CN106088697B - The dustless assembly shop of GIS cubicle switchs and assembly method - Google Patents

The dustless assembly shop of GIS cubicle switchs and assembly method Download PDF

Info

Publication number
CN106088697B
CN106088697B CN201610681202.6A CN201610681202A CN106088697B CN 106088697 B CN106088697 B CN 106088697B CN 201610681202 A CN201610681202 A CN 201610681202A CN 106088697 B CN106088697 B CN 106088697B
Authority
CN
China
Prior art keywords
group
gis
spring
passage
operation room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610681202.6A
Other languages
Chinese (zh)
Other versions
CN106088697A (en
Inventor
卢工
鲁武斌
李兴俭
李强
王辉
高运兴
陈兆利
张建忠
陈鑫
华相
华相一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tai'an Tengfei Industrial Co Ltd
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Tai'an Tengfei Industrial Co Ltd
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tai'an Tengfei Industrial Co Ltd, State Grid Corp of China SGCC, TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Tai'an Tengfei Industrial Co Ltd
Priority to CN201610681202.6A priority Critical patent/CN106088697B/en
Publication of CN106088697A publication Critical patent/CN106088697A/en
Application granted granted Critical
Publication of CN106088697B publication Critical patent/CN106088697B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/023Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using fluid means
    • F16F15/0232Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using fluid means with at least one gas spring
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H11/00Apparatus or processes specially adapted for the manufacture of electric switches

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Cleaning In General (AREA)

Abstract

The dustless assembly shop of GIS cubicle switchs of the present invention and assembly method belong to technical field of power systems;The assembly shop includes that wind drenches passage and operation room, and wind drenches passage and is assemblied between external environment condition and operation room, and the operation room includes vibrating isolation system and integrates the operating system of cleaning, evacuation and aeration;The assembly method drenches passage by wind in operator and equipment, entered after operation room by extraneous, equipment is put on vibrating isolation system, then equipment is cleaned, again GIS cubicle switchs are repeatedly evacuated and charge operation, last time carries out air suction process, GIS cubicle switchs is evacuated, GIS cubicle switchs are filled with sulfur hexafluoride gas finally;The present invention can effectively improve the purity of sulfur hexafluoride, and then improve the properties of GIS cubicle switchs.

Description

The dustless assembly shop of GIS cubicle switchs and assembly method
Technical field
The dustless assembly shop of GIS cubicle switchs of the present invention and assembly method belong to technical field of power systems.
Background technology
GIS cubicle switchs are the adjustment equipments of a kind of electric current and voltage, are not only able to control effectively big voltage, are prevented Only power equipment is suffered damage due to the excessive over loading of electric current in running, and GIS cubicle switchs can also be confession in addition The stability and reliability of electricity provides sound assurance, so GIS cubicle switchs are widely used in electric utility.
GIS cubicle switchs need to be filled with sulfur hexafluoride gas, and the purity of sulfur hexafluoride is directly connected to GIS cubicle switchs Properties.Want to make sulfur hexafluoride that there is higher purity, not only need to remove the interference of dust, and need to remove other The interference of foreign gas.
At present, the rule of operation that can much improve sulfur hexafluoride purity has been occurred in that, but has not but found one There is provided the assembly shop of powerful guarantee can to these rule of operation, this also causes many rule of operation to become empty talk of paper, nothing Method is realized.
The content of the invention
In order to solve the above problems, the present invention devises a kind of dustless assembly shop of GIS cubicle switchs and assembly method, should Assembly shop and assembly method can effectively improve the purity of sulfur hexafluoride, and then improve the properties of GIS cubicle switchs.
The object of the present invention is achieved like this:
The dustless assembly shop of GIS cubicle switchs, including wind pouring passage and operation room,
The wind drenches passage and is assemblied between external environment condition and operation room, for the operator into operation room and equipment Carry out blowing pouring, the dust entrained by removing operator and equipment effectively reduces dust and enters operation room;
The operation room includes the vibrating isolation system for load bearing equipment, integrates the operation of cleaning, evacuation and aeration System;
The vibrating isolation system includes vibration-isolating platform and is arranged on multiple air springs of vibration-isolating platform bottom;
The operating system includes for evacuation and injects the supervisor of sulfur hexafluoride gas and for spraying cleaning Looped pipeline,
At the top of the supervisor, bleed-off passage and sulfur hexafluoride passage are inflated in connection respectively, parallel on the inflation bleed-off passage Inflator pump and air pump are provided with, the sulfur hexafluoride passage connects sulfur hexafluoride air accumulator, and supervisor bottom is detachably connected and connects Head;
The looped pipeline is co-axially located in supervisor, stretches out from supervisor's side wall, connect alcohol container at the top of looped pipeline.
The dustless assembly shop of above-mentioned GIS cubicle switchs, the wind are drenched passage and are provided with moving sidewalk, when:
When moving sidewalk is run from external environment condition to operation room direction, while moving horizontally and up-down vibration;
When moving sidewalk is run from operation room external environment direction, only move horizontally.
The dustless assembly shop of above-mentioned GIS cubicle switchs, the air spring have six, and each two is divided into one group;First Group spring and the 3rd group of spring are fixedly mounted on the edge of vibration-isolating platform, and second group of spring is arranged on first group of spring and the 3rd group Between spring, second group of spring bottom is provided with guide rail, and top is provided with pulley, second group of spring can in first group of spring and Move between 3rd group of spring, second group of spring position adjustment is comprised the following steps:
Step a, first group of spring force of contrast and the 3rd group of spring force size;
Step b, by second group of spring to first group of larger spring of elastic force or the movement of the 3rd group of spring direction;
Step c, when first group of spring force is equal with the 3rd group of spring force, second group of spring stops movement.
The dustless assembly shop of above-mentioned GIS cubicle switchs, outside the air pump, is additionally provided with gas transmission absorption pipeline, The inwall of pipeline is adsorbed in the gas transmission, is provided with impurity absorption layer, and the impurity absorption layer includes the Os Draconis being arranged alternately Flower pulp layer and cotton layer.
The dustless assembly method of GIS cubicle switchs realized on the dustless assembly shop of above-mentioned GIS cubicle switchs, including it is following Step:
Step a, operator and equipment drench passage by wind, enter operation room by the external world;
Step b, equipment are put on vibrating isolation system;
Step c, closing supervisor, the ethanol sprayed using looped pipeline are cleaned to equipment;
Step d, closing looped pipeline, close sulfur hexafluoride passage, successively in only pumping pump work and the bar for inflating pump work Under part, GIS cubicle switchs are repeatedly evacuated and charge operation, carry out air suction process for the last time, GIS cubicle switchs are taken out Into vacuum;
Step e, closing looped pipeline, close inflation bleed-off passage, open sulfur hexafluoride passage, GIS cubicle switchs are filled with six Sulfur fluoride gas.
Beneficial effect:
Firstth, passage is drenched due to being provided with wind, therefore can the operator into operation room and equipment be carried out blowing pouring, remove Operator and the dust entrained by equipment are removed, dust is effectively reduced and is entered operation room, and then improve the purity of sulfur hexafluoride, so as to Improve the properties of GIS cubicle switchs.
Secondth, due to being provided with vibrating isolation system, therefore pulse of the earth is effectively isolated, reduces the vibration in operating process, make Complete equipment is more steady, and this is equally beneficial for, and reduction dust is disorderly, the purity of raising sulfur hexafluoride, so as to improve GIS combinations The properties of switch.
3rd, due to being designed with the operating system for integrating cleaning, evacuation and aeration, therefore whole operation same Inner space is carried out, and without changing different instruments, is equally beneficial for resisting the invasion and attack of external dust, is improved sulfur hexafluoride Purity, so as to improve the properties of GIS cubicle switchs.
4th, as joint is designed to the structure being detachably connected, therefore suitable joint can be changed as needed, make Of the invention must can be used for different model, different size, different types of GIS cubicle switchs, the scope of application is wider.
5th, due to being repeatedly evacuated and charge operation, therefore can be by the dust of GIS cubicle switchs inner space Effectively filtered, be equally beneficial for improving the purity of sulfur hexafluoride, so as to improve the properties of GIS cubicle switchs.
Description of the drawings
Fig. 1 is the dustless assembly shop's schematic diagram of GIS cubicle switchs of the present invention.
Fig. 2 is the structural representation of vibrating isolation system.
Fig. 3 is the structural representation of operating system.
In figure:1 vibrating isolation system, 11 vibration-isolating platforms, 12 air springs, 2 operating systems, 21 supervisors, 211 inflator pumps, 212 are taken out Air pump, 213 sulfur hexafluoride air accumulators, 214 gas transmissions absorption pipeline, 22 looped pipelines, 221 alcohol containers, 23 joints.
Specific embodiment
Below in conjunction with the accompanying drawings the specific embodiment of the invention is described in further detail.
Specific embodiment one
The present embodiment is the embodiment of the dustless assembly shop of GIS cubicle switchs.
The dustless assembly shop of GIS cubicle switchs of the present embodiment, including wind pouring passage and operation room, as shown in Figure 1.
The wind drenches passage and is assemblied between external environment condition and operation room, for the operator into operation room and equipment Carry out blowing pouring, the dust entrained by removing operator and equipment effectively reduces dust and enters operation room;
The operation room includes the vibrating isolation system 1 for load bearing equipment, integrates the operation of cleaning, evacuation and aeration System 2;
The structural representation of the vibrating isolation system 1 as shown in Fig. 2 vibrating isolation system 1 include vibration-isolating platform 11 and be arranged on every Shake multiple air springs 12 of 11 bottom of platform;
The structural representation of the operating system 2 is as shown in figure 3, operating system 2 includes for evacuation and injects hexafluoro Change the supervisor 21 of sulfur gas and the looped pipeline 22 for spraying cleaning,
At the top of the supervisor 21, bleed-off passage and sulfur hexafluoride passage are inflated in connection respectively, on the inflation bleed-off passage simultaneously Row is provided with inflator pump 211 and air pump 212, and the sulfur hexafluoride passage connection sulfur hexafluoride air accumulator 213 is responsible for 21 bottoms It is detachably connected joint 23;
The looped pipeline 22 is co-axially located in supervisor 21, stretches out from 21 side walls of supervisor, connect alcohol container at the top of looped pipeline 22 221。
Specific embodiment two
The present embodiment is the embodiment of the dustless assembly shop of GIS cubicle switchs.
The dustless assembly shop of above-mentioned GIS cubicle switchs, the wind are drenched passage and are provided with moving sidewalk, when:
When moving sidewalk is run from external environment condition to operation room direction, while moving horizontally and up-down vibration;It is this Functional design, can will be attached to operator and the dust on equipment shakes, and further improve dust removing effects, and then improve hexafluoro Change the purity of sulfur, improve the properties of GIS cubicle switchs.
When moving sidewalk is run from operation room external environment direction, only move horizontally;Eliminate in this direction Lower vibrating function, can be with save energy.
It should be noted that realizing moving sidewalk up-down vibration, can be lifted by arranging in moving sidewalk bottom Device is realized, skilled person will know how realization, is not repeated explanation in this application.
Specific embodiment three
The present embodiment is the embodiment of the dustless assembly shop of GIS cubicle switchs.
The dustless assembly shop of above-mentioned GIS cubicle switchs, the air spring 12 have six, and each two is divided into one group;The One group of spring and the 3rd group of spring are fixedly mounted on the edge of vibration-isolating platform 11, and second group of spring is arranged on first group of spring and the Between three groups of springs, second group of spring bottom is provided with guide rail, and top is provided with pulley, and second group of spring can be in first group of bullet Move between spring and the 3rd group of spring, this structure is equally applicable in fig. 2, second group of spring position adjustment includes following step Suddenly:
Step a, first group of spring force of contrast and the 3rd group of spring force size;
Step b, by second group of spring to first group of larger spring of elastic force or the movement of the 3rd group of spring direction;
Step c, when first group of spring force is equal with the 3rd group of spring force, second group of spring stops movement.
This structure design, it is ensured that main passive first group of spring and the 3rd group of spring stress are identical, Avoid a certain group of spring from taking the lead in fatigue, extend the service life of vibrating isolation system 1.
Specific embodiment four
The present embodiment is the embodiment of the dustless assembly shop of GIS cubicle switchs.
The dustless assembly shop of above-mentioned GIS cubicle switchs, outside the air pump 212, is additionally provided with gas transmission adsorption tube Road 214, the gas transmission adsorb the inwall of pipeline 214, are provided with impurity absorption layer, and the impurity absorption layer is set including alternating The keel flower pulp layer put and cotton layer.
This structure design, it is possible to use adjacent two-layer cotton layer is bonded together by keel flower slurry, and keel flower slurry Adhering dust can also be played a part of;The structure that keel flower pulp layer and cotton layer are arranged alternately is designed to, gas biography can be extended The effective time of defeated absorption pipeline 214, two-layer cotton layer is separated by keel flower slurry, using one layer of cotton with gas directly contact Flower layer and keel flower pulp layer are adsorbed, and after saturation, keel flower slurry can be dried, and lose the cementability to two-layer cotton layer, And make to come off with the cotton layer of gas directly contact, the cotton layer for newly exposing then takes over adsorption function.
Need it is further noted that keel flower of the present invention slurry, directly obtain by extruding Os Draconis scape;And take off Backward cotton layer and the keel flower slurry being dried, stay in the inwall that pipeline 214 is adsorbed in gas transmission, treat that impurity absorption layer is whole (impurity can be judged by designing PM2.5 concentration threshold in gas, or setting time threshold after body loses adsorption function Adsorption layer whether loss of function), 214 integral replacing of pipeline is adsorbed in gas transmission, or only changes gas transmission absorption pipeline Impurity absorption layer in 214.
For this purpose, having carried out following experiment:
Firstth, one layer of keel flower pulp layer and one layer of cotton layer are considered as into one group, contrast one group and it is multigroup under adsorption effect, Comparing result is that quality incrementss are the multiple of quality incrementss after one group of absorption, the multiple and group base after multigroup absorption This is consistent, it was demonstrated that multigroup effect having not available for a group.
Secondth, thickness identical cotton layer is contrasted with alternating structure of the present invention, comparing result is, merely using cotton Flower layer, it is former be not as many as present configuration quality incrementss, it was demonstrated that the design of keel flower slurry of the present invention has more preferably absorption effect Really.A kind of effect is keel flower slurry itself with more superior than cotton layer adsorption effect, and a kind of effect is made using keel flower slurry New cotton layer continuously emerges, it is ensured that adsorption effect.
Specific embodiment five
The present embodiment is the embodiment of the dustless assembly method of GIS cubicle switchs.
The dustless assembly method of GIS cubicle switchs realized on the dustless assembly shop of above-mentioned GIS cubicle switchs, including it is following Step:
Step a, operator and equipment drench passage by wind, enter operation room by the external world;
Step b, equipment are put on vibrating isolation system 1;
Step c, closing supervisor 21, the ethanol sprayed using looped pipeline 22 are cleaned to equipment;
Step d, closing looped pipeline 22, close sulfur hexafluoride passage, successively in the work of only air pump 212 and inflator pump 211 Under conditions of work, GIS cubicle switchs are repeatedly evacuated and charge operation, are carried out air suction process for the last time, by GIS groups Combination switch is evacuated;
Need explanation, the last time in this step frequency threshold value can be previously set, reaches threshold value and is considered as It is last time, it is also possible to by monitoring gas bleeding air quality, for example, monitor the concentration of PM2.5, when air quality reaches That pumping for requiring is evacuated as last time;
Step e, closing looped pipeline 22, close inflation bleed-off passage, open sulfur hexafluoride passage, GIS cubicle switchs are filled with Sulfur hexafluoride gas.
It should be noted that in the embodiment above, as long as reconcilable technical scheme can carry out permutation and combination, this Art personnel can be possible to according to the mathematical knowledge limit of permutation and combination, therefore, the present invention is no longer to permutation and combination Technical scheme afterwards is illustrated one by one, but it is understood that presently disclosed for the technical scheme after permutation and combination.

Claims (5)

  1. The dustless assembly shop of 1.GIS cubicle switchs, it is characterised in that drench passage and operation room including wind,
    The wind drenches passage and is assemblied between external environment condition and operation room, for carrying out to the operator into operation room and equipment Pouring is blown, the dust entrained by removing operator and equipment effectively reduces dust and enters operation room;
    The operation room includes the vibrating isolation system (1) for load bearing equipment, integrates the operation system of cleaning, evacuation and aeration System (2);
    The vibrating isolation system (1) is including vibration-isolating platform (11) and is arranged on multiple air springs of vibration-isolating platform (11) bottom (12);
    The operating system (2) includes for evacuation and injects the supervisor (21) of sulfur hexafluoride gas and use for spraying cleaning Looped pipeline (22),
    At the top of the supervisor (21), bleed-off passage and sulfur hexafluoride passage are inflated in connection respectively, parallel on the inflation bleed-off passage It is provided with inflator pump (211) and air pump (212), sulfur hexafluoride passage connection sulfur hexafluoride air accumulator (213), supervisor (21) bottom is detachably connected joint (23);
    The looped pipeline (22) is co-axially located in supervisor (21), stretches out from supervisor's (21) side wall, connect ethanol at the top of looped pipeline (22) Tank (221).
  2. 2. the dustless assembly shop of GIS cubicle switchs according to claim 1, it is characterised in that the wind drenches passage to be installed There is moving sidewalk, when:
    When moving sidewalk is run from external environment condition to operation room direction, while moving horizontally and up-down vibration;
    When moving sidewalk is run from operation room external environment direction, only move horizontally.
  3. 3. the dustless assembly shop of GIS cubicle switchs according to claim 1, it is characterised in that the air spring (12) Six are had, each two is divided into one group;First group of spring and the 3rd group of spring are fixedly mounted on the edge of vibration-isolating platform (11), and Two groups of springs are arranged between first group of spring and the 3rd group of spring, and second group of spring bottom is provided with guide rail, and top is provided with Pulley, second group of spring can be moved between first group of spring and the 3rd group of spring, the adjustment of second group of spring position include with Lower step:
    Step a, first group of spring force of contrast and the 3rd group of spring force size;
    Step b, by second group of spring to first group of larger spring of elastic force or the movement of the 3rd group of spring direction;
    Step c, when first group of spring force is equal with the 3rd group of spring force, second group of spring stops movement.
  4. 4. the dustless assembly shop of GIS cubicle switchs according to claim 1, it is characterised in that the air pump (212) is outward Portion, is additionally provided with gas transmission absorption pipeline (214), and the inwall of gas transmission absorption pipeline (214) is provided with impurity suction Attached layer, the impurity absorption layer include the keel flower pulp layer being arranged alternately and cotton layer.
  5. 5. the dustless assembly method of GIS cubicle switchs realized on the dustless assembly shop of GIS cubicle switchs described in claim 1, Characterized in that, comprising the following steps:
    Step a, operator and equipment drench passage by wind, enter operation room by the external world;
    Step b, equipment are put on vibrating isolation system (1);
    Step c, closing supervisor (21), the ethanol sprayed using looped pipeline (22) are cleaned to equipment;
    Step d, closing looped pipeline (22), close sulfur hexafluoride passage, work and inflator pump in only air pump (212) successively (211), under conditions of working, GIS cubicle switchs are repeatedly evacuated and charge operation, are carried out air suction process for the last time, will GIS cubicle switchs are evacuated;
    Step e, closing looped pipeline (22), close inflation bleed-off passage, open sulfur hexafluoride passage, GIS cubicle switchs are filled with six Sulfur fluoride gas.
CN201610681202.6A 2016-08-17 2016-08-17 The dustless assembly shop of GIS cubicle switchs and assembly method Expired - Fee Related CN106088697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610681202.6A CN106088697B (en) 2016-08-17 2016-08-17 The dustless assembly shop of GIS cubicle switchs and assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610681202.6A CN106088697B (en) 2016-08-17 2016-08-17 The dustless assembly shop of GIS cubicle switchs and assembly method

Publications (2)

Publication Number Publication Date
CN106088697A CN106088697A (en) 2016-11-09
CN106088697B true CN106088697B (en) 2017-03-29

Family

ID=58069410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610681202.6A Expired - Fee Related CN106088697B (en) 2016-08-17 2016-08-17 The dustless assembly shop of GIS cubicle switchs and assembly method

Country Status (1)

Country Link
CN (1) CN106088697B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108284107A (en) * 2018-02-02 2018-07-17 安徽静斯德科技有限公司 A kind of workpiece cleaning method
CN109004571B (en) * 2018-07-26 2020-08-25 广西金德泰电气有限公司 Gas-insulated closed compact metal-enclosed switch

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533826A (en) * 1991-07-29 1993-02-09 Showa Electric Wire & Cable Co Ltd Active vibration isolation device
JP2005069303A (en) * 2003-08-21 2005-03-17 Tokkyokiki Corp Pneumatic control type vibration isolator
CN201160197Y (en) * 2008-02-02 2008-12-03 安徽省电力公司阜阳供电公司 Multifunctional inflation and deflation integrated joint of SF6 electrical equipment
CN204983781U (en) * 2015-08-26 2016-01-20 国家电网公司 A clean assembly room for GIS combined electrical apparatus on -site Assembly
CN105846329B (en) * 2016-03-22 2018-02-13 国网山东省电力公司淄博供电公司 Transformer station GIS installs dustlessization construction method

Also Published As

Publication number Publication date
CN106088697A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106088697B (en) The dustless assembly shop of GIS cubicle switchs and assembly method
CN102167102B (en) Suction cup type pneumatic wall-climbing robot
CN204033226U (en) A kind of cleaning device that can vertically climb
CN105747986A (en) Suspended type window cleaning equipment
CN107327152A (en) A kind of curtain wall robot and control method for easily realizing wall adsorption
CN105854499A (en) Dust removal device used in weaving workshop
CN212149084U (en) Negative pressure adsorption type wall-climbing robot
CN105514883A (en) Bidirectional air exhaust cable cooling device
CN104841232A (en) Air purifier with cleaning function
CN110409786B (en) Multi-functional hanging flower basket construction equipment for building
KR101026705B1 (en) Insulator cleaning system
CN207245230U (en) A kind of curtain wall robot for easily realizing wall adsorption
CN107745963A (en) Take discharge mechanism and take discharging device
CN100500257C (en) Dust remover
CN106043486A (en) Crawling robot used for concrete cable bent tower apparent crack detection
CN208295030U (en) A kind of lorry novel shock absorption device
CN105212843B (en) A kind of curtain cleaning device
CN205673270U (en) A kind of machine components cleaning dries drying plant
CN105889233B (en) A kind of high-pressure installation and method for purifying hydraulic oil
CN206766328U (en) A kind of vibration damping shatter-resistant assembly apparatus of unmanned plane
CN205518792U (en) Discharge tube aqueous vapor separator of valve body cleaning machine
CN209897329U (en) Can prevent that excavator oil tank that oil tank takes place to rock uses electricity removal device
CN207206416U (en) A kind of mechanical gripper fixing device
CN209497752U (en) A kind of industrial robot electric cabinet with function of safety protection
CN209353664U (en) Buffer unit is used in a kind of landing of building Lifting basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20170817