CN108118893A CN201810042300.4A CN201810042300A CN108118893A CN 108118893 A CN108118893 A CN 108118893A CN 201810042300 A CN201810042300 A CN 201810042300A CN 108118893 A CN108118893 A CN 108118893A
Authority
CN
China
Prior art keywords
concrete
cast
preformed hole
reserving
bolt hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810042300.4A
Other languages
Chinese (zh)
Inventor
魏忠
黄茂清
付兴祥
杨勇
范晓红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201810042300.4A priority Critical patent/CN108118893A/en
Publication of CN108118893A publication Critical patent/CN108118893A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/04Cores for anchor holes or the like around anchors embedded in the concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to technical field of building construction, disclose a kind of formwork structure for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, the preformed hole box being composed including the Interal fixation connection by bottom and surrounding, the preformed hole box is fixedly installed in concrete foundation, for pouring inner concrete inside the preformed hole box, the inner concrete is used to fix foundation bolt.The present invention can directly reserve the mounting hole of pre-embedded bolt in concrete foundation, preformed hole box is without removing, it is connected with concrete foundation as whole use, and can ensure enough bonding strengths, it between embedded hole box and concrete foundation and can realize and be stably connected between inner concrete and preformed hole box.

Description

For reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete
Technical field
It is more particularly to a kind of to be used to reserve Equipment Foundations in cast-in-place concrete the present invention relates to technical field of building construction The formwork structure of pre-embedded bolt hole.
Background technology
Cast-in-place concrete prepared screw-bolt hole, traditional prepared screw-bolt hole generally add the gluing of 12mm thickness using plank or wooden a tree, used in making timber for boats Plate is fabricated to the geometry diaphragm capsule of design requirement, and concreting removes diaphragm capsule after completing initial set.But this structure Diaphragm capsule is not easily assembled fixation, fragile structural concrete during dismounting, and having torn concrete open early easily caves in, and pore-forming physical dimension is not easy Ensure design requirement;It has torn open late and has been present with dismounting difficulty, special bottom hole and hole internal corner formwork, which are torn open, does not influence second coagulation soil totally Grouting quality and dismounting labour cost increase.
The content of the invention
The technical problems to be solved by the invention are:In view of the above problems, a kind of be used for cast-in-place mixed is provided The formwork structure of equipment basic pre-buried bolt hole is reserved in solidifying soil, the peace of pre-embedded bolt can be directly reserved in concrete foundation Hole is filled, preformed hole box is connected with concrete foundation as whole use without removing, and can ensure enough bonding strengths, in advance It between buried via hole box and concrete foundation and can realize and be stably connected between inner concrete and preformed hole box.
The technical solution adopted by the present invention is as follows:The technical solution adopted by the present invention is such:For in cast-in-place coagulation The formwork structure of equipment basic pre-buried bolt hole is reserved in soil, is composed including the Interal fixation connection by bottom and surrounding Preformed hole box, the preformed hole box are fixedly installed in concrete foundation, are used to pour internal coagulation inside the preformed hole box Soil, the inner concrete are used to fix foundation bolt.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, it is described pre- Box of boxing out is bullet small, lower mouth is big suitable for reading.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, it is described pre- Box out box surrounding steel plate outer wall on be fixedly connected with outer resistance to plucking bar, the outer resistance to plucking bar is fixedly connected with concrete foundation.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, it is described outer One end of resistance to plucking bar is fixedly connected with the outer wall of the preformed hole box surrounding steel plate, and another end extends into concrete foundation and upward It sticks up so that one end of outer resistance to plucking bar is less than its another end.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, reserved The vertical direction of hole box surrounding steel plate outer wall sets an outer resistance to plucking bar at interval of 250mm.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, it is described pre- The inner wall of box of boxing out is fixedly installed interior resistance to plucking bar and/or anti-skid chequer.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, it is described interior One end of resistance to plucking bar is fixedly connected with the inner wall of the preformed hole box surrounding steel plate, another end extend into inner concrete and to It is sagging so that one end of interior resistance to plucking bar is higher than its another end.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, the bottom The steel plate of portion and surrounding is fixedly connected by welding.
Formwork structure of the present invention for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete, it is described pre- The box out upper end of box is fixedly installed sealing plate.
Compared with prior art, having the beneficial effect that using above-mentioned technical proposal:The present invention can be directly in concrete foundation In reserve the mounting hole of pre-embedded bolt, preformed hole box is connected as whole use with concrete foundation without removing, and can protect Enough bonding strengths are demonstrate,proved, can be realized between embedded hole box and concrete foundation and between inner concrete and preformed hole box It is stably connected with.
Description of the drawings
Fig. 1 is the top view of the preformed hole box of the present invention;
Fig. 2 is sectional view along A-A in Fig. 1;
Fig. 3 is that the present invention is installed to the sectional view in concrete foundation.
Reference numeral:1 is steel plate, and 2 be concrete foundation, and 3 be inner concrete, and 4 be foundation bolt, and 5 be outer resistance to plucking bar, 6 be interior resistance to plucking bar, and 7 be anti-skid chequer, and 8 be sealing plate.
Specific embodiment
The present invention is described further below in conjunction with the accompanying drawings.
Embodiment 1
As shown in Figures 1 to 3, for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, including the bottom of by The steel plate 1 of portion and surrounding is fixedly connected with the preformed hole box being composed, and the thickness of steel plate 1 is 5mm, specifically, bottom and four The steel plate 1 in week is fixedly connected by welding, and overall construction intensity convenient and efficient by welding assembly is good, and preformed hole box is fixed It is arranged in concrete foundation 2, for pouring inner concrete 3 inside preformed hole box, inner concrete 3 is used to fix lower margin spiral shell Bolt 4, specifically, preformed hole box are bullet small, lower mouth is big suitable for reading, and surrounding is surrounded by four pieces of welding of steel plate 1, suitable for reading and lower mouth It is rectangle, the lower end of bottom plate and four blocks of steel plates 1 is welded and fixed, and seals lower mouth, rectangle suitable for reading is less than the rectangle of lower mouth, pre- It boxes out after having poured inner concrete 3 in box, sealing plate 8, sealing plate 8 further is set by being welded and fixed in the upper end of preformed hole box For steel plate, be conducive to preformed hole box forming a closed cavity, what inner concrete 3 more consolidated is fixed on closed cavity Interior, the upper end of foundation bolt 4 is pierced by sealing plate 8, and preformed hole box reserves mounting hole in concrete foundation 2, internal mixed pouring During solidifying soil 3, preformed hole box is connected with concrete foundation 2 and inner concrete 3 as whole use without removing.
Embodiment 2
As shown in Figures 1 to 3, on the basis of embodiment 1, it is fixedly connected by welding on the outer wall of preformed hole box surrounding steel plate 1 Outer resistance to plucking bar 5, outer resistance to plucking bar 5 are screw-thread steel, and outer resistance to plucking bar 5 is fixedly connected with concrete foundation 2, promote the resistance to plucking of preformed hole box Performance makes it be stably mounted in concrete foundation 2, further, one end and the preformed hole box surrounding steel plate of outer resistance to plucking bar 5 1 outer wall is fixedly connected by welding, and another end is extended into concrete foundation 2 and tilted upward so that one end of outer resistance to plucking bar 5 is low In its another end, the resistance to plucking structure of similar hangnail is formed, the extraction-resistant behavior of preformed hole box is further improved, ensures preformed hole box more Add and be stably mounted in concrete foundation 2 so that preformed hole box forms reliable anchoring system with concrete foundation 2, specifically Ground sets an outer resistance to plucking bar 5, specifically at each piece in the vertical direction of 1 outer wall of preformed hole box surrounding steel plate at interval of 250mm Four outer resistance to plucking bars 5 are connected on the outer wall of steel plate 1.
Embodiment 3
As shown in Figures 1 to 3, on the basis of embodiment 1, the inner wall of preformed hole box is fixedly installed interior resistance to plucking bar 6 and/or anti-skidding Line 7, interior resistance to plucking bar 6 are welded and fixed with inner wall, and anti-skid chequer 7 can be integrally formed with steel plate 1, and interior resistance to plucking bar 6 is screw-thread steel, i.e. inner wall On interior resistance to plucking bar 6 or anti-skid chequer 7 can individually be fixedly installed, alternatively, on inner wall simultaneously fixed setting in resistance to plucking bar 6 and anti-skid chequer 7, it can promote the extraction-resistant behavior of inner concrete 3 so that inner concrete 3 is firmly arranged in preformed hole box, further Ground, when being fixedly installed interior resistance to plucking bar 6 on inner wall, one end of interior resistance to plucking bar 6 and the inner wall of preformed hole box surrounding steel plate 1 are fixed Connection, another end are extended into inner concrete 3 and let droop so that one end of interior resistance to plucking bar 6 is higher than its another end, is formed similar The resistance to plucking structure of hangnail further promotes the extraction-resistant behavior of inner concrete 3 so that inner concrete 3 is more firmly set Resistance to plucking bar 6 and anti-skid chequer 7 in preformed hole box, be specifically fixedly installed simultaneously on inner wall herein.
The invention is not limited in foregoing specific embodiments.The present invention, which expands to, any in the present specification to be disclosed The step of new feature or any new combination and any new method or process disclosed or any new combination.If this Field technology personnel are altered or modified in the unsubstantiality that the spirit for not departing from the present invention is done, should belong to power of the present invention The claimed scope of profit.

Claims (9)

1. for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, it is characterised in that:Including the bottom of by Portion and the steel plate of surrounding(1)The preformed hole box being composed is fixedly connected with, the preformed hole box is fixedly installed on concrete foundation (2)In, it is used to pour inner concrete inside the preformed hole box(3), the inner concrete(3)For fixing foundation bolt (4).
2. it is according to claim 1 for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, It is characterized in that:The preformed hole box is bullet small, lower mouth is big suitable for reading.
3. it is according to claim 1 for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, It is characterized in that:The preformed hole box surrounding steel plate(1)Outer wall on be fixedly connected with outer resistance to plucking bar(5), the outer resistance to plucking bar(5) With concrete foundation(2)It is fixedly connected.
4. it is according to claim 3 for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, It is characterized in that:The outer resistance to plucking bar(5)One end and the preformed hole box surrounding steel plate(1)Outer wall be fixedly connected, another end Extend into concrete foundation(2)It is interior and tilt upward so that outer resistance to plucking bar(5)One end be less than its another end.
5. the template knot for the reserved equipment basic pre-buried bolt hole in cast-in-place concrete according to claim 3 or 4 Structure, it is characterised in that:In preformed hole box surrounding steel plate(1)The vertical direction of outer wall is described outer anti-at interval of 250mm settings one Dead man(5).
6. it is according to claim 1 for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, It is characterized in that:The inner wall of the preformed hole box is fixedly installed interior resistance to plucking bar(6)And/or anti-skid chequer(7).
7. it is according to claim 6 for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, It is characterized in that:The interior resistance to plucking bar(6)One end and the preformed hole box surrounding steel plate(1)Inner wall be fixedly connected, another end Extend into inner concrete(3)It is interior and let droop so that interior resistance to plucking bar(6)One end be higher than its another end.
8. it is according to claim 1 for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, It is characterized in that:The bottom and the steel plate of surrounding(1)It is fixedly connected by welding.
9. it is according to claim 1 for reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete, It is characterized in that:The upper end of the preformed hole box is fixedly installed sealing plate(8).
CN201810042300.4A 2018-01-17 2018-01-17 For reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete Pending CN108118893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810042300.4A CN108118893A (en) 2018-01-17 2018-01-17 For reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810042300.4A CN108118893A (en) 2018-01-17 2018-01-17 For reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete

Publications (1)

Publication Number Publication Date
CN108118893A true CN108118893A (en) 2018-06-05

Family

ID=62232962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810042300.4A Pending CN108118893A (en) 2018-01-17 2018-01-17 For reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete

Country Status (1)

Country Link
CN (1) CN108118893A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797632A (en) * 2018-08-29 2018-11-13 中国恩菲工程技术有限公司 Equipment anchor bolt positioning device and method
CN109695252A (en) * 2018-12-12 2019-04-30 上海巴安水务股份有限公司 A kind of Equipment Foundations hole to be provided work progress method of quality control
CN111042188A (en) * 2019-12-05 2020-04-21 中冶天工集团有限公司 Supporting-free template for reserved bolt holes of roughing mill body and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2470219A1 (en) * 1979-11-20 1981-05-29 Laroche Jean Pierre Fixing anchor for concrete wall - has tube to extend cast-in bolt which enters tapered pocket to accept nut with conical thrust washer
JPH084285A (en) * 1994-06-17 1996-01-09 Toshiba Eng & Constr Co Ltd Anchor form, and anchor construction method using the same
CN202247938U (en) * 2011-09-22 2012-05-30 河北省第四建筑工程公司 Wedge-shaped foundation bolt preformed hole core formwork device
CN203373768U (en) * 2013-06-14 2014-01-01 鞍钢集团工程技术有限公司 Equipment foundation bolt preformed hole model
CN104032768A (en) * 2014-06-06 2014-09-10 江苏中核华纬工程设计研究有限公司 Foundation bolt structure and construction method thereof
CN204112360U (en) * 2014-09-26 2015-01-21 中建七局第二建筑有限公司 The formwork structure of equipment Foundations prepared screw-bolt hole

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2470219A1 (en) * 1979-11-20 1981-05-29 Laroche Jean Pierre Fixing anchor for concrete wall - has tube to extend cast-in bolt which enters tapered pocket to accept nut with conical thrust washer
JPH084285A (en) * 1994-06-17 1996-01-09 Toshiba Eng & Constr Co Ltd Anchor form, and anchor construction method using the same
CN202247938U (en) * 2011-09-22 2012-05-30 河北省第四建筑工程公司 Wedge-shaped foundation bolt preformed hole core formwork device
CN203373768U (en) * 2013-06-14 2014-01-01 鞍钢集团工程技术有限公司 Equipment foundation bolt preformed hole model
CN104032768A (en) * 2014-06-06 2014-09-10 江苏中核华纬工程设计研究有限公司 Foundation bolt structure and construction method thereof
CN204112360U (en) * 2014-09-26 2015-01-21 中建七局第二建筑有限公司 The formwork structure of equipment Foundations prepared screw-bolt hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797632A (en) * 2018-08-29 2018-11-13 中国恩菲工程技术有限公司 Equipment anchor bolt positioning device and method
CN109695252A (en) * 2018-12-12 2019-04-30 上海巴安水务股份有限公司 A kind of Equipment Foundations hole to be provided work progress method of quality control
CN109695252B (en) * 2018-12-12 2021-03-05 上海巴安水务股份有限公司 Quality control method for construction process of equipment foundation reserved hole
CN111042188A (en) * 2019-12-05 2020-04-21 中冶天工集团有限公司 Supporting-free template for reserved bolt holes of roughing mill body and construction method

Similar Documents

Publication Publication Date Title
CN107268807B (en) A kind of Prefabricated concrete-filled steel tube superposed column
CN104018436B (en) Prefabricated box culvert system and its installation method
CN108118893A (en) For reserving the formwork structure of equipment basic pre-buried bolt hole in cast-in-place concrete
US4571124A (en) Method of forming cast-in-place concrete pile
JP5372289B1 (en) Boundary wall structure
CN110409491A (en) Pile plate type retaining wall integral casting template structure and construction method thereof
CN106437033B (en) A kind of steel core concrete column embedded column base
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN110409713A (en) A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure
CN108442404A (en) Assembled composite ecotype retaining wall and its construction method
CN110499869A (en) Bracket composite beam and its construction method
CN109356183A (en) A kind of open caisson reserved opening plugging structure and its construction method
CN108343094A (en) A kind of waterproof construction and its construction method of basement bottom board lattice column
CN104358275A (en) Construction method for deeper elevator well or water collecting well
CN206233560U (en) Wall formwork erecting structure
CN210658442U (en) Roof plate upturning beam structure of subway station
CN210712833U (en) Waterproof prestressed anchor rod structure
CN208152108U (en) A kind of waterproof construction of basement bottom board lattice column
JPH0220769B2 (en)
CN110805147A (en) Constructional column embedded steel bar inserting device and construction method thereof
KR101440392B1 (en) Bridge structure and construction method thereof
CN107119808B (en) Induce crack structure and its construction method
CN103061334B (en) I-section prestressed reinforced concrete support pile by centrifugal pouring
CN207813026U (en) A kind of cast-in-place concrete set aside pre-embedded bolt hole structure
CN207109611U (en) A kind of prefabricated just beam buttress

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605