CN107443566A - The preparation method of prefabricated constructional column formwork - Google Patents

The preparation method of prefabricated constructional column formwork Download PDF

Info

Publication number
CN107443566A
CN107443566A CN201710719125.3A CN201710719125A CN107443566A CN 107443566 A CN107443566 A CN 107443566A CN 201710719125 A CN201710719125 A CN 201710719125A CN 107443566 A CN107443566 A CN 107443566A
Authority
CN
China
Prior art keywords
constructional column
prefabricated
stop collar
inner template
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710719125.3A
Other languages
Chinese (zh)
Other versions
CN107443566B (en
Inventor
姚荣
曹雄锋
姚贵树
吴海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201710719125.3A priority Critical patent/CN107443566B/en
Publication of CN107443566A publication Critical patent/CN107443566A/en
Application granted granted Critical
Publication of CN107443566B publication Critical patent/CN107443566B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • B28B1/0873Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould the mould being placed on vibrating or jolting supports, e.g. moulding tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of preparation method of prefabricated constructional column formwork, utilize prefabricated constructional column formwork producing device, pass through the perforation both ends of constructional column reinforcing bar being each passed through on the seal cover board of both ends, constructional column reinforcing bar can just be positioned, then the casting concrete directly into constructional column concrete pouring groove, Vibration on Start-up platform simultaneously, concrete can be made uniformly to be filled in each position in constructional column concrete pouring groove, it can avoid producing cavitation, after concrete setting, corresponding template is removed, its making is simple and convenient, and Forming Quality is high.

Description

The preparation method of prefabricated constructional column formwork
Technical field
The present invention relates to the realm of building construction, and in particular to a kind of preparation method of prefabricated constructional column formwork.
Background technology
Frame structure is flexible due to separating with space, from heavy and light, saves material;Architectural plane can more neatly be coordinated The advantages that arrangement, house, school, office building etc. are widely used in, also prestressing force can be applied to beams of concrete or plate as needed, with Suitable for larger span.The mode that filling wall is built after frame structure main body construction is completed, after generally use realizes space The function of separating and go along with sb. to guard him.To improve the integral rigidity of building and overall ductility, the development of wall body slit is constrained, is increased The stability of building, strengthen the shock resistance of building, fill and require to set the secondary constructional column poured in wall.
The existing secondary structure Constructional Col-umn Construction technique of frame structure, after masonry completion, live colligation constructional column reinforcing bar, Supporting module, casting concrete, form removal.Working procedure is cumbersome, template usage amount is big, work consuming amount is big, long construction period.Constructed Cheng Zhong, because construction column dimension is smaller, concrete vibrating is more difficult, causes concrete pouring quality not ensure, impression quality Poor, when floor height is higher, constructional column needs segmentation to pour, and difficulty of construction is larger.
In order to solve the above-mentioned technical problem, a kind of construction method of prefabricated constructional column is inventor provided, employs part Then prefabricated method, first prefabricated one section of constructional column formwork drill through bar planting hole on upper beam and bottom plate respectively again, the plant on bottom plate Muscle hole is implanted into fixed steel bars, then inserts in upper beam bar planting hole the reinforcing bar of prefabricated constructional column formwork upper end and inserts anchoring adhesive It is fixed, prefabricated constructional column formwork upper end is connected on upper beam, reinforcing bar and the fixed steel bars colligation of prefabricated constructional column formwork lower end It is fixed, then outwards laid bricks from prefabricated constructional column formwork both ends, afterwards the supporting module below prefabricated constructional column formwork, from prefabricated Constructional column formwork concrete perfusion, the form removal after concrete setting.But wherein how prefabricated constructional column is made, There can be the features such as making is simple and convenient, and Forming Quality is high, it is necessary to further account for.
The content of the invention
For above-mentioned the deficiencies in the prior art, the technical problems to be solved by the invention are:How a kind of making letter is provided Folk prescription just, the construction method of the high prefabricated constructional column of Forming Quality.
In order to solve the above-mentioned technical problem, present invention employs following technical scheme:
A kind of preparation method of prefabricated constructional column formwork, comprises the following steps:
(a)A kind of prefabricated constructional column formwork producing device, including shaking platform are obtained, two pieces are placed with the top surface of shaking platform Left and right is relatively and symmetrically arranged constructional column exterior sheathing, constructional column exterior sheathing are vertically arranged and horizontally extending, construction Post exterior sheathing is in integrally horse tooth trough structure, and the external mold for two blocks of constructional column exterior sheathings to be carried out with supporting is provided with shaking platform Slab supporting device, formed with constructional column concrete pouring groove between two blocks of constructional column exterior sheathings, poured into a mould positioned at constructional column concrete The opening at groove both ends is separately provided for the seal cover board sealed to it, and being offered on seal cover board multiple can make The perforation that constructional column reinforcing bar is passed through and sealed engagement therewith, the perforation on two pieces of seal cover boards are oppositely arranged, set on shaking platform The cover plate suspension device for carrying out supporting to seal cover board is equipped with, being horizontally disposed with constructional column concrete pouring groove has along construction The tubulose inner template of post concrete pouring basin length direction extension, the rear and front end of tubulose inner template is fitted in two pieces of sealings respectively On the medial surface of cover plate, tubulose inner template is separated by setting with the constructional column exterior sheathing of its both sides respectively, under tubulose inner template Being provided with the shaking platform of side can be supported to tubulose inner template so that tubulose inner template is separated by setting with shaking platform Internal model plate supporting device, the height of tubulose inner template upper surface is less than the height of constructional column concrete pouring basin notch, perforation It is located at tubulose inner template along constructional column concreting slot length side along the projection on constructional column concrete pouring groove length direction Outside upward projection;
(b)Obtain the constructional column reinforcing bar of respective numbers, the corresponding one group of perforation being oppositely arranged of every constructional column reinforcing bar, constructional column steel The both ends of muscle are stretched out from the perforation on the seal cover board positioned at constructional column concrete pouring groove both ends respectively, are pointed to constructional column and mix The possessive construction post reinforcing bar that solidifying soil is poured in groove carries out colligation so that it links together;
(c)The casting concrete into constructional column concrete pouring groove is until pour specified altitude assignment, while Vibration on Start-up platform is carried out Vibration is until concreting is completed;
(d)After concrete setting in step c, constructional column exterior sheathing and seal cover board are removed, by the constructional column film of prefabricated completion Shell is extracted out from tubulose inner template;
(e)The position that every two neighboring jog on obtained prefabricated constructional column formwork side has a common boundary is drilled with along right and left To the through hole of extension.
In the present invention, using prefabricated constructional column formwork producing device, by the way that the both ends of constructional column reinforcing bar are each passed through Perforation on the seal cover board of both ends, it becomes possible to positioned to constructional column reinforcing bar, then directly to constructional column concrete pouring groove Interior casting concrete, while Vibration on Start-up platform, can be such that concrete is uniformly filled in constructional column concrete pouring groove It each position, can avoid producing cavitation, after concrete setting, remove corresponding template, its making is simple and convenient, Forming Quality is high.
As optimization, the exterior sheathing suspension device is located at including two above two blocks of constructional column exterior sheathings The guide rail for being same as horizontal plane and be arrangeding in parallel in left-right direction, the vibration on the outside of two blocks of constructional column exterior sheathings are put down The both ends for corresponding to two guide rails on platform and respectively are fixedly connected with support column for being supported to guide rail, on every guide rail point Be not arranged with two it is corresponding with two blocks of constructional column exterior sheathings respectively and can be slidably matched along its length with it Sliding sleeve, connecting rod is provided with sliding sleeve, one end of connecting rod is fixed on sliding sleeve, and the other end is fixedly connected on sliding sleeve phase where its On the lateral surface of the corresponding constructional column exterior sheathing, being arranged with the guide rail of sliding sleeve both sides can be along rail length side Xiang Yuqi is slidably matched and spacing stop collar can be carried out to sliding sleeve, on stop collar is provided with that stop collar can be locked at and leads Spacing sleeve locking apparatus on rail.By adjusting the position of two sliding sleeves on guide rail, and then two pieces of constructional column external molds can be adjusted The relative distance of plate, it becomes possible to adjust the width of prefabricated constructional column formwork, to meet different construction demands, be also convenient in addition pre- Constructional column formwork processed complete after the demoulding.Each sliding sleeve corresponds to the stop collar of its both sides, by the limit for adjusting sliding sleeve both sides Position set, is defined to the position of sliding sleeve, and then completes the support to constructional column exterior sheathing.
As optimization, the spacing sleeve locking apparatus include being arranged on external screw thread on the outer surface of described stop collar one end and The locking nut being engaged with external screw thread, the screwhole diameter of locking nut are gradual along its axis direction towards the other end by its one end Reduce, the screw larger diameter end of locking nut is engaged with external screw thread, and the minimum diameter of the screw of locking nut is more than described lead The diameter of rail, the stop collar be located at externally threaded one end be provided with along its circumferential uniform intervals it is a plurality of along the stop collar axis Direction extension bar shaped breach, when locking nut towards the stop collar away from externally threaded one end precession when, the stop collar The guide rail can be clamped positioned at externally threaded one end.By rotational lock nut, its screw smaller diameter end can gradually extrude limit Position set, because spacing running-on has the presence of bar shaped breach, enables stop collar male end to deform therewith, and then clamp stop collar On guide rail.
In summary, the beneficial effects of the present invention are:The present invention utilizes prefabricated constructional column formwork producing device, is vibrating Install corresponding template on platform, and using template reinforcing bar is carried out being set to fixation, while utilize shaking platform to carry out when pouring Vibration, the constructional column Forming Quality so made is high, while makes simple and convenient.
Brief description of the drawings
In order that the purpose, technical scheme and advantage of invention are clearer, the present invention is made into one below in conjunction with accompanying drawing The detailed description of step, wherein:
Fig. 1 is the front view after the completion of prefabricated constructional column construction;
Fig. 2 is the structural representation of prefabricated constructional column formwork producing device in the present invention.
Embodiment
Below in conjunction with the accompanying drawings and the construction method of prefabricated constructional column the present invention is described in further detail.
As depicted in figs. 1 and 2, the construction method of the prefabricated constructional column in present embodiment, comprises the following steps:
(1)Obtain prefabricated constructional column formwork, the length of prefabricated constructional column formwork be less than positioned at the floor of construction location and upper beam it Between distance length, the left and right sides of prefabricated constructional column formwork is horse tooth trough structure, and the top surface of prefabricated constructional column formwork is provided with The concreting cavity of prefabricated constructional column formwork bottom surface is extended to along prefabricated constructional column formwork length direction, positioned at prefabricated construction Top end on front side of post formwork offers and concreting mouth is connected with concreting cavity, along it on prefabricated constructional column formwork Length direction is also equipped with more constructional column reinforcing bars, and the both ends of constructional column reinforcing bar stretch out in the upper and lower of prefabricated constructional column formwork respectively Both ends;
(2)Wall construction line is drawn on floor according to construction drawing, in the upper beam following table above constructional column position to be onstructed Upper bar planting hole is bored in face, and the quantity in upper bar planting hole is consistent with constructional column number of steel bars, arrangement position and the constructional column steel in upper bar planting hole The arrangement position of muscle is corresponding, bar planting hole under being bored on the floor upper surface below constructional column position to be onstructed, lower bar planting The quantity in hole is consistent with the quantity in upper bar planting hole, and the arrangement position in lower bar planting hole is corresponding with the arrangement position in upper bar planting hole, under Fixed steel bars are implanted with by anchoring adhesive in bar planting hole;
(3)After the anchoring adhesive solidification in lower bar planting hole, prefabricated constructional column formwork is installed, prefabricated constructional column formwork upper end will be located at Constructional column reinforcing bar be inserted into bar planting hole, and addition anchoring adhesive in bar planting hole upwards, then by prefabricated constructional column formwork Upper end end face is connected to the lower surface of upper beam, then by positioned at the constructional column reinforcing bar and fixed steel bars of prefabricated constructional column formwork lower end Correspondingly and by iron wire banding fixed together;
(4)After the anchoring adhesive solidification in upper bar planting hole, outwards built by laying bricks or stones along wall construction line at left and right sides of prefabricated constructional column formwork Fragment of brick, and reserve the constructional column pouring area below prefabricated constructional column formwork;
(5)After the completion for the treatment of that fragment of brick is built by laying bricks or stones in step 4, constructional column formwork for placing is installed respectively in the front and rear sides of constructional column pouring area Chamber is poured to form constructional column;
(6)Concreting hopper is installed at concreting mouth, the quarrel of concreting hopper is highly higher than upper beam Floor height, then by concreting hopper to concreting cavity placing concrete, until the concrete after pouring Surface is higher than the bottom surface of upper beam;
(7)After the concrete setting in step 6, constructional column formwork for placing and concreting hopper are removed, and will be located at mixed Solidifying soil pours the concrete projection formed at hopper and cut, and receives light.
In present embodiment, the preparation method of the prefabricated constructional column formwork comprises the following steps:
(a)A kind of prefabricated constructional column formwork producing device, including shaking platform 1 are obtained, two are placed with the top surface of shaking platform 1 Block or so is relative and symmetrically arranged constructional column exterior sheathing 2, constructional column exterior sheathing 2 be it is vertically arranged and horizontally extending, It is in horse tooth trough structure that constructional column exterior sheathing 2 is overall, is provided with shaking platform 1 for propping up two blocks of constructional column exterior sheathings 2 The exterior sheathing suspension device of shield, formed with constructional column concrete pouring groove between two blocks of constructional column exterior sheathings 2, mixed positioned at constructional column The opening for coagulating native pouring basin both ends is separately provided for the seal cover board 3 sealed to it, is offered on seal cover board 3 Multiple perforation that constructional column reinforcing bar can be made to pass through and seal engagement therewith, the perforation on two pieces of seal cover boards 3 are oppositely arranged, shaken The cover plate suspension device for carrying out supporting to seal cover board 3 is provided with moving platform 1, it is horizontal in constructional column concrete pouring groove It is provided with the tubulose inner template 4 extended along constructional column concrete pouring basin length direction, the rear and front end difference of tubulose inner template 4 It is fitted on the medial surface of two pieces of seal cover boards 3, tubulose inner template 4 is separated by setting with the constructional column exterior sheathing 2 of its both sides respectively, Being provided with the shaking platform 1 of the lower section of tubulose inner template 4 can be supported to tubulose inner template 4 so that tubulose inner template 4 are separated by the internal model plate supporting device of setting with shaking platform 1, and the height of the upper surface of tubulose inner template 4 is less than constructional column concrete The height of pouring basin notch, perforate and be located at tubulose inner template 4 along structure along the projection on constructional column concrete pouring groove length direction Make outside the projection on post concrete pouring groove length direction;
(b)Obtain the constructional column reinforcing bar of respective numbers, the corresponding one group of perforation being oppositely arranged of every constructional column reinforcing bar, constructional column steel The both ends of muscle are stretched out from the perforation on the seal cover board positioned at constructional column concrete pouring groove both ends respectively, are pointed to constructional column and mix The possessive construction post reinforcing bar that solidifying soil is poured in groove carries out colligation so that it links together;
(c)The casting concrete into constructional column concrete pouring groove is until pour specified altitude assignment, while Vibration on Start-up platform 1 is carried out Vibration is until concreting is completed;
(d)After concrete setting in step c, constructional column exterior sheathing 2 and seal cover board 3 are removed, by the constructional column of prefabricated completion Putamina is extracted out from tubulose inner template 4;
(e)The position that every two neighboring jog on obtained prefabricated constructional column formwork side has a common boundary is drilled with along right and left To the through hole of extension.
In present embodiment, in steps of 5, after the completion of fragment of brick is built by laying bricks or stones, before and after the constructional column pouring area A sealing strip is bonded along constructional column pouring area profile respectively at the fragment of brick edge of both sides, mould is poured by installing constructional column Plate is extruded sealing strip, and concrete that can be in constructional column pouring area is sealed.
In present embodiment, in step 2, a kind of bar planting hole perforating positioning apparatus is first obtained, including upper bar planting is determined Position plate and lower bar planting location-plate, the arrangement position of the constructional column reinforcing bar according to step 1 is respectively in upper bar planting location-plate with Corresponding upper Positioning holes and lower Positioning holes are correspondingly opened up on bar planting location-plate, the diameter of upper Positioning holes is more than the diameter in upper bar planting hole 1~2mm, the diameter of lower Positioning holes are more than the 1~2mm of diameter in lower bar planting hole;
When bar planting hole on drilling through, upper bar planting location-plate is connected on the upper beam lower surface, according to upper Positioning holes It is positioned on upper beam lower surface and bores upper bar planting hole, when lower bar planting hole is drilled through, lower bar planting location-plate is connected to described On plate upper surface, lower bar planting hole is bored according to being positioned on floor upper surface for lower Positioning holes.
Specific implementation when can also so do, outwards built by laying bricks or stones at left and right sides of prefabricated constructional column formwork fragment of brick when Wait, require uniform, full, closely knit with prefabricated constructional column formwork joint masonry mortar joint, make prefabricated constructional column formwork and masonry tight It is close to be connected.The length of steel tie is configured according to Architectural Design Requirements, seismic fortification intensity be 8 degree and more than, drawknot steel Muscle is through masonry where whole prefabricated constructional column formwork, and seismic fortification intensity is for 7 degree and following, and steel tie only inserts into prefabricated In the masonry of constructional column formwork both sides, intubating length meets to grow more than 700mm or more than 1/5th walls.Poured installing constructional column When building mould, it is desirable to which constructional column formwork for placing surface is smooth clean and tidy, no breakage.Two pieces of constructional column formwork for placing are used to drawing Screw rod sockets, and reinforces stable.Constructional column formwork for placing cleans out the backplate surface of constructional column pouring area before installing, and must not have Ponding, debris, and construction seam surface laitance is rejected, washed down with water.While to concreting cavity placing concrete, Percussion rapping is carried out to the outer surface of prefabricated constructional column formwork, carries out rapping successively from bottom to top, it is ensured that concreting cavity Interior concrete vibrating in place, middle stem concrete compaction, no hollowing hole phenomenon.
In addition, exterior sheathing suspension device is located at including two above two blocks of constructional column exterior sheathings 2 is same as horizontal plane And the guide rail 5 be arrangeding in parallel in left-right direction, correspond on the shaking platform 1 in two pieces of outsides of constructional column exterior sheathing 2 and respectively The both ends of two guide rails 5 are fixedly connected with the support column 6 for being supported to guide rail 5, and two are arranged with respectively on every guide rail 5 Sliding sleeve 7 that is individual corresponding with two blocks of constructional column exterior sheathings 2 respectively and being slidably matched along its length with it, on sliding sleeve 7 Connecting rod 8 is provided with, one end of connecting rod 8 is fixed on sliding sleeve 7, and sliding sleeve 7 where the other end is fixedly connected on it is corresponding On the lateral surface of constructional column exterior sheathing 2, being arranged with the guide rail 5 of the both sides of sliding sleeve 7 can be along rail length direction and its It is slidably matched and spacing stop collar 9 can be carried out to sliding sleeve 7, stop collar can be locked on guide rail 5 by being provided with stop collar 9 On spacing sleeve locking apparatus.By adjusting the position of two sliding sleeves on guide rail, and then two blocks of constructional column exterior sheathings can be adjusted Relative distance, it becomes possible to adjust the width of prefabricated constructional column formwork, to meet different construction demands, be also convenient in addition prefabricated Constructional column formwork complete after the demoulding.Each sliding sleeve corresponds to the stop collar of its both sides, by adjusting the spacing of sliding sleeve both sides Set, is defined to the position of sliding sleeve, and then completes the support to constructional column exterior sheathing.
The spacing sleeve locking apparatus includes the external screw thread and and external screw thread being arranged on one end outer surface of stop collar 9 The locking nut being engaged, the screwhole diameter of locking nut are gradually reduced by its one end along its axis direction towards the other end, lock The screw larger diameter end of tight nut is engaged with external screw thread, and the minimum diameter of the screw of locking nut is more than the straight of the guide rail 5 Footpath, the stop collar 9 be located at externally threaded one end be provided with along its circumferential uniform intervals it is a plurality of along the axis direction of stop collar 9 The bar shaped breach of extension, when locking nut towards the stop collar 9 away from externally threaded one end precession when, the stop collar 9 The guide rail 5 can be clamped in externally threaded one end.By rotational lock nut, its screw smaller diameter end can gradually extrude spacing Set, because spacing running-on has the presence of bar shaped breach, enables stop collar male end to deform therewith, and then be clamped in stop collar On guide rail.
It is located at constructional column external mold respectively positioned at two connecting rods 8 of the same side and the junction of constructional column exterior sheathing 2 Plate 2 along its length on two trisection points on.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although passing through ginseng According to the preferred embodiments of the present invention, invention has been described, it should be appreciated by those of ordinary skill in the art that can So that various changes are made to it in the form and details, the present invention that is limited without departing from appended claims Spirit and scope.

Claims (3)

  1. A kind of 1. preparation method of prefabricated constructional column formwork, it is characterised in that:Comprise the following steps:
    (a)A kind of prefabricated constructional column formwork producing device, including shaking platform are obtained, two pieces are placed with the top surface of shaking platform Left and right is relatively and symmetrically arranged constructional column exterior sheathing, constructional column exterior sheathing are vertically arranged and horizontally extending, construction Post exterior sheathing is in integrally horse tooth trough structure, and the external mold for two blocks of constructional column exterior sheathings to be carried out with supporting is provided with shaking platform Slab supporting device, formed with constructional column concrete pouring groove between two blocks of constructional column exterior sheathings, poured into a mould positioned at constructional column concrete The opening at groove both ends is separately provided for the seal cover board sealed to it, and being offered on seal cover board multiple can make The perforation that constructional column reinforcing bar is passed through and sealed engagement therewith, the perforation on two pieces of seal cover boards are oppositely arranged, set on shaking platform The cover plate suspension device for carrying out supporting to seal cover board is equipped with, being horizontally disposed with constructional column concrete pouring groove has along construction The tubulose inner template of post concrete pouring basin length direction extension, the rear and front end of tubulose inner template is fitted in two pieces of sealings respectively On the medial surface of cover plate, tubulose inner template is separated by setting with the constructional column exterior sheathing of its both sides respectively, under tubulose inner template Being provided with the shaking platform of side can be supported to tubulose inner template so that tubulose inner template is separated by setting with shaking platform Internal model plate supporting device, the height of tubulose inner template upper surface is less than the height of constructional column concrete pouring basin notch, perforation It is located at tubulose inner template along constructional column concreting slot length side along the projection on constructional column concrete pouring groove length direction Outside upward projection;
    (b)Obtain the constructional column reinforcing bar of respective numbers, the corresponding one group of perforation being oppositely arranged of every constructional column reinforcing bar, constructional column steel The both ends of muscle are stretched out from the perforation on the seal cover board positioned at constructional column concrete pouring groove both ends respectively, are pointed to constructional column and mix The possessive construction post reinforcing bar that solidifying soil is poured in groove carries out colligation so that it links together;
    (c)The casting concrete into constructional column concrete pouring groove is until pour specified altitude assignment, while Vibration on Start-up platform is carried out Vibration is until concreting is completed;
    (d)After concrete setting in step c, constructional column exterior sheathing and seal cover board are removed, by the constructional column film of prefabricated completion Shell is extracted out from tubulose inner template;
    (e)The position that every two neighboring jog on obtained prefabricated constructional column formwork side has a common boundary is drilled with along right and left To the through hole of extension.
  2. 2. the preparation method of prefabricated constructional column formwork according to claim 1, it is characterised in that:The external mold slab supporting dress Put and be located at what is be same as horizontal plane and be arranged in parallel in left-right direction including two above two blocks of constructional column exterior sheathings Guide rail, the both ends for corresponding on the shaking platform on the outside of two blocks of constructional column exterior sheathings and respectively two guide rails are fixed Be connected with the support column for being supported to guide rail, be arranged with respectively on every guide rail two respectively with two pieces of constructional columns Exterior sheathing is corresponding and the sliding sleeve that can be slidably matched along its length with it, and connecting rod is provided with sliding sleeve, connecting rod One end is fixed on sliding sleeve, the lateral surface of the corresponding constructional column exterior sheathing of sliding sleeve where the other end is fixedly connected on it On, being arranged with the guide rail of sliding sleeve both sides can be slidably matched with it along rail length direction and sliding sleeve can be carried out Spacing stop collar, the spacing sleeve locking apparatus that stop collar can be locked on guide rail is provided with stop collar.
  3. 3. the preparation method of prefabricated constructional column formwork according to claim 2, it is characterised in that:The spacing cover locking dress Put including the external screw thread being arranged on the outer surface of described stop collar one end and the locking nut being engaged with external screw thread, locking nut Screwhole diameter be gradually reduced by its one end along its axis direction towards the other end, the screw larger diameter end of locking nut and outer spiral shell Line is engaged, and the minimum diameter of the screw of locking nut is more than the diameter of the guide rail, and the stop collar is located at externally threaded one End is provided with a plurality of bar shaped breach extended along the stop collar axis direction along its circumferential uniform intervals, when locking nut direction When the stop collar is away from externally threaded one end precession, the stop collar, which is located at externally threaded one end, can clamp the guide rail.
CN201710719125.3A 2017-08-21 2017-08-21 The production method of prefabricated constructional column formwork Active CN107443566B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710719125.3A CN107443566B (en) 2017-08-21 2017-08-21 The production method of prefabricated constructional column formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710719125.3A CN107443566B (en) 2017-08-21 2017-08-21 The production method of prefabricated constructional column formwork

Publications (2)

Publication Number Publication Date
CN107443566A true CN107443566A (en) 2017-12-08
CN107443566B CN107443566B (en) 2019-07-19

Family

ID=60492894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710719125.3A Active CN107443566B (en) 2017-08-21 2017-08-21 The production method of prefabricated constructional column formwork

Country Status (1)

Country Link
CN (1) CN107443566B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107214815A (en) * 2017-07-31 2017-09-29 重庆志谋科技有限公司 A kind of building structural post shaped device
CN109137989A (en) * 2018-10-23 2019-01-04 北京市城远市政工程有限责任公司 Well room builds device
CN110774423A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Multi-curved surface modeling lining die for concrete structure and manufacturing method thereof
CN110788970A (en) * 2019-10-30 2020-02-14 中国建筑第八工程局有限公司 Multi-curved surface modeling lining die for concrete structure
CN110788972A (en) * 2019-10-30 2020-02-14 中国建筑第八工程局有限公司 Method for manufacturing multi-curved surface modeling lining die for concrete structure
CN111002432A (en) * 2019-07-01 2020-04-14 中国二十冶集团有限公司 Prefabricated constructional column template and using method thereof
CN113664955A (en) * 2021-09-05 2021-11-19 中建八局第四建设有限公司 Constructional column template and installation method
CN113700139A (en) * 2021-09-05 2021-11-26 中建八局第四建设有限公司 Prefabricated assembled bolted connection constructional column ring beam and construction method
CN114932643A (en) * 2022-04-11 2022-08-23 重庆力昇特装科技有限公司 Box forming die

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201730325U (en) * 2010-05-05 2011-02-02 王连起 Formwork for concrete column
CN105064548A (en) * 2015-08-03 2015-11-18 中冶建工集团有限公司 Wall structure of dismounting-free constructional column formwork and construction method of wall structure
KR20160002066A (en) * 2014-06-30 2016-01-07 강말선 Vibrate circle pipe forming mold
CN206015861U (en) * 2016-07-28 2017-03-15 上海嘉实(集团)有限公司 The cast-in-place core body of light block wall
CN106968366A (en) * 2017-05-09 2017-07-21 中原工学院 A kind of construction method for pouring constructional column free removal template

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201730325U (en) * 2010-05-05 2011-02-02 王连起 Formwork for concrete column
KR20160002066A (en) * 2014-06-30 2016-01-07 강말선 Vibrate circle pipe forming mold
CN105064548A (en) * 2015-08-03 2015-11-18 中冶建工集团有限公司 Wall structure of dismounting-free constructional column formwork and construction method of wall structure
CN206015861U (en) * 2016-07-28 2017-03-15 上海嘉实(集团)有限公司 The cast-in-place core body of light block wall
CN106968366A (en) * 2017-05-09 2017-07-21 中原工学院 A kind of construction method for pouring constructional column free removal template

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107214815A (en) * 2017-07-31 2017-09-29 重庆志谋科技有限公司 A kind of building structural post shaped device
CN109137989A (en) * 2018-10-23 2019-01-04 北京市城远市政工程有限责任公司 Well room builds device
CN109137989B (en) * 2018-10-23 2023-09-22 北京市城远市政工程有限责任公司 Well chamber masonry device
CN111002432A (en) * 2019-07-01 2020-04-14 中国二十冶集团有限公司 Prefabricated constructional column template and using method thereof
CN110788972B (en) * 2019-10-30 2021-06-11 中国建筑第八工程局有限公司 Method for manufacturing multi-curved surface modeling lining die for concrete structure
CN110788972A (en) * 2019-10-30 2020-02-14 中国建筑第八工程局有限公司 Method for manufacturing multi-curved surface modeling lining die for concrete structure
CN110788970A (en) * 2019-10-30 2020-02-14 中国建筑第八工程局有限公司 Multi-curved surface modeling lining die for concrete structure
CN110788970B (en) * 2019-10-30 2021-06-11 中国建筑第八工程局有限公司 Multi-curved surface modeling lining die for concrete structure
CN110774423B (en) * 2019-10-30 2021-06-11 中国建筑第八工程局有限公司 Multi-curved surface modeling lining die for concrete structure and manufacturing method thereof
CN110774423A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Multi-curved surface modeling lining die for concrete structure and manufacturing method thereof
CN113664955A (en) * 2021-09-05 2021-11-19 中建八局第四建设有限公司 Constructional column template and installation method
CN113700139A (en) * 2021-09-05 2021-11-26 中建八局第四建设有限公司 Prefabricated assembled bolted connection constructional column ring beam and construction method
CN113700139B (en) * 2021-09-05 2022-08-26 中建八局第四建设有限公司 Prefabricated assembled bolted connection constructional column ring beam and construction method
CN114932643A (en) * 2022-04-11 2022-08-23 重庆力昇特装科技有限公司 Box forming die
CN114932643B (en) * 2022-04-11 2024-07-26 重庆力昇特装科技有限公司 Box forming die

Also Published As

Publication number Publication date
CN107443566B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN107443566B (en) The production method of prefabricated constructional column formwork
CN107288263B (en) The construction method of prefabricated constructional column
CN102003069B (en) Construction method and pouring device for framework masonry infill wall structure
CN105298020B (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN105965672B (en) A kind of fabricated shear wall model structure unitary mould
CN103806651A (en) Bridge embedded part and method for installing bridge through bridge embedded part
CN108412094A (en) The construction method and device of the hollow concrete wall of masonry between a kind of replacement shear wall
CN110409713A (en) A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure
CN206015861U (en) The cast-in-place core body of light block wall
CN110499869A (en) Bracket composite beam and its construction method
CN207077580U (en) Prefabricated constructional column formwork producing device
CN108018878A (en) Piping lane bottom model sheetinstallat structure, piping lane model sheetinstallat system and its construction method
CN114294015A (en) Intelligent positioning template hydraulic trolley for loess tunnel VI-level surrounding rock double-layer lining construction
CN106049665B (en) The construction method of the cast-in-place core of light block wall
CN211114261U (en) Precast concrete shear force wall panel structure
CN107762001A (en) A kind of assembly concrete variable cross-section newel post type shearing wall member and its construction method
CN208363609U (en) A kind of constructional column assembly type can have enough to meet the need aluminum alloy pattern plate
CN113605688B (en) Constructional column concrete pouring mold and pouring method thereof
CN207376882U (en) A kind of assembly concrete variable cross-section newel post type shearing wall member and its making mold
CN207405819U (en) A kind of assembly concrete variable cross-section shearing wall limb and its making mold
CN108729456A (en) It is a kind of one concrete revetment pour mold and its pouring construction method
CN113073789B (en) Construction method of crotch column inclined column of swimming pool
CN108908664A (en) A kind of Vertical Combination die assembly
CN107090976A (en) Lifting-type water-dripping slot-forming system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant