US20150299976A1 - Method for manufacturing a pile - Google Patents
Method for manufacturing a pile Download PDFInfo
- Publication number
- US20150299976A1 US20150299976A1 US14/647,900 US201314647900A US2015299976A1 US 20150299976 A1 US20150299976 A1 US 20150299976A1 US 201314647900 A US201314647900 A US 201314647900A US 2015299976 A1 US2015299976 A1 US 2015299976A1
- Authority
- US
- United States
- Prior art keywords
- pipe
- inner pipe
- pile
- drilling
- drill pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/22—Placing by screwing down
Definitions
- the drilling pipe may also be referred to as an auger with a large core pipe.
- the drilling pipe preferably comprises a cutting helix along its entire sinkable outer wall. There can also be provided two, three or four cutting helixes.
- the cutting helix is advantageously adjacent in the lower end of the drilling pipe to the outer wall. It is preferably immediately adjacent to a lower end surface of the drilling pipe on the outer wall and extends further advantageously up to an upper end section of the sinkable outer wall of the drilling pipe, i.e. up to an upper end section of the drilling pipe below a top opening area, by means of which the drilling pipe is attached to a drilling apparatus, in particular a rotary motor, and wherein material can be filled in through an opening provided therein.
- the closing means 28 is arranged in the lower end of the drilling pipe 12 , and can be alternatively or additionally formed as a plate or a cover.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention relates to a pile, wherein a drilling tube comprising at least one cutting helix arranged in a partial section of an outer wall of the same is drilled until a subsoil having good bearing capacity is reached, a pile foot formed by an inner tube that can be arranged in the drilling tube, at least one end region of the inner tube is inserted into the pile foot, at least one grany material comprising at least one binder is filled via the inner tube and the drilling tube and the inner tube are removed from the subsoil.
Description
- This application is the U.S. national phase of PCT/EP2013/003586 filed Nov. 27, 2013, which claims priority of
German Patent Application 10 2012 023 185.7 filed Nov. 28, 2012. - The present invention relates to a method for producing a pile, whereby both a bore as well as a ramming take place.
- Piles are generally used in the building industry in many applications. In particular, in the field of foundation engineering, besides drilled piles it is rammed piles that are particularly used, in which a pilot drive pipe is driven/rammed into the ground by inner or outer ramming. By means of the so-called “inner ramming”, for example, a FRANKIPFAHL* (“FRANKIPFAHL” is a registered trademark of FRANKI Grundbau GmbH & Co. KG, Seevetal, Germany) is sunk into the ground as a pilot drive pipe. The pilot drive pipe is aligned by a leader mast and is connected to a first winch usually by two cables via a deflection arranged in the head region of the leader mast. Another cable, which is also guided over the deflection in the head region of the leader mast, holds a ram, which is guided or works in the pilot drive pipe. When a load-bearing ground is reached, the closing means serving as a closure for the piling pipe, for example sand or other material, is expelled by the ramming hammer to form a pile base. Concrete or similar material can also be added. Then, a reinforcement cage is set up, concrete is filled in and the pilot drive pipe is again pulled. It is also possible to perform a so-called preliminary gravel compaction, wherein the subsoil in a corresponding region below and above the pile sitting depth is improved by tamping gravel and also somewhat compressed.
- In differing from the internal driving described above, foot plate-piles, for example, are produced by means of an external driving, wherein, in order to produce said piles, driven casing pipes are used, which are closed at their lower end region by a foot plate that becomes lost, serving as the closure means. Techniques are also known in which the foot plate does not disappear. Using a leader, the driven casing pipe/piling pipe is driven into the subsoil via a pile driver, which can be designed, in particular, as a free-falling pile driver, a diesel pile driver, or a hydraulic pile driver. The pile driver acts thereby on the head of the piling pipe. The driving is conducted as far as the load bearing ground region, as described above for the internal driving. Subsequently, a reinforcing cage is inserted and concrete is poured into the pile shaft while simultaneously, or subsequently, removing the pile pipe in increments. With an external driving, the foot plate may become lost thereby, depending on the technology employed. Concrete slides out of the, now open, bottom of the pile pipe and fills the pile shaft up to approximately the outer edge of the pile pipe. The foot plate, which has disappeared thereby into the ground, can form the support surface for the pile.
- With the methods described above, both the internal driving as well as the external driving, the considerable vibrations associated therewith are a disadvantage. In particular in densely constructed areas, this leads to considerable adverse effects in the immediate surroundings.
- The object of the invention is to provide a method for manufacturing a pile and a corresponding device, with which, in particular, vibrations are reduced.
- The technical task of the present invention is to provide a method for producing a pile, with which in particular vibrations are reduced.
- This task is solved by a method for making a pile, wherein a drilling pipe with at least one cutting helix preferably arranged in a lower section of an outer wall thereof is drilled into a load-bearing subsoil forming a pile base by an additional drilling pipe that can be arranged in the drilling pipe, at least an end section of the inner pipe is introduced into the pile base, granular material containing at least one binder is filled through the inner pipe, and the drilling pipe and the inner pipe are removed from the ground, wherein the pile base is formed by inner ramming and the inner pipe protrudes with its end-side end face that faces the load-bearing subsoil an end-side end face of the drilling pipe.
- The drilling pipe may also be referred to as an auger with a large core pipe. The drilling pipe preferably comprises a cutting helix along its entire sinkable outer wall. There can also be provided two, three or four cutting helixes. The cutting helix is advantageously adjacent in the lower end of the drilling pipe to the outer wall. It is preferably immediately adjacent to a lower end surface of the drilling pipe on the outer wall and extends further advantageously up to an upper end section of the sinkable outer wall of the drilling pipe, i.e. up to an upper end section of the drilling pipe below a top opening area, by means of which the drilling pipe is attached to a drilling apparatus, in particular a rotary motor, and wherein material can be filled in through an opening provided therein.
- The inner pipe, which has no cutting helix on its outer wall, is arranged within the drilling pipe. The ratio of the diameter of the drilling pipe to the diameter of the inner pipe, measured in each case starting from the respective outer walls of the pipes, is in a range of about 1.1:1 to about 2.5:1, preferably in a range between about 1.25:1 and about 1.75:1.
- An inner wall of the drilling pipe is preferably sealed against the outer wall of the inner pipe with at least a sealant. The sealant is to serve the function of preventing the penetration of subsoil into the area between the inner wall of the drilling pipe and the outer wall of the inner pipe. The sealant can for example be designed as an annular seal, wherein the sealing profile in the cross section can be designed as double-dovetail or easy-dovetailed, but other embodiments of the sealant are possible. The sealant is advantageously arranged fixed to the inner wall of the drilling pipe, but can also be arranged fixedly on the outer wall of the inner pipe. The sealant can be made of any suitable material possible, in particular of high-solid plastic materials, although still exhibiting a sufficient elasticity, for example a filler-reinforced rubber material or the like. In particular, a plurality of sealing means can be arranged over the length of the drilling pipe or the inner pipe at its inner wall or outer wall.
- The inner pipe can already before the start of drilling protrude with an end-side end face, which faces the construction ground, an end face of the drilling pipe, which is also facing the construction ground. The overhang of the end-side end face of the inner pipe over the end-side end face of the drilling pipe is preferably within a range between about 20 cm and 200 cm, more preferably within a range between about 50 cm and about 120 cm, but may in some construction ground situations be also greater than 200 cm. However, the overhang can also be generated only after reaching a final depth in the ground by corresponding displacement of the inner pipe relative to the drilling pipe. The shift can be done by rotational movements or by a longitudinal, non-rotating sliding movement and/or both by inner and top ramming. It can also be provided to produce an overhang in that the inner pipe is driven by inner ramming down to a load-bearing ground, while the drilling pipe is drilled to a certain depth. Also, for example, the inner pipe and the drilling pipe can be drilled only into a load-bearing ground, and then an overhang is formed by further sinking the inner pipe by inner ramming.
- The pile base produced by the inventive method is made according to the principle of FRANKIPFAHL*. According to the invention, the pile base is formed by inner ramming that can also be called inner pipe ramming. A top ramming by hydraulic or diesel rams would be possible. With an inner ramming, a ram is preferably introduced into the inner pipe, more preferably the ram is introduced into a closing means, which is arranged in the end region of the drilling pipe and/or inner pipe facing the load-bearing ground. The ram is advantageously used in the clamped state. The resting on the closing means can be carried out before the drilling, more preferably it is carried out during the drilling of the drilling pipe, more preferably the resting of the piling ram takes place both before the drilling and during the drilling when a final depth is reached.
- The pile base is advantageously formed by tamping by inner ramming or inner pipe ramming the granular material in the inner pipe, which can also contain a binder, and preferably is it dry concrete, and ultimately can also serve as a closing means, as described below, which process can be repeated by adding further batches of granular material until the ramming is done over a desired length, which ultimately allows to vary or adjust the length of the pile base. The pile base preferably has an outer diameter, which [missing verb] the outer wall of the inner pipe, and more preferably also extends beyond the outer wall of the drill pipe. By driving the inner pipe into the pile foot, preferably a pile narrowing directly above and bordering on the pile foot is avoided.
- The drilling, preferably as far as a load bearing subsoil, occurs by means of the drill pipe, as specified above, advantageously with the provision of at least one closure means in the end region of the drill pipe and/or inner pipe facing the load bearing subsoil. As a closure means, a foot plate, for example, can be provided thereby, which can be designed as a lost foot plate, but can also be designed as a foot plate that can be recovered. Alternatively, a type of cover can be provided, which, seen in its cross-section, can be regarded as a triangle standing on its head. An alternative closure means is the provision of a plug made of gravel and/or sand and/or a granular material having at least one binder, in particular made of concrete, in particular dry concrete, by means of which the drill pipe and/or the inner pipe are closed off. Both a foot plate or cover, as well as a plug made of a granular material etc. could be provided. A foot plate or cover as a closure means are preferably disposed on, in particular attached to, the end region of the drill pipe facing the subsoil. They can additionally be disposed on the end region of the inner pipe, in particular on the terminal end surface thereof. The foot plate, or the cover, respectively, are disposed on the end region of the drill pipe such that they do not extend beyond the outer wall of the drill pipe. The foot plate or cover are knocked away by means of driving, preferably internal driving, through the inner pipe, thus formed as a lost foot plate or cover, or opened, respectively, in order to then enable a further sinking of the inner pipe and/or the formation of the pile foot.
- The pile foot is formed solely by means of the inner pipe. The drill pipe is there in order to introduce a drilling into the subsoil that has emissions that are as low as possible, preferably as far as the load bearing subsoil. The inner pipe thus also substantially determines the diameter of the pile, which basically corresponds to the inner diameter of the inner pipe. Preferably the pile produced with the method according to the invention has a pile diameter having basically the inner diameter of the inner pipe over its entire length. It can, however, also be provided that, for example, the inner pipe is removed from the subsoil in the course of the introduction of material, until its terminal end surface no longer extends beyond that of the drill pipe, such that then an expansion of the pile diameter can occur at this point, in particular when the inner pipe is fully removed from the subsoil, while the drill pipe remains therein, and material is then poured in via said drill pipe, in order to form the pile.
- A pile can advantageously be produced at a high speed with only limited vibrations by means of the method according to the invention, having a load bearing capability that is nearly identical, or similar, to a FRANKIPFAHL. The major advantage with respect to a FRANKIPFAHL is that this pile, due to the complete displacement thereof, by means of driving the piling pipe, is characterized by a long ramming time and high vibrations. Compared to known piles such as the VB pile or the SOB pile, a significantly increased load capacity is achieved. The low vibrations are achieved by a deep ramming, because the ram works by inner ramming in the final depth and/or not at the beginning of the drilling process, definitely below the subsoil surface, from which the drilling has been done.
- The drilling is carried out by screwing the drilling pipe up into a particularly load-bearing ground. The inner pipe is advantageously introduced into the construction ground together with the drilling pipe. Particularly preferably, the inner pipe is rotated when being introduced. More preferably, the rotation is performed during the drilling action of the drilling pipe. Advantageously, a control is provided such that the rotary motion of the drilling pipe and the inner pipe are synchronized with each other. Preferably, during the drilling process the inner pipe while drilling has no drive, which generates torque that is then transmitted via the inner pipe into the existing subsoil. Conversely, during its removal from the ground the inner pipe can be provided with a drive. An entrainment of the inner pipe (rotating, sliding, shifting, vibrating, etc.) while drilling is preferably carried out by the movement of the drilling pipe. Alternatively it can be provided that by means of one or more sealants the inner pipe is firmly held by the drilling pipe, and upon setting an overhang before the drilling, the rotating inner pipe is then moving, together with the drilling pipe, into the construction ground due to entrainment without the need for additional control.
- Advantageously, rinse fluids, for example, bentonite suspensions, water or the like are introduced through the inner pipe. By means of the rinse fluids, which are introduced through an upper opening of the inner pipe and/or drilling pipe, for example by means of hoses, and which can escape via openings provided in the wall of the inner pipe, the drilling speed and also the pile bearing behavior can be improved. If the material used as a rinse fluid also includes one binder, the surrounding subsoil can be solidified. The rinse fluids can be used both while drilling, as well as after achieving the final depth and during the subsequent removal of the drilling pipe and the inner pipe from the ground.
- Alternatively to rotating both the drilling pipe and the inner pipe during the drilling it can be provided that only the drilling pipe is rotated, and the inner pipe is held and is tracked within the drilling pipe in the drilling progress. For this purpose, the inner pipe can be fixed, above the drilling pipe, to a leader mast, which also leads the drilling pipe. For example, one can proceed in such a manner that the drilling pipe is provided with a closing means, and the inner pipe is disposed in its lower end by a sealing means between the outer wall of the inner pipe and the inner wall of the drilling pipe; however, the sealing means does not transmit the rotational movement of the drilling pipe to the inner pipe, because it is not sufficiently firmly arranged at it. The inner pipe can also be synchronously moved with, or subsequently guided into, the drill pipe during the sinking, above the at least one sealing means, for example, and, upon first reaching the final depth, be moved toward the load bearing subsoil, in order to obtain the excess length in relation to the drill pipe, such that then, subsequently, the at least one sealing means is brought to rest against the outer wall of the inner pipe. The inner pipe and/or the drill pipe can, moreover, also have spacing means and guidance means disposed on their outer walls, which facilitate a guidance of the inner pipe into the drill pipe.
- The pile foot can be produced in accordance with the method according to the invention, without such an excess length between the end surface of the inner pipe and the end surface of the drill pipe being provided, but it can also be generated when there is an excess length of the inner pipe. Following the formation of the pile foot, preferably by compression, the excess length between the end surface of the inner pipe and the end surface of the drill pipe is then either increased, or retained, and the inner pipe is inserted into the pile foot, optionally while also displacing the drill pipe along with it, or it is guided into the pile foot through the formation of the excess length of the inner pipe. The insertion of the inner pipe into the pile foot can occur in a turning manner, or through a longitudinal sliding movement of the inner pipe toward the pile foot, through driving, for example. In a further preferred embodiment of the present invention, not only the inner pipe, but also the drill pipe can be slid, preferably, into the pile foot, preferably by means of a turning movement. The insertion of the inner pipe into the pile foot advantageously occurs at least so far that the end surface of the drill pipe lies on the surface of the pile foot.
- The removal of the drilling pipe and the inner pipe can be done such that the overhang of the inner pipe is maintained during the removal. However, the overhang can also be reduced or led back to zero in direction of the bottom surface, for example during the removal, by an additional movement of the inner pipe relative to the drilling pipe, insofar as both are removed from the ground together so that an end face of the inner pipe is at least on the same level as an end face of the drilling pipe or is even arranged with a recess within the drilling pipe. The drilling pipe can be removed from the ground by pulling or by turning, as can the inner pipe. The above-mentioned various ways of removing the drilling pipe and the inner pipe allow realizing different pile diameters.
- The inventive method provides piles, which have no weakening above the pile base. In addition, depending on the ground conditions, different shank diameters can be created, for example, a larger near the surface and lower in the area above the pile base, in order to economize the energy and materials spent. Even gravel pre-compaction is possible with the inventive method.
- Furthermore, according to the invention the inner pipe can have a widening in its lower end region facing the ground. This widening can also serve as a guide means of the inner pipe in the drilling pipe. In particular, if prior to drilling an overhang between the inner pipe and the drilling pipe is provided, the expansion of the inner pipe can also be equal to the outer diameter of the drilling pipe, or extend beyond this. By filling the inner pipe with a granular material containing at least one binder, the widening allows to achieve a widened pile diameter when removing it from the load-bearing and non-load-bearing ground, whether this is achieved by turning or pulling. In addition, the connection of the pile to the pile base is thereby improved. With such design, the drilling pipe is advantageously removed from the construction ground first by pulling or rotating, preferably pulling, and then the same is done with the inner pipe.
- In the context of the present invention, it can basically be provided for the removal of the drilling pipe and the inner pipe from the ground that during the removal of the drilling pipe the inner pipe is removed from the ground with a time lag, but simultaneously in some time periods, and vice versa.
- The inventive method can be implemented with an apparatus for producing a drilled pile with a pile base, comprising a drilling pipe and an inner pipe arranged in it, wherein between an outer wall of the inner pipe and an inner wall of the drilling pipe at least one sealing means for prevention of the entry of in particular non-load-bearing and/or load-bearing ground is arranged.
- The inventive apparatus further advantageously has an overhang between an end-side end surface of the inner pipe and an end-side end surface of the drilling pipe, so that the inner pipe protrudes over the drilling pipe facing the construction ground. The sealant may be formed as already illustrated above in connection with the inventive method. The inner pipe is advantageously fixed by a holding device, preferably a leader mast, above the upper edge of the drilling pipe. The drilling pipe of the inventive apparatus can be formed as shown in connection with the method according to the invention, and in particular can have at least one cutting helix. Also closing means may be provided, for example in the form of permanent or not permanent continuous bed plates which are mounted on the drilling pipe, or as a plug, as also described in connection with the inventive method.
- These and other advantages of the present invention are explained in detail based on the following
FIG. 1 A, 1 B/C and 1 D/E, which show five process states A, B, C, D and E. - First, it is pointed out that the embodiment of the inventive method shown in the figures and the inventive apparatus should not be interpreted as limiting. Rather, the features described therein can be combined with each other and with the features described above to form further embodiments. It should also be noted that the reference numerals given in the description of the figures do not limit the scope of the present invention, but merely refer to the embodiments shown in the figures. Same parts or parts with the same function have in the following text the same reference numerals. It should be especially noted that the process shown in the figures according to the invention with an inner ramming represents only one possible embodiment, and that the common sinking and removal of a drilling pipe having an inner pipe as shown in the embodiment, is only one of the possible embodiments of the present invention.
-
FIG. 1 A shows in section A anapparatus 10 according to the invention, in which aninner pipe 14 is arranged in adrilling pipe 12.Drilling pipe 12 andinner pipe 14 are attached to aleader mast 20. In the inner pipe 14 aram 22, held by arope 24 to theleader mast 20, is held on a winch, not shown here, and lies on a closing means 28, designed as a plug, formed for example of gravel or dry concrete. Thedrilling pipe 12 comprises anouter wall 13 on which is arranged a cuttinghelix 18, whichouter wall 13 is arranged, starting from an end-side end surface 52 on theouter wall 13 into the upper area below the attachment of thedrilling pipe 12 on theleader mast 20. - The closing means 28 is arranged in the lower end of the
drilling pipe 12, and can be alternatively or additionally formed as a plate or a cover. - The
apparatus 10 stands on abottom surface 60. Below thebottom surface 60 there is a water table 30 within a non-load-bearingground 32, below the non-load-bearingground 32 is the load-bearing construction ground 34. - In Section B of
FIG. 1 B/C, thedrilling pipe 12 is rotationally sunk into the 32 and 34, wherein the rotational movement is indicated by the arrows 36.1 and 36.2. Theground inner pipe 14 is thereby entrained by thedrilling pipe 12, and, moreover, is protected from the entry of 32, 34 into the space betweenconstruction ground outer wall 17 ofinner pipe 14 andinner wall 11 of thedrilling pipe 12 by aseal 16, preferably in the form of a ring. - The
ram 22 further rests on theplug 28. Upon reaching a final depth in load-bearing ground 34 is expelled apile base 46 in the direction ofarrows 38 through the pilinghammer 22 in the form of a deep ramming shown in section C ofFIG. 1 B/C. Should a plate or a cover be provided alternatively or additionally as a closing means 28, it would be knocked away by ramming it. A compactedsubsoil area 56 is formed around thepile base 46 at sinking the drilling pipe to the inner pipe (see Section D,FIG. 1 D/E). - For the production of the pile base can also, for example, dry concrete be introduced into the
inner pipe 14, also more than once, which is then tamped with the material of theplug 28 and forms thepile base 46. After thepile base 46 is tamped, theinner pipe 14 is advanced into thepile base 46 until anoverhang 26 is formed between an end-side end face 54 of theinner pipe 14 and an end-side end face 52 of thedrilling pipe 12, which is for example 100 cm. Subsequently, theram 22 is removed from theinner pipe 14, and a granular material containing at least one binder, such as in particular liquid concrete 44, symbolized by the arrow, is filled into the inner pipe and/or the 12, 14 up to thedrilling pipe pile base 30 46. - Here, a
reinforcement cage 42, as shown in Section D ofFIG. 1 D/E, can be set up in thedrilling pipe 12 orinner pipe 14 before the filling with the concrete 44, but also during the filling with the concrete 44 or simultaneously. - During the filling with the concrete, the
drilling pipe 12 is removed, by pulling in the direction of anarrow 40, from the 32, 34 together with theground inner pipe 14, as described in Section D ofFIG. 1 D/E so that apile 50 is formed as shown in section E ofFIG. 1 D/E. It comprises apile base 46 which merges without any weakening above thepile base 46 in apile shaft 51.
Claims (17)
1. A method for producing a pile (50), wherein a drill pipe (12) having at least one cutting helix (18) disposed in a subsection of an outer wall (13) thereof, drills into a subsoil (34), a pile foot (46) is formed by means of an inner pipe (14) that can be disposed in the drill pipe (12), at least an end region (15) of the inner pipe (14) is inserted into the pile foot (46), a granular material having at least one binder is poured in via the inner pipe (14), and the drill pipe (12) and the inner pipe (14) are removed from the subsoil (32, 34).
2. The method according to claim 1 , characterized in that the removal of the drill pipe (40) and/or the inner pipe (14) occurs by means of pulling and/or turning (40).
3. The method according to one of the preceding claims, characterized in that an outer wall (17) of the inner pipe (14) is sealed against an inner wall (11) of the drill pipe (12) with at least one sealing means (16).
4. The method according to one of the preceding claims, characterized in that the pile foot (46) is formed by means of internal driving.
5. The method according to claim 4 , characterized in that a pile driver (22) is inserted in the inner pipe (14) for the internal driving.
6. The method according to one of the preceding claims, characterized in that the drill pipe (12) has at least one closure means (28) an its end region (48) facing the load bearing subsoil (34).
7. The method according to one of the preceding claims, characterized in that the inner pipe (14) and the drill pipe (12) are inserted into the pile foot (46).
8. The method according to one of the preceding claims, characterized in that the inner pipe (14), with its end surface (54) facing the load bearing subsoil (34), extends beyond the end surface (52) of the drill pipe (12).
9. The method according to one of the preceding claims, characterized in that the drill pipe (12) and/or the inner pipe (14) are provided with a plug (28) made of gravel and/or sand and/or a granular material having at least one binder.
10. The method according to claim 9 , characterized in that the pile driver (22) is placed on the plug (28).
11. The method according to one of the preceding claims, characterized in that the inner pipe (14), together with the drill pipe (12), is removed from the subsoil (32, 34).
12. The method according to one of the preceding claims, characterized in that the removal of the inner pipe (14) and/or the drill pipe (12) occurs during the pouring of the granular material (44) having at least one binder.
13. The method according to one of the preceding claims, characterized in that the inner pipe (14) is inserted into the load bearing subsoil (34) together with the drill pipe (12).
14. The method according to one of the preceding claims, characterized in that the inner pipe (14) is turned during the insertion.
15. The method according to claim 14 , characterized in that the turning occurs during the drilling movement of the drill pipe (12).
16. The method according to one of the preceding claims, characterized in that rinsing agents are introduced through the inner pipe (14).
17. A device (10) for producing a drilled pile (50) having a pile foot (46), comprising a drill pipe (12) and an inner pipe (14) disposed therein, wherein at least one sealing means (16) is disposed between an outer wall (17) of the inner pipe (14) and an inner wall (11) of the drill pipe (12), for preventing the ingress of subsoil (32, 34).
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102012023185.7A DE102012023185A1 (en) | 2012-11-28 | 2012-11-28 | Method for producing a pile |
| DE102012023185.7 | 2012-11-28 | ||
| PCT/EP2013/003586 WO2014082741A1 (en) | 2012-11-28 | 2013-11-27 | Method for manufacturing a pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20150299976A1 true US20150299976A1 (en) | 2015-10-22 |
Family
ID=49726688
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/647,900 Abandoned US20150299976A1 (en) | 2012-11-28 | 2013-11-27 | Method for manufacturing a pile |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20150299976A1 (en) |
| EP (1) | EP2925934B1 (en) |
| AU (1) | AU2013351554B2 (en) |
| DE (1) | DE102012023185A1 (en) |
| DK (1) | DK2925934T3 (en) |
| PL (1) | PL2925934T3 (en) |
| WO (1) | WO2014082741A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110230314A (en) * | 2019-04-28 | 2019-09-13 | 广东工业大学 | A kind of piling strtucture and its construction method |
| CN113668512A (en) * | 2021-08-24 | 2021-11-19 | 中铁广州工程局集团深圳工程有限公司 | Construction method of adjacent subway full casing full slewing drilling machine pile foundation |
| CN113700000A (en) * | 2021-08-26 | 2021-11-26 | 中建八局第二建设有限公司 | Supporting construction of binary geology hitching leg stake |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3351687B1 (en) | 2017-01-24 | 2019-04-03 | Franki Grundbau GmbH & Co. KG | Method of making a pile |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB402799A (en) * | 1932-05-09 | 1933-12-11 | Marcel Gallai Hatchard | Improvements relating to piling foundations |
| GB477190A (en) * | 1937-01-04 | 1937-12-23 | Handelmij J De Wit & Zonen N V | Method and apparatus for forming concrete foundation piles in situ |
| US20040115011A1 (en) * | 2000-06-15 | 2004-06-17 | Geotechnical Reinforcement Company, Inc. | Apparatus and method for building support piers from one or successive lifts formed in a soil matrix |
| US20060147274A1 (en) * | 2004-11-12 | 2006-07-06 | Jinliang Ding | Construction process for composite pile foundation |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CH373326A (en) * | 1959-07-09 | 1963-11-15 | Dicht Ag | Method and device for the manufacture of concrete cast-in posts |
| FR2318275A1 (en) * | 1975-07-17 | 1977-02-11 | Labrue Jean Marie | PROCESS FOR MAKING PILES MOLDED IN THE SOIL AND HOLLOW AUGER FOR IMPLEMENTING THE PROCESS |
| DE3324509A1 (en) * | 1983-07-07 | 1985-01-17 | Frankipfahl Baugesellschaft mbH, 4000 Düsseldorf | Method of producing bored piles having improved bearing capacity |
| FR2642777B1 (en) * | 1989-02-09 | 1991-05-24 | Sif Entreprise Bachy | DEVICE FOR EXECUTING HOLLOW MOLDS IN THE GROUND |
| NL193948C (en) * | 1992-05-18 | 2001-03-02 | Hollandsche Betongroep Nv | Method for manufacturing a concrete pile in the ground with a widened lower part. |
| NL9202008A (en) * | 1992-11-18 | 1994-06-16 | Beton Son Bv | Method for applying a foundation pile to the ground in a vibration-free manner, as well as a device for applying the method. |
| DE19935813A1 (en) * | 1999-07-29 | 2001-02-01 | Schorr Claus Peter | Device for fabrication of in-situ concrete piles consists of endless drilling screw with core tube containing separately controlled inner tube |
| DE102006023799B4 (en) * | 2006-05-20 | 2014-05-15 | Franki Grundbau Gmbh & Co.Kg | Device for producing foundation elements |
| DE102006050307A1 (en) * | 2006-10-23 | 2008-04-30 | Lutz Stolze | Method and device for introducing profiles into the soil |
-
2012
- 2012-11-28 DE DE102012023185.7A patent/DE102012023185A1/en not_active Ceased
-
2013
- 2013-11-27 PL PL13802241T patent/PL2925934T3/en unknown
- 2013-11-27 AU AU2013351554A patent/AU2013351554B2/en not_active Ceased
- 2013-11-27 DK DK13802241.3T patent/DK2925934T3/en active
- 2013-11-27 US US14/647,900 patent/US20150299976A1/en not_active Abandoned
- 2013-11-27 EP EP13802241.3A patent/EP2925934B1/en active Active
- 2013-11-27 WO PCT/EP2013/003586 patent/WO2014082741A1/en not_active Ceased
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB402799A (en) * | 1932-05-09 | 1933-12-11 | Marcel Gallai Hatchard | Improvements relating to piling foundations |
| GB477190A (en) * | 1937-01-04 | 1937-12-23 | Handelmij J De Wit & Zonen N V | Method and apparatus for forming concrete foundation piles in situ |
| US20040115011A1 (en) * | 2000-06-15 | 2004-06-17 | Geotechnical Reinforcement Company, Inc. | Apparatus and method for building support piers from one or successive lifts formed in a soil matrix |
| US20060147274A1 (en) * | 2004-11-12 | 2006-07-06 | Jinliang Ding | Construction process for composite pile foundation |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110230314A (en) * | 2019-04-28 | 2019-09-13 | 广东工业大学 | A kind of piling strtucture and its construction method |
| CN113668512A (en) * | 2021-08-24 | 2021-11-19 | 中铁广州工程局集团深圳工程有限公司 | Construction method of adjacent subway full casing full slewing drilling machine pile foundation |
| CN113700000A (en) * | 2021-08-26 | 2021-11-26 | 中建八局第二建设有限公司 | Supporting construction of binary geology hitching leg stake |
Also Published As
| Publication number | Publication date |
|---|---|
| PL2925934T3 (en) | 2017-05-31 |
| WO2014082741A1 (en) | 2014-06-05 |
| AU2013351554A1 (en) | 2015-07-16 |
| DE102012023185A1 (en) | 2014-05-28 |
| EP2925934B1 (en) | 2016-10-19 |
| DK2925934T3 (en) | 2017-02-06 |
| EP2925934A1 (en) | 2015-10-07 |
| AU2013351554B2 (en) | 2018-02-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3839149A1 (en) | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor | |
| CN106013151A (en) | Continuous pile wall construction method and construction device used for continuous pile wall construction method | |
| CN102900079A (en) | High-frequency hydraulic vibratory construction method for cement-soil core-inserted combined pile | |
| CN103821141A (en) | Thread pile construction process | |
| CN106812149A (en) | A kind of construction method of pile foundation | |
| CN106192996A (en) | The construction method of a kind of T-shaped stake and the T-shaped drilling tool of T-shaped cast pile driving construction | |
| US20150299976A1 (en) | Method for manufacturing a pile | |
| CN101575852A (en) | Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles | |
| CN103243740B (en) | Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall | |
| CN104711975B (en) | Construction technology for long spiral cast-in-situ bored pile | |
| CN104563104B (en) | Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method | |
| CN107653889A (en) | A kind of shaped steel pressure is poured water the construction method of soil curtain support pile | |
| CN105297710A (en) | High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method | |
| CN103790148A (en) | Combined treatment construction method for collapsible loess foundation | |
| CN110700245B (en) | Construction method of cast-in-place pile | |
| JP2015504123A (en) | Pile driving device and method for installing pile material assembly | |
| CN105064352A (en) | Building expanding head anchor rod pile construction technology and anchor rod pile adopting technology | |
| CN107587502A (en) | A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method | |
| CN205742191U (en) | A kind of piling wall constructing device continuously | |
| CN202530447U (en) | Bored cast-in-place pile structure formed by sinking double pipes and drawing inner pipe | |
| CN204626416U (en) | A kind of from creeping into steel pipe pile diaphragm wall | |
| CN104532832A (en) | Steel retaining cylinder and application method thereof | |
| JP4811176B2 (en) | Construction method of ready-made piles | |
| CN204370413U (en) | A kind of steel pile casting | |
| WO2013149471A1 (en) | Piling method based on hole-forming by sinking double pipes and pulling inner pipe, and application thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: FRANKI GRUNDBAU GMBH & CO. KG, GERMANY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:RINNO, MANFRED;NEUBAUER, OTTO;SIGNING DATES FROM 20150609 TO 20150623;REEL/FRAME:036855/0701 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE |