CN105965672B - A kind of fabricated shear wall model structure unitary mould - Google Patents
A kind of fabricated shear wall model structure unitary mould Download PDFInfo
- Publication number
- CN105965672B CN105965672B CN201610445235.0A CN201610445235A CN105965672B CN 105965672 B CN105965672 B CN 105965672B CN 201610445235 A CN201610445235 A CN 201610445235A CN 105965672 B CN105965672 B CN 105965672B
- Authority
- CN
- China
- Prior art keywords
- mold system
- template
- formwork
- plate
- model structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009415 formwork Methods 0.000 claims abstract description 90
- 239000000725 suspension Substances 0.000 claims abstract description 12
- 230000001105 regulatory effect Effects 0.000 claims abstract description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 6
- 239000011150 reinforced concrete Substances 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 239000004567 concrete Substances 0.000 abstract description 14
- 238000010276 construction Methods 0.000 abstract description 9
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000000465 moulding Methods 0.000 abstract description 2
- 239000000203 mixture Substances 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000012360 testing method Methods 0.000 description 4
- 238000000354 decomposition reaction Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000012528 membrane Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 238000001802 infusion Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000004379 similarity theory Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000001179 sorption measurement Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0091—Transformable moulds allowing the change of shape of an initial moulded preform by preform deformation or the change of its size by moulding on the preform
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/28—Cores; Mandrels
- B28B7/30—Cores; Mandrels adjustable, collapsible, or expanding
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
Description
技术领域technical field
本发明涉及装配式混凝土模型结构施工领域,特别涉及一种装配式剪力墙模型结构整体模具,可用于例如以“口”型为基本单元组成建筑平面图的现浇剪力墙模型结构或装配式剪力墙模型结构的制作。The present invention relates to the construction field of prefabricated concrete model structures, in particular to an integral mold for prefabricated shear wall model structures, which can be used for cast-in-place shear wall model structures or prefabricated model structures such as "mouth" as the basic unit to form a building plan. Fabrication of shear wall model structures.
背景技术Background technique
在土木工程领域,为检验新的结构设计理论或新的结构体系,一般是通过模型结构试验研究对其进行检验或验证。模型结构是通过几何缩尺后,按照一定的相似理论进行设计计算并制作。对于剪力墙模型结构,层高一般为300mm~800mm,墙厚度为20mm~50mm,洞口尺寸及墙厚较小,加之应用低强度及低弹性模量混凝土,后期模板较难拆除,暴力拆模会对模型结构造成损害,进一步影响试验结果的准确性。对于装配式剪力墙模型结构,按照原型结构的施工工艺,模型结构墙体混凝土应分两次浇筑,在预制墙体和现浇部位接触部位形成竖向分隔缝,如何在模型结构钢筋绑扎阶段设置合理有效的分隔装置,并与模板相结合,是一个难题。In the field of civil engineering, in order to test new structural design theories or new structural systems, it is generally tested or verified through model structural test research. The model structure is designed, calculated and produced according to a certain similarity theory after geometric scaling. For the shear wall model structure, the storey height is generally 300mm-800mm, the wall thickness is 20mm-50mm, the opening size and wall thickness are small, and the low-strength and low-elastic modulus concrete is used, and the later formwork is difficult to remove. It will cause damage to the model structure and further affect the accuracy of the test results. For the prefabricated shear wall model structure, according to the construction technology of the prototype structure, the concrete of the model structure wall should be poured twice, and a vertical separation joint should be formed at the contact part between the prefabricated wall and the cast-in-place part. It is a difficult problem to set up a reasonable and effective partition device and combine it with the formwork.
传统的大比尺模型结构用木模板或泡沫制作,木模板不易拆除且重复利用的次数较低,泡沫制作时,造价较高,制作完成的模型结构表面粗糙,棱角模糊。The traditional large-scale model structure is made of wooden formwork or foam. Wooden formwork is not easy to dismantle and the number of times of reuse is low. When making foam, the cost is high, and the finished model structure has a rough surface and fuzzy edges and corners.
发明内容Contents of the invention
针对上述现有技术中存在的问题,本发明的目的在于,提供一种装配式剪力墙模型结构整体模具,方便模型结构狭小空间内模板的制作与拆除,减轻暴力拆模对模型结构的损害,减轻对试验结果的影响。可用于以“口”型为基本单元组成建筑平面图的现浇剪力墙模型结构或装配式剪力墙模型结构的制作。In view of the problems existing in the above-mentioned prior art, the object of the present invention is to provide an integral mold for an assembled shear wall model structure, which facilitates the manufacture and removal of the formwork in the narrow space of the model structure, and reduces the damage to the model structure caused by violent formwork demolition , to reduce the impact on the test results. It can be used in the manufacture of cast-in-place shear wall model structures or prefabricated shear wall model structures that use the "mouth" type as the basic unit to form a building plan.
本发明采用以下技术方案:The present invention adopts following technical scheme:
一种装配式剪力墙模型结构整体模具,包括外模系统以及设置在外模系统内部的内模系统:An integral mold for a prefabricated shear wall model structure, including an outer mold system and an inner mold system arranged inside the outer mold system:
所述的外模系统包括一对平行设置的第一外模板和一对平行设置的第二外模板,第一外模板和第二外模板端部相接使外模系统为矩形结构;所述的第二外模板的外壁上沿第二外模板的长度方向设置有第一卡肋;The outer mold system includes a pair of first outer templates arranged in parallel and a second outer template arranged in parallel, the ends of the first outer template and the second outer template are connected to make the outer mold system a rectangular structure; The outer wall of the second outer formwork is provided with a first card rib along the length direction of the second outer formwork;
所述的内模系统包括一对平行设置的第一内模板和一对平行设置的第二内模板,第一内模板和第二内模板端部相接使内模系统为矩形结构;在第二内模板的内壁上沿第二内模板的长度方向上设置有第二卡肋;The inner mold system includes a pair of first inner templates arranged in parallel and a second inner template arranged in parallel, the ends of the first inner template and the second inner template are connected to make the inner mold system a rectangular structure; The inner wall of the second inner formwork is provided with a second card rib along the length direction of the second inner formwork;
外模系统与内模系统之间设置有悬挂装置,悬挂装置包括丝杆,丝杆上套装有一对定位片,在每个定位片的侧面上均开设有卡槽,通过定位片上的卡槽与所述的第一卡肋、第二卡肋的配合实现外模系统与内模系统的连接;A suspension device is provided between the outer mold system and the inner mold system. The suspension device includes a screw mandrel. A pair of positioning pieces are set on the screw mandrel. A slot is provided on the side of each positioning piece. Through the slot on the positioning piece and the The cooperation of the first rib and the second rib realizes the connection between the outer mold system and the inner mold system;
所述的内模系统上方通过支撑装置设置有第三内模板。A third inner formwork is arranged above the inner formwork system through a supporting device.
进一步地,所述的第一外模板包括第一板体以及设置在第一板体同一侧面边缘上且相互平行的一对腹板,在每个腹板上均开设有多个L形的缺口,缺口的一端穿出腹板的侧面;所述的第二外模板包括第二板体,第二板体沿宽度方向的边缘上分布有固定螺栓。Further, the first outer template includes a first plate body and a pair of webs arranged on the same side edge of the first plate body and parallel to each other, and a plurality of L-shaped notches are opened on each web plate One end of the notch passes through the side of the web; the second outer formwork includes a second plate body, and fixing bolts are distributed on the edge of the second plate body along the width direction.
进一步地,所述的第一外模板、第二外模板的外壁上均成排成列地设置有肋条,每排肋条均与每列肋条垂直相交;在第一外模板、第二外模板上均分布有多个穿透第一外模板、第二外模板的定位孔。Further, the outer walls of the first outer template and the second outer template are provided with ribs in rows, and each row of ribs is perpendicular to each column of ribs; on the first outer template and the second outer template A plurality of positioning holes penetrating through the first outer formwork and the second outer formwork are evenly distributed.
进一步地,所述的第一内模板包括第一拼合板、第二拼合板和第三拼合板,其中第一拼合板、第三拼合板的结构、规格均相同,第二拼合板的宽度小于第一拼合板;第二拼合板的两侧设置有第一固定槽,第一拼合板、第二拼合板的边缘均设置有与第一固定槽契合的第二固定槽;在第二拼合板表面上通过组装螺栓可拆卸地设置有固定钢板,固定钢板的长度大于第二拼合板的宽度。Further, the first inner template includes a first split board, a second split board and a third split board, wherein the structures and specifications of the first split board and the third split board are the same, and the width of the second split board is smaller than The first split board; the two sides of the second split board are provided with first fixing grooves, and the edges of the first split board and the second split board are all provided with second fixing grooves fitting with the first fixing grooves; on the second split board A fixed steel plate is detachably arranged on the surface through assembly bolts, and the length of the fixed steel plate is greater than the width of the second split plate.
进一步地,所述的支撑装置为设置在第一拼合板、第三拼合板侧面上的承压耳板,承压耳板上放置有平台承压板,平台承压板的上表面与第一拼合板上端面齐平;在平台承压板上等间距分布有凹槽。Further, the supporting device is a pressure-bearing ear plate arranged on the sides of the first split plate and the third split plate, a platform pressure-bearing plate is placed on the pressure-bearing ear plate, and the upper surface of the platform pressure-bearing plate is in contact with the first The end surfaces of the spliced plates are flush; grooves are distributed at equal intervals on the platform pressure plate.
进一步地,所述的第三内模板为钢筋混凝土结构,第三内模板内部的钢筋为冷拔钢丝,冷拔钢丝穿出第三内模板的端面。Further, the third inner formwork is a reinforced concrete structure, and the reinforcement inside the third inner formwork is cold-drawn steel wire, and the cold-drawn steel wire passes through the end surface of the third inner formwork.
进一步地,所述的内模系统、外模系统之间设置有墙厚调节装置,墙厚调节装置包括定位螺母,定位螺母的一端同轴贯连有带有外螺纹的套圈;穿过定位螺母和套圈设置有一根调节杆,调节杆的一端带有一段外螺纹,且设置有外螺纹的一段较调节杆上不带外螺纹的部分直径大;调节杆设置有外螺纹一端的端部呈外六方形结构,未设置外螺纹一端表面套有一层2mm厚橡胶套。Further, a wall thickness adjustment device is provided between the inner mold system and the outer mold system, the wall thickness adjustment device includes a positioning nut, and one end of the positioning nut is coaxially connected with a ferrule with an external thread; through the positioning The nut and the ferrule are provided with an adjusting rod, and one end of the adjusting rod has a section of external thread, and the section provided with the external thread is larger in diameter than the part without external thread on the adjusting rod; the end of the adjusting rod is provided with one end of the external thread It has an external hexagonal structure, and the surface of the end without external thread is covered with a layer of 2mm thick rubber sleeve.
进一步地,所述的外模系统、内模系统之间可拆卸地设置有骨架分隔纱网,骨架分隔纱网为矩形框结构,由四段矩形的框架可拆卸地拼合构成;在矩形框内部设置有纱网,纱网边缘上包裹有骨架钢片;所述的外模系统的内壁上、内模系统的外壁上均沿垂直于地面方向对称设置有滑槽,骨架分隔纱网通过滑槽安装在内模系统、外模系统之间。Further, a skeleton separating gauze is detachably arranged between the outer mold system and the inner mold system, and the skeleton separating gauze is a rectangular frame structure composed of four sections of rectangular frames detachably assembled; inside the rectangular frame A gauze is provided, and the edge of the gauze is wrapped with a skeleton steel sheet; the inner wall of the outer mold system and the outer wall of the inner mold system are symmetrically arranged with chutes along the direction perpendicular to the ground, and the skeleton separates the gauze through the chute Installed between the inner mold system and the outer mold system.
进一步地,所述的内模系统的外壁上可拆卸地设置有孔洞成型装置,孔洞成型装置包括由四段条形磁铁构成的矩形结构,矩形结构内部设置有加固装置,加固装置包括呈十字形布设的支撑杆,支撑杆的端部设置有支撑片;将加固装置安装在矩形结构内部后,支撑片与条形磁铁紧密接触以起到支撑作用;所述的条形磁铁的宽度与内模系统、外模系统的间距相同,在所述的矩形结构外部套装有橡胶圈。Further, the outer wall of the inner mold system is detachably provided with a hole forming device. The hole forming device includes a rectangular structure composed of four sections of bar magnets. A reinforcing device is provided inside the rectangular structure. The reinforcing device includes a cross-shaped The supporting rod is arranged, and the end of the supporting rod is provided with a supporting sheet; after the reinforcement device is installed inside the rectangular structure, the supporting sheet is in close contact with the bar magnet to play a supporting role; the width of the bar magnet is the same as that of the inner mold The distance between the system and the outer mold system is the same, and a rubber ring is sheathed outside the rectangular structure.
本发明与现有技术相比具有以下技术特点:Compared with the prior art, the present invention has the following technical characteristics:
1.本发明的整体结构模具重复利用次数高、易拆除、能结合装配式模型结构施工工艺,可用于以“口”型为基本单元组成建筑平面图的现浇剪力墙模型结构或装配式剪力墙模型结构的制作;1. The integral structure mold of the present invention has high reuse times, is easy to dismantle, and can be combined with the assembly-type model structure construction technology, and can be used for cast-in-place shear wall model structures or assembly-type shear walls that use the "mouth" type as the basic unit to form a building plan. Fabrication of force wall model structure;
2.采用本发明可以方便模型狭小结构空间模板的制作与拆除,减轻暴力拆模对模型结构的损害,对实验结果的影响小,为装配式混凝土模型结构施工领域提供了一种新的研究工具。2. Adopting the present invention can facilitate the manufacture and dismantling of the formwork in the narrow structure space of the model, reduce the damage to the model structure caused by violent form removal, and have little influence on the experimental results, and provide a new research tool for the field of prefabricated concrete model structure construction .
附图说明Description of drawings
图1为外模系统的结构示意图;Fig. 1 is the structural representation of external mold system;
图2为第一外模板的结构示意图;Fig. 2 is the structural representation of the first outer formwork;
图3为第二外模板的结构示意图;Fig. 3 is the structural representation of the second outer formwork;
图4为悬挂装置与内模系统、外模系统配合的结构示意图;Fig. 4 is the structural schematic diagram that suspension device cooperates with inner mold system, outer mold system;
图5为内模系统的结构分解示意图;Fig. 5 is the structural decomposition diagram of internal model system;
图6为第一内模板的结构分解示意图;Fig. 6 is a schematic exploded view of the structure of the first inner template;
图7为第二内模板的结构分解示意图;Fig. 7 is a schematic exploded view of the structure of the second inner template;
图8为第三内模板的结构示意图;Fig. 8 is a schematic structural diagram of a third inner template;
图9为洞孔成形装置的结构分解示意图;Fig. 9 is a schematic exploded view of the structure of the hole forming device;
图10为墙厚调节装置的结构示意图;Fig. 10 is the structural representation of wall thickness adjusting device;
图11为骨架分隔纱网的结构分解示意图;Fig. 11 is the schematic diagram of the structural decomposition of the skeleton separating gauze;
A—外模系统,B—内模系统,1—第一外模板,2—第二外模板,3—定位孔,4—肋条,5—定位片,6—滑槽,7—缺口,8—腹板,9—第一卡肋,10—固定螺栓,11—第二内模板,12—卡槽,13—骨架分隔纱网,131—框架,132—骨架钢片,133—纱网,14—丝杆,15—第三内模板,151—钢筋,16—平台承压板,17—第一内模板,171—第一拼合板,172—第二拼合板,173—第三拼合板,174—组装螺栓,175—承压耳板,18—固定钢板,19—孔洞成型装置,191—条形磁铁,192—橡胶圈,193—加固装置,194—支撑片,20—凹槽,21—调节杆,22—套圈,23—定位螺母。A—outer mold system, B—inner mold system, 1—first outer formwork, 2—second outer formwork, 3—positioning hole, 4—rib, 5—positioning piece, 6—chute, 7—notch, 8 —web plate, 9—first rib, 10—fixing bolt, 11—second inner formwork, 12—slot, 13—skeleton separating gauze, 131—frame, 132—skeleton steel sheet, 133—gauze, 14—screw rod, 15—third inner formwork, 151—rebar, 16—platform bearing plate, 17—first inner formwork, 171—first split plate, 172—second split plate, 173—third split plate , 174—assembly bolts, 175—pressure lug plate, 18—fixed steel plate, 19—hole forming device, 191—bar magnet, 192—rubber ring, 193—reinforcement device, 194—support piece, 20—groove, 21—adjusting rod, 22—ferrule, 23—locating nut.
具体实施方式Detailed ways
遵从上述技术方案,如图1至图11所示,一种装配式剪力墙模型结构整体模具,包括外模系统A以及设置在外模系统A内部的内模系统B:According to the above-mentioned technical scheme, as shown in Figure 1 to Figure 11, an integral mold of a prefabricated shear wall model structure includes an outer mold system A and an inner mold system B arranged inside the outer mold system A:
所述的外模系统A包括一对平行设置的第一外模板1和一对平行设置的第二外模板2,第一外模板1和第二外模板2端部相接使外模系统A为矩形结构,即从俯视的角度看,第一外模板1、第二外模板2分别为一个矩形的两条相互平行的边;两个第一外模板1的规格相同,两个第二外模板2的规格相同,第一外模板1长度小于第二外模板2,第一外模板1宽度与第二外模板2相同。所述的第二外模板2的外壁上沿第二外模板2的长度方向设置有第一卡肋9。The outer mold system A includes a pair of first outer formwork 1 arranged in parallel and a second outer formwork 2 arranged in parallel. The ends of the first outer formwork 1 and the second outer formwork 2 are connected so that the outer mold system A It is a rectangular structure, that is, viewed from a top view, the first outer template 1 and the second outer template 2 are two mutually parallel sides of a rectangle respectively; the specifications of the two first outer templates 1 are the same, and the two second outer templates The specifications of the templates 2 are the same, the length of the first outer template 1 is smaller than that of the second outer template 2 , and the width of the first outer template 1 is the same as that of the second outer template 2 . The outer wall of the second outer formwork 2 is provided with first ribs 9 along the length direction of the second outer formwork 2 .
如图2所示,第一外模板1包括第一板体以及设置在第一板体同一侧面边缘上且相互平行的一对腹板8,腹板8厚度5mm;在每个腹板8上均开设有多个L形的缺口7,缺口7的一端穿出腹板8的侧面,即缺口7一端贯通而另一端不贯通;缺口7的厚度为5mm,宽度为17mm,纵横长度均为35mm;腹板8与第一板体共同构成“[”的形状,便于和第二外模板2之间的安装;所述的第二外模板2包括第二板体,第二板体沿宽度方向的边缘上分布有固定螺栓10;在安装第一外模板1的第二外模板2时,首先将第一外模板1、第二外模板2在竖直方向上略微错开,使第二外模板2的固定螺栓10先滑入到缺口7中后,再向上提,使固定螺栓10卡在缺口7的端部,此时第一外模板1、第二外模板2的顶端依然齐平,但由于缺口7的设置,可以使在水平方向上第一外模板1、第二外模板2不能分开,由此保证结构的坚固性;再通过固定螺栓10将缺口7与第二外模板2进行紧固,实现第一外模板1、第二外模板2的相对固定。As shown in Figure 2, the first outer template 1 includes a first plate body and a pair of webs 8 that are arranged on the same side edge of the first plate body and are parallel to each other, and the thickness of the webs 8 is 5 mm; on each web 8 A plurality of L-shaped notches 7 are provided, and one end of the notch 7 passes through the side of the web 8, that is, one end of the notch 7 penetrates and the other end does not penetrate; the thickness of the notch 7 is 5mm, the width is 17mm, and the length and width are 35mm The web 8 and the first plate jointly form the shape of "[", which is convenient for installation with the second outer formwork 2; the second outer formwork 2 includes a second plate body, and the second plate body is along the width direction Fixing bolts 10 are distributed on the edge of the first outer formwork 1; when installing the second outer formwork 2 of the first outer formwork 1, the first outer formwork 1 and the second outer formwork 2 are slightly staggered in the vertical direction so that the second outer formwork 2, the fixing bolt 10 first slides into the notch 7, and then lifts up, so that the fixing bolt 10 is stuck at the end of the notch 7. At this time, the tops of the first outer formwork 1 and the second outer formwork 2 are still flush, but Due to the setting of the gap 7, the first outer template 1 and the second outer template 2 can not be separated in the horizontal direction, thereby ensuring the firmness of the structure; Solid, to realize the relative fixation of the first outer formwork 1 and the second outer formwork 2.
如图2、图3所示,第一外模板1、第二外模板2的外壁上均成排成列地设置有肋条4,每排肋条4均与每列肋条4垂直相交;肋条4采用焊接的方式固定,厚度为4mm,宽度为50mm;间距为200mm,形成“井”型网,其作用是提高外模板平面内刚度,减小模型制作时带来的附加变形,影响结构墙体表面平整度。在第一外模板1、第二外模板2上均分布有多个穿透第一外模板1、第二外模板2的定位孔3,定位孔3的作用是辅助调节内模系统B、外模系统A的间距;定位孔3是螺栓孔,直径为15mm。As shown in Figure 2 and Figure 3, ribs 4 are arranged in rows and rows on the outer walls of the first outer formwork 1 and the second outer formwork 2, and each row of ribs 4 is perpendicular to each row of ribs 4; the ribs 4 adopt The welding method is fixed, the thickness is 4mm, the width is 50mm; the spacing is 200mm, forming a "well" type network, its function is to improve the in-plane rigidity of the outer formwork, reduce the additional deformation caused by model making, and affect the surface of the structural wall flatness. On the first outer template 1 and the second outer template 2, there are a plurality of positioning holes 3 penetrating the first outer template 1 and the second outer template 2. The function of the positioning holes 3 is to assist in adjusting the inner mold system B, the outer The spacing of the mold system A; the positioning hole 3 is a bolt hole with a diameter of 15mm.
所述的内模系统B包括一对平行设置的第一内模板17和一对平行设置的第二内模板11,第一内模板17和第二内模板11端部相接使内模系统B为矩形结构;在第二内模板11的内壁上沿第二内模板11的长度方向上设置有第二卡肋;内模系统B的基本结构与外模系统A相似,均为矩形结构。The internal mold system B includes a pair of first inner formwork 17 arranged in parallel and a pair of second inner formwork 11 arranged in parallel. The ends of the first inner formwork 17 and the second inner formwork 11 are connected to make the inner mold system B It is a rectangular structure; on the inner wall of the second inner template 11, a second rib is provided along the length direction of the second inner template 11; the basic structure of the inner mold system B is similar to that of the outer mold system A, both of which are rectangular structures.
具体地,第一内模板17包括第一拼合板171、第二拼合板172和第三拼合板173,其中第一拼合板171、第三拼合板173的结构、规格均相同,第二拼合板172的宽度小于第一拼合板171(短50mm,以方便纵向拆除);第二拼合板172的两侧设置有第一固定槽,第一拼合板171、第二拼合板172的边缘均设置有与第一固定槽配合的第二固定槽;第一拼合板171、第二拼合板172和第三拼合板173之间通过固定槽实现相对的连接;连接后,在第二拼合板172表面上通过组装螺栓174可拆卸地设置有固定钢板18,固定钢板18的长度大于第二拼合板172的宽度;需要相对固定三个拼合板时,将固定钢板18压在三块拼合板上,然后拧紧组装螺栓174,即完成了第一内模板17的组装,如图6所示。Specifically, the first inner template 17 includes a first split board 171, a second split board 172 and a third split board 173, wherein the structures and specifications of the first split board 171 and the third split board 173 are the same, and the second split board The width of 172 is less than the first split plate 171 (short 50mm, to facilitate longitudinal removal); The second fixing groove that cooperates with the first fixing groove; Between the first split plate 171, the second split plate 172 and the third split plate 173, realize the relative connection by the fixing groove; after connecting, on the second split plate 172 surface Detachably be provided with fixed steel plate 18 by assembling bolt 174, the length of fixed steel plate 18 is greater than the width of second split plate 172; Assembling the bolts 174 completes the assembly of the first inner template 17, as shown in FIG. 6 .
图7为第二内模板11的结构分解示意图,与第一内模板17相同,第二内模板11也是由三块拼合板构成的,并且三块拼合板之间的连接方式与第一内模板17完全相同,在此不赘述。区别是第二内模板11较第一内模板17长,因此拼合板也较第一内模板17的拼合板长一些,为此设置了两块固定钢板18进行固定。Fig. 7 is the exploded schematic view of the structure of the second inner formwork 11, same as the first inner formwork 17, the second inner formwork 11 is also composed of three split panels, and the connection mode between the three split panels is the same as that of the first inner template 17 is exactly the same, and will not be repeated here. The difference is that the second inner formwork 11 is longer than the first inner formwork 17, so the split plate is also longer than the first inner formwork 17. For this reason, two fixed steel plates 18 are provided for fixing.
第一内模板17和第二内模板11材料为Q345钢材,方便设计为易拆除可组装模具,第三内模板15材料为钢筋混凝土,在施工阶段具有承载成形的功能,浇筑完板面混凝土后,与后浇混凝土共同作为模型结构的构件。The material of the first inner formwork 17 and the second inner formwork 11 is Q345 steel, which is conveniently designed as an easy-to-remove and assembleable mold. The material of the third inner formwork 15 is reinforced concrete, which has the function of bearing and forming during the construction stage. After pouring the slab concrete , together with post-cast concrete as a component of the model structure.
外模系统A与内模系统B之间设置有悬挂装置,悬挂装置的作用是辅助安装外模系统A和内模系统B;悬挂装置包括丝杆14,丝杆14上套装有一对定位片5,在每个定位片5的侧面上均开设有卡槽12,通过定位片5上的卡槽12与所述的第一卡肋9、第二卡肋的配合实现外模系统A与内模系统B的连接,如图4所示。外模系统A、内模系统B安装好之后可以卸下悬挂装置。A suspension device is provided between the outer mold system A and the inner mold system B, and the function of the suspension device is to assist the installation of the outer mold system A and the inner mold system B; the suspension device includes a screw rod 14, and a pair of positioning pieces 5 are set on the screw rod 14 , on the side of each positioning piece 5 is provided with a slot 12, through the cooperation of the slot 12 on the positioning piece 5 with the first rib 9 and the second rib to realize the outer mold system A and the inner mold The connection of system B is shown in Figure 4. After the outer mold system A and the inner mold system B are installed, the suspension device can be removed.
所述的内模系统B上方通过支撑装置设置有第三内模板15,如图5、图6所示,支撑装置为设置在第一拼合板171、第三拼合板173侧面上的承压耳板175,承压耳板175厚度8mm,呈直角三角形状,承担平台承压板16和第三内模板15传递的施工荷载;承压耳板175上放置有平台承压板16,平台承压板16的上表面与第一拼合板171上端面齐平;在平台承压板16上等间距分布有凹槽20。组装好整个装置后,将第三内模板15的两端放置在内膜系统两块第一内模板17上放置的平台承压板16上。第三内模板15为钢筋混凝土结构,第三内模板15内部的刚度较大的冷拔钢丝,钢丝直径为5mm,间距为50mm,沿混凝土板短边方向单向布置,冷拔钢丝穿出第三内模板15的端面;第三内模板15采用的混凝土为细石混凝土,强度等级为C30,可根据设计尺寸预制。The top of the inner mold system B is provided with a third inner formwork 15 through a supporting device, as shown in Figure 5 and Figure 6, the supporting device is a pressure bearing ear arranged on the sides of the first split plate 171 and the third split plate 173 The plate 175, the thickness of the pressure ear plate 175 is 8 mm, and it is in the shape of a right triangle, which bears the construction load transmitted by the platform pressure plate 16 and the third inner formwork 15; the platform pressure plate 16 is placed on the pressure ear plate 175, and the platform pressure The upper surface of the plate 16 is flush with the upper end surface of the first split plate 171 ; grooves 20 are equally spaced on the platform pressure bearing plate 16 . After the whole device is assembled, the two ends of the third inner formwork 15 are placed on the platform pressure bearing plate 16 placed on the two first inner formworks 17 of the intima system. The third inner formwork 15 is a reinforced concrete structure. The cold-drawn steel wires with greater rigidity inside the third inner formwork 15 have a diameter of 5 mm and a spacing of 50 mm. They are arranged in one direction along the short side of the concrete slab. The cold-drawn steel wires pass through the first The end face of the third inner formwork 15; the concrete used in the third inner formwork 15 is fine stone concrete with a strength grade of C30, which can be prefabricated according to the design size.
更优的,内模系统B、外模系统A之间设置有墙厚调节装置,墙厚调节装置包括定位螺母23,定位螺母23的一端同轴贯连有带有外螺纹的套圈22;穿过定位螺母23和套圈22设置有一根调节杆21,调节杆21的一端带有一段外螺纹,且设置有外螺纹的一段较调节杆21上不带外螺纹的部分直径大(大4mm);不带螺纹的一端套装有橡胶层。调节杆21设置有外螺纹一端的端部呈外六方形结构,以便于拧动调节杆21。使用时,先将带有外螺纹的套圈22拧入到第一外模板1、第二外模板2上的定位孔3(螺纹孔)中,然后再将调节杆21穿过定位螺母23和套圈22,使调节螺杆不带外螺纹的一端顶在内模系统B的外壁上,这样通过拧动定位螺母23,即可调节内膜系统、外模系统A的间距。More preferably, a wall thickness adjustment device is provided between the inner mold system B and the outer mold system A, the wall thickness adjustment device includes a positioning nut 23, and one end of the positioning nut 23 is coaxially connected with a ferrule 22 with an external thread; Through the positioning nut 23 and the ferrule 22, an adjusting rod 21 is provided, and one end of the adjusting rod 21 has a section of external thread, and the diameter of the section provided with the external thread is larger than that of the adjusting rod 21 without external thread (larger than 4mm). ); the non-threaded end is fitted with a rubber layer. The end of the adjusting rod 21 provided with an external thread has an outer hexagonal structure, so that the adjusting rod 21 can be twisted. During use, earlier the ferrule 22 that has external thread is screwed in the locating hole 3 (threaded hole) on the first outer template 1, the second outer template 2, then adjusting rod 21 is passed through locating nut 23 and The ferrule 22 makes the end of the adjusting screw rod without external threads push against the outer wall of the inner mold system B, so that the distance between the inner membrane system and the outer mold system A can be adjusted by turning the positioning nut 23.
进一步地,外模系统A、内模系统B之间可拆卸地设置有骨架分隔纱网13,如图11所示,骨架分隔纱网13为矩形框结构,由四段矩形的框架131可拆卸地拼合构成;在矩形框内部设置有纱网133,纱网133边缘上包裹有骨架钢片132;所述的外模系统A的内壁上、内模系统B的外壁上均沿垂直于地面方向对称设置有滑槽6,骨架分隔纱网13通过滑槽6安装在内模系统B、外模系统A之间;可根据需要设置滑槽6的对数,每一对滑槽6均可以安装一个骨架分隔纱网13;本实施例中在内膜系统、外模系统A的长度、宽度方向上均设置有两对滑槽6。在模型结构钢筋151绑扎阶段,将水平钢筋151穿过纱网133,形成装配式剪力墙结构预制墙片和后浇部分混凝土之间的竖向分隔功能。Further, a skeleton separating gauze 13 is detachably arranged between the outer mold system A and the inner mold system B. As shown in FIG. The ground is assembled; a gauze 133 is arranged inside the rectangular frame, and a skeleton steel sheet 132 is wrapped on the edge of the gauze 133; the inner wall of the outer mold system A and the outer wall of the inner mold system B are all along the direction perpendicular to the ground. The chute 6 is symmetrically arranged, and the skeleton separating gauze 13 is installed between the inner mold system B and the outer mold system A through the chute 6; the logarithm of the chute 6 can be set according to the needs, and each pair of chute 6 can be installed A skeleton separates the gauze 13; in this embodiment, two pairs of slide grooves 6 are provided in the length and width directions of the inner membrane system and the outer mold system A. In the binding stage of the model structural reinforcement 151, the horizontal reinforcement 151 is passed through the gauze 133 to form a vertical separation function between the prefabricated wall piece of the prefabricated shear wall structure and the post-casting part of the concrete.
在进行模型制作时,有时需根据实际情况在模型的墙壁上留下孔洞。为了解决这个问题,本方案中内模系统B的外壁上可拆卸地设置有孔洞成型装置19,孔洞成型装置19包括由四段条形磁铁191构成的矩形结构,通过吸附固定在内模系统B外壁上需要的位置处;矩形结构内部设置有加固装置193,加固装置193包括呈十字形布设的支撑杆,支撑杆的端部设置有支撑片194;将加固装置193安装在矩形结构内部后,支撑片194与条形磁铁191紧密接触以起到支撑作用;所述的条形磁铁191的宽度与内模系统B、外模系统A的间距相同,在所述的矩形结构外部套装有橡胶圈192。橡胶圈192起到保护条形磁铁191的作用,防止混凝土粘在磁铁表面。在进行内模系统B、外模系统A之间灌注成型时,孔洞成型装置19能保持这部分结构始终不被灌注。When making a model, sometimes it is necessary to leave holes on the wall of the model according to the actual situation. In order to solve this problem, a hole forming device 19 is detachably arranged on the outer wall of the inner mold system B in this solution. The hole forming device 19 includes a rectangular structure composed of four sections of bar magnets 191, which are fixed to the inner mold system B by adsorption. On the required position on the outer wall; a reinforcing device 193 is arranged inside the rectangular structure, and the reinforcing device 193 includes a support rod arranged in a cross shape, and a supporting piece 194 is provided at the end of the supporting rod; after the reinforcing device 193 is installed inside the rectangular structure, The support piece 194 is in close contact with the bar magnet 191 to play a supporting role; the width of the bar magnet 191 is the same as the distance between the inner mold system B and the outer mold system A, and a rubber ring is sleeved outside the rectangular structure 192. The rubber ring 192 plays the role of protecting the bar magnet 191 to prevent concrete from sticking to the surface of the magnet. When performing infusion molding between the inner mold system B and the outer mold system A, the hole forming device 19 can keep this part of the structure from being poured all the time.
使用方法:Instructions:
通过拼合的方式组装第一内模板17、第二内模板11的组装;将平台承压板16置于第一内模板17的承压耳板175上,第二内模板11的内侧与平台承压板16端部对齐,第二内模板11的端部与第一内模板17内侧对其,完成内模系统B的组装。将孔洞成形装置吸附在内模系统B的外侧,形成洞口的边界,同时将加固装置193支撑在其内部。Assembling the first inner formwork 17 and the second inner formwork 11 by assembling; placing the platform pressure bearing plate 16 on the pressure bearing lug 175 of the first inner formwork 17, the inner side of the second inner formwork 11 and the platform bearing The ends of the pressing plate 16 are aligned, and the ends of the second inner formwork 11 are aligned with the inside of the first inner formwork 17 to complete the assembly of the inner mold system B. The hole forming device is sucked to the outside of the inner mold system B to form the boundary of the hole while supporting the reinforcement device 193 inside it.
将第二外模板2固定在悬挂装置上,按照墙厚初步定位,安装第一外模板1,将第二外模板2的端部的固定螺栓10安装在第一外模板1端部腹板8的缺口7中,然后安装垫片及固定螺栓10的螺母,将骨架分隔纱网13对应地插在外模系统A和内模系统B之间的滑槽6中,拧动螺母以初步固定外模系统A。Fix the second outer formwork 2 on the suspension device, initially position according to the wall thickness, install the first outer formwork 1, install the fixing bolts 10 at the end of the second outer formwork 2 on the web plate 8 at the end of the first outer formwork 1 Then install the gasket and the nut of the fixing bolt 10, insert the skeleton separating gauze 13 into the chute 6 between the outer mold system A and the inner mold system B correspondingly, and screw the nut to initially fix the outer mold System A.
安装墙厚调节装置,将套圈22拧入到定位孔3中,再将调节杆21插入到定位螺母23和套圈22中,以精确调整调节杆21的位置,从而固定墙的厚度,然后再紧固螺母,通过螺母和定位杆将内模系统B、外模系统A形成整体。Install the wall thickness adjusting device, screw the ferrule 22 into the positioning hole 3, then insert the adjusting rod 21 into the positioning nut 23 and the ferrule 22 to precisely adjust the position of the regulating rod 21, thereby fixing the thickness of the wall, and then Then tighten the nuts, and form the inner mold system B and the outer mold system A into a whole through the nuts and positioning rods.
拆除悬挂装置,浇注墙体内部混凝土,待浇筑至墙高位置后,安装第三内模板15,绑扎板顶钢筋151,浇筑第三内模板15表面混凝土,完成模型结构模板支护及制作工作。Remove the suspension device, pour the concrete inside the wall, and after pouring to the height of the wall, install the third inner formwork 15, bind the steel bars 151 on the top of the slab, pour the concrete on the surface of the third inner formwork 15, and complete the formwork support and production work of the model structure.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610445235.0A CN105965672B (en) | 2016-06-20 | 2016-06-20 | A kind of fabricated shear wall model structure unitary mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610445235.0A CN105965672B (en) | 2016-06-20 | 2016-06-20 | A kind of fabricated shear wall model structure unitary mould |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105965672A CN105965672A (en) | 2016-09-28 |
CN105965672B true CN105965672B (en) | 2018-04-17 |
Family
ID=57021476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610445235.0A Expired - Fee Related CN105965672B (en) | 2016-06-20 | 2016-06-20 | A kind of fabricated shear wall model structure unitary mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105965672B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106493837B (en) * | 2016-11-22 | 2018-12-07 | 西安建筑科技大学 | A kind of general side mode being used to prepare fabricated shear wall component |
CN107891511B (en) * | 2017-12-14 | 2023-10-20 | 中国建筑第七工程局有限公司 | Separated prefabricated bay window die |
CN110821150B (en) * | 2018-08-08 | 2022-12-06 | 李宜君 | House slip form forming device and forming method |
CN111496979B (en) * | 2019-01-31 | 2025-03-04 | 周兆弟 | A mold for assembled wall |
CN111667752B (en) * | 2020-07-08 | 2024-08-09 | 泰州职业技术学院 | Manufacturing model capable of being used for practical training of prefabricated shear wall reinforcement arrangement |
CN113006481A (en) * | 2021-03-29 | 2021-06-22 | 新乡市达威智能门窗实用技术研究中心 | Magnetic suction type pouring template and pouring wall |
CN117386031B (en) * | 2023-12-11 | 2024-02-20 | 山西省安装集团股份有限公司 | Construction device and construction process for heat preservation layer of refrigeration house |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2159318C (en) * | 1993-03-31 | 1999-11-30 | Jan Hendrik Mensen | Concrete form walls |
WO2012123964A3 (en) * | 2011-03-06 | 2012-11-08 | Prakash Prabhakar Pawar | Casting designer walls for building by using moulds |
CN204450816U (en) * | 2015-01-15 | 2015-07-08 | 中交天航滨海环保浚航工程有限公司 | A kind of mould of short silt dike transmission block |
CN104786349A (en) * | 2015-05-06 | 2015-07-22 | 重庆海德冶金材料有限责任公司 | Splash-proof tundish current regulator forming device |
CN204626956U (en) * | 2015-04-30 | 2015-09-09 | 国家电网公司 | A kind of combination set shaped steel formwork |
CN204983199U (en) * | 2015-09-30 | 2016-01-20 | 山东瑞京建筑科技有限公司 | Screw thread subassembly and corresponding building templates for building templates |
CN205685510U (en) * | 2016-06-20 | 2016-11-16 | 西安建筑科技大学 | A kind of fabricated shear wall model structure unitary mould |
-
2016
- 2016-06-20 CN CN201610445235.0A patent/CN105965672B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2159318C (en) * | 1993-03-31 | 1999-11-30 | Jan Hendrik Mensen | Concrete form walls |
WO2012123964A3 (en) * | 2011-03-06 | 2012-11-08 | Prakash Prabhakar Pawar | Casting designer walls for building by using moulds |
CN204450816U (en) * | 2015-01-15 | 2015-07-08 | 中交天航滨海环保浚航工程有限公司 | A kind of mould of short silt dike transmission block |
CN204626956U (en) * | 2015-04-30 | 2015-09-09 | 国家电网公司 | A kind of combination set shaped steel formwork |
CN104786349A (en) * | 2015-05-06 | 2015-07-22 | 重庆海德冶金材料有限责任公司 | Splash-proof tundish current regulator forming device |
CN204983199U (en) * | 2015-09-30 | 2016-01-20 | 山东瑞京建筑科技有限公司 | Screw thread subassembly and corresponding building templates for building templates |
CN205685510U (en) * | 2016-06-20 | 2016-11-16 | 西安建筑科技大学 | A kind of fabricated shear wall model structure unitary mould |
Also Published As
Publication number | Publication date |
---|---|
CN105965672A (en) | 2016-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105965672B (en) | A kind of fabricated shear wall model structure unitary mould | |
CN205685510U (en) | A kind of fabricated shear wall model structure unitary mould | |
CN105178597B (en) | Floor slab back casting band template and mold method | |
CN111305439A (en) | Laminated slab with disassembly-free die steel frame | |
CN207079910U (en) | A kind of steel concrete shuttering for being easy to quick form removal | |
CN215368705U (en) | Floor post-cast strip pouring mold structure | |
CN205399774U (en) | Cast -in -place hollow superstructure mandrel is anti to float and prevents side and move structure | |
CN113898102A (en) | A ribbed concrete laminate | |
CN206157973U (en) | Lead to muscle formula concrete coincide floor structures and prefabricated panel's preparation mould thereof | |
KR101859398B1 (en) | Building construction method using exposed concrete wall | |
KR100695491B1 (en) | Binding holes, formwork structures for pre-assembled concrete structures and construction methods using them | |
CN216076318U (en) | Reinforcing device for aluminum alloy reverse ridge template | |
CN201225001Y (en) | Composite die for casting building frame | |
CN210289158U (en) | Temporary support device for connecting laminated plate with beam or wall | |
CN207290434U (en) | A kind of laminated board surround mold | |
KR101859406B1 (en) | Building construction method using exposed concrete wall | |
CN208294062U (en) | A kind of concrete wall template and support combinations structure | |
KR101320697B1 (en) | Concrete mold connector and method for connecting concrete mold using concrete mold connector | |
CN219255978U (en) | Prefabricated post reinforcing bar positioning die | |
KR101483910B1 (en) | Wedge form spacer for truss girder integrated deck without permanent form and the deck | |
CN221972987U (en) | Pouring frame fixing structure | |
KR20130076845A (en) | Hybrid assembly and the used wall construction method | |
JP6700384B2 (en) | Formwork panel assembly | |
CN110894753B (en) | A formwork device for a wall and a method of making the same | |
CN217998929U (en) | Pouring mold for constructional column formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210707 Address after: 710043 No. 5 happy South Road, Xincheng District, Shaanxi, Xi'an Patentee after: Xi'an Huaqing science and education industry (Group) Co.,Ltd. Address before: 710055 No. 13, Yanta Road, Shaanxi, Xi'an Patentee before: XIAN University OF ARCHITECTURE AND TECHNOLOG |
|
TR01 | Transfer of patent right | ||