CN109024933A - Post empiricism structure - Google Patents
Post empiricism structure Download PDFInfo
- Publication number
- CN109024933A CN109024933A CN201811055407.9A CN201811055407A CN109024933A CN 109024933 A CN109024933 A CN 109024933A CN 201811055407 A CN201811055407 A CN 201811055407A CN 109024933 A CN109024933 A CN 109024933A
- Authority
- CN
- China
- Prior art keywords
- post
- cast strip
- cover board
- empiricism
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004567 concrete Substances 0.000 claims abstract description 17
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 25
- 238000004062 sedimentation Methods 0.000 abstract description 8
- 230000008602 contraction Effects 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 4
- 238000005266 casting Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6801—Fillings therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6803—Joint covers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6806—Waterstops
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The present invention relates to construction engineering fields, more particularly, to the post empiricism structure in construction.The post empiricism structure, including post-cast strip, the two sides of post-cast strip are first to pour band, and supporting element is provided with below post-cast strip, several reinforcing bars are provided in post-cast strip;Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Spacing distance between the through-hole is 4m-6m.Post empiricism structure of the present invention, when it effectively can ensure to pour post-cast strip every time, the amount of the contraction of post-cast strip and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, construction effect difference caused by avoiding the occurrence of because of construction time, construction personnel's difference.
Description
Technical field
The present invention relates to construction engineering fields, more particularly, to the post empiricism structure in construction.
Background technique
At present in construction engineering field, to prevent monolithic reinforced concrete structure uneven or heavy due to autogenous shrinkage
Uneven and issuable harmful cracks are dropped, can be reserved in the corresponding position for first pouring mixed mud of sole plate, wall, beam etc.
Temporary construction seam, such temporary construction seam is exactly post-cast strip.Under normal conditions, the linear spacing side by side setting in post-cast strip,
For gauge from usually 3m-4m, width is usually within 1m.
Under normal conditions, pouring for post-cast strip needs just to start to construct after first casting concrete sedimentation is complete, meeting in this way
Cause it to take a long time, while when pouring post-cast strip, is manually poured since post-cast strip itself fully relies on, the concrete poured
Amount also depend on construction personnel determine;Therefore, after casting concrete, whether the amount of the amount and sedimentation shunk can for post-cast strip
In conjunction with the concrete parts first poured preferably, then it cannot achieve stable guarantee.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of post empiricism structure, can effectively ensure to pour every time
When building post-cast strip, the amount of the amount of the contraction of post-cast strip and sedimentation can be preferable and stable with concrete parts knot that is first pouring
It closes, construction effect difference caused by avoiding the occurrence of because of construction time, construction personnel's difference.
The present invention is achieved through the following technical solutions: a kind of post empiricism structure, including post-cast strip, post-cast strip
Two sides be first to pour band, supporting element is provided with below post-cast strip, several reinforcing bars are provided in post-cast strip;
Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Between between the through-hole
Gauge is from being 4m-6m.
Preferably, partial through holes connection pours part, other through-holes are as gas vent.
Preferably, the height for pouring part is no more than 1m.
Preferably, waterproof layer is provided with above cover board.
Preferably, the cover board is concrete cover.
Preferably, height of the interior bottom edge of cover board apart from post-cast strip is greater than the depth of post-cast strip.
Preferably, the distance of the inner side edge of cover board is greater than the width of post-cast strip.
Post-pouring zone construction process and constructing structure of the present invention, utilize the setting of increased cover board, cover board and post-cast strip it
Between height, width and can the amount of casting concrete can be designed in early period, band top is being poured by cover board setting
After defined and stablized, under condition of construction different in this way, when effectively can ensure to pour post-cast strip every time, the contraction of post-cast strip
Amount and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, avoid the occurrence of because the construction time,
Construction effect difference caused by construction personnel is different.
Detailed description of the invention
Fig. 1 is the side view of embodiment of the present invention post empiricism structure.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with embodiment of the present invention
In attached drawing, the technical solution in embodiment of the present invention is clearly and completely described, it is clear that described embodiment party
Formula is only some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ability
Domain those of ordinary skill every other embodiment obtained without making creative work, belongs to the present invention
The range of protection.In the absence of conflict, the feature in the embodiment and embodiment in the present invention can be mutually any
Combination.
As shown in FIG. 1, FIG. 1 is the side views of embodiment of the present invention post empiricism structure.It applies post-cast strip shown in FIG. 1
Work structure includes post-cast strip 3, and the two sides of post-cast strip 3 are first to pour band 2, and the lower section of post-cast strip 3 is provided with supporting element 1, post-cast strip 3
Inside it is provided with several reinforcing bars 8;
The top of post-cast strip 3 is provided with cover board 4, and cover board 4 is provided with through-hole 7, and the connection of through-hole 7 pours part 6;The through-hole 7
Between spacing distance be 4m-6m.
The connection of partial through holes 7 pours part, other through-holes 7 are used as gas vent, and the height for pouring part 6 is no more than 1m, cover board 4
Top is provided with waterproof layer 5.
The cover board 4 is concrete cover, and height h1 of the interior bottom edge of cover board 4 apart from post-cast strip 3 is greater than the depth of post-cast strip 3
H2 is spent, the distance l1 of the inner side edge of cover board 4 is greater than the width l2 of post-cast strip 3
Embodiment of the present invention post-pouring zone construction process and constructing structure, utilize increased cover board setting, cover board with
Height, width between post-cast strip and can the amount of casting concrete can be designed in early period, poured by cover board setting
Define and stablized after building band top, in this way under difference condition of construction, when effectively can ensure to pour post-cast strip every time, after pour
The amount of the contraction of band and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, avoid the occurrence of because applying
Between working hour, construction effect difference caused by construction personnel is different.
In addition, the application embodiment preferably uses partial through holes connection to pour part, other through-holes are set as gas vent
Mode is set, setting unit through-hole is as gas vent in the set-up mode, and observable pours when being not only convenient for post-cast strip casting concrete
The amount of concrete is built, can also be acted on after pouring convenient for its ventilation, due tos avoid occurring after pouring in cover board sedimentation, self-constriction etc.
Lead to air pressure change, reduces difficulty when later period cover board is removed.
In addition, the application embodiment is preferably no more than the set-up mode of 1m, the set-up mode using the height for pouring part
Can reduce causes to pour not convenient situation because pouring part excessive height.
In addition, the application embodiment preferably uses the set-up mode for being provided with waterproof layer above cover board, the setting side
Formula avoids influence of the moisture to the construction time it is possible to prevente effectively from moisture immerses in the post-cast strip of casting concrete.
In addition, height of the interior bottom edge of the application embodiment cover board apart from post-cast strip be greater than post-cast strip depth and/or
The distance of the inner side edge of cover board is greater than the set-up mode of the width of post-cast strip, which can be in casting concrete, can
With formerly pour band not completely sedimentation or not complete self-constriction when the amount that pours post-cast strip, and pour can be omited by aforementioned setting
Greater than normal amount, with offset pour after first pour band and settle again or the amount of self-constriction, when such mode can reduce construction
Between, it improves efficiency.
The above is only the preferred embodiment of the present invention, it is noted that above-mentioned preferred embodiment is not construed as pair
Limitation of the invention, protection scope of the present invention should be defined by the scope defined by the claims..For the art
For those of ordinary skill, without departing from the spirit and scope of the present invention, several improvements and modifications can also be made, these change
It also should be regarded as protection scope of the present invention into retouching.
Claims (7)
1. post empiricism structure, it is characterised in that: including post-cast strip, the two sides of post-cast strip are first to pour band, under post-cast strip
Side is provided with supporting element, and several reinforcing bars are provided in post-cast strip;
Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Interval distance between the through-hole
From being 4m-6m.
2. post empiricism structure according to claim 1, it is characterised in that: partial through holes connection pours part, other are logical
Hole is as gas vent.
3. post empiricism structure according to claim 1, it is characterised in that: the height for pouring part is no more than 1m.
4. post empiricism structure according to claim 1, it is characterised in that: be provided with waterproof layer above cover board.
5. post empiricism structure according to claim 1, it is characterised in that: the cover board is concrete cover.
6. post empiricism structure according to claim 1, it is characterised in that: height of the interior bottom edge of cover board apart from post-cast strip
Degree is greater than the depth of post-cast strip.
7. post empiricism structure according to claim 1, it is characterised in that: the distance of the inner side edge of cover board is poured after being greater than
The width of band.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811055407.9A CN109024933A (en) | 2018-09-11 | 2018-09-11 | Post empiricism structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811055407.9A CN109024933A (en) | 2018-09-11 | 2018-09-11 | Post empiricism structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109024933A true CN109024933A (en) | 2018-12-18 |
Family
ID=64620969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811055407.9A Pending CN109024933A (en) | 2018-09-11 | 2018-09-11 | Post empiricism structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109024933A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109944278A (en) * | 2019-03-11 | 2019-06-28 | 国骅建设有限公司 | Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201660973U (en) * | 2010-03-09 | 2010-12-01 | 北京六建集团公司 | Concrete post-pouring belt pre-sealing air exhaust structure |
CN104805870A (en) * | 2015-04-16 | 2015-07-29 | 中国二十二冶集团有限公司 | Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement |
CN208884737U (en) * | 2018-09-11 | 2019-05-21 | 四川大诚建筑工程有限公司 | Post empiricism structure |
-
2018
- 2018-09-11 CN CN201811055407.9A patent/CN109024933A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201660973U (en) * | 2010-03-09 | 2010-12-01 | 北京六建集团公司 | Concrete post-pouring belt pre-sealing air exhaust structure |
CN104805870A (en) * | 2015-04-16 | 2015-07-29 | 中国二十二冶集团有限公司 | Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement |
CN208884737U (en) * | 2018-09-11 | 2019-05-21 | 四川大诚建筑工程有限公司 | Post empiricism structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109944278A (en) * | 2019-03-11 | 2019-06-28 | 国骅建设有限公司 | Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649326B (en) | A kind of formwork structure and method for blocking for being used to block exterior wall reserved opening | |
CN108678370A (en) | A kind of wall reserved opening plugging device and method for blocking | |
CN109024933A (en) | Post empiricism structure | |
CN208884737U (en) | Post empiricism structure | |
CN109537770B (en) | Wall connecting system and processing method thereof | |
CN205438835U (en) | Assembled tongue -and -groove template down | |
CN208451857U (en) | Mold is arranged in a kind of assembled architecture precast concrete wall side keyway | |
CN207419778U (en) | A kind of free removal wall body casting template device | |
CN208201856U (en) | A kind of concrete filling pile head laitance concrete collection device | |
CN208309998U (en) | Hanging plate under a kind of once-cast beam | |
CN107119808B (en) | Induce crack structure and its construction method | |
CN213952977U (en) | Anti-leakage structure and pouring mold | |
CN112554051B (en) | Prefabricated part and bridge structure | |
CN208870064U (en) | A kind of precast slab constructed instead of brick fetal membrane | |
CN107152111A (en) | The lenticular plain concrete construction of guide wall technique used between many boiled water rooms | |
CN206448378U (en) | A kind of post-pouring belt of outer wall structure | |
CN209523599U (en) | The flashing frame of window | |
CN207700363U (en) | Floor buildings waterproof structure and drip forming panel | |
CN216921350U (en) | Prefabricated superimposed sheet post-cast strip leak protection thick liquid structure and prefabricated superimposed sheet | |
CN208305322U (en) | The mixed mud building block template of height-adjustable | |
CN207812999U (en) | Digital alloy steel framework plastic formwork | |
CN216641446U (en) | Post-cast plate seam leak protection structure | |
CN207998875U (en) | A kind of basement post-pouring zone prefabricated retaining wall | |
CN215106157U (en) | Temporarily confined post-cast strip structure | |
CN208534489U (en) | Tunnel portal veneer construction formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |