CN104805870A - Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement - Google Patents

Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement Download PDF

Info

Publication number
CN104805870A
CN104805870A CN201510178244.3A CN201510178244A CN104805870A CN 104805870 A CN104805870 A CN 104805870A CN 201510178244 A CN201510178244 A CN 201510178244A CN 104805870 A CN104805870 A CN 104805870A
Authority
CN
China
Prior art keywords
settlement
post
cast strip
basement
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510178244.3A
Other languages
Chinese (zh)
Inventor
苑宗双
吕思清
雷小通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201510178244.3A priority Critical patent/CN104805870A/en
Publication of CN104805870A publication Critical patent/CN104805870A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to a construction method of a building project, in particular to a construction method for first soil filling and then casting at a settlement post-cast strip of a top plate of a basement. The construction method comprises the following steps of chiseling and cleaning the two sides of the settlement post-cast strip; supporting a formwork and a support system at the lower part of the settlement post-cast strip; manufacturing an inverted U-shaped reinforced concrete cover plate at the upper part of the settlement post-cast strip; pre-embedding a steel pipe on the cover plate; adhering soft plastic bars at the corners of the cover plate; constructing a waterproof layer of the top plate of the basement; constructing a waterproof protecting layer of the top plate of the basement; backfilling soil; arranging a protecting device; casting concrete onto the settlement post-cast strip. The construction method has the advantages that the soil can be backfilled at the upper part without sealing the post-cast strip, and then a flat site land is formed, so as to facilitate the plane arrangement of the site; a grouting enlarging space which is higher than the top plate of the basement is formed under the inverted U-shaped cover plate, so the casting thickness of the post-cast strip is guaranteed; after soil backfilling is realized for a post-cast hole passage of the steel pipe, the concrete is cast onto the post-cast strip; by arranging the soft plastic bars, the nonuniform settlement amounts at the two sides of the settlement post-cast strip can be adjusted and absorbed, and the tension fracture of a coil on the cover plate is prevented.

Description

Basement roof pouring after settlement place first banket after casting construction method
Technical field
The present invention relates to building engineering construction method, specifically a kind of basement roof pouring after settlement place first banket after casting construction method.
Background technology
Modern overlooking community is designed with high residential building and the overlooking commercial building of multilayer and underground garage more, and the building basement of differing heights links together because of the using function of underground garage.Because highrise building and multistory building are comparatively large to the different loading of ground effect, thus cause the differential settlement of ground, basement structure is occurred even to rupture in crack.In order to avoid this problem, usually the multistory building design of basement pouring after settlement around highrise building, pouring after settlement whole load after highrise building agent structure binds has added and has been poured into a mould after settlement stability, from pouring after settlement indwelling to pouring after settlement casting complete, forming complete basement space often needs for a long time.Basement is imperfect, cannot carry out the backfill construction of basement roof top, thus construction plant cannot make full use of, greatly affect engineering construction efficiency, restriction construction period.
Summary of the invention
The present invention is intended to solve the problems referred to above that prior art exists, and provides a kind of with low cost, easy and simple to handle, can basement roof pouring after settlement place that significantly accelerating construction progress improves construction quality first banket after casting construction method.
The technical scheme that the present invention solves the employing of described problem is:
First banketing after-pouring construction method in a kind of basement roof pouring after settlement place, carries out in the steps below:
(1) cutter cleaning is picked in pouring after settlement both sides;
(2) pouring after settlement bottom installs template and support system;
(3) muscle is tied up on pouring after settlement top, formwork builds inverted U cast-in-situ concrete cover plate, embedded steel tube in cover plate;
(4) soft plastic rod is pasted in cover plate bight;
(5) basement roof construction of waterproof layer;
(6) basement roof fish tail and waterproof layer construction;
(7) backfill construction;
(8) embedded steel tube protective device is set;
(9) pouring after settlement concrete is built by embedded steel tube.
Adopt the present invention of technique scheme, compared with prior art, its beneficial effect:
1. can realize not closing ater-casting and carrying out top backfill construction, form smooth on-the-spot place, be beneficial to spot plane and arrange;
2. arrange inverted U cover plate, form the grouting exceeding basement roof under cover plate and add large space, what ensure ater-casting plate builds thickness;
3. arrange steel pipe back pouring hole road realize backfill complete after ater-casting concrete after-pouring.
4. 50 soft plastic rods are set and can regulate absorption pouring after settlement left and right sides differential settlement amount, prevent the coiled material drawing crack of cover plate top.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention;
In figure: scaffold support standpipe 1-1, the stupefied 1-2 of steel pipe master, flitch 1-3, composite board 1-4; Pouring after settlement 2; Basement roof 3; Concrete cover 4; Waterproofing course 5; Steel pipe 6; Temporary plugging plank 7; Reinforced frame protective emblem 8; Soft plastic rod 9; Fish tail and waterproof layer 10; Backfill 11.
Detailed description of the invention
The present invention is further elaborated for the embodiment provided below in conjunction with accompanying drawing, but embodiment does not form any restriction to the present invention.
See Fig. 1, the basement roof pouring after settlement place described in the present embodiment first banket after casting construction method, carry out in the steps below:
(1) pouring after settlement 2 both sides are picked cutter and are cleaned out.
(2) pouring after settlement 2 bottom installs template and support system; Template and support system are made up of scaffold support standpipe 1-1, the stupefied 1-2 of steel pipe master, flitch 1-3, composite board 1-4, and scaffold support standpipe 1-1, the stupefied 1-2 of steel pipe master are f48*3.0 steel pipe, scaffold support standpipe 1-1 in length and breadth to 300 one, step pitch 1800; The stupefied 1-2300(400 of steel pipe master) together; Flitch 1-3 is 50 × 100 flitch 150 one; Composite board 1-4 is 18 thick composite board.
(3) muscle is tied up on pouring after settlement 2 top, formwork builds inverted U cast-in-situ concrete cover plate 4, pre-buried f200 steel pipe 6 in concrete cover 4, exterior angle, the concrete cover 4 top fillet of falling f50.
(4) f50 soft plastic rod 9 is pasted in concrete cover 4 bight, presets pouring after settlement 2 left and right sides differential settlement amount, prevents the coiled material drawing crack of concrete cover 4 top.
(5) waterproofing course 5 of construction basement roof 3, waterproof edge concrete cover 4 top is rolled up to steel pipe 6 suitable for reading always, and concrete cover 4 top is that empty paving is to adapt to the amount of tension that pouring after settlement 2 left and right sides differential settlement causes.
(6) build the fish tail and waterproof layer 10 of basement roof 3, the cotton felt-cloth of the waterproof on steel pipe 6 wraps up as topping.
(7) backfill 11 is constructed, and the interim capping of steel pipe 6 temporary plugging plank 7 suitable for reading, backfill 11 surface roadways hardens, and corresponding steel pipe 6 place suitable for reading arranges reinforced frame protective emblem 8, avoids wheel to roll.
(8) agent structure bind 14 days after pouring after settlement 2 possess when building condition, excavate local, steel pipe 6 top backfill, expose steel pipe 6 mouthfuls, build ater-casting concrete by steel pipe 6 mouthfuls, build height high to 500mm in steel pipe 6, by minor diameter vibrating spear vibration compacting.
(9) in steel pipe 6, remaining space fills out the compacting of element soil timber, mouth of pipe shutoff 3mm steel plate.
The foregoing is only the better feasible embodiment of the present invention, not thereby limit to interest field of the present invention, the equivalent structure change that all utilizations manual of the present invention and accompanying drawing content are done, be all contained within interest field of the present invention.

Claims (1)

1. first banket an after-pouring construction method in basement roof pouring after settlement place, it is characterized in that, carry out in the steps below:
(1) cutter cleaning is picked in pouring after settlement both sides;
(2) pouring after settlement bottom installs template and support system;
(3) muscle is tied up on pouring after settlement top, formwork builds inverted U cast-in-situ concrete cover plate, embedded steel tube in cover plate;
(4) soft plastic rod is pasted in cover plate bight;
(5) basement roof construction of waterproof layer;
(6) basement roof fish tail and waterproof layer construction;
(7) backfill construction;
(8) embedded steel tube protective device is set;
(9) pouring after settlement concrete is built by embedded steel tube.
CN201510178244.3A 2015-04-16 2015-04-16 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement Pending CN104805870A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178244.3A CN104805870A (en) 2015-04-16 2015-04-16 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510178244.3A CN104805870A (en) 2015-04-16 2015-04-16 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement

Publications (1)

Publication Number Publication Date
CN104805870A true CN104805870A (en) 2015-07-29

Family

ID=53691038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178244.3A Pending CN104805870A (en) 2015-04-16 2015-04-16 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement

Country Status (1)

Country Link
CN (1) CN104805870A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350581A (en) * 2015-10-10 2016-02-24 中建二局第二建筑工程有限公司 Advanced sealing structure for basement top slab settlement post-cast strips
CN105649197A (en) * 2016-01-31 2016-06-08 江苏扬建集团有限公司 Post-pouring belt construction method conducted under green-landscape-first condition
CN106088161A (en) * 2016-06-08 2016-11-09 中国十七冶集团有限公司 A kind of soil that backfills settles the structure watering band
CN108396783A (en) * 2018-05-17 2018-08-14 中冶天工集团天津有限公司 A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN108678009A (en) * 2018-07-26 2018-10-19 中建四局第四建筑工程有限公司 A kind of basement post-pouring zone reserved passageway construction method and device
CN108842827A (en) * 2018-08-07 2018-11-20 广东建星建造集团有限公司 Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method
CN109024933A (en) * 2018-09-11 2018-12-18 四川大诚建筑工程有限公司 Post empiricism structure
CN109944278A (en) * 2019-03-11 2019-06-28 国骅建设有限公司 Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip
CN111549828A (en) * 2020-05-28 2020-08-18 深圳市建工集团股份有限公司 Construction method of detachable blocking steel plate of basement roof post-cast strip
CN112459126A (en) * 2020-11-10 2021-03-09 北京首钢建设集团有限公司 Method for closing underground garage settlement post-cast strip in advance
CN113374263A (en) * 2021-07-19 2021-09-10 云南建投第六建设有限公司 Construction method for closing settled post-cast strip in advance
CN115387392A (en) * 2022-08-23 2022-11-25 中国五冶集团有限公司 Basement post-cast strip construction structure and method
CN115450262A (en) * 2022-08-31 2022-12-09 上海城建市政工程(集团)有限公司 Working method for arranging construction channel at upper part of post-cast strip of building structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100544A (en) * 1995-10-09 1997-04-15 Takeshige Shimonohara Joint method of precast concrete member and joint construction
CN103410172A (en) * 2013-08-21 2013-11-27 天津二十冶建设有限公司 Construction method for post pouring belt plugging of underground structural roof plate
CN203546759U (en) * 2013-09-17 2014-04-16 中联世纪建设集团有限公司 Plugging structure for post-cast strip of underground building
CN203613561U (en) * 2013-08-20 2014-05-28 中国建筑第八工程局有限公司 Post-cast strip prefabricated cover plate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100544A (en) * 1995-10-09 1997-04-15 Takeshige Shimonohara Joint method of precast concrete member and joint construction
CN203613561U (en) * 2013-08-20 2014-05-28 中国建筑第八工程局有限公司 Post-cast strip prefabricated cover plate
CN103410172A (en) * 2013-08-21 2013-11-27 天津二十冶建设有限公司 Construction method for post pouring belt plugging of underground structural roof plate
CN203546759U (en) * 2013-09-17 2014-04-16 中联世纪建设集团有限公司 Plugging structure for post-cast strip of underground building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
田金成: "《地下室顶板沉降后浇带提前封闭施工技术》", 《施工技术》, vol. 38, no. 12, 31 December 2009 (2009-12-31), pages 54 - 57 *
蒋虎山: "《地下室顶板沉降后浇带预封闭施工技术》", 《科技与创新》, no. 19, 31 October 2014 (2014-10-31), pages 75 - 76 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350581A (en) * 2015-10-10 2016-02-24 中建二局第二建筑工程有限公司 Advanced sealing structure for basement top slab settlement post-cast strips
CN105649197A (en) * 2016-01-31 2016-06-08 江苏扬建集团有限公司 Post-pouring belt construction method conducted under green-landscape-first condition
CN105649197B (en) * 2016-01-31 2018-07-13 江苏扬建集团有限公司 Rear pouring tape construction method of Afforestation Landscape under the conditions of in advance
CN106088161A (en) * 2016-06-08 2016-11-09 中国十七冶集团有限公司 A kind of soil that backfills settles the structure watering band
CN108396783A (en) * 2018-05-17 2018-08-14 中冶天工集团天津有限公司 A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN108678009A (en) * 2018-07-26 2018-10-19 中建四局第四建筑工程有限公司 A kind of basement post-pouring zone reserved passageway construction method and device
CN108842827A (en) * 2018-08-07 2018-11-20 广东建星建造集团有限公司 Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method
CN109024933A (en) * 2018-09-11 2018-12-18 四川大诚建筑工程有限公司 Post empiricism structure
CN109944278A (en) * 2019-03-11 2019-06-28 国骅建设有限公司 Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip
CN111549828A (en) * 2020-05-28 2020-08-18 深圳市建工集团股份有限公司 Construction method of detachable blocking steel plate of basement roof post-cast strip
CN111549828B (en) * 2020-05-28 2021-11-23 深圳市建工集团股份有限公司 Construction method of detachable blocking steel plate of basement roof post-cast strip
CN112459126A (en) * 2020-11-10 2021-03-09 北京首钢建设集团有限公司 Method for closing underground garage settlement post-cast strip in advance
CN113374263A (en) * 2021-07-19 2021-09-10 云南建投第六建设有限公司 Construction method for closing settled post-cast strip in advance
CN115387392A (en) * 2022-08-23 2022-11-25 中国五冶集团有限公司 Basement post-cast strip construction structure and method
CN115387392B (en) * 2022-08-23 2023-12-15 中国五冶集团有限公司 Basement post-pouring strip construction structure and method
CN115450262A (en) * 2022-08-31 2022-12-09 上海城建市政工程(集团)有限公司 Working method for arranging construction channel at upper part of post-cast strip of building structure
CN115450262B (en) * 2022-08-31 2024-01-26 上海城建市政工程(集团)有限公司 Working method for setting construction channel on upper part of post-pouring strip of building structure

Similar Documents

Publication Publication Date Title
CN104805870A (en) Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN106759439B (en) Tower crane foundation for foundation pit and construction method thereof
CN103161176B (en) Tower crane foundation construction method in main building disjunctor garage
CN104060781A (en) Cast-in-situ cranked slab stair without seams at stair sections and construction method
CN108130837A (en) A kind of prefabricated road plate and its construction method
CN104295003A (en) Structural column construction method
CN206233560U (en) Wall formwork erecting structure
CN111287199A (en) Super high-rise building deep foundation pit and construction method thereof
CN113417300B (en) Slope support system and construction method thereof
JP7101407B2 (en) On-site placement reinforcement top type pile foundation and its construction method
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN104890434A (en) Plastic-stone landscape making method
CN111119219B (en) Reinforced foundation tire membrane structure and construction method thereof
CN108004866A (en) A kind of precast concrete road system and construction method
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method
KR101230986B1 (en) Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
CN115961647A (en) Basement roof post-cast strip advanced sealing structure, construction structure and construction method
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN104963364A (en) Disposing method for topdown structural slab lower side wall construction joint
CN111576658B (en) Construction method of post-cast strip protection wall of assembled basement outer wall
CN108149707A (en) A kind of basement building structure and its construction method
CN103866738A (en) Rock-fill concrete construction method used for wave wall foundation platform
CN104878756A (en) Sand-filling hollow structure based cast-in-place special-shaped pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150729