CN106088583B - 建筑顶面混凝土双模结构 - Google Patents
建筑顶面混凝土双模结构 Download PDFInfo
- Publication number
- CN106088583B CN106088583B CN201610655628.4A CN201610655628A CN106088583B CN 106088583 B CN106088583 B CN 106088583B CN 201610655628 A CN201610655628 A CN 201610655628A CN 106088583 B CN106088583 B CN 106088583B
- Authority
- CN
- China
- Prior art keywords
- support frame
- beam support
- collar tie
- tie beam
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000007373 indentation Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/38—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610655628.4A CN106088583B (zh) | 2016-08-12 | 2016-08-12 | 建筑顶面混凝土双模结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610655628.4A CN106088583B (zh) | 2016-08-12 | 2016-08-12 | 建筑顶面混凝土双模结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106088583A CN106088583A (zh) | 2016-11-09 |
CN106088583B true CN106088583B (zh) | 2018-07-31 |
Family
ID=57456344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610655628.4A Active CN106088583B (zh) | 2016-08-12 | 2016-08-12 | 建筑顶面混凝土双模结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088583B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107119553B (zh) * | 2017-05-31 | 2023-01-20 | 济南城建集团有限公司 | 一种钢箱梁预制板及制作方法 |
CN107882240B (zh) | 2017-10-16 | 2020-09-22 | 华南理工大学 | 一种再生块体混凝土预制叠合板及其制作工艺 |
CN113463853A (zh) * | 2021-06-25 | 2021-10-01 | 浙江宏超建设集团有限公司 | 一种上人屋面施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2068988U (zh) * | 1989-06-23 | 1991-01-09 | 李渊河 | 可获平整接缝的楼板模板架设装置 |
GB2370603A (en) * | 2000-10-07 | 2002-07-03 | Odell Consultants Ltd | A concrete shuttering platform and support beam |
JP2004197389A (ja) * | 2002-12-18 | 2004-07-15 | Jfe Engineering Kk | フラットスラブ構造 |
CN1982012A (zh) * | 2005-12-14 | 2007-06-20 | 邱则有 | 一种模壳构件的部件成型模具 |
CN203097265U (zh) * | 2013-02-07 | 2013-07-31 | 朱新伟 | 模板托持座以及使用该托持座的托顶装置 |
CN105401679A (zh) * | 2015-12-18 | 2016-03-16 | 上海嘉实(集团)有限公司 | 大坡度现浇混凝土斜屋面施工方法 |
CN106150082A (zh) * | 2016-08-18 | 2016-11-23 | 上海二十冶建设有限公司 | 用于坡屋面屋脊处现浇结构的模板支设结构及支设方法 |
-
2016
- 2016-08-12 CN CN201610655628.4A patent/CN106088583B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2068988U (zh) * | 1989-06-23 | 1991-01-09 | 李渊河 | 可获平整接缝的楼板模板架设装置 |
GB2370603A (en) * | 2000-10-07 | 2002-07-03 | Odell Consultants Ltd | A concrete shuttering platform and support beam |
JP2004197389A (ja) * | 2002-12-18 | 2004-07-15 | Jfe Engineering Kk | フラットスラブ構造 |
CN1982012A (zh) * | 2005-12-14 | 2007-06-20 | 邱则有 | 一种模壳构件的部件成型模具 |
CN203097265U (zh) * | 2013-02-07 | 2013-07-31 | 朱新伟 | 模板托持座以及使用该托持座的托顶装置 |
CN105401679A (zh) * | 2015-12-18 | 2016-03-16 | 上海嘉实(集团)有限公司 | 大坡度现浇混凝土斜屋面施工方法 |
CN106150082A (zh) * | 2016-08-18 | 2016-11-23 | 上海二十冶建设有限公司 | 用于坡屋面屋脊处现浇结构的模板支设结构及支设方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106088583A (zh) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013531B (zh) | 具有凹凸纹路的基于3d打印的混凝土剪力墙结构 | |
CN106088583B (zh) | 建筑顶面混凝土双模结构 | |
CN206873930U (zh) | 一种可调节的装配式组合梁模具 | |
CN106113230B (zh) | 用于梯段预制的非定型、可周转模板体系及其施工方法 | |
CN106149877B (zh) | 混凝土框架结构预制柱与梁板节点处的对接结构及方法 | |
CN110805274A (zh) | 一种y型柱的钢模及其浇筑方法 | |
CN107762001A (zh) | 一种装配式混凝土变截面端柱型剪力墙构件及其施工方法 | |
CN108582426A (zh) | 一种劲性柱的制作装置与制作方法 | |
CN106476125A (zh) | 一种用于生产高速无砟铁路岔枕的模型及其生产岔枕的方法 | |
CN210216896U (zh) | 一种预制板骨架及预制板 | |
CN207376882U (zh) | 一种装配式混凝土变截面端柱型剪力墙构件及其制作模具 | |
CN207405819U (zh) | 一种装配式混凝土变截面剪力墙肢及其制作模具 | |
CN207997396U (zh) | 一种免支模构造柱定型模具 | |
CN104797762B (zh) | 一种建筑物及其施工方法 | |
CN205908016U (zh) | 大坡度现浇混凝土斜屋面支模体系 | |
CN210552011U (zh) | 一种带混凝土养护功能的预制楼梯模具 | |
CN209066507U (zh) | 基于钢模板的地下室外墙后浇带支模结构 | |
CN208428440U (zh) | 预制混凝土盖板简易模具 | |
CN210011144U (zh) | 工地围挡预制基础 | |
CN207405817U (zh) | 一种装配式混凝土变截面t型剪力墙构件及其制作模具 | |
CN206242227U (zh) | 一种多功能立体组合变换模具 | |
CN206477251U (zh) | 横向预应力全宽钢筋混凝土桥面板预制模板体系 | |
CN108643341B (zh) | 超高层建筑箱型结构转换层的施工方法 | |
CN206016254U (zh) | 建筑用预制构造柱免支模u型壳 | |
CN206000020U (zh) | 混凝土框架结构预制柱与梁板节点处的对接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180710 Address after: 276800 Li Jia Hu Village, happy town, Arashiyama District, Rizhao City, Shandong Applicant after: Rizhao Weiye Tool Co.,Ltd. Address before: 264404 Zeku Town, Zeku Town, Wendeng District, Weihai, Shandong Applicant before: Meng Honglin |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 276800 Li Jia Hu Village, happy town, Arashiyama District, Rizhao City, Shandong Patentee after: Rizhao Weiye Tools Co., Ltd Address before: 276800 Li Jia Hu Village, happy town, Arashiyama District, Rizhao City, Shandong Patentee before: RIZHAO WEIYE TOOLS Co.,Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Double formwork structure of building top concrete Effective date of registration: 20201203 Granted publication date: 20180731 Pledgee: Lanshan Branch of Rizhao Bank Co.,Ltd. Pledgor: Rizhao Weiye Tools Co.,Ltd. Registration number: Y2020980008768 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220107 Granted publication date: 20180731 Pledgee: Lanshan Branch of Rizhao Bank Co.,Ltd. Pledgor: Rizhao Weiye Tools Co.,Ltd. Registration number: Y2020980008768 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Building top concrete double formwork structure Effective date of registration: 20220218 Granted publication date: 20180731 Pledgee: Lanshan Branch of Rizhao Bank Co.,Ltd. Pledgor: Rizhao Weiye Tools Co.,Ltd. Registration number: Y2022980001638 |