CN106088161A - A kind of soil that backfills settles the structure watering band - Google Patents

A kind of soil that backfills settles the structure watering band Download PDF

Info

Publication number
CN106088161A
CN106088161A CN201610418252.5A CN201610418252A CN106088161A CN 106088161 A CN106088161 A CN 106088161A CN 201610418252 A CN201610418252 A CN 201610418252A CN 106088161 A CN106088161 A CN 106088161A
Authority
CN
China
Prior art keywords
concrete
reversed beam
template
settlement
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610418252.5A
Other languages
Chinese (zh)
Inventor
荣赛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201610418252.5A priority Critical patent/CN106088161A/en
Publication of CN106088161A publication Critical patent/CN106088161A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of soil that backfills and settle the structure watering band, including reinforced concrete structure-steel framing, the top middle portion of described reinforced concrete structure-steel framing is provided with pouring after settlement and concrete reversed beam, described concrete reversed beam is separately positioned on the both sides, top of pouring after settlement, the top of described pouring after settlement is provided with template and covers, described concrete reversed beam top is provided with retaining wall, and the outside of described retaining wall is provided with waterproof mortar;Being provided with inner support frame in the middle part of described reinforced concrete structure-steel framing, described reinforced concrete structure-steel framing top is placed with planting soil;Construction method of the present invention is easy, without complicated technology, also saves the duration, improves concrete protective effect simultaneously.

Description

A kind of soil that backfills settles the structure watering band
Technical field
The present invention relates to one backfill soil sedimentation and water band, a kind of soil that backfills settles the structure watering band, belongs to building Technical field.
Background technology
At present in construction industry, along with economic develops rapidly, automobile pollution sharply increases, the least District can arrange underground parking garage, and owing to the scale of construction is excessive, it has to section construction, pouring after settlement more and more uses.Build Build in industry, relatively more popular way be exactly water belt construction after settling after carry out again backfilling soil operation, long-term due to engineering Property, by long-term exposure in atmosphere, after expanding with heat and contract with cold, concrete easily produces crack, and the greening operation in later stage to concrete Delay to carry out, have a strong impact on construction period and construction quality.So pouring after settlement structure skill when strengthening backfilling soil in advance Art research and application, the method is the most significant in technology and benefit.
Summary of the invention
The present invention provides a kind of soil that backfills to settle the structure watering band, and construction method is easy, without complicated technology, also saves work Phase, improve concrete protective effect simultaneously.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
A kind of soil that backfills of the present invention settles the structure watering band, and including reinforced concrete structure-steel framing, described reinforced concrete is tied The top middle portion of framework is provided with pouring after settlement and concrete reversed beam, and described concrete reversed beam is separately positioned on pouring after settlement Both sides, top, the top of described pouring after settlement is provided with template and covers, and described concrete reversed beam top is provided with retaining wall, described gear The outside of cob wall is provided with waterproof mortar;Being provided with inner support frame in the middle part of described reinforced concrete structure-steel framing, described reinforced concrete is tied Framework top is placed with planting soil.
As a preferred technical solution of the present invention, during structure is the most above-mentioned,
Step one, material;
Prepare construction concrete, template, waterproof mortar, solid concrete brick, methyl silicon resin, aqueous release agent;
Step 2, model sheetinstallat;
1) material and main facility:
A, matched template: flat-die, angle mould, through-wall bolt and sleeve pipe;
B, interleaving agent: methyl silicon resin, aqueous release agent;
C typically should be respectively arranged with hammer, axe, perforating electric drill, monkey wrench, handsaw, horizon rule, line pendant, crowbar, lifting rope Tool;
2) operating condition:
A, carry out stencil design according to invention description, it is ensured that intensity, rigidity and stability;
B, determine the centrage of reversed beam, elevation line;
Template plate face should be cleaned out before c, installation form, brush interleaving agent, not in template in place after brush isolation Agent, prevents from polluting reinforcing bar and concrete surface, and brushing uniformly, must not leak brush;
Step 3, concreting;
Use layout design concrete grade, use special messenger's nurse during concreting, it is impossible to leakage being shaken, being shaken less, in order to avoid going out Existing cavity affects waterproof effect, and concrete discharging point answers dispersed placement, continuous placing, is less than 2 hours interval time;Lower floor shakes Concrete is reinjected until concreting completes after puddling is real;Curing concrete on request;
Step 4, reversed beam are built solid brick by laying bricks or stones and make waterproof mortar;
After concrete reversed beam reaches requirement of strength, building solid brick on reversed beam by laying bricks or stones, mortar joint should be full, forbids occurring leading to Seam, baste;After having built by laying bricks or stones paint 2CM waterproof mortar levelling.
The present invention is reached to provide the benefit that:
Construction method of the present invention is easy, without complicated technology, also saves the duration, improves concrete protective effect simultaneously.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, with the reality of the present invention Execute example together for explaining the present invention, be not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is that a kind of structure backfilling the structure that band is watered in soil sedimentation of the present invention is intended to;
Fig. 2 is enlarged diagram at a kind of A backfilling the structure that band is watered in soil sedimentation of the present invention;
In figure: 1, concrete reversed beam;2, retaining wall;3, waterproof mortar;4, planting soil;5, pouring after settlement;6, reinforcing bar mixes Xtah Crude Clay structure frame;7, inner support frame;8, template covers.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred reality described herein Execute example be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment: as shown in Figure 1-2, a kind of soil that backfills of the present invention settles the structure watering band, including reinforced concrete structure Frame 6, it is characterised in that the top middle portion of described reinforced concrete structure-steel framing 6 is provided with pouring after settlement 5 and concrete reversed beam 1, institute Stating concrete reversed beam 1 and be separately positioned on the both sides, top of pouring after settlement 5, the top of described pouring after settlement 5 is provided with template and covers Lid 8, described concrete reversed beam 1 top is provided with retaining wall, and the outside of described retaining wall is provided with waterproof mortar;Described reinforced concrete Being provided with inner support frame 7 in the middle part of structure-steel framing 6, described reinforced concrete structure-steel framing 6 top is placed with planting soil.
A kind of soil that backfills settles the constructing technology watering band, during structure is the most above-mentioned,
Step one, material;
Prepare construction concrete, template, waterproof mortar 3, solid concrete brick, methyl silicon resin, aqueous release agent;
Step 2, model sheetinstallat;
1) material and main facility:
A, matched template: flat-die, angle mould, through-wall bolt and sleeve pipe;
B, interleaving agent: methyl silicon resin, aqueous release agent;
C typically should be respectively arranged with hammer, axe, perforating electric drill, monkey wrench, handsaw, horizon rule, line pendant, crowbar, lifting rope Tool;
2) operating condition:
A, carry out stencil design according to invention description, it is ensured that intensity, rigidity and stability;
B, determine the centrage of reversed beam, elevation line;
Template plate face should be cleaned out before c, installation form, brush interleaving agent, not in template in place after brush isolation Agent, prevents from polluting reinforcing bar and concrete surface, and brushing uniformly, must not leak brush;
Step 3, concreting;
Use layout design concrete grade, use special messenger's nurse during concreting, it is impossible to leakage being shaken, being shaken less, in order to avoid going out Existing cavity affects waterproof effect, and concrete discharging point answers dispersed placement, continuous placing, is less than 2 hours interval time;Lower floor shakes Concrete is reinjected until concreting completes after puddling is real;Curing concrete on request;
Step 4, reversed beam are built solid brick by laying bricks or stones and make waterproof mortar;
After concrete reversed beam reaches requirement of strength, building solid brick on reversed beam by laying bricks or stones, mortar joint should be full, forbids occurring leading to Seam, baste;After having built by laying bricks or stones paint 2CM waterproof mortar levelling.
Construction method of the present invention is easy, without complicated technology, also saves the duration, improves concrete protective effect simultaneously.
Finally it is noted that the foregoing is only the preferred embodiments of the present invention, it is not limited to the present invention, Although being described in detail the present invention with reference to previous embodiment, for a person skilled in the art, it still may be used So that the technical scheme described in foregoing embodiments to be modified, or wherein portion of techniques feature is carried out equivalent. All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included in the present invention's Within protection domain.

Claims (2)

1. backfill soil sedimentation and water a structure for band, including reinforced concrete structure-steel framing (6), it is characterised in that described reinforcing bar mixes The top middle portion of clay structure frame (6) is provided with pouring after settlement (5) and concrete reversed beam (1), and described concrete reversed beam (1) is respectively Being arranged on the both sides, top of pouring after settlement (5), the top of described pouring after settlement (5) is provided with template and covers (8), described coagulation Soil reversed beam (1) top is provided with retaining wall, and the outside of described retaining wall is provided with waterproof mortar;Described reinforced concrete structure-steel framing (6) Middle part is provided with inner support frame (7), and described reinforced concrete structure-steel framing (6) top is placed with planting soil.
2. one kind backfills the native constructing technology settling and watering band, it is characterised in that in structure such as claim 1,
Step one, material;
Prepare construction concrete, template, waterproof mortar (3), solid concrete brick, methyl silicon resin, aqueous release agent;
Step 2, model sheetinstallat;
1) material and main facility:
A, matched template: flat-die, angle mould, through-wall bolt and sleeve pipe;
B, interleaving agent: methyl silicon resin, aqueous release agent;
C typically should be respectively arranged with hammer, axe, perforating electric drill, monkey wrench, handsaw, horizon rule, line pendant, crowbar, hoisting rig;
2) operating condition:
A, carry out stencil design according to invention description, it is ensured that intensity, rigidity and stability;
B, determine the centrage of reversed beam, elevation line;
Template plate face should be cleaned out before c, installation form, brush interleaving agent, not in template rear brush interleaving agent in place, anti- Only polluting reinforcing bar and concrete surface, brushing uniformly, must not leak brush;
Step 3, concreting;
Use layout design concrete grade, use special messenger's nurse during concreting, it is impossible to leakage is shaken, shaken less, in order to avoid sky occurs Hole affects waterproof effect, and concrete discharging point answers dispersed placement, continuous placing, is less than 2 hours interval time;Lower floor vibrates close Concrete is reinjected until concreting completes after reality;Curing concrete on request;
Step 4, reversed beam are built solid brick by laying bricks or stones and make waterproof mortar;
After concrete reversed beam reaches requirement of strength, building solid brick on reversed beam by laying bricks or stones, mortar joint should be full, forbids straight joint, vacation occur Seam;After having built by laying bricks or stones paint 2CM waterproof mortar levelling.
CN201610418252.5A 2016-06-08 2016-06-08 A kind of soil that backfills settles the structure watering band Pending CN106088161A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610418252.5A CN106088161A (en) 2016-06-08 2016-06-08 A kind of soil that backfills settles the structure watering band

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610418252.5A CN106088161A (en) 2016-06-08 2016-06-08 A kind of soil that backfills settles the structure watering band

Publications (1)

Publication Number Publication Date
CN106088161A true CN106088161A (en) 2016-11-09

Family

ID=57846864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610418252.5A Pending CN106088161A (en) 2016-06-08 2016-06-08 A kind of soil that backfills settles the structure watering band

Country Status (1)

Country Link
CN (1) CN106088161A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506593A (en) * 2022-10-12 2022-12-23 中国二十二冶集团有限公司 Garage top wall column construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3038524A1 (en) * 1980-10-11 1982-04-29 Leschus, geb. Putsch, Hildegard, 5600 Wuppertal Water bar or sealing strip for concrete joints - has integral grout tube for later injection of expanding grout to seal leaks
DE3634906A1 (en) * 1986-10-14 1988-04-28 Bilfinger Berger Bau Precast concrete member and method of constructing a trench wall with the use of the precast concrete member
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
CN104790436A (en) * 2015-04-16 2015-07-22 中国二十二冶集团有限公司 High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN104805870A (en) * 2015-04-16 2015-07-29 中国二十二冶集团有限公司 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement
CN205152991U (en) * 2015-11-20 2016-04-13 中建四局第一建筑工程有限公司 Late poured band structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3038524A1 (en) * 1980-10-11 1982-04-29 Leschus, geb. Putsch, Hildegard, 5600 Wuppertal Water bar or sealing strip for concrete joints - has integral grout tube for later injection of expanding grout to seal leaks
DE3634906A1 (en) * 1986-10-14 1988-04-28 Bilfinger Berger Bau Precast concrete member and method of constructing a trench wall with the use of the precast concrete member
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
CN104790436A (en) * 2015-04-16 2015-07-22 中国二十二冶集团有限公司 High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN104805870A (en) * 2015-04-16 2015-07-29 中国二十二冶集团有限公司 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement
CN205152991U (en) * 2015-11-20 2016-04-13 中建四局第一建筑工程有限公司 Late poured band structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张业梁: "地下室沉降后浇带混凝土施工技术例析", 《建筑》 *
肖幼锋: "浅谈后浇带的应用和施工质量控制", 《河南建材》 *
路志旭: "浅谈工程施工中后浇带处理的工艺技术", 《建筑安全》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506593A (en) * 2022-10-12 2022-12-23 中国二十二冶集团有限公司 Garage top wall column construction method

Similar Documents

Publication Publication Date Title
CN105908777B (en) A kind of pipe gallery sliding mould and its application method
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN110258640B (en) Construction method of superposed wall system for cover-excavation top-down construction
CN110872869A (en) Waterproof construction method for joints of external wall panels
CN108005118A (en) Underground pipe gallery agent structure integrates construction method
CN105839677A (en) Advanced water prevention construction process for post-cast strip of side wall of basement
CN106869548A (en) A kind of newel framework assembled underground parking structural system and construction method
CN102444143A (en) Construction method for cancelling operation channel for facades of basement
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN110158656A (en) A kind of integrated template piping lane and its method of construction
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN106884436B (en) A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN103953036A (en) Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation
CN103726508B (en) A kind of precast rc slab material loose tool and construction method
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN107905609A (en) Underground people's air defense construction method
CN110670741A (en) Method for processing deformation joint of building wall body
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN103790168A (en) Application method of soil nailing wall in deep foundation pit supporting
KR100940937B1 (en) Concrete structure repairing method
CN206299392U (en) A kind of high osmosis water-rich sand layer shield end reinforcement system
CN108590680A (en) A kind of construction method that launching shaft foundation pit vertical section pours
CN205296197U (en) Prefabricated cushion cap of anticorrosive industry factory building concrete rim of a cup formula
CN106088161A (en) A kind of soil that backfills settles the structure watering band

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication