CN109024933A - Post empiricism structure - Google Patents

Post empiricism structure Download PDF

Info

Publication number
CN109024933A
CN109024933A CN201811055407.9A CN201811055407A CN109024933A CN 109024933 A CN109024933 A CN 109024933A CN 201811055407 A CN201811055407 A CN 201811055407A CN 109024933 A CN109024933 A CN 109024933A
Authority
CN
China
Prior art keywords
post
cast strip
cover board
empiricism
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811055407.9A
Other languages
Chinese (zh)
Inventor
肖雪梅
蒋昔勇
范元甫
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Dacheng Building Engineering Co Ltd
Original Assignee
Sichuan Dacheng Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Dacheng Building Engineering Co Ltd filed Critical Sichuan Dacheng Building Engineering Co Ltd
Priority to CN201811055407.9A priority Critical patent/CN109024933A/en
Publication of CN109024933A publication Critical patent/CN109024933A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6803Joint covers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to construction engineering fields, more particularly, to the post empiricism structure in construction.The post empiricism structure, including post-cast strip, the two sides of post-cast strip are first to pour band, and supporting element is provided with below post-cast strip, several reinforcing bars are provided in post-cast strip;Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Spacing distance between the through-hole is 4m-6m.Post empiricism structure of the present invention, when it effectively can ensure to pour post-cast strip every time, the amount of the contraction of post-cast strip and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, construction effect difference caused by avoiding the occurrence of because of construction time, construction personnel's difference.

Description

Post empiricism structure
Technical field
The present invention relates to construction engineering fields, more particularly, to the post empiricism structure in construction.
Background technique
At present in construction engineering field, to prevent monolithic reinforced concrete structure uneven or heavy due to autogenous shrinkage Uneven and issuable harmful cracks are dropped, can be reserved in the corresponding position for first pouring mixed mud of sole plate, wall, beam etc. Temporary construction seam, such temporary construction seam is exactly post-cast strip.Under normal conditions, the linear spacing side by side setting in post-cast strip, For gauge from usually 3m-4m, width is usually within 1m.
Under normal conditions, pouring for post-cast strip needs just to start to construct after first casting concrete sedimentation is complete, meeting in this way Cause it to take a long time, while when pouring post-cast strip, is manually poured since post-cast strip itself fully relies on, the concrete poured Amount also depend on construction personnel determine;Therefore, after casting concrete, whether the amount of the amount and sedimentation shunk can for post-cast strip In conjunction with the concrete parts first poured preferably, then it cannot achieve stable guarantee.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of post empiricism structure, can effectively ensure to pour every time When building post-cast strip, the amount of the amount of the contraction of post-cast strip and sedimentation can be preferable and stable with concrete parts knot that is first pouring It closes, construction effect difference caused by avoiding the occurrence of because of construction time, construction personnel's difference.
The present invention is achieved through the following technical solutions: a kind of post empiricism structure, including post-cast strip, post-cast strip Two sides be first to pour band, supporting element is provided with below post-cast strip, several reinforcing bars are provided in post-cast strip;
Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Between between the through-hole Gauge is from being 4m-6m.
Preferably, partial through holes connection pours part, other through-holes are as gas vent.
Preferably, the height for pouring part is no more than 1m.
Preferably, waterproof layer is provided with above cover board.
Preferably, the cover board is concrete cover.
Preferably, height of the interior bottom edge of cover board apart from post-cast strip is greater than the depth of post-cast strip.
Preferably, the distance of the inner side edge of cover board is greater than the width of post-cast strip.
Post-pouring zone construction process and constructing structure of the present invention, utilize the setting of increased cover board, cover board and post-cast strip it Between height, width and can the amount of casting concrete can be designed in early period, band top is being poured by cover board setting After defined and stablized, under condition of construction different in this way, when effectively can ensure to pour post-cast strip every time, the contraction of post-cast strip Amount and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, avoid the occurrence of because the construction time, Construction effect difference caused by construction personnel is different.
Detailed description of the invention
Fig. 1 is the side view of embodiment of the present invention post empiricism structure.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with embodiment of the present invention In attached drawing, the technical solution in embodiment of the present invention is clearly and completely described, it is clear that described embodiment party Formula is only some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ability Domain those of ordinary skill every other embodiment obtained without making creative work, belongs to the present invention The range of protection.In the absence of conflict, the feature in the embodiment and embodiment in the present invention can be mutually any Combination.
As shown in FIG. 1, FIG. 1 is the side views of embodiment of the present invention post empiricism structure.It applies post-cast strip shown in FIG. 1 Work structure includes post-cast strip 3, and the two sides of post-cast strip 3 are first to pour band 2, and the lower section of post-cast strip 3 is provided with supporting element 1, post-cast strip 3 Inside it is provided with several reinforcing bars 8;
The top of post-cast strip 3 is provided with cover board 4, and cover board 4 is provided with through-hole 7, and the connection of through-hole 7 pours part 6;The through-hole 7 Between spacing distance be 4m-6m.
The connection of partial through holes 7 pours part, other through-holes 7 are used as gas vent, and the height for pouring part 6 is no more than 1m, cover board 4 Top is provided with waterproof layer 5.
The cover board 4 is concrete cover, and height h1 of the interior bottom edge of cover board 4 apart from post-cast strip 3 is greater than the depth of post-cast strip 3 H2 is spent, the distance l1 of the inner side edge of cover board 4 is greater than the width l2 of post-cast strip 3
Embodiment of the present invention post-pouring zone construction process and constructing structure, utilize increased cover board setting, cover board with Height, width between post-cast strip and can the amount of casting concrete can be designed in early period, poured by cover board setting Define and stablized after building band top, in this way under difference condition of construction, when effectively can ensure to pour post-cast strip every time, after pour The amount of the contraction of band and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, avoid the occurrence of because applying Between working hour, construction effect difference caused by construction personnel is different.
In addition, the application embodiment preferably uses partial through holes connection to pour part, other through-holes are set as gas vent Mode is set, setting unit through-hole is as gas vent in the set-up mode, and observable pours when being not only convenient for post-cast strip casting concrete The amount of concrete is built, can also be acted on after pouring convenient for its ventilation, due tos avoid occurring after pouring in cover board sedimentation, self-constriction etc. Lead to air pressure change, reduces difficulty when later period cover board is removed.
In addition, the application embodiment is preferably no more than the set-up mode of 1m, the set-up mode using the height for pouring part Can reduce causes to pour not convenient situation because pouring part excessive height.
In addition, the application embodiment preferably uses the set-up mode for being provided with waterproof layer above cover board, the setting side Formula avoids influence of the moisture to the construction time it is possible to prevente effectively from moisture immerses in the post-cast strip of casting concrete.
In addition, height of the interior bottom edge of the application embodiment cover board apart from post-cast strip be greater than post-cast strip depth and/or The distance of the inner side edge of cover board is greater than the set-up mode of the width of post-cast strip, which can be in casting concrete, can With formerly pour band not completely sedimentation or not complete self-constriction when the amount that pours post-cast strip, and pour can be omited by aforementioned setting Greater than normal amount, with offset pour after first pour band and settle again or the amount of self-constriction, when such mode can reduce construction Between, it improves efficiency.
The above is only the preferred embodiment of the present invention, it is noted that above-mentioned preferred embodiment is not construed as pair Limitation of the invention, protection scope of the present invention should be defined by the scope defined by the claims..For the art For those of ordinary skill, without departing from the spirit and scope of the present invention, several improvements and modifications can also be made, these change It also should be regarded as protection scope of the present invention into retouching.

Claims (7)

1. post empiricism structure, it is characterised in that: including post-cast strip, the two sides of post-cast strip are first to pour band, under post-cast strip Side is provided with supporting element, and several reinforcing bars are provided in post-cast strip;
Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Interval distance between the through-hole From being 4m-6m.
2. post empiricism structure according to claim 1, it is characterised in that: partial through holes connection pours part, other are logical Hole is as gas vent.
3. post empiricism structure according to claim 1, it is characterised in that: the height for pouring part is no more than 1m.
4. post empiricism structure according to claim 1, it is characterised in that: be provided with waterproof layer above cover board.
5. post empiricism structure according to claim 1, it is characterised in that: the cover board is concrete cover.
6. post empiricism structure according to claim 1, it is characterised in that: height of the interior bottom edge of cover board apart from post-cast strip Degree is greater than the depth of post-cast strip.
7. post empiricism structure according to claim 1, it is characterised in that: the distance of the inner side edge of cover board is poured after being greater than The width of band.
CN201811055407.9A 2018-09-11 2018-09-11 Post empiricism structure Pending CN109024933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811055407.9A CN109024933A (en) 2018-09-11 2018-09-11 Post empiricism structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811055407.9A CN109024933A (en) 2018-09-11 2018-09-11 Post empiricism structure

Publications (1)

Publication Number Publication Date
CN109024933A true CN109024933A (en) 2018-12-18

Family

ID=64620969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811055407.9A Pending CN109024933A (en) 2018-09-11 2018-09-11 Post empiricism structure

Country Status (1)

Country Link
CN (1) CN109024933A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944278A (en) * 2019-03-11 2019-06-28 国骅建设有限公司 Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201660973U (en) * 2010-03-09 2010-12-01 北京六建集团公司 Concrete post-pouring belt pre-sealing air exhaust structure
CN104805870A (en) * 2015-04-16 2015-07-29 中国二十二冶集团有限公司 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement
CN208884737U (en) * 2018-09-11 2019-05-21 四川大诚建筑工程有限公司 Post empiricism structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201660973U (en) * 2010-03-09 2010-12-01 北京六建集团公司 Concrete post-pouring belt pre-sealing air exhaust structure
CN104805870A (en) * 2015-04-16 2015-07-29 中国二十二冶集团有限公司 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement
CN208884737U (en) * 2018-09-11 2019-05-21 四川大诚建筑工程有限公司 Post empiricism structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944278A (en) * 2019-03-11 2019-06-28 国骅建设有限公司 Support construction and rear pouring tape construction method are exempted from a kind of post-cast strip

Similar Documents

Publication Publication Date Title
CN105649326B (en) A kind of formwork structure and method for blocking for being used to block exterior wall reserved opening
CN108678370A (en) A kind of wall reserved opening plugging device and method for blocking
CN109024933A (en) Post empiricism structure
CN208884737U (en) Post empiricism structure
CN109537770B (en) Wall connecting system and processing method thereof
CN205438835U (en) Assembled tongue -and -groove template down
CN208451857U (en) Mold is arranged in a kind of assembled architecture precast concrete wall side keyway
CN207419778U (en) A kind of free removal wall body casting template device
CN208201856U (en) A kind of concrete filling pile head laitance concrete collection device
CN208309998U (en) Hanging plate under a kind of once-cast beam
CN107119808B (en) Induce crack structure and its construction method
CN213952977U (en) Anti-leakage structure and pouring mold
CN112554051B (en) Prefabricated part and bridge structure
CN208870064U (en) A kind of precast slab constructed instead of brick fetal membrane
CN107152111A (en) The lenticular plain concrete construction of guide wall technique used between many boiled water rooms
CN206448378U (en) A kind of post-pouring belt of outer wall structure
CN209523599U (en) The flashing frame of window
CN207700363U (en) Floor buildings waterproof structure and drip forming panel
CN216921350U (en) Prefabricated superimposed sheet post-cast strip leak protection thick liquid structure and prefabricated superimposed sheet
CN208305322U (en) The mixed mud building block template of height-adjustable
CN207812999U (en) Digital alloy steel framework plastic formwork
CN216641446U (en) Post-cast plate seam leak protection structure
CN207998875U (en) A kind of basement post-pouring zone prefabricated retaining wall
CN215106157U (en) Temporarily confined post-cast strip structure
CN208534489U (en) Tunnel portal veneer construction formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination