CN110409713A - A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure - Google Patents
A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure Download PDFInfo
- Publication number
- CN110409713A CN110409713A CN201910694714.XA CN201910694714A CN110409713A CN 110409713 A CN110409713 A CN 110409713A CN 201910694714 A CN201910694714 A CN 201910694714A CN 110409713 A CN110409713 A CN 110409713A
- Authority
- CN
- China
- Prior art keywords
- segmentation
- concrete
- constructional column
- plugging device
- poured
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000011218 segmentation Effects 0.000 title claims abstract description 48
- 238000010276 construction Methods 0.000 title claims abstract description 34
- 238000005266 casting Methods 0.000 title claims abstract description 29
- 238000009434 installation Methods 0.000 claims abstract description 10
- 238000013461 design Methods 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 claims description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 4
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 2
- 238000009435 building construction Methods 0.000 abstract description 2
- 210000003205 muscle Anatomy 0.000 description 6
- 230000004907 flux Effects 0.000 description 4
- 230000015271 coagulation Effects 0.000 description 3
- 238000005345 coagulation Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 229910000838 Al alloy Inorganic materials 0.000 description 2
- 229910000851 Alloy steel Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000011470 perforated brick Substances 0.000 description 1
- 238000003325 tomography Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/06—Solidifying concrete, e.g. by application of vacuum before hardening
- E04G21/08—Internal vibrators, e.g. needle vibrators
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
It is poured the invention discloses a kind of segmentation of constructional column concrete and smashes construction method and constructional column casting and compacting of concrete constructing structure, belong to technical field of building construction.The segmentation of constructional column concrete, which is poured, smashes construction method and realized by following steps: S1: stencil design, setting segmentation pours on integral mold plate, and segmentation pours every section of dismountable reserved opening plugging device of top setting, and the reserved opening is as feed inlet;S2: template installation, reserved opening plugging device are installed together together with integral mold plate;S3: it pours and vibrates;S4: form removable.Constructional column casting and compacting of concrete constructing structure, including master module, segmentation plugging device, detachable horn mouth and vibrating spear.The present invention, which can solve conventional construction column and pour, smashes quality problems existing for leakiness, easy for construction, high-efficient, so that concreting compactness is largely increased, effectively reduces quality problems.
Description
Technical field
The present invention relates to technical field of building construction, specifically a kind of constructional column concrete segmentation, which is poured, smashes construction method
With constructional column casting and compacting of concrete constructing structure.
Background technique
With the development of society and frequently occurring for global seismicity, the quality requirement of building is continuously improved, is built
The anti-seismic performance for building object is also paid attention to further.In the existing most of frame structure buildings in China, air entrained concrete is mostly used greatly
For the light blocks such as building block, sintered hollow block, sintered perforated brick as filling wall, filling wall corner, wall end set constructional column, and wall is long super
It crosses 2 times of layer height and sets constructional column, filling wall pours constructional column and tension rib by privileged site and main structure is linked to be entirety, improves
The globality of building, to improve Antiseismic building performance.However in practice of construction, since constructional column concrete is from top one
The secondary height that pours is higher, the matter such as running pulp, dew stone, dew muscle, tomography, hole, pitted skin, horse tooth trough inner corner trim leakiness can often occurs
Amount problem.
Summary of the invention
Technical assignment of the invention is place against the above deficiency, provides a kind of segmentation of constructional column concrete and pours and smashes construction party
Method and constructional column casting and compacting of concrete constructing structure can solve conventional construction column and pour and smash quality problems existing for leakiness, construct
It is convenient, it is high-efficient, so that concreting compactness is largely increased, effectively reduces quality problems.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of segmentation of constructional column concrete, which is poured, smashes construction method, and this method passes through following steps realization:
S1: stencil design is arranged on integral mold plate according to the structure of constructional column and size selection integral mold plate appropriate
Segmentation pours, and segmentation pours every section of top and dismountable reserved opening plugging device is arranged, and the reserved opening is as feed inlet;
S2: template installation, constructional column two sides wall structural strength reach the installation of progress template after the intensity that specification allows,
Reserved opening plugging device is installed together together with integral mold plate;
S3: pouring and vibrate, and pours first segment from the bottom to top, opens reserved opening plugging device at the top of first segment, pours coagulation
Soil, while being inserted into vibrating spear and vibrating;Second segment is poured from the bottom to top, and reserved opening plugging device at the top of first segment is blocked
It is good, reserved opening plugging device at the top of second segment, casting concrete are opened, while being inserted into vibrating spear and vibrating;Same method
Segmentation casting concrete is continued up to pushing up section;
S4: form removable, column concrete to be constructed remove integral mold plate after reaching strength of mould stripping.
Preferably, every section poured that is segmented pours height no more than 1.2m, according to constructional column total height and small-sized vibration
The depth of effectively vibrating of tamper is determining, preferably 1m-1.2m.
Preferably, the reserved opening installs detachable horn mouth, is constructed when pouring by detachable horn mouth.
When segmentation pours, this section of reserved opening plugging device of dismantling installs detachable horn mouth at reserved opening, passes through detachable loudspeaker
Mouth is poured, and after the completion of pouring, is dismantled and detachable horn mouth and is installed plugging device.
Preferably, effective vibration depth of the vibrating spear is 1-1.2m, diameter 30mm, and vibration frequency is adjustable and and structure
It is flux matched to make column concreting.
Preferably, when often pouring section pouring construction, reserved opening plugging device is blocked and upper section concreting will be in lower end
It completes before concrete initial set, pours in this way, entitled segmentation pours, and it is practical to be formed with one-piece casting, but this pours mode and makes to construct
Each position of column can sufficiently vibrate, and keep Concrete Filled more closely knit.
The casting method of the constructional column solves constructional column concreting leakiness, vibrate difficult, frequent appearance part dew
Muscle, hole, crack common fault problem.
The invention also discloses a kind of constructional column casting and compacting of concrete constructing structure, including master module, segmentation plugging device, can
Detachable horn mouth and vibrating spear;
Master module is provided with segmentation on master module and pours feed inlet, feed inlet by vertical master stupefied and multiple cross stupefied fixation
Positioned at the top for often pouring section, feed inlet is blocked by detachable segmentation plugging device;
Segmentation plugging device installed with master module together with, carry out from the bottom to top segmentation pour, carry out be segmented pour when, tear open
The plugging device of this section is unloaded, and detachable horn mouth is installed at the feed inlet;
It vibrates when pouring from horn mouth insertion vibrating spear;
Detachable horn mouth is removed after pouring, and plugging device is installed.
It is arranged what segmentation poured according to the structure of constructional column and size selection integral mold plate appropriate, and on integral mold plate
Position pour vibrating by often pouring the feed inlet at top of section;It pours to vibrate and need to first dismantle the closure for pouring section dress
It sets, detachable horn mouth is installed, is then vibrated when pouring by vibrating spear;It pours after the completion of smashing, to be torn open before concrete initial set
Fall the plugging device that detachable horn mouth installs this section.
Preferably, the plugging device includes that plugging plate and closure are horizontal stupefied,
Block the horizontal stupefied upper and lower part that plugging plate is fixed on by iron nail;
The stupefied upper pre-embedded bolt of the master of master module, the closure cross is stupefied to offer connecting hole, blocks horizontal stupefied solid by connecting hole
It is fastened and fixed due to the stupefied pre-embedded bolt of master, then by nut.
Preferably, the detachable bell-mouthed two sides are provided with fixed edge, and screw hole is offered on fixed edge, removable
Formula horn mouth is unloaded to be fixed on master module by bolts through bolt holes.
Preferably, every section poured that is segmented pours height no more than 1.2m, according to constructional column total height and small-sized vibration
The depth of effectively vibrating of tamper determines.
Further, vibrating spear diameter be 30mm, long 1m, effectively vibrate depth be 1m-1.2m, vibration frequency is adjustable and with
Constructional column concreting is flux matched.
A kind of constructional column concrete segmentation of the invention pour smash construction method and constructional column casting and compacting of concrete constructing structure and
The prior art is compared, and is had the advantages that
The construction method is easy to operate, can be improved constructional column concrete density, and less running pulp, dew muscle, is broken at dew stone
The appearance of layer, hole, pitted skin, horse tooth trough inner corner trim leakiness and other issues reduces maintenance capacity of doing over again, and wall entirety can be improved
Quality improves construction efficiency.
Construction column sectional is poured and is vibrated by the constructional column casting and compacting of concrete constructing structure, one piece pouring molding, to compared with
The quality problems that high, thinner constructional column is easy to appear can effectively solve the problem that.The structure construction is convenient, high-efficient, pours concrete
It builds compactness to be largely increased, quality problems are greatly decreased.
Detailed description of the invention
Fig. 1 is constructional column casting and compacting of concrete construction overall structure diagram;
Fig. 2 is often to pour a section schematic view of facade structure;
Fig. 3 is the structure chart of plugging device;
Fig. 4 is detachable bell-mouthed structure chart.
In figure, 1, master module, 2, main stupefied, 3, horizontal stupefied, 4, split bolt, 5, plugging device, 6, plugging plate, 7, closure cross
It is stupefied, 8, screw, 9, bolt, 10, vibrating spear, 11, detachable horn mouth, 12, flange, 13, screw hole.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
Embodiment one
A kind of segmentation of constructional column concrete, which is poured, smashes construction method, and this method passes through following steps realization:
S1: stencil design,
According to the structure of constructional column and size selection integral mold plate appropriate, i.e. master module 1, the setting point on master module 1
Section pours, and segmentation pours every section of top and dismountable reserved opening plugging device 5 is arranged, and is segmented every section poured and pours height less
In 1.2m, determined according to the depth of effectively vibrating of constructional column total height and small-sized vibrating spear, preferably 1m-1.2m;
The reserved opening installs detachable horn mouth 11 as feed inlet, reserved opening, passes through detachable loudspeaker when pouring
Mouth 11 is constructed;
When segmentation pours, this section of reserved opening plugging device 5 of dismantling installs detachable horn mouth 11 at reserved opening, leads to
It crosses detachable horn mouth 11 to be poured, after the completion of pouring, dismantles and detachable horn mouth 11 and plugging device 5 is installed.
S2: template installation,
Constructional column two sides wall structural strength reaches the installation of progress template after the intensity that specification allows, and measures and determines construction
The exact position of column;Check that reinforcing bar binding meets design requirement before installation, not skewed shift, it is ensured that do not reveal muscle, mouth under horse tooth trough
45 ° of oblique angles are cut in building block, it is ensured that mouth inner corner trim concrete is more closely knit under horse tooth trough, bottom construction joint dabbing, it is ensured that construction joint is new and old mixed
Solidifying soil combines more preferable;The fixed split bolt 4 of template is passed through from horse tooth trough position;Reserved opening plugging device 5 is together with integral mold plate one
And it installs.
S3: pouring and vibrate,
First segment is poured from the bottom to top, opens reserved opening plugging device 5 at the top of first segment, detachable horn mouth is installed
11, casting concrete, while being inserted into vibrating spear 10 and vibrating, effective vibration depth of vibrating spear 10 is 1-1.2m, and diameter is
30mm, vibration frequency is adjustable and flux matched with constructional column concreting;
Second segment is poured from the bottom to top, reserved opening plugging device 5 at the top of first segment is blocked, and is opened pre- at the top of second segment
Mouthful plugging device 5 is stayed, detachable horn mouth 11, casting concrete are installed, while being inserted into vibrating spear 10 and vibrating;
Third section is poured from the bottom to top, reserved opening plugging device 5 at the top of second segment is blocked, and is opened pre- at the top of third section
Mouthful plugging device 5 is stayed, detachable horn mouth 11, casting concrete are installed, while being inserted into vibrating spear 10 and vibrating;
Top section is poured from the bottom to top, reserved opening plugging device 5 at the top of third section is blocked, in construction capital section reserved opening
Detachable horn mouth 11, casting concrete are installed, while being inserted into vibrating spear 10 and vibrating.
S4: form removable, column concrete to be constructed remove integral mold plate after reaching strength of mould stripping, remove detachable loudspeaker
Mouth 11.
When often pouring section pouring construction, reserved opening plugging device 5 is blocked and upper section concreting will be in lower end concrete
It completes before pre-hardening, pours in this way, entitled segmentation pours, practical with one-piece casting molding, but this pours mode makes each portion of constructional column
Position can sufficiently vibrate, and keep Concrete Filled more closely knit.
Wherein, plugging device 5 includes plugging plate 6 and blocks cross stupefied 7, and plugging plate 6 is fixed on master module by blocking cross stupefied 7
1, it is connected and fixed by screw 8 and bolt 9.
Detachable horn mouth 11 uses steel or aluminium alloy system, and the two sides and bottom edge contacted with constructional column are respectively provided with
Screw hole 13 is arranged in 15mm flange 12, every flange 12, and the removable horn mouth that unloads is fixed with master module 1 by screw.
The casting method of the constructional column solves constructional column concreting leakiness, vibrate difficult, frequent appearance part dew
Muscle, hole, crack common fault problem.
Embodiment two
A kind of constructional column casting and compacting of concrete constructing structure, including master module 1, segmentation plugging device 5, detachable horn mouth
11 and vibrating spear 10.
Master module 1 is fixed by vertical master stupefied 2 and multiple cross stupefied 3, is provided with segmentation on master module 1 and pours feed inlet, into
Material mouth is located at the top for often pouring section, and feed inlet is blocked by detachable segmentation plugging device 5.
The plugging device 5 includes plugging plate 6 and closure cross stupefied 7.It blocks cross stupefied 7 and plugging plate 6 is fixed on by screw 8
Upper and lower part;Pre-embedded bolt on the master of master module 1 stupefied 2, the closure cross stupefied 7 offer connecting hole, block cross stupefied 7 and pass through company
Hole is connect to be fixed on the pre-embedded bolt of master stupefied 2 and then be fastened and fixed by nut 9.
Plugging device 5 is installed together with master module 1, carry out from the bottom to top segmentation pour, carry out segmentation pour when, disassembly
The plugging device 5 of this section, and detachable horn mouth 11 is installed at the feed inlet, vibrating spear 10 is inserted into from horn mouth when pouring
It vibrates;Detachable horn mouth 11 is removed after pouring, and plugging device 5 is installed.
The two sides of the detachable horn mouth 11 are provided with fixed edge, and screw hole is offered on fixed edge, detachable
Horn mouth 11 is fixed on master module 1 by bolts through bolt holes.10 diameter of vibrating spear is 30mm, long 1m, and effectively vibration is deep
Degree is 1m-1.2m, and vibration frequency is adjustable and flux matched with constructional column concreting.It is segmented every section poured and pours height less
In 1.2m, determined according to the depth of effectively vibrating of constructional column total height and small-sized vibrating spear 10.
It is arranged what segmentation poured according to the structure of constructional column and size selection integral mold plate appropriate, and on integral mold plate
Position pour vibrating by often pouring the feed inlet at top of section;It pours to vibrate and need to first dismantle the closure for pouring section dress
5 are set, detachable horn mouth 11 is installed, then passes through vibrating spear 10 when pouring and vibrates;It pours after the completion of smashing, to concrete initial set
Before dismantle detachable horn mouth 11 plugging device 5 of this section is installed.
The Specific construction process of the structure is as follows:
Stencil design:
According to the structure and size of constructional column, master module 1 appropriate is selected, it is removable to pour every section of top setting in segmentation
The reserved opening plugging device 5 that unload, can be blocked, every section is segmented the height poured and is not preferably greater than 1.2 meters.5 plugging plate 6 of plugging device with
Upper and lower two closure horizontal stupefied 7 are fixed with screw 8, and horizontal stupefied 7 both ends of closure are connect with nut 9 with the pre-embedded bolt of template master stupefied 2 solid
It is fixed.For reserved opening as feed inlet, the detachable horn mouth 11 of installation at feed inlet, material is steel or aluminium alloy;It is detachable
The two sides and bottom edge that horn mouth 11 is contacted with constructional column are all provided with 15mm flange 12, and every side flange 12 sets screw hole 13, detachably
Formula horn mouth 11 and template are fixed by screw.
Template installation:
Constructional column two sides wall structural strength reaches the installation of progress template after specification proof strength.It measures and determines constructional column
Exact position, check that reinforcing bar binding meets design requirement before installing, not skewed shift, it is ensured that do not reveal muscle;Mouth is built under horse tooth trough
Block cuts 45 ° of oblique angles, it is ensured that mouth inner corner trim concrete is more closely knit under horse tooth trough, bottom construction joint dabbing, it is ensured that the new and old coagulation of construction joint
Soil combines more preferable.The fixation split bolt 4 of master module 1 is passed through from horse tooth trough position, between the upper and lower away from no more than 500mm;Reserved opening
Plugging device 5 installed together together with integral mold plate.
First segment is poured from the bottom to top:
The reserved opening plugging plate 6 at the top of first segment is opened, detachable horn mouth 11 is installed, pours first segment from feed inlet
Concrete is inserted into simultaneouslyThe small-sized vibrating spear 10 of long 1m is sufficiently vibrated.
Second segment is poured from the bottom to top:
Before first segment concrete initial set, reserved opening plugging plate 6 at the top of first segment is installed, is opened reserved at the top of second segment
Mouth plugging plate 6, installs detachable horn mouth 11, pours the second section concrete, be inserted into simultaneouslyThe long small-sized vibrating spear of 1m
10 are sufficiently vibrated;Reserved opening plugging plate 6 is installed at the top of first segment, the second section concrete starts to pour in first segment coagulation
It is carried out before native initial set.
Third section is poured from the bottom to top:
Before second segment concrete initial set, reserved opening plugging plate 6 at the top of second segment is installed, is opened reserved at the top of third section
Mouth plugging plate 6, installs detachable 11 device of horn mouth, pours third section concrete, be inserted into simultaneouslyThe long small-sized vibration of 1m
Tamper 10 is sufficiently vibrated;Reserved opening plugging plate 6 is installed at the top of second segment, third section concrete starts to pour in second segment
It is carried out before concrete initial set.
Top section is poured from the bottom to top:
Before third section concrete initial set, reserved opening plugging plate 6 at the top of third section is installed, in construction top end reserved opening
Detachable 11 device of horn mouth is installed, top section concrete is poured, is inserted into simultaneouslyThe long small-sized vibrating spear 10 of 1m is filled
Divide and vibrates.
Form removable:
Constructional column concrete reaches form removal after some strength, removes detachable 11 device of horn mouth.
The technical personnel in the technical field can readily realize the present invention with the above specific embodiments,.But it answers
Work as understanding, the present invention is not limited to above-mentioned specific embodiments.On the basis of the disclosed embodiments, the technical field
Technical staff can arbitrarily combine different technical features, to realize different technical solutions.
Except for the technical features described in the specification, it all is technically known to those skilled in the art.
Claims (10)
1. a kind of constructional column concrete segmentation, which is poured, smashes construction method, it is characterised in that this method is realized by following steps:
S1: stencil design, setting segmentation pours on integral mold plate, and segmentation pours every section of top and dismountable reserved opening envelope is arranged
Block apparatus, the reserved opening is as feed inlet;
S2: template installation, reserved opening plugging device are installed together together with integral mold plate;
S3: pouring and vibrate, and pours first segment from the bottom to top, opens reserved opening plugging device at the top of first segment, casting concrete, together
When insertion vibrating spear vibrate;Second segment is poured from the bottom to top, reserved opening plugging device at the top of first segment is blocked, and is opened
Reserved opening plugging device at the top of second segment, casting concrete, while being inserted into vibrating spear and vibrating;Same method continues up
Segmentation casting concrete is to pushing up section;
S4: form removable, column concrete to be constructed remove integral mold plate after reaching strength of mould stripping.
2. a kind of constructional column concrete segmentation according to claim 1, which is poured, smashes construction method, it is characterised in that the segmentation
Every section poured pours height no more than 1.2m.
3. a kind of constructional column concrete segmentation according to claim 1, which is poured, smashes construction method, it is characterised in that reserved opening peace
Detachable horn mouth is filled, is constructed when pouring by horn mouth.
4. a kind of constructional column concrete segmentation according to claim 2 or 3, which is poured, smashes construction method, it is characterised in that the vibration
Effective vibration depth of tamper is 1-1.2m, diameter 30mm.
5. a kind of constructional column concrete segmentation according to claim 1, which is poured, smashes construction method, it is characterised in that often pour section
When pouring construction, reserved opening plugging device is blocked and upper section concreting will be completed before the concrete initial set of lower end.
6. a kind of constructional column casting and compacting of concrete constructing structure, it is characterised in that including master module, be segmented plugging device, detachable
Horn mouth and vibrating spear;
Master module is provided with segmentation on master module and pours feed inlet, feed inlet is located at by vertical master stupefied and multiple cross stupefied fixation
The top of section is often poured, feed inlet is blocked by detachable segmentation plugging device;
Segmentation plugging device installed with master module together with, carry out from the bottom to top segmentation pour, carry out segmentation pour when, disassembly be somebody's turn to do
The plugging device of section, and detachable horn mouth is installed at the feed inlet;
It vibrates when pouring from horn mouth insertion vibrating spear;
Detachable horn mouth is removed after pouring, and plugging device is installed.
7. a kind of constructional column casting and compacting of concrete constructing structure according to claim 6, it is characterised in that the plugging device
It is horizontal stupefied including plugging plate and closure,
Block the horizontal stupefied upper and lower part that plugging plate is fixed on by iron nail;
The stupefied upper pre-embedded bolt of the master of master module, the closure cross is stupefied to offer connecting hole, and closure cross is stupefied to be fixed on by connecting hole
Master is stupefied and passes through nut fastening.
8. a kind of constructional column casting and compacting of concrete constructing structure according to claim 6 or 7, it is characterised in that described detachable
The bell-mouthed two sides of formula are provided with fixed edge, and fixed edge opens up screw hole, and detachable horn mouth is fixed on main mould by screw
Plate.
9. a kind of constructional column casting and compacting of concrete constructing structure according to claim 6, it is characterised in that the segmentation pours
Every section pour height no more than 1.2m.
10. a kind of constructional column casting and compacting of concrete constructing structure according to claim 9, it is characterised in that vibrating spear diameter is
30mm, long 1m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910694714.XA CN110409713A (en) | 2019-07-30 | 2019-07-30 | A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910694714.XA CN110409713A (en) | 2019-07-30 | 2019-07-30 | A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110409713A true CN110409713A (en) | 2019-11-05 |
Family
ID=68364116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910694714.XA Pending CN110409713A (en) | 2019-07-30 | 2019-07-30 | A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110409713A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111677286A (en) * | 2020-06-30 | 2020-09-18 | 中国二十二冶集团有限公司 | Concrete pouring and vibrating device assembly for closed space and vibrating method |
CN112031273A (en) * | 2020-09-07 | 2020-12-04 | 华创建筑设计有限公司 | Fabricated building constructional column and construction method thereof |
CN112267670A (en) * | 2020-10-15 | 2021-01-26 | 中国一冶集团有限公司 | Vibratile aluminum mould suitable for masonry constructional column and aluminum mould construction method |
CN113047612A (en) * | 2021-03-26 | 2021-06-29 | 河南省育兴建设工程管理有限公司 | Fabricated building constructional column and construction method thereof |
CN115012650A (en) * | 2022-06-08 | 2022-09-06 | 陕西建工第三建设集团有限公司 | Vibratile constructional column construction device and method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120286134A1 (en) * | 2009-12-10 | 2012-11-15 | Efrain Rojas Pimienta | Adjustable metal formwork system for concrete structures |
CN203373968U (en) * | 2013-06-28 | 2014-01-01 | 中建七局第二建筑有限公司 | Filler wall constructional column formwork structure |
CN104831923A (en) * | 2015-05-26 | 2015-08-12 | 温州东瓯建设集团有限公司 | Constructional column steel molding plate |
CN205259600U (en) * | 2015-12-30 | 2016-05-25 | 兖矿东华建设有限公司 | Template is pour to high -rise building constructional column |
CN205955191U (en) * | 2016-08-26 | 2017-02-15 | 山东三箭建设工程股份有限公司 | Constructional column side template device for concreting |
CN106948595A (en) * | 2017-03-31 | 2017-07-14 | 中国冶集团有限公司 | Secondary structure gang form |
CN107217845A (en) * | 2017-07-19 | 2017-09-29 | 北京城建七建设工程有限公司 | Core column concrete pours mouth mold tool and pours a mouthful method for shaping |
CN210658959U (en) * | 2019-07-30 | 2020-06-02 | 中建八局第二建设有限公司 | Constructional column concrete placement construction structures of smashing |
-
2019
- 2019-07-30 CN CN201910694714.XA patent/CN110409713A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120286134A1 (en) * | 2009-12-10 | 2012-11-15 | Efrain Rojas Pimienta | Adjustable metal formwork system for concrete structures |
CN203373968U (en) * | 2013-06-28 | 2014-01-01 | 中建七局第二建筑有限公司 | Filler wall constructional column formwork structure |
CN104831923A (en) * | 2015-05-26 | 2015-08-12 | 温州东瓯建设集团有限公司 | Constructional column steel molding plate |
CN205259600U (en) * | 2015-12-30 | 2016-05-25 | 兖矿东华建设有限公司 | Template is pour to high -rise building constructional column |
CN205955191U (en) * | 2016-08-26 | 2017-02-15 | 山东三箭建设工程股份有限公司 | Constructional column side template device for concreting |
CN106948595A (en) * | 2017-03-31 | 2017-07-14 | 中国冶集团有限公司 | Secondary structure gang form |
CN107217845A (en) * | 2017-07-19 | 2017-09-29 | 北京城建七建设工程有限公司 | Core column concrete pours mouth mold tool and pours a mouthful method for shaping |
CN210658959U (en) * | 2019-07-30 | 2020-06-02 | 中建八局第二建设有限公司 | Constructional column concrete placement construction structures of smashing |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111677286A (en) * | 2020-06-30 | 2020-09-18 | 中国二十二冶集团有限公司 | Concrete pouring and vibrating device assembly for closed space and vibrating method |
CN112031273A (en) * | 2020-09-07 | 2020-12-04 | 华创建筑设计有限公司 | Fabricated building constructional column and construction method thereof |
CN112267670A (en) * | 2020-10-15 | 2021-01-26 | 中国一冶集团有限公司 | Vibratile aluminum mould suitable for masonry constructional column and aluminum mould construction method |
CN113047612A (en) * | 2021-03-26 | 2021-06-29 | 河南省育兴建设工程管理有限公司 | Fabricated building constructional column and construction method thereof |
CN113047612B (en) * | 2021-03-26 | 2022-11-29 | 河南省育兴建设工程管理有限公司 | Fabricated building constructional column and construction method thereof |
CN115012650A (en) * | 2022-06-08 | 2022-09-06 | 陕西建工第三建设集团有限公司 | Vibratile constructional column construction device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110409713A (en) | A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure | |
CN106592426B (en) | The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system | |
CN104594500B (en) | Integrated slab column formwork structure system and construction method | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN110509396B (en) | Laminated slab, laminated slab production equipment and laminated slab production method | |
CN107443566A (en) | The preparation method of prefabricated constructional column formwork | |
CN207988490U (en) | A kind of easy device that deformation joint shear wall formwork installs | |
CN108166750A (en) | A kind of manpower-free's vibrated concrete wall construction template and implementing process | |
CN206233560U (en) | Wall formwork erecting structure | |
CN107288263A (en) | The construction method of prefabricated constructional column | |
CN108005255A (en) | A kind of construction method of wall | |
CN210658959U (en) | Constructional column concrete placement construction structures of smashing | |
CN216360918U (en) | Exempt from to pick chisel quick detach pin-connected panel wall body hole shutoff mould | |
CN108582426A (en) | A kind of producing device and production method of stiffened column | |
CN211923107U (en) | Formwork-supporting-free structure of constructional column in wall | |
CN108638322A (en) | Prefabricated post concreting method in a kind of assembled architecture | |
CN112609986A (en) | Method for controlling pouring forming quality of concrete batter post | |
CN108544655A (en) | The curved beam prefabricated construction method of curved bridge | |
CN206267523U (en) | A kind of constructional column based on standard knot combination is poured uses template | |
CN110130271A (en) | A kind of construction method of side wall concrete single-sided formwork reinforcement | |
CN211774799U (en) | Formwork-supporting-free structure for constructional column at joint of T-shaped wall | |
CN108166676A (en) | A kind of embedded rib superimposed sheet of band and laminated structure member and method for prefabricating | |
CN211774796U (en) | Cross wall connection department constructional column exempts from formwork structure | |
CN107587637A (en) | The box internal model hollow floor of air-entrained concrete building block and its construction method | |
CN114083641A (en) | Vibrator combined structure in precast T-beam concrete pouring process and use method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |