CN106099744A - 一种高压电缆巡检维修机器人 - Google Patents
一种高压电缆巡检维修机器人 Download PDFInfo
- Publication number
- CN106099744A CN106099744A CN201610396455.9A CN201610396455A CN106099744A CN 106099744 A CN106099744 A CN 106099744A CN 201610396455 A CN201610396455 A CN 201610396455A CN 106099744 A CN106099744 A CN 106099744A
- Authority
- CN
- China
- Prior art keywords
- gear
- clamping plate
- cable
- frame
- slide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 13
- 230000005611 electricity Effects 0.000 claims description 15
- 229910052744 lithium Inorganic materials 0.000 claims description 7
- WHXSMMKQMYFTQS-UHFFFAOYSA-N Lithium Chemical compound [Li] WHXSMMKQMYFTQS-UHFFFAOYSA-N 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000005389 magnetism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Manipulator (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610396455.9A CN106099744B (zh) | 2016-06-07 | 2016-06-07 | 一种高压电缆巡检维修机器人 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610396455.9A CN106099744B (zh) | 2016-06-07 | 2016-06-07 | 一种高压电缆巡检维修机器人 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106099744A true CN106099744A (zh) | 2016-11-09 |
CN106099744B CN106099744B (zh) | 2017-08-29 |
Family
ID=57448472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610396455.9A Expired - Fee Related CN106099744B (zh) | 2016-06-07 | 2016-06-07 | 一种高压电缆巡检维修机器人 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106099744B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112165030A (zh) * | 2020-10-29 | 2021-01-01 | 国网河北省电力有限公司沧州供电分公司 | 垂直排列式双悬垂线夹临时保护装置及补销预处理方法 |
WO2021088102A1 (zh) * | 2019-11-08 | 2021-05-14 | 中国科学院自动化研究所 | 用于线上行走的运载机构 |
CN117990949A (zh) * | 2024-04-07 | 2024-05-07 | 国网山东省电力公司青岛供电公司 | 一种用于高压电缆的异常监测装置及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11150821A (ja) * | 1997-11-19 | 1999-06-02 | Nishi Nippon Electric Wire & Cable Co Ltd | ロボット操作用電線ヒュ−ズ案内工具 |
CN101771246A (zh) * | 2008-12-31 | 2010-07-07 | 中国科学院沈阳自动化研究所 | 一种具有升降夹持功能的巡检机器人机构 |
US20140208976A1 (en) * | 2013-01-29 | 2014-07-31 | Korea Institute Of Science And Technology | Driving wheel of robot moving along the wire and robot having the same |
CN105305296A (zh) * | 2015-10-10 | 2016-02-03 | 王俊 | 一种高压线巡检机器人 |
-
2016
- 2016-06-07 CN CN201610396455.9A patent/CN106099744B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11150821A (ja) * | 1997-11-19 | 1999-06-02 | Nishi Nippon Electric Wire & Cable Co Ltd | ロボット操作用電線ヒュ−ズ案内工具 |
CN101771246A (zh) * | 2008-12-31 | 2010-07-07 | 中国科学院沈阳自动化研究所 | 一种具有升降夹持功能的巡检机器人机构 |
US20140208976A1 (en) * | 2013-01-29 | 2014-07-31 | Korea Institute Of Science And Technology | Driving wheel of robot moving along the wire and robot having the same |
CN105305296A (zh) * | 2015-10-10 | 2016-02-03 | 王俊 | 一种高压线巡检机器人 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021088102A1 (zh) * | 2019-11-08 | 2021-05-14 | 中国科学院自动化研究所 | 用于线上行走的运载机构 |
US11283247B2 (en) | 2019-11-08 | 2022-03-22 | Institute Of Automation, Chinese Academy Of Sciences | Carrier mechanism for walking on line |
CN112165030A (zh) * | 2020-10-29 | 2021-01-01 | 国网河北省电力有限公司沧州供电分公司 | 垂直排列式双悬垂线夹临时保护装置及补销预处理方法 |
CN117990949A (zh) * | 2024-04-07 | 2024-05-07 | 国网山东省电力公司青岛供电公司 | 一种用于高压电缆的异常监测装置及方法 |
CN117990949B (zh) * | 2024-04-07 | 2024-06-07 | 国网山东省电力公司青岛供电公司 | 一种用于高压电缆的异常监测装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106099744B (zh) | 2017-08-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108616076B (zh) | 一种带电作业机器人拆装避雷器的方法 | |
CN106099744A (zh) | 一种高压电缆巡检维修机器人 | |
CN110854739B (zh) | 一种基于无人机的架空输电线路验电接地方法 | |
CN111969478B (zh) | 不停电作业架空线路驱鸟器绝缘电动安装工具 | |
CN105828047A (zh) | 一种便携式电力设备检查装置 | |
CN111300337A (zh) | 一种输电电缆终端杆引流板的拆装工具及拆装方法 | |
CN116902242A (zh) | 一种架空输电线路无人机不停电作业装置及作业方法 | |
CN111431088B (zh) | 一种输电线路自动检修装置 | |
CN110238813A (zh) | 一种电力设备内检机器人 | |
CN210838395U (zh) | 一种外挂于无人机上变电设备用接地装置 | |
CN106932628A (zh) | 便携式多功能电力检测设备 | |
CN118010167A (zh) | 一种电力故障设备的一体化检测装置 | |
CN113193512A (zh) | 一种线缆检修装置 | |
CN108512119B (zh) | 一种高压输电线路巡检机器人 | |
CN111371037A (zh) | 一种高压线路巡检装置 | |
CN219414695U (zh) | 一种多功能照明灯装置 | |
CN114700909B (zh) | 一种用于安装r销的装置 | |
CN216902580U (zh) | 一种新型的组合式绝缘操作杆 | |
CN206609910U (zh) | 一种便携式多功能电力检测设备 | |
CN211579403U (zh) | 一种高压线路巡检装置 | |
CN219226658U (zh) | 一种能实时观测接电线夹状态的监控报警装置 | |
CN115411660B (zh) | 一种电网爬杆作业机器人 | |
CN218216362U (zh) | 架空线检修系统 | |
CN210224779U (zh) | 一种多功能输配电线路巡线装置 | |
CN217413893U (zh) | 一种螺丝套修复工具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Lv Huijun Inventor before: The inventor has waived the right to be mentioned |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170802 Address after: 100194, No. 29, Tu three or four village, Su Zhen Town, Sioux City, Beijing, Haidian District Applicant after: Beijing Huiyu Hengye Technology Co. Ltd. Address before: 054900 No. 54 Yao Lou, Linxi County, Hebei, Xingtai Applicant before: Xu Hongjun |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190620 Address after: 075000 East Garden Town Emerging Industry Demonstration Park B7, Huailai County, Zhangjiakou City, Hebei Province Patentee after: Huiyu Hengye Huailai Mechanical and Electrical Equipment Co., Ltd. Address before: 100194 Tuqiao 29, Susansi Village, Sujiatuo Town, Haidian District, Beijing Patentee before: Beijing Huiyu Hengye Technology Co. Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20210607 |
|
CF01 | Termination of patent right due to non-payment of annual fee |