CN104805870A - Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement - Google Patents
Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement Download PDFInfo
- Publication number
- CN104805870A CN104805870A CN201510178244.3A CN201510178244A CN104805870A CN 104805870 A CN104805870 A CN 104805870A CN 201510178244 A CN201510178244 A CN 201510178244A CN 104805870 A CN104805870 A CN 104805870A
- Authority
- CN
- China
- Prior art keywords
- settlement
- post
- cast strip
- basement
- cover plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention relates to a construction method of a building project, in particular to a construction method for first soil filling and then casting at a settlement post-cast strip of a top plate of a basement. The construction method comprises the following steps of chiseling and cleaning the two sides of the settlement post-cast strip; supporting a formwork and a support system at the lower part of the settlement post-cast strip; manufacturing an inverted U-shaped reinforced concrete cover plate at the upper part of the settlement post-cast strip; pre-embedding a steel pipe on the cover plate; adhering soft plastic bars at the corners of the cover plate; constructing a waterproof layer of the top plate of the basement; constructing a waterproof protecting layer of the top plate of the basement; backfilling soil; arranging a protecting device; casting concrete onto the settlement post-cast strip. The construction method has the advantages that the soil can be backfilled at the upper part without sealing the post-cast strip, and then a flat site land is formed, so as to facilitate the plane arrangement of the site; a grouting enlarging space which is higher than the top plate of the basement is formed under the inverted U-shaped cover plate, so the casting thickness of the post-cast strip is guaranteed; after soil backfilling is realized for a post-cast hole passage of the steel pipe, the concrete is cast onto the post-cast strip; by arranging the soft plastic bars, the nonuniform settlement amounts at the two sides of the settlement post-cast strip can be adjusted and absorbed, and the tension fracture of a coil on the cover plate is prevented.
Description
Technical field
The present invention relates to building engineering construction method, specifically a kind of basement roof pouring after settlement place first banket after casting construction method.
Background technology
Modern overlooking community is designed with high residential building and the overlooking commercial building of multilayer and underground garage more, and the building basement of differing heights links together because of the using function of underground garage.Because highrise building and multistory building are comparatively large to the different loading of ground effect, thus cause the differential settlement of ground, basement structure is occurred even to rupture in crack.In order to avoid this problem, usually the multistory building design of basement pouring after settlement around highrise building, pouring after settlement whole load after highrise building agent structure binds has added and has been poured into a mould after settlement stability, from pouring after settlement indwelling to pouring after settlement casting complete, forming complete basement space often needs for a long time.Basement is imperfect, cannot carry out the backfill construction of basement roof top, thus construction plant cannot make full use of, greatly affect engineering construction efficiency, restriction construction period.
Summary of the invention
The present invention is intended to solve the problems referred to above that prior art exists, and provides a kind of with low cost, easy and simple to handle, can basement roof pouring after settlement place that significantly accelerating construction progress improves construction quality first banket after casting construction method.
The technical scheme that the present invention solves the employing of described problem is:
First banketing after-pouring construction method in a kind of basement roof pouring after settlement place, carries out in the steps below:
(1) cutter cleaning is picked in pouring after settlement both sides;
(2) pouring after settlement bottom installs template and support system;
(3) muscle is tied up on pouring after settlement top, formwork builds inverted U cast-in-situ concrete cover plate, embedded steel tube in cover plate;
(4) soft plastic rod is pasted in cover plate bight;
(5) basement roof construction of waterproof layer;
(6) basement roof fish tail and waterproof layer construction;
(7) backfill construction;
(8) embedded steel tube protective device is set;
(9) pouring after settlement concrete is built by embedded steel tube.
Adopt the present invention of technique scheme, compared with prior art, its beneficial effect:
1. can realize not closing ater-casting and carrying out top backfill construction, form smooth on-the-spot place, be beneficial to spot plane and arrange;
2. arrange inverted U cover plate, form the grouting exceeding basement roof under cover plate and add large space, what ensure ater-casting plate builds thickness;
3. arrange steel pipe back pouring hole road realize backfill complete after ater-casting concrete after-pouring.
4. 50 soft plastic rods are set and can regulate absorption pouring after settlement left and right sides differential settlement amount, prevent the coiled material drawing crack of cover plate top.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention;
In figure: scaffold support standpipe 1-1, the stupefied 1-2 of steel pipe master, flitch 1-3, composite board 1-4; Pouring after settlement 2; Basement roof 3; Concrete cover 4; Waterproofing course 5; Steel pipe 6; Temporary plugging plank 7; Reinforced frame protective emblem 8; Soft plastic rod 9; Fish tail and waterproof layer 10; Backfill 11.
Detailed description of the invention
The present invention is further elaborated for the embodiment provided below in conjunction with accompanying drawing, but embodiment does not form any restriction to the present invention.
See Fig. 1, the basement roof pouring after settlement place described in the present embodiment first banket after casting construction method, carry out in the steps below:
(1) pouring after settlement 2 both sides are picked cutter and are cleaned out.
(2) pouring after settlement 2 bottom installs template and support system; Template and support system are made up of scaffold support standpipe 1-1, the stupefied 1-2 of steel pipe master, flitch 1-3, composite board 1-4, and scaffold support standpipe 1-1, the stupefied 1-2 of steel pipe master are f48*3.0 steel pipe, scaffold support standpipe 1-1 in length and breadth to 300 one, step pitch 1800; The stupefied 1-2300(400 of steel pipe master) together; Flitch 1-3 is 50 × 100 flitch 150 one; Composite board 1-4 is 18 thick composite board.
(3) muscle is tied up on pouring after settlement 2 top, formwork builds inverted U cast-in-situ concrete cover plate 4, pre-buried f200 steel pipe 6 in concrete cover 4, exterior angle, the concrete cover 4 top fillet of falling f50.
(4) f50 soft plastic rod 9 is pasted in concrete cover 4 bight, presets pouring after settlement 2 left and right sides differential settlement amount, prevents the coiled material drawing crack of concrete cover 4 top.
(5) waterproofing course 5 of construction basement roof 3, waterproof edge concrete cover 4 top is rolled up to steel pipe 6 suitable for reading always, and concrete cover 4 top is that empty paving is to adapt to the amount of tension that pouring after settlement 2 left and right sides differential settlement causes.
(6) build the fish tail and waterproof layer 10 of basement roof 3, the cotton felt-cloth of the waterproof on steel pipe 6 wraps up as topping.
(7) backfill 11 is constructed, and the interim capping of steel pipe 6 temporary plugging plank 7 suitable for reading, backfill 11 surface roadways hardens, and corresponding steel pipe 6 place suitable for reading arranges reinforced frame protective emblem 8, avoids wheel to roll.
(8) agent structure bind 14 days after pouring after settlement 2 possess when building condition, excavate local, steel pipe 6 top backfill, expose steel pipe 6 mouthfuls, build ater-casting concrete by steel pipe 6 mouthfuls, build height high to 500mm in steel pipe 6, by minor diameter vibrating spear vibration compacting.
(9) in steel pipe 6, remaining space fills out the compacting of element soil timber, mouth of pipe shutoff 3mm steel plate.
The foregoing is only the better feasible embodiment of the present invention, not thereby limit to interest field of the present invention, the equivalent structure change that all utilizations manual of the present invention and accompanying drawing content are done, be all contained within interest field of the present invention.
Claims (1)
1. first banket an after-pouring construction method in basement roof pouring after settlement place, it is characterized in that, carry out in the steps below:
(1) cutter cleaning is picked in pouring after settlement both sides;
(2) pouring after settlement bottom installs template and support system;
(3) muscle is tied up on pouring after settlement top, formwork builds inverted U cast-in-situ concrete cover plate, embedded steel tube in cover plate;
(4) soft plastic rod is pasted in cover plate bight;
(5) basement roof construction of waterproof layer;
(6) basement roof fish tail and waterproof layer construction;
(7) backfill construction;
(8) embedded steel tube protective device is set;
(9) pouring after settlement concrete is built by embedded steel tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510178244.3A CN104805870A (en) | 2015-04-16 | 2015-04-16 | Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510178244.3A CN104805870A (en) | 2015-04-16 | 2015-04-16 | Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104805870A true CN104805870A (en) | 2015-07-29 |
Family
ID=53691038
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510178244.3A Pending CN104805870A (en) | 2015-04-16 | 2015-04-16 | Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104805870A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350581A (en) * | 2015-10-10 | 2016-02-24 | 中建二局第二建筑工程有限公司 | Advanced sealing structure for basement top slab settlement post-cast strips |
CN105649197A (en) * | 2016-01-31 | 2016-06-08 | 江苏扬建集团有限公司 | Post-pouring belt construction method conducted under green-landscape-first condition |
CN106088161A (en) * | 2016-06-08 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of soil that backfills settles the structure watering band |
CN108396783A (en) * | 2018-05-17 | 2018-08-14 | 中冶天工集团天津有限公司 | A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement |
CN108678009A (en) * | 2018-07-26 | 2018-10-19 | 中建四局第四建筑工程有限公司 | A kind of basement post-pouring zone reserved passageway construction method and device |
CN108842827A (en) * | 2018-08-07 | 2018-11-20 | 广东建星建造集团有限公司 | Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method |
CN109024933A (en) * | 2018-09-11 | 2018-12-18 | 四川大诚建筑工程有限公司 | Post empiricism structure |
CN109944278A (en) * | 2019-03-11 | 2019-06-28 | 国骅建设有限公司 | Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip |
CN111549828A (en) * | 2020-05-28 | 2020-08-18 | 深圳市建工集团股份有限公司 | Construction method of detachable blocking steel plate of basement roof post-cast strip |
CN112459126A (en) * | 2020-11-10 | 2021-03-09 | 北京首钢建设集团有限公司 | Method for closing underground garage settlement post-cast strip in advance |
CN113374263A (en) * | 2021-07-19 | 2021-09-10 | 云南建投第六建设有限公司 | Construction method for closing settled post-cast strip in advance |
CN115387392A (en) * | 2022-08-23 | 2022-11-25 | 中国五冶集团有限公司 | Basement post-cast strip construction structure and method |
CN115450262A (en) * | 2022-08-31 | 2022-12-09 | 上海城建市政工程(集团)有限公司 | Working method for arranging construction channel at upper part of post-cast strip of building structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09100544A (en) * | 1995-10-09 | 1997-04-15 | Takeshige Shimonohara | Joint method of precast concrete member and joint construction |
CN103410172A (en) * | 2013-08-21 | 2013-11-27 | 天津二十冶建设有限公司 | Construction method for post pouring belt plugging of underground structural roof plate |
CN203546759U (en) * | 2013-09-17 | 2014-04-16 | 中联世纪建设集团有限公司 | Plugging structure for post-cast strip of underground building |
CN203613561U (en) * | 2013-08-20 | 2014-05-28 | 中国建筑第八工程局有限公司 | Post-cast strip prefabricated cover plate |
-
2015
- 2015-04-16 CN CN201510178244.3A patent/CN104805870A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09100544A (en) * | 1995-10-09 | 1997-04-15 | Takeshige Shimonohara | Joint method of precast concrete member and joint construction |
CN203613561U (en) * | 2013-08-20 | 2014-05-28 | 中国建筑第八工程局有限公司 | Post-cast strip prefabricated cover plate |
CN103410172A (en) * | 2013-08-21 | 2013-11-27 | 天津二十冶建设有限公司 | Construction method for post pouring belt plugging of underground structural roof plate |
CN203546759U (en) * | 2013-09-17 | 2014-04-16 | 中联世纪建设集团有限公司 | Plugging structure for post-cast strip of underground building |
Non-Patent Citations (2)
Title |
---|
田金成: "《地下室顶板沉降后浇带提前封闭施工技术》", 《施工技术》, vol. 38, no. 12, 31 December 2009 (2009-12-31), pages 54 - 57 * |
蒋虎山: "《地下室顶板沉降后浇带预封闭施工技术》", 《科技与创新》, no. 19, 31 October 2014 (2014-10-31), pages 75 - 76 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350581A (en) * | 2015-10-10 | 2016-02-24 | 中建二局第二建筑工程有限公司 | Advanced sealing structure for basement top slab settlement post-cast strips |
CN105649197A (en) * | 2016-01-31 | 2016-06-08 | 江苏扬建集团有限公司 | Post-pouring belt construction method conducted under green-landscape-first condition |
CN105649197B (en) * | 2016-01-31 | 2018-07-13 | 江苏扬建集团有限公司 | Rear pouring tape construction method of Afforestation Landscape under the conditions of in advance |
CN106088161A (en) * | 2016-06-08 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of soil that backfills settles the structure watering band |
CN108396783A (en) * | 2018-05-17 | 2018-08-14 | 中冶天工集团天津有限公司 | A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement |
CN108678009A (en) * | 2018-07-26 | 2018-10-19 | 中建四局第四建筑工程有限公司 | A kind of basement post-pouring zone reserved passageway construction method and device |
CN108842827A (en) * | 2018-08-07 | 2018-11-20 | 广东建星建造集团有限公司 | Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method |
CN109024933A (en) * | 2018-09-11 | 2018-12-18 | 四川大诚建筑工程有限公司 | Post empiricism structure |
CN109944278A (en) * | 2019-03-11 | 2019-06-28 | 国骅建设有限公司 | Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip |
CN111549828A (en) * | 2020-05-28 | 2020-08-18 | 深圳市建工集团股份有限公司 | Construction method of detachable blocking steel plate of basement roof post-cast strip |
CN111549828B (en) * | 2020-05-28 | 2021-11-23 | 深圳市建工集团股份有限公司 | Construction method of detachable blocking steel plate of basement roof post-cast strip |
CN112459126A (en) * | 2020-11-10 | 2021-03-09 | 北京首钢建设集团有限公司 | Method for closing underground garage settlement post-cast strip in advance |
CN113374263A (en) * | 2021-07-19 | 2021-09-10 | 云南建投第六建设有限公司 | Construction method for closing settled post-cast strip in advance |
CN115387392A (en) * | 2022-08-23 | 2022-11-25 | 中国五冶集团有限公司 | Basement post-cast strip construction structure and method |
CN115387392B (en) * | 2022-08-23 | 2023-12-15 | 中国五冶集团有限公司 | Basement post-pouring strip construction structure and method |
CN115450262A (en) * | 2022-08-31 | 2022-12-09 | 上海城建市政工程(集团)有限公司 | Working method for arranging construction channel at upper part of post-cast strip of building structure |
CN115450262B (en) * | 2022-08-31 | 2024-01-26 | 上海城建市政工程(集团)有限公司 | Working method for setting construction channel on upper part of post-pouring strip of building structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104805870A (en) | Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement | |
CN102561402B (en) | Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method | |
CN106759439B (en) | Tower crane foundation for foundation pit and construction method thereof | |
CN103161176B (en) | Tower crane foundation construction method in main building disjunctor garage | |
CN104060781A (en) | Cast-in-situ cranked slab stair without seams at stair sections and construction method | |
CN108130837A (en) | A kind of prefabricated road plate and its construction method | |
CN104295003A (en) | Structural column construction method | |
CN206233560U (en) | Wall formwork erecting structure | |
CN111287199A (en) | Super high-rise building deep foundation pit and construction method thereof | |
CN113417300B (en) | Slope support system and construction method thereof | |
JP7101407B2 (en) | On-site placement reinforcement top type pile foundation and its construction method | |
CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
CN104890434A (en) | Plastic-stone landscape making method | |
CN111119219B (en) | Reinforced foundation tire membrane structure and construction method thereof | |
CN108004866A (en) | A kind of precast concrete road system and construction method | |
CN203905331U (en) | Cast-in-place plate-type staircase with seamless steps | |
CN107237448A (en) | A kind of prefabricated interior fill concrete wallboard and its manufacture method | |
KR101230986B1 (en) | Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow | |
CN115961647A (en) | Basement roof post-cast strip advanced sealing structure, construction structure and construction method | |
CN103374915B (en) | Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof | |
CN104963364A (en) | Disposing method for topdown structural slab lower side wall construction joint | |
CN111576658B (en) | Construction method of post-cast strip protection wall of assembled basement outer wall | |
CN108149707A (en) | A kind of basement building structure and its construction method | |
CN103866738A (en) | Rock-fill concrete construction method used for wave wall foundation platform | |
CN104878756A (en) | Sand-filling hollow structure based cast-in-place special-shaped pile construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150729 |