CN106087776B - A kind of second pontic erection method of split type level bridges - Google Patents

A kind of second pontic erection method of split type level bridges Download PDF

Info

Publication number
CN106087776B
CN106087776B CN201610454340.0A CN201610454340A CN106087776B CN 106087776 B CN106087776 B CN 106087776B CN 201610454340 A CN201610454340 A CN 201610454340A CN 106087776 B CN106087776 B CN 106087776B
Authority
CN
China
Prior art keywords
pontic
split type
type level
erection method
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610454340.0A
Other languages
Chinese (zh)
Other versions
CN106087776A (en
Inventor
张清林
汪立之
吴家骅
梁涛
刘志雄
洗振佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Original Assignee
ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd filed Critical ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Priority to CN201610454340.0A priority Critical patent/CN106087776B/en
Publication of CN106087776A publication Critical patent/CN106087776A/en
Application granted granted Critical
Publication of CN106087776B publication Critical patent/CN106087776B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/08Methods or apparatus specially adapted for erecting or assembling bridges by rotational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Abstract

The invention discloses a kind of the second pontic erection method of split type level bridges, comprise the following steps:First, after having set up the first pontic, second pontic is pushed on the first pontic for having set up, second pontic in place after, one end of second pontic is connected with the first pontic, second pontic carries folding-unfolding mechanism, driven and deployed by folding-unfolding mechanism, the other end of the second pontic of control gradually decreases down to be bonded with the first pontic;2nd, the connection between the first pontic and the second pontic is released, first pontic and the second pontic are pivotally connected in side, it is then lifted out the second pontic so that the second pontic rotates relative to the first pontic, and the second pontic and the first pontic are in parallel arranged on same plane after having rotated.The second pontic erection method is very ingenious in above-mentioned erection method, and the center of gravity of the second pontic remains at relatively low position during its erection, is consumed energy when its erection can be greatly reduced.

Description

A kind of second pontic erection method of split type level bridges
Technical field
The present invention relates to a kind of the second pontic erection method of split type level bridges.
Background technology
The fast construction bridge on river or gully is in emergency circumstances needed some, now in order to ensure that bridge is quickly taken Build, it is general to solve the problem using split type level bridges are set up, but the erection method of existing split type level bridges is present Some problems, for example, need to be equipped with larger counterweight, power consumption is high, sets up efficiency deficiency etc. other shortcomings, for this, the present invention carries For a kind of the second pontic erection method of split type level bridges.
The content of the invention
In order to solve the above problems, the present invention provides a kind of second pontic erection method of split type level bridges.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of second pontic erection method of split type level bridges, the split type level bridges include pedestal, one folding First pontic and at least one foldable second pontic, it is characterised in that comprise the following steps:
First, after having set up the first pontic, the second pontic is pushed on the first pontic for having set up, the second pontic in place after, One end of second pontic is connected with the first pontic, the second pontic carries folding-unfolding mechanism, is driven and deployed by folding-unfolding mechanism, control The other end of second pontic gradually decreases down to be bonded with the first pontic;
2nd, the connection between the first pontic and the second pontic is released, the first pontic and the second pontic are pivotally connected in side, so After lift the second pontic so that the second pontic rotates relative to the first pontic, and the second pontic and the first pontic are in same after having rotated Parallel arranged in plane.
Present invention additionally comprises:
Step 3: the pontic of lifting first and the second pontic are so that erection support, completion are set up thereunder.
The pedestal is provided with winding plant, and the second pontic is pushed on the first pontic for having set up by winding plant, The other end for controlling the second pontic by winding plant is gradually reduced.
In the step 2 after the second pontic has been overturn, the connection of the first pontic and the second pontic is released, by the second bridge Body translates setpoint distance.
The beneficial effects of the invention are as follows:It is very low to counterweight requirements when the second pontic is set up in above-mentioned erection method, second Pontic erection method is very ingenious, and the center of gravity of the second pontic remains at relatively low position during its erection, can be big Width consumes energy when reducing its erection, and stability when lifting erection, has the advantages of low-energy-consumption high-efficiency.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples:
Fig. 1 is the schematic diagram one of step 1 in the present invention;
Fig. 2 is the schematic diagram two of step 1 in the present invention;
Fig. 3 is the schematic diagram three of step 1 in the present invention;
Fig. 4 is the schematic diagram of step 2 in the present invention.
Embodiment
1~Fig. 4 of reference picture, the present invention are a kind of erection methods of the second pontic 4 of split type level bridges, the split type steelframe Bridge includes pedestal 1, folding first pontic 3 and at least one foldable second pontic 4, it is characterised in that including following step Suddenly:
First, after having set up the first pontic 3, the second pontic 4 is pushed on the first pontic 3 for having set up, the second pontic 4 is in place Afterwards, one end of the second pontic 4 is connected with the first pontic 3, the second pontic 4 carries folding-unfolding mechanism, and exhibition is driven by folding-unfolding mechanism Open, the other end of the second pontic 4 of control gradually decreases down to be bonded with the first pontic 3;
2nd, the connection between the first pontic 3 and the second pontic 4 is released, by the first pontic 3 and the second pontic 4 in side pivot Connect, be then lifted out the second pontic 4 so that the second pontic 4 rotates relative to the first pontic 3, the second pontic 4 and the first bridge after having rotated Body 3 is in parallel arranged on same plane;
Step 3: lifting the first pontic 3 and the second pontic 4 are so that erection support, completion are set up thereunder.In step 2 After the second pontic 4 has been overturn, the connection of the first pontic 3 and the second pontic 4 is released, the second pontic 4 is translated into setpoint distance.On State in erection method very low to counterweight requirements when the second pontic 4 is set up, the erection method of the second pontic 4 is very ingenious, the second bridge The center of gravity of body 4 remains at relatively low position during its erection, is consumed energy when its erection can be greatly reduced, and hoisting frame If when stability, there is the advantages of low-energy-consumption high-efficiency.
As Figure 1-Figure 4, pedestal 1 is provided with winding plant 2, is pushed into set up by the second pontic 4 by winding plant 2 The first pontic 3 on, by winding plant 2 control the second pontic 4 the other end be gradually reduced.The working stability of winding plant 2, can Carry out the control of big stroke.
Above-described embodiment is the preferred scheme of the present invention, and the present invention can also have other embodiments.The technology of this area Personnel can also make equivalent variations or replacement on the premise of without prejudice to spirit of the invention, and these equivalent modifications or replacement are wrapped It is contained in the scope set by the application claim.

Claims (4)

1. a kind of the second pontic erection method of split type level bridges, the split type level bridges include pedestal, one folding the One pontic and at least one foldable second pontic, it is characterised in that comprise the following steps:
First, after having set up the first pontic, the second pontic is pushed on the first pontic for having set up, the second pontic in place after, by One end of two pontics is connected with the first pontic, and the second pontic carries folding-unfolding mechanism, is driven and deployed by folding-unfolding mechanism, control second The other end of pontic gradually decreases down to be bonded with the first pontic;
2nd, the connection between the first pontic and the second pontic is released, the first pontic and the second pontic are pivotally connected in side, Ran Houti Rise the second pontic so that the second pontic rotates relative to the first pontic, and the second pontic and the first pontic are in same plane after having rotated Upper parallel arranged.
2. the second pontic erection method of a kind of split type level bridges as claimed in claim 1, it is characterised in that it also includes:
Step 3: the pontic of lifting first and the second pontic are so that erection support, completion are set up thereunder.
A kind of 3. the second pontic erection method of split type level bridges as claimed in claim 1, it is characterised in that the pedestal Winding plant is provided with, the second pontic is pushed on the first pontic for having set up by winding plant, controlled by winding plant The other end of second pontic is gradually reduced.
A kind of 4. the second pontic erection method of split type level bridges as claimed in claim 1, it is characterised in that the step In two after the second pontic has been overturn, the connection of the first pontic and the second pontic is released, the second pontic is translated into setpoint distance.
CN201610454340.0A 2016-06-20 2016-06-20 A kind of second pontic erection method of split type level bridges Active CN106087776B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610454340.0A CN106087776B (en) 2016-06-20 2016-06-20 A kind of second pontic erection method of split type level bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610454340.0A CN106087776B (en) 2016-06-20 2016-06-20 A kind of second pontic erection method of split type level bridges

Publications (2)

Publication Number Publication Date
CN106087776A CN106087776A (en) 2016-11-09
CN106087776B true CN106087776B (en) 2017-12-05

Family

ID=57238668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610454340.0A Active CN106087776B (en) 2016-06-20 2016-06-20 A kind of second pontic erection method of split type level bridges

Country Status (1)

Country Link
CN (1) CN106087776B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938518A (en) * 2017-11-21 2018-04-20 中铁四局集团钢结构建筑有限公司 One kind is first turned across busy railway freely-supported steel truss girder translates erection construction method again

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2556175A (en) * 1945-06-12 1951-06-12 Lester P Frost Bridge and mobile launching structure therefor
US3837027A (en) * 1972-03-11 1974-09-24 H Gehlen Vehicle with depositable ramp for the forming of bridges, particularly floating bridges and ferries
EP0280626A1 (en) * 1987-02-27 1988-08-31 Constructions Industrielles De La Mediterranee C.N.I.M. System for unfolding and placing a bridge from a vehicle such as a bridge-laying tank for passing an obstacle
CN101949127A (en) * 2010-09-29 2011-01-19 王贵宣 Movable type rescue auxiliary bridge vehicle
CN203514172U (en) * 2013-10-21 2014-04-02 贾针 Emergency rescue device
CN204023395U (en) * 2014-08-20 2014-12-17 青岛理工大学 A kind of rescue bridge layer
CN104499417A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Gravity self-balance type emergency rehabilitation rapid self-erection bridge
CN104495638A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Portable hydraulic auxiliary erected automobile obstacle crossing device
CN104499419A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Steel structure emergency traffic-repairing and traffic-keeping integrated bridge
CN104499418A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Folding assembly type vehicle-mounted bridge

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2556175A (en) * 1945-06-12 1951-06-12 Lester P Frost Bridge and mobile launching structure therefor
US3837027A (en) * 1972-03-11 1974-09-24 H Gehlen Vehicle with depositable ramp for the forming of bridges, particularly floating bridges and ferries
EP0280626A1 (en) * 1987-02-27 1988-08-31 Constructions Industrielles De La Mediterranee C.N.I.M. System for unfolding and placing a bridge from a vehicle such as a bridge-laying tank for passing an obstacle
CN101949127A (en) * 2010-09-29 2011-01-19 王贵宣 Movable type rescue auxiliary bridge vehicle
CN203514172U (en) * 2013-10-21 2014-04-02 贾针 Emergency rescue device
CN204023395U (en) * 2014-08-20 2014-12-17 青岛理工大学 A kind of rescue bridge layer
CN104499417A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Gravity self-balance type emergency rehabilitation rapid self-erection bridge
CN104495638A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Portable hydraulic auxiliary erected automobile obstacle crossing device
CN104499419A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Steel structure emergency traffic-repairing and traffic-keeping integrated bridge
CN104499418A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Folding assembly type vehicle-mounted bridge

Also Published As

Publication number Publication date
CN106087776A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN201729632U (en) Hydraulic lifter
CN106087776B (en) A kind of second pontic erection method of split type level bridges
CN201942481U (en) Scissors type lifting platform arm support mechanism
CN105421236A (en) Closing method for cable-stayed and suspension composite bridge
CN207296344U (en) It is a kind of to carry the construction platform automatically moved with material delivery functions
CN207725577U (en) Stepping on by device between a kind of wind turbine O&M ship and fan platform
CN105926462B (en) A kind of erection method of split type level bridges
CN205943360U (en) Portable energy -conserving garden publicity column
CN203021255U (en) Mechanical linkage platform
CN105386425A (en) Hydraulic dam supporting mechanism capable of being limited in folded mode
CN205472522U (en) Electrical urgent repair frame
CN203428799U (en) Annular jacking crossbeam device of tower crane
CN203912780U (en) Irrigation sprinkler supporting mechanism
CN205575474U (en) Cavity upset lift integration platform
CN201717244U (en) Acid pouring mechanism of diode
CN204825655U (en) Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place
CN208544729U (en) A kind of adjustable continuity material lift equipment of architectural engineering
CN203568661U (en) Built-in tail-sliding lifting lug
CN203910437U (en) Oil-immersed transformer provided with self hoisting core
CN203983316U (en) A kind of semi-automatic sun energy cell panel frame loader
CN202688996U (en) Pile driver with hydraulic folding oil cylinder
CN203626267U (en) Building roof lifting device
CN206590457U (en) A kind of stepless elevation device of drag conveyor
CN205771289U (en) A kind of pressure head structure of garbage compression station
CN206538147U (en) A kind of mobile lifting platform of convenient use

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant