CN208884737U - Post empiricism structure - Google Patents

Post empiricism structure Download PDF

Info

Publication number
CN208884737U
CN208884737U CN201821484382.XU CN201821484382U CN208884737U CN 208884737 U CN208884737 U CN 208884737U CN 201821484382 U CN201821484382 U CN 201821484382U CN 208884737 U CN208884737 U CN 208884737U
Authority
CN
China
Prior art keywords
post
cast strip
cover board
empiricism
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821484382.XU
Other languages
Chinese (zh)
Inventor
肖雪梅
蒋昔勇
范元甫
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Dacheng Building Engineering Co Ltd
Original Assignee
Sichuan Dacheng Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Dacheng Building Engineering Co Ltd filed Critical Sichuan Dacheng Building Engineering Co Ltd
Priority to CN201821484382.XU priority Critical patent/CN208884737U/en
Application granted granted Critical
Publication of CN208884737U publication Critical patent/CN208884737U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to construction engineering fields, more particularly, to the post empiricism structure in construction.The post empiricism structure, including post-cast strip, the two sides of post-cast strip are first to pour band, and supporting element is provided with below post-cast strip, several reinforcing bars are provided in post-cast strip;Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Spacing distance between the through-hole is 4m-6m.The utility model post empiricism structure, when it effectively can ensure to pour post-cast strip every time, the amount of the contraction of post-cast strip and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, construction effect difference caused by avoiding the occurrence of because of construction time, construction personnel's difference.

Description

Post empiricism structure
Technical field
The utility model relates to construction engineering fields, more particularly, to the post empiricism knot in construction Structure.
Background technique
At present in construction engineering field, to prevent monolithic reinforced concrete structure uneven or heavy due to autogenous shrinkage Uneven and issuable harmful cracks are dropped, can be reserved in the corresponding position for first pouring mixed mud of sole plate, wall, beam etc. Temporary construction seam, such temporary construction seam is exactly post-cast strip.Under normal conditions, the linear spacing side by side setting in post-cast strip, For gauge from usually 3m-4m, width is usually within 1m.
Under normal conditions, pouring for post-cast strip needs just to start to construct after first casting concrete sedimentation is complete, meeting in this way Cause it to take a long time, while when pouring post-cast strip, is manually poured since post-cast strip itself fully relies on, the concrete poured Amount also depend on construction personnel determine;Therefore, after casting concrete, whether the amount of the amount and sedimentation shunk can for post-cast strip In conjunction with the concrete parts first poured preferably, then it cannot achieve stable guarantee.
Utility model content
In view of the shortcomings of the prior art, the utility model provides a kind of post empiricism structure, can effectively ensure every Secondary when pouring post-cast strip, the amount of the amount of the contraction of post-cast strip and sedimentation can be preferable and stable with concrete section that is first pouring Divide and combines, construction effect difference caused by avoiding the occurrence of because of construction time, construction personnel's difference.
The utility model is achieved through the following technical solutions: a kind of post empiricism structure, including post-cast strip, after The two sides for pouring band are first to pour band, and supporting element is provided with below post-cast strip, several reinforcing bars are provided in post-cast strip;
Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Between between the through-hole Gauge is from being 4m-6m.
Preferably, partial through holes connection pours part, other through-holes are as gas vent.
Preferably, the height for pouring part is no more than 1m.
Preferably, waterproof layer is provided with above cover board.
Preferably, the cover board is concrete cover.
Preferably, height of the interior bottom edge of cover board apart from post-cast strip is greater than the depth of post-cast strip.
Preferably, the distance of the inner side edge of cover board is greater than the width of post-cast strip.
The utility model post-pouring zone construction process and constructing structure, utilize the setting of increased cover board, and cover board is poured with after Height, width between band and can the amount of casting concrete can be designed in early period, band is being poured by cover board setting It is defined and is stablized behind top, under condition of construction different in this way, when effectively can ensure to pour post-cast strip every time, post-cast strip The amount of contraction and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, when avoiding the occurrence of because of construction Between, construction personnel it is different caused by construction effect difference.
Detailed description of the invention
Fig. 1 is the side view of the utility model embodiment post empiricism structure.
Specific embodiment
For the purpose of this utility model, technical solution and advantage is more clearly understood, below in conjunction with the utility model The technical solution in the utility model embodiment is clearly and completely described in attached drawing in embodiment, it is clear that institute The embodiment of description is only a part of embodiment of the utility model, rather than whole embodiments.It is practical based on this Embodiment in novel, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment is fallen within the protection scope of the utility model.In the absence of conflict, the embodiment in the utility model and Feature in embodiment can mutual any combination.
As shown in FIG. 1, FIG. 1 is the side views of the utility model embodiment post empiricism structure.It is poured after shown in FIG. 1 Belt construction structure includes post-cast strip 3, and the two sides of post-cast strip 3 are first to pour band 2, and the lower section of post-cast strip 3 is provided with supporting element 1, after It pours and is provided with several reinforcing bars 8 in band 3;
The top of post-cast strip 3 is provided with cover board 4, and cover board 4 is provided with through-hole 7, and the connection of through-hole 7 pours part 6;The through-hole 7 Between spacing distance be 4m-6m.
The connection of partial through holes 7 pours part, other through-holes 7 are used as gas vent, and the height for pouring part 6 is no more than 1m, cover board 4 Top is provided with waterproof layer 5.
The cover board 4 is concrete cover, and height h1 of the interior bottom edge of cover board 4 apart from post-cast strip 3 is greater than the depth of post-cast strip 3 H2 is spent, the distance l1 of the inner side edge of cover board 4 is greater than the width l2 of post-cast strip 3
The utility model embodiment post-pouring zone construction process and constructing structure utilize the setting of increased cover board, lid Height, width between plate and post-cast strip and can the amount of casting concrete can be designed in early period, be arranged by cover board It is defined and is stablized after pouring band top, under condition of construction different in this way, when effectively can ensure to pour post-cast strip every time, The amount of the contraction of post-cast strip and the amount of sedimentation can be preferable and stable in conjunction with the concrete parts first poured, avoid the occurrence of Because construction time, construction personnel it is different caused by construction effect difference.
In addition, the application embodiment preferably uses partial through holes connection to pour part, other through-holes are set as gas vent Mode is set, setting unit through-hole is as gas vent in the set-up mode, and observable pours when being not only convenient for post-cast strip casting concrete The amount of concrete is built, can also be acted on after pouring convenient for its ventilation, due tos avoid occurring after pouring in cover board sedimentation, self-constriction etc. Lead to air pressure change, reduces difficulty when later period cover board is removed.
In addition, the application embodiment is preferably no more than the set-up mode of 1m, the set-up mode using the height for pouring part Can reduce causes to pour not convenient situation because pouring part excessive height.
In addition, the application embodiment preferably uses the set-up mode for being provided with waterproof layer above cover board, the setting side Formula avoids influence of the moisture to the construction time it is possible to prevente effectively from moisture immerses in the post-cast strip of casting concrete.
In addition, height of the interior bottom edge of the application embodiment cover board apart from post-cast strip be greater than post-cast strip depth and/or The distance of the inner side edge of cover board is greater than the set-up mode of the width of post-cast strip, which can be in casting concrete, can With formerly pour band not completely sedimentation or not complete self-constriction when the amount that pours post-cast strip, and pour can be omited by aforementioned setting Greater than normal amount, with offset pour after first pour band and settle again or the amount of self-constriction, when such mode can reduce construction Between, it improves efficiency.
Above are merely preferred embodiments of the utility model, it is noted that above-mentioned preferred embodiment should not regard For limitations of the present invention, the protection scope of the utility model should be defined by the scope defined by the claims..For For those skilled in the art, without departing from the spirit and scope of the utility model, it can also make several Improvements and modifications, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (7)

1. post empiricism structure, it is characterised in that: including post-cast strip, the two sides of post-cast strip are first to pour band, under post-cast strip Side is provided with supporting element, and several reinforcing bars are provided in post-cast strip;
Cover board is provided with above post-cast strip, cover board is provided with through-hole, and through-hole connection pours part;Interval distance between the through-hole From being 4m-6m.
2. post empiricism structure according to claim 1, it is characterised in that: partial through holes connection pours part, other are logical Hole is as gas vent.
3. post empiricism structure according to claim 1, it is characterised in that: the height for pouring part is no more than 1m.
4. post empiricism structure according to claim 1, it is characterised in that: be provided with waterproof layer above cover board.
5. post empiricism structure according to claim 1, it is characterised in that: the cover board is concrete cover.
6. post empiricism structure according to claim 1, it is characterised in that: height of the interior bottom edge of cover board apart from post-cast strip Degree is greater than the depth of post-cast strip.
7. post empiricism structure according to claim 1, it is characterised in that: the distance of the inner side edge of cover board is poured after being greater than The width of band.
CN201821484382.XU 2018-09-11 2018-09-11 Post empiricism structure Expired - Fee Related CN208884737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821484382.XU CN208884737U (en) 2018-09-11 2018-09-11 Post empiricism structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821484382.XU CN208884737U (en) 2018-09-11 2018-09-11 Post empiricism structure

Publications (1)

Publication Number Publication Date
CN208884737U true CN208884737U (en) 2019-05-21

Family

ID=66511995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821484382.XU Expired - Fee Related CN208884737U (en) 2018-09-11 2018-09-11 Post empiricism structure

Country Status (1)

Country Link
CN (1) CN208884737U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024933A (en) * 2018-09-11 2018-12-18 四川大诚建筑工程有限公司 Post empiricism structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024933A (en) * 2018-09-11 2018-12-18 四川大诚建筑工程有限公司 Post empiricism structure

Similar Documents

Publication Publication Date Title
CN105649326B (en) A kind of formwork structure and method for blocking for being used to block exterior wall reserved opening
CN208088615U (en) A kind of prefabricated board and hollow laminated floor slab
US20090129907A1 (en) Weight Ballast for a Counterweight Device and Method of Making thereof
CN109024989A (en) Precast shear wall body and precast shear wall body production method
CN208884737U (en) Post empiricism structure
CN109024933A (en) Post empiricism structure
CN109537770A (en) Wall connecting system and its processing method
KR101087644B1 (en) The water-storage tank of assembly type and method for constructing thereof
CN108118893A (en) For reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete
CN207419778U (en) A kind of free removal wall body casting template device
CN209585062U (en) A kind of assembly type cable slot and cable duct groove pour mold
CN208293616U (en) A kind of prefabricated four drifting of cover board open-type octagonal cable
CN208309998U (en) Hanging plate under a kind of once-cast beam
CN109208786A (en) A kind of ring muscle that is easily installed fastens shear wall structure and its installation method
CN212316946U (en) Underground continuous wall plate structure
CN107152111A (en) The lenticular plain concrete construction of guide wall technique used between many boiled water rooms
CN206448378U (en) A kind of post-pouring belt of outer wall structure
CN209179505U (en) Combined movable hopper and constructional column formwork structure with hopper
CN208497274U (en) Precast shear wall mold
CN208305322U (en) The mixed mud building block template of height-adjustable
CN208870064U (en) A kind of precast slab constructed instead of brick fetal membrane
CN207812999U (en) Digital alloy steel framework plastic formwork
CN207959959U (en) A kind of alcove structure on construction wall
CN208202549U (en) A kind of kitchen and bath's drop plate shaper
CN209194672U (en) A kind of formwork for placing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190521