concordant with ground after construction shape State schematic diagram.
Fig. 1-6 is after existing employing manual type construction pile cover pile head is truncated to the stake top mark height being pre-designed Construction State schematic diagram.
Fig. 1-7 for during existing employing manual type construction pile cover in clay model Construction State during institute's concrete perfusion Schematic diagram.
Fig. 1-8 is the structural representation of existing employing manual type construction molding pile cover.
Fig. 1 is the structural representation of pile cover former of the present invention.
Fig. 2 is the use state reference map of pile cover former of the present invention.
Fig. 3 is the method flow block diagram using the present invention to carry out when Stake head handling is constructed with pile cover.
Fig. 3-1 is the Construction State schematic diagram during pile concrete pouring construction of the present invention.
Fig. 3-2 is the Construction State schematic diagram after pile concrete pouring construction of the present invention completes.
Construction State when Fig. 3-3 is after pile concrete pouring construction of the present invention completes to clear up stake holes aperture shows It is intended to.
When stake holes inside upper part any excess concrete is taken out after completing for pile concrete pouring construction of the present invention by Fig. 3-4 Construction State schematic diagram.
Construction State signal when Fig. 3-5 is to carry out concrete vibrating after pile concrete pouring construction of the present invention completes Figure.
Fig. 3-6 complete for Stake head handling of the present invention after Construction State schematic diagram.
Fig. 3-7 is that the present invention is by Construction State schematic diagram during pile cover molding device alignment pile crown.
Fig. 3-8 uses Construction State schematic diagram when boring under pile cover molding device for the present invention.
Fig. 3-9 uses for the present invention and bores the Construction State schematic diagram after forming clay model under pile cover molding device.
Fig. 3-10 constructed for pile cover of the present invention after Construction State schematic diagram.
Fig. 4 is the schematic block circuit diagram of pile cover former of the present invention.
Fig. 5 is the perspective view of construction molding pile cover of the present invention.
Fig. 6 is the structural representation of construction molding pile cover of the present invention.
Description of reference numerals:
1-1 holes;1-2 drilling rod;1-3 bored concrete pile pile body;
The cylindric clay model of 1-4;1-5 concrete pile follower;1-6 pile body;
Drill bit bottom 1-7;2 need to construct pile cover;3 core pipes;
4 helical blades;5 lower drive shafts;Power transmission shaft on 6;
7 lower installation boards;8 reinforcing plates;9 times adpting flanges;
Adpting flange on 10;11-1 master control set;11-2 rotation speed detection unit;
11-3 turns to detector unit;12 excavators;13 hydraulic motors;
14 plastic foils;15 pile cover clay models.
Detailed description of the invention
A kind of pile cover former as shown in Figure 1 and Figure 2, including the pile cover molding that pile cover 2 of need to constructing carries out drilling construction The rotating driving device that drill bit and the described pile cover forming drill of drive rotate continuously, described rotating driving device is positioned at described Above pile cover forming drill, described pile cover forming drill is in transmission connection with described rotating driving device;In conjunction with Fig. 5 and Fig. 6, Described pile cover 2 of need to constructing includes top pile cover section and bottom pile cover section, and described top pile cover section is round table-like, described bottom pile cover Section be circular cone shape, and the diameter of described bottom pile cover section is from top to bottom gradually reduced and its upper end diameter and described top pile cover section Diameter identical;Under the described pile cover that pile cover 2 is bored concrete pile of need to constructing, the diameter of described bored concrete pile and described bottom pile cover section End diameter is identical;
Described pile cover forming drill includes can from top to bottom coaxial package core pipe 3 on the pile body 1-6 of described bored concrete pile From top to bottom it is laid in the helical blade 4 on core pipe 3 lateral wall, the internal diameter of described core pipe 3 diameter not less than pile body 1-6; Described core pipe 3 is arranged on described rotating driving device, and described core pipe 3 is in transmission connection with described rotating driving device;
The height of described core pipe 3 not less than constructing the height of pile cover 2, the height of described helical blade 4 with need construction stake The height of cap 2 is identical;Described core pipe 3 is divided into upper segment and is positioned at the bottom sections immediately below described upper segment, described on Portion's sections and described bottom sections connect as one, and the height of described bottom sections is identical with the height of described bottom pile cover section; Under described helical blade 4 is divided into the upper blade being laid in outside described upper segment and is laid in outside the sections of described bottom Portion's blade, described upper blade connects as one with described lower blade;Described upper segment and described upper blade composition circle Column drill bit, the external diameter of described cylindric drill bit is identical with the diameter of described top pile cover section, the width of described upper blade by Under up to the most identical;Described bottom sections and described lower blade composition circular cone shape drill bit, described circular cone shape drill bit upper End external diameter is identical with the upper end diameter of described bottom pile cover section, the lower end external diameter of described circular cone shape drill bit and described bottom pile cover The lower end diameter of section is identical, and the width of described lower blade is from top to bottom gradually reduced.
In the present embodiment, the height of described core pipe 3 is more than the height of pile cover 2 of need to constructing.
Further, the height of described core pipe 3 be need to construct pile cover 2 height 1.2 times~1.8 times.
Actual add man-hour, can according to specific needs the height of core pipe 3 be adjusted accordingly.
In the present embodiment, the diameter D1=Φ 600mm~Φ 2000mm of described top pile cover section and its height h1=100mm ~500mm, the lower end diameter D2=Φ 400mm~Φ 1000mm of described bottom pile cover section and its height h2=100mm~ 500mm。
During practice of construction, can according to specific needs, to the diameter D1 of described top pile cover section and height h1 and described under The value size of lower end diameter D2 of portion's pile cover section and height h2 adjusts accordingly respectively.
In the present embodiment, the surface of described core pipe 3 is provided with lower drive shaft 5, and described lower drive shaft 5 and core pipe 3 are in same Axle is laid;Being coaxially installed with power transmission shaft 6 on the power output shaft of described rotating driving device, described upper power transmission shaft 6 is positioned at institute Stating below rotating driving device, described upper power transmission shaft 6 is positioned at the surface of lower drive shaft 5 and the two is coaxially connected.
During actual installation, it is attached by lower installation board 7 between described core pipe 3 and lower drive shaft 5, described lower installation board 7 with the perpendicular laying of core pipe 3, the lower outside of described lower drive shaft 5 is provided with multiple tracks reinforcing plate 8, reinforcing plate 8 edge described in multiple tracks Circumferencial direction is uniformly laid in outside lower drive shaft 5, reinforcing plate 8 described in multiple tracks be modification of right-angled triangle plate and its bottom the most fixing On lower installation board 7.
In the present embodiment, described lower installation board 7 is circular flat board.Further, described lower installation board 7 and reinforcing plate 8 are not Rust steel plate.Described core pipe 3 is stainless steel tube.
In the present embodiment, be attached by lower adpting flange 9 between described upper power transmission shaft 6 and lower drive shaft 5, described under Adpting flange 9 and the perpendicular laying of core pipe 3;Described rotating driving device top is equipped with upper adpting flange 10, and described rotation drives Device is arranged on hanging device by upper adpting flange 10.
In the present embodiment, described rotating driving device is laid in coaxial with core pipe 3.
Further, described core pipe 3 is in vertically laying, and described lower adpting flange 9 and upper adpting flange 10 are all laid in level.
In the present embodiment, described rotating driving device is hydraulic motor 13.
Time actually used, described rotating driving device can also use other type of rotational driving device, such as motor Deng.
Meanwhile, as shown in Figure 4, pile cover former of the present invention, also include master control set 11-1, described pile cover is become Rotation speed detection unit 11-2 that the rotating speed of type drill bit detects in real time and turn to described pile cover forming drill is carried out in real time That detects turns to detector unit 11-3, and described rotating driving device is controlled by master control set 11-1;Described Rotating speed measring list Unit 11-2 and turn to detector unit 11-3 to be all connected with master control set 11-1.Thus, actual control is the easiest.
In the present embodiment, described core pipe 3 is intended between helical blade 4 be fixed with welding manner.Described core pipe 3 and lower peace Under between dress plate 7, between lower installation board 7 and lower drive shaft 5 and reinforcing plate 8 and lower drive shaft 5 and lower adpting flange 9 being positioned at All it is fixed with welding manner between the ring flange of side.The flange that described upper power transmission shaft 6 is above with lower adpting flange 9 It is fixed with welding manner between dish.The shell of described hydraulic motor 13 and upper adpting flange 10 are positioned at the ring flange of lower section Between be fixed with welding manner.
A kind of method utilizing pile cover former that bored concrete pile carries out Stake head handling and pile cover construction as shown in Figure 3, bag Include following steps:
Step one, Stake head handling: mix after the pile concrete pouring construction of constructed bored concrete pile completes and being irrigated Before the initial set of solidifying soil, according to the elevation of top of the constructed bored concrete pile pile body 1-6 being pre-designed, unnecessary by stake holes inside upper part Concrete takes out, and refers to Fig. 3-1, Fig. 3-2, Fig. 3-3 and Fig. 3-4;After institute's concrete perfusion final set, it is thus achieved that the stake of construction molding Body 1-6;
The height on described pile body 1-6 top to ground is h, and wherein h is less than the height of pile cover 2 of need to constructing;
Bore under step 2, pile cover former and form pile cover clay model: by hanging device, described pile cover former is lifted extremely On the stake position of constructed bored concrete pile, it is then turned on described rotating driving device and drives described pile cover forming drill to bore from top to bottom Enter, it is thus achieved that construction molding and the pile cover clay model 15 for described pile cover 2 of need to constructing of constructing, refer to Fig. 3-7, Fig. 3-8 and Fig. 3-9; After having crept into, close described rotating driving device;
Step 3, pile cover filling concrete are constructed: upwards carried described pile cover former to pile cover soil by hanging device Outside mould 15, then carrying out filling concrete construction in pile cover clay model 15, the filling concrete of the pile cover 2 that completes to construct was constructed Journey;
Step 4, pile cover molding: after institute's concrete perfusion final set in step 3, it is thus achieved that the pile cover of construction molding, described Pile cover is positioned at the surface of pile body 1-6 and it pours with pile body 1-6 and is integrated, and refers to Fig. 3-10.
In the present embodiment, before the pile concrete of constructed bored concrete pile is irrigated by step one, first described stake holes is entered Row construction;Concrete perfusion in described stake holes again, completes the pile concrete pouring construction process of constructed bored concrete pile;It After, according to the elevation of top of the constructed bored concrete pile pile body 1-6 being pre-designed, by any excess concrete of described stake holes inside upper part Take out, refer to Fig. 3-4;Then, concrete vibrating device is used the concrete in described stake holes to be vibrated and completes pile crown Cover layer protecting film in processing procedure, then the pile crown in described stake holes, refer to Fig. 3-5 and Fig. 3-6.
In the present embodiment, described protecting film is plastic foil 14.
In the present embodiment, before any excess concrete of described stake holes inside upper part is taken out, first on described stake holes aperture Loosened soil and the laitance in portion are cleared up, and refer to Fig. 3-3.
Further, after the pile crown in described stake holes covers one layer of described protecting film, Stake head handling process is completed.
In the present embodiment, after the pile concrete pouring construction of constructed bored concrete pile completes, just can carry out pile crown immediately Process.Wherein, Stake head handling includes the loosened soil to top, described stake holes aperture and laitance is cleared up, by stake holes inside upper part Any excess concrete takes out, uses concrete vibrating device to vibrate the concrete in described stake holes and in described stake holes Cover one layer of this four step of described protecting film on pile crown, refer to Fig. 3-3 to Fig. 3-6.
Further, after the pile concrete pouring construction of constructed bored concrete pile completes 28 days, institute's concrete perfusion is the most solidifying Gu, just can enter step 2, carry out pile cover construction.
In the present embodiment, after having crept in step 2, the lower end of described pile cover former core pipe 3 is sleeved on pile body 1- Outside the upper end of 6, refer to Fig. 3-9.
In the present embodiment, before step 3 carries out pile cover filling concrete construction, also need artificial in pile cover clay model 15 Residue dregs carry out cleaning and densification is real.
In the present embodiment, when described stake holes is constructed, drilling rod 1-2 is used to creep into from top to bottom until creeping into being executed The design hole depth of work bored concrete pile, it is thus achieved that the boring 1-1 of construction molding;It is lifted up drilling rod 1-2 again, until being proposed by drilling rod 1-2 To boring 1-1;During being lifted up, synchronize from the bottom to top to carry out filling concrete in boring 1-1 by drilling rod 1-2 Construction, completes the pile concrete pouring construction process of described bored concrete pile;Described boring 1-1 by the described stake of construction bored concrete pile Hole.
Wherein, described boring 1-1 is the stake holes of described bored concrete pile.
In the present embodiment, before using drilling rod 1-2 to creep into from top to bottom, first drilling rod 1-2 is moved to the stake of described bored concrete pile On position, the most described drilling rod 1-2 lays along the central axis of described bored concrete pile.
In the present embodiment, using in drilling rod 1-2 drilling process from top to bottom, described drilling rod 1-2 uses the side of rotary squeezing Formula is holed.
In the present embodiment, described drilling rod 1-2 includes the core bar of inner hollow and is laid in from the bottom to top outside described core bar Body of rod external thread structure on wall.Correspondingly, described pile body 1-6 is llong helix bored piles (also referred to as Screw Pile), described pile body Pile body external thread structure it is provided with from the bottom to top on 1-6.Described body of rod external thread structure and the knot of described pile body external thread structure Structure is identical, described body of rod external thread structure is all not provided with cutting in tooth, and boring procedure be unearthed the most laterally, boring procedure For full soil compaction work progress.
Described pile body external thread structure be equal pitch thread and its be single thread or multi start thread;Described pile body external screw thread Structure is cylindrical thread.
During practice of construction, it would however also be possible to employ the mode that rotary cutting combines with rotary squeezing is holed.Now, described It is provided with cutting tooth on body of rod external thread structure, boring procedure is unearthed laterally, but amount of being unearthed is the least.Thus, holed Journey is the work progress that cutting combines with soil compaction, also referred to as half soil compaction work progress.
In the present embodiment, the outside of described helical blade 2-2 is provided with cutting tooth or blade.
In the present embodiment, using in drilling rod 1-2 drilling process from top to bottom, described drilling rod 1-2 is for turning clockwise;Upwards During promoting drilling rod 1-2, described drilling rod 1-2 is to rotate, during such drilling rod 1-2 is lifted up, to molded counterclockwise Boring 1-1 is screwed hole without any effect, the boring 1-1 of construction molding.
During practice of construction, when being not provided with described pile body external thread structure on pile body 1-6, turn clockwise;Upwards During promoting drilling rod 1-2, described drilling rod 1-2 is for turning clockwise, during such drilling rod 1-2 is lifted up, to molded Boring 1-1 extrudes, and the boring 1-1 of construction molding is cylindrical hole.
In the present embodiment, described drilling rod 1-2 is the drilling rod of screw pile driver, and described screw pile driver includes pile frame and installation Drilling equipment on pile frame, described drilling equipment includes drilling rod 1-2 and the electronic rotation driving drilling rod 1-2 to rotate continuously Drive mechanism;Described electronic rotation drive mechanism is in transmission connection with the outer end of drilling rod 1-2, and described drilling rod 1-2 is internal The body of rod of hollow and its outer end connect with grouting equipment;
In the present embodiment, described electronic rotation drive mechanism is unit head, and described unit head uses on 07 04th, 2012 Disclosed in the application for a patent for invention of disclosed Publication No. CN102535445A (Application No. CN201210026528.7) High pulling torque adjustable speed unit head.
" long spire squeezes in the application for a patent for invention of employing Publication No. CN102535445A of screw pile driver described in step one Press-in rock filling pile shaped device and forming method " disclosed in shaped device, difference is, and the boring in step 2 Method, " long spire is squeezed into rock filling pile shaped device and becomes the application for a patent for invention with Publication No. CN102535445A Type method " in boring method identical.
In the present embodiment, hanging device described in step 2 is excavator 12;Described pile cover former is lifted on excavator Below the crane arm of 12.
Further, described pile cover former is arranged on described crane arm by upper adpting flange 10.In the present embodiment, described It is fixed with welding manner between ring flange above in the crane arm of excavator 12 and upper adpting flange 10.
The above, be only presently preferred embodiments of the present invention, not impose any restrictions the present invention, every according to the present invention Any simple modification, change and the equivalent structure change that above example is made by technical spirit, all still falls within skill of the present invention In the protection domain of art scheme.

Claims (10)

1. a pile cover former, it is characterised in that: include the pile cover forming drill that pile cover (2) of need to constructing is carried out drilling construction With the rotating driving device driving described pile cover forming drill to rotate continuously, described rotating driving device is positioned at described pile cover Above forming drill, described pile cover forming drill is in transmission connection with described rotating driving device;Described pile cover (2) of need to constructing Including top pile cover section and bottom pile cover section, described top pile cover section is round table-like, and described bottom pile cover section is circular cone shape, institute State the diameter of bottom pile cover section to be from top to bottom gradually reduced and its upper end diameter is identical with the diameter of described top pile cover section;Described Pile cover (2) of need to constructing is the pile cover of bored concrete pile, and the diameter of described bored concrete pile is identical with the lower end diameter of described bottom pile cover section;
Described pile cover forming drill includes can from top to bottom coaxial package core pipe (3) on the pile body (1-6) of described bored concrete pile The helical blade (4) being from top to bottom laid on core pipe (3) lateral wall, the internal diameter of described core pipe (3) is not less than pile body (1-6) Diameter;Described core pipe (3) is arranged on described rotating driving device, and described core pipe (3) is carried out with described rotating driving device It is in transmission connection;
The height of described core pipe (3) not less than constructing the height of pile cover (2), the height of described helical blade (4) with need construction The height of pile cover (2) is identical;Described core pipe (3) is divided into upper segment and is positioned at the bottom sections immediately below described upper segment, Described upper segment and described bottom sections connect as one, the height of described bottom sections and the height of described bottom pile cover section Identical;Described helical blade (4) is divided into the upper blade being laid in outside described upper segment and is laid in described bottom sections The lower blade in outside, described upper blade connects as one with described lower blade;Described upper segment and described upper leaf Sheet forms cylindric drill bit, and the external diameter of described cylindric drill bit is identical with the diameter of described top pile cover section, described upper blade Width the most identical;Described bottom sections and described lower blade composition circular cone shape drill bit, described circular cone shape The upper end external diameter of drill bit is identical with the upper end diameter of described bottom pile cover section, and the lower end external diameter of described circular cone shape drill bit is with described The lower end diameter of bottom pile cover section is identical, and the width of described lower blade is from top to bottom gradually reduced.
2. according to a kind of pile cover former described in claim 1, it is characterised in that: the diameter D1=Φ of described top pile cover section 600mm~Φ 2000mm and its height h1=100mm~500mm, the lower end diameter D2=Φ 400mm of described bottom pile cover section~ Φ 1000mm and its height h2=100mm~500mm.
3. according to a kind of pile cover former described in claim 1 or 2, it is characterised in that: the surface of described core pipe (3) is installed Lower drive shaft (5), described lower drive shaft (5) is had to lay in coaxial with core pipe (3);The power output shaft of described rotating driving device On be coaxially installed with power transmission shaft (6), described upper power transmission shaft (6) is positioned at below described rotating driving device, described upper power transmission shaft (6) it is positioned at the surface of lower drive shaft (5) and the two is coaxially connected.
4. according to a kind of pile cover former described in claim 3, it is characterised in that: described core pipe (3) and lower drive shaft (5) it Between be attached by lower installation board (7), described lower installation board (7) and core pipe (3) perpendicular laying, described lower drive shaft (5) Lower outside be provided with multiple tracks reinforcing plate (8), described in multiple tracks, reinforcing plate (8) is the most uniformly laid in lower drive shaft (5) outside, reinforcing plate (8) described in multiple tracks be modification of right-angled triangle plate and its bottom be each attached on lower installation board (7).
5. according to a kind of pile cover former described in claim 3, it is characterised in that: described upper power transmission shaft (6) and lower drive shaft (5) it is attached by lower adpting flange (9) between, described lower adpting flange (9) and core pipe (3) perpendicular laying;Described rotation Rotary driving device top is arranged on lifting equipped with upper adpting flange (10), described rotating driving device by upper adpting flange (10) On equipment.
6. according to a kind of pile cover former described in claim 1 or 2, it is characterised in that: described rotating driving device and core pipe (3) laying in coaxial, described rotating driving device is hydraulic motor (13).
7. according to a kind of pile cover former described in claim 1 or 2, it is characterised in that: also include master control set (11-1), right Rotation speed detection unit (11-2) that the rotating speed of described pile cover forming drill detects in real time and to described pile cover forming drill Turning to that detects in real time to turn to detector unit (11-3), described rotating driving device is controlled by master control set (11-1) System;Described rotation speed detection unit (11-2) and turn to detector unit (11-3) to be all connected with master control set (11-1).
8. utilize the method that according to pile cover former described in claim, bored concrete pile is carried out Stake head handling and pile cover construction, It is characterized in that, the method comprises the following steps:
Step one, Stake head handling: after the pile concrete pouring construction of constructed bored concrete pile completes and at institute's concrete perfusion Before initial set, according to the elevation of top of the constructed bored concrete pile pile body (1-6) being pre-designed, unnecessary by stake holes inside upper part mixes Solidifying soil takes out;After institute's concrete perfusion final set, it is thus achieved that the pile body (1-6) of construction molding;
The height on described pile body (1-6) top to ground is h, and wherein h is less than the height of pile cover (2) of need to constructing;
Bore under step 2, pile cover former and form pile cover clay model: by hanging device by the lifting of described pile cover former to being executed On the stake position of work bored concrete pile, it is then turned on described rotating driving device and drives described pile cover forming drill to creep into from top to bottom, obtaining Construction molding and being used for is constructed the pile cover clay model (15) of described pile cover (2) of need to constructing;After having crept into, close described rotation and drive Dynamic device;
Step 3, pile cover filling concrete are constructed: upwards carried described pile cover former to pile cover clay model by hanging device (15) outside, then carries out filling concrete construction in pile cover clay model (15), and the filling concrete of the pile cover (2) that completes to construct is executed Work process;
Step 4, pile cover molding: after institute's concrete perfusion final set in step 3, it is thus achieved that the pile cover of construction molding, described pile cover It is positioned at the surface of pile body (1-6) and it pours with pile body (1-6) and is integrated.
The most in accordance with the method for claim 8, it is characterised in that: in step one, the pile concrete to constructed bored concrete pile fills Before note, first described stake holes is constructed;Concrete perfusion in described stake holes again, the pile body completing constructed bored concrete pile mixes Solidifying soil pouring construction process;Afterwards, according to the elevation of top of the constructed bored concrete pile pile body (1-6) being pre-designed, by described stake Any excess concrete of hole inside upper part takes out;Then, use concrete vibrating device that the concrete in described stake holes is shaken Smash and complete to cover in Stake head handling process, then the pile crown in described stake holes layer protecting film;
After having crept in step 2, the lower end of described pile cover former core pipe (3) is sleeved on outside the upper end of pile body (1-6) Side.
The most in accordance with the method for claim 9, it is characterised in that: when described stake holes is constructed, use drilling rod (1-2) Creep into until creeping into the design hole depth to constructed bored concrete pile from top to bottom, it is thus achieved that the boring (1-1) of construction molding;The most upwards carry Rise drilling rod (1-2), until proposing drilling rod (1-2) to boring (1-1) outside;During being lifted up, by drilling rod (1-2) by Under supreme synchronization to boring (1-1) in carry out filling concrete construction, complete the pile concrete pouring construction of described bored concrete pile Process;Described boring (1-1) by the described stake holes of construction bored concrete pile;
Hanging device described in step 2 is excavator (12);Described pile cover former is lifted under the crane arm of excavator (12) Side.
CN201610726720.5A 2016-08-25 2016-08-25 A kind of pile cover former and Stake head handling and pile cover construction method Active CN106120785B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610726720.5A CN106120785B (en) 2016-08-25 2016-08-25 A kind of pile cover former and Stake head handling and pile cover construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610726720.5A CN106120785B (en) 2016-08-25 2016-08-25 A kind of pile cover former and Stake head handling and pile cover construction method

Publications (2)

Publication Number Publication Date
CN106120785A true CN106120785A (en) 2016-11-16
CN106120785B CN106120785B (en) 2018-03-09

Family

ID=57274359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610726720.5A Active CN106120785B (en) 2016-08-25 2016-08-25 A kind of pile cover former and Stake head handling and pile cover construction method

Country Status (1)

Country Link
CN (1) CN106120785B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703021A (en) * 2017-03-17 2017-05-24 中交公局第工程有限公司 Construction method for pile cap of screw pile, and device thereof
CN106759339A (en) * 2017-03-17 2017-05-31 中交公局第工程有限公司 Exempt from pile cover concrete construction method and its device that inter-pile soil is excavated
CN108755729A (en) * 2018-08-20 2018-11-06 中铁二十局集团第工程有限公司 A kind of CFG pile foundations pile cover and pile body integrative construction device and method
CN109537582A (en) * 2018-11-22 2019-03-29 中铁十二局集团有限公司 Pile crown is cut before CFG a kind of and clay model pours the construction method of pile cover
CN112411528A (en) * 2020-11-27 2021-02-26 江苏建院营造股份有限公司 Novel spiral steel pipe pile and construction process thereof
CN113684785A (en) * 2021-08-23 2021-11-23 中交(天津)疏浚工程有限公司 Construction process of pile foundation wharf
CN114045813A (en) * 2021-11-24 2022-02-15 中铁建工集团有限公司 Pile cap construction method
CN114635413A (en) * 2022-02-25 2022-06-17 中铁二十局集团第二工程有限公司 Pile construction method
CN115354662A (en) * 2022-09-14 2022-11-18 湖北萨莱玛木结构工程有限公司 Dampproofing construction frock of log cabin ground

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011012497A (en) * 2009-07-03 2011-01-20 Maeta Seihin Hanbai Ltd Head for drilling expanded hole
CN204609754U (en) * 2015-05-12 2015-09-02 中铁第四勘察设计院集团有限公司 A kind of reverse frustoconic pile cover foundation trench Spiral digging machine
CN205288179U (en) * 2015-12-22 2016-06-08 山东瑞尚化工机械有限公司 Agitated vessel uses double -deck frame
CN105862732A (en) * 2016-06-12 2016-08-17 江苏昌鑫基础工程有限公司 PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap
CN105888576A (en) * 2016-06-12 2016-08-24 江苏昌鑫基础工程有限公司 Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap
CN206034435U (en) * 2016-08-25 2017-03-22 铁道第三勘察设计院集团有限公司 Pile cover shaper

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011012497A (en) * 2009-07-03 2011-01-20 Maeta Seihin Hanbai Ltd Head for drilling expanded hole
CN204609754U (en) * 2015-05-12 2015-09-02 中铁第四勘察设计院集团有限公司 A kind of reverse frustoconic pile cover foundation trench Spiral digging machine
CN205288179U (en) * 2015-12-22 2016-06-08 山东瑞尚化工机械有限公司 Agitated vessel uses double -deck frame
CN105862732A (en) * 2016-06-12 2016-08-17 江苏昌鑫基础工程有限公司 PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap
CN105888576A (en) * 2016-06-12 2016-08-24 江苏昌鑫基础工程有限公司 Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap
CN206034435U (en) * 2016-08-25 2017-03-22 铁道第三勘察设计院集团有限公司 Pile cover shaper

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759339B (en) * 2017-03-17 2022-06-03 中交一公局第一工程有限公司 Pile cap concrete construction method and device without digging and removing soil between piles
CN106759339A (en) * 2017-03-17 2017-05-31 中交公局第工程有限公司 Exempt from pile cover concrete construction method and its device that inter-pile soil is excavated
CN106703021B (en) * 2017-03-17 2018-11-02 中交一公局第一工程有限公司 A kind of construction method and its device of screw rod pile pile cover
CN106703021A (en) * 2017-03-17 2017-05-24 中交公局第工程有限公司 Construction method for pile cap of screw pile, and device thereof
CN108755729A (en) * 2018-08-20 2018-11-06 中铁二十局集团第工程有限公司 A kind of CFG pile foundations pile cover and pile body integrative construction device and method
CN108755729B (en) * 2018-08-20 2023-07-04 中铁二十局集团第一工程有限公司 CFG pile foundation pile cap and pile body integrated construction device and method
CN109537582B (en) * 2018-11-22 2021-03-30 中铁十二局集团有限公司 Construction method for CFG pile front cut pile head and earth mould pouring pile cap
CN109537582A (en) * 2018-11-22 2019-03-29 中铁十二局集团有限公司 Pile crown is cut before CFG a kind of and clay model pours the construction method of pile cover
CN112411528A (en) * 2020-11-27 2021-02-26 江苏建院营造股份有限公司 Novel spiral steel pipe pile and construction process thereof
CN113684785A (en) * 2021-08-23 2021-11-23 中交(天津)疏浚工程有限公司 Construction process of pile foundation wharf
CN114045813A (en) * 2021-11-24 2022-02-15 中铁建工集团有限公司 Pile cap construction method
CN114045813B (en) * 2021-11-24 2023-02-28 中铁建工集团有限公司 Pile cap construction method
CN114635413A (en) * 2022-02-25 2022-06-17 中铁二十局集团第二工程有限公司 Pile construction method
CN115354662A (en) * 2022-09-14 2022-11-18 湖北萨莱玛木结构工程有限公司 Dampproofing construction frock of log cabin ground
CN115354662B (en) * 2022-09-14 2023-10-27 湖北萨莱玛木结构工程有限公司 Moistureproof construction tool for wooden house foundation

Also Published As

Publication number Publication date
CN106120785B (en) 2018-03-09

Similar Documents

Publication Publication Date Title
CN106120785A (en) A kind of pile cover former and Stake head handling and pile cover construction method
CN105887876B (en) A kind of construction method and its pile-forming apparatus of cast-in-place major diameter combination thin-walled screw thread pile tube
CN103806840B (en) One-way spiral half soil compaction drill bit and one-way spiral half Squeezing Soil Pile construction technology
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
CN203808822U (en) Full-hydraulic double power head device of rotary drilling rig
CN101864768A (en) Pile-forming drilling tool for screw pile and pile-forming construction method thereof
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
CN207296871U (en) The structure-improved of full-sleeve twist bit
CN106192996B (en) A kind of T shape drilling tools of construction method and T shapes the cast pile driving construction of T shapes stake
CN101255691B (en) Construction method for complete casing tube thin wall filling pile and movable internal mold
CN103821141A (en) Thread pile construction process
CN102605771B (en) Construction method for drilling cast-in-place concrete pipe pile and drilling tool for concrete pipe pile
CN203685019U (en) Long spiral drilling machine
CN105113488B (en) Construction method of multi-head minor-diameter long-spiral drilling machine in cast-in-situ major-diameter tubular pile
CN206495201U (en) A kind of positioner of filling concrete pile cages
CN203769662U (en) One-way spiral semi-soil-squeezing drill bit
CN210530738U (en) Pile system is planted in drilling in groups
CN106351213B (en) A kind of reverse screw stake shaped device and molding construction technique
WO2022057437A1 (en) Stirring pile construction apparatus provided with stirring cage
CN206034435U (en) Pile cover shaper
CN206015668U (en) A kind of T-shaped pours into a mould the T-shaped drilling tool of pile driving construction
CN107245997A (en) A kind of Dense Broken Stone Peg pile-forming equipment and bore forming method
CN106149714B (en) Integrated pile cover former and construction method
CN108018856A (en) A kind of Novel spiral pile-driving machine and its construction method
US20150299976A1 (en) Method for manufacturing a pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: The northern section of Beilin District Yanta Road 710054 Shaanxi city of Xi'an province No. 8 unit 2 Building 2 room 22308

Applicant after: Shaanxi Pile Construction Technology Co., Ltd.

Applicant after: China Railway Design Group Limited

Address before: 300142 Hebei District, Zhongshan Road, No. 10,

Applicant before: China Railway Third Survey and Design Institute Group Ltd.

Applicant before: Shaanxi Pile Construction Technology Co., Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant