CN106087776B - A kind of second pontic erection method of split type level bridges - Google Patents
A kind of second pontic erection method of split type level bridges Download PDFInfo
- Publication number
- CN106087776B CN106087776B CN201610454340.0A CN201610454340A CN106087776B CN 106087776 B CN106087776 B CN 106087776B CN 201610454340 A CN201610454340 A CN 201610454340A CN 106087776 B CN106087776 B CN 106087776B
- Authority
- CN
- China
- Prior art keywords
- pontic
- split type
- type level
- erection method
- erection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/08—Methods or apparatus specially adapted for erecting or assembling bridges by rotational movement of the bridge or bridge sections
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
Abstract
The invention discloses a kind of the second pontic erection method of split type level bridges, comprise the following steps:First, after having set up the first pontic, second pontic is pushed on the first pontic for having set up, second pontic in place after, one end of second pontic is connected with the first pontic, second pontic carries folding-unfolding mechanism, driven and deployed by folding-unfolding mechanism, the other end of the second pontic of control gradually decreases down to be bonded with the first pontic;2nd, the connection between the first pontic and the second pontic is released, first pontic and the second pontic are pivotally connected in side, it is then lifted out the second pontic so that the second pontic rotates relative to the first pontic, and the second pontic and the first pontic are in parallel arranged on same plane after having rotated.The second pontic erection method is very ingenious in above-mentioned erection method, and the center of gravity of the second pontic remains at relatively low position during its erection, is consumed energy when its erection can be greatly reduced.
Description
Technical field
The present invention relates to a kind of the second pontic erection method of split type level bridges.
Background technology
The fast construction bridge on river or gully is in emergency circumstances needed some, now in order to ensure that bridge is quickly taken
Build, it is general to solve the problem using split type level bridges are set up, but the erection method of existing split type level bridges is present
Some problems, for example, need to be equipped with larger counterweight, power consumption is high, sets up efficiency deficiency etc. other shortcomings, for this, the present invention carries
For a kind of the second pontic erection method of split type level bridges.
The content of the invention
In order to solve the above problems, the present invention provides a kind of second pontic erection method of split type level bridges.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of second pontic erection method of split type level bridges, the split type level bridges include pedestal, one folding
First pontic and at least one foldable second pontic, it is characterised in that comprise the following steps:
First, after having set up the first pontic, the second pontic is pushed on the first pontic for having set up, the second pontic in place after,
One end of second pontic is connected with the first pontic, the second pontic carries folding-unfolding mechanism, is driven and deployed by folding-unfolding mechanism, control
The other end of second pontic gradually decreases down to be bonded with the first pontic;
2nd, the connection between the first pontic and the second pontic is released, the first pontic and the second pontic are pivotally connected in side, so
After lift the second pontic so that the second pontic rotates relative to the first pontic, and the second pontic and the first pontic are in same after having rotated
Parallel arranged in plane.
Present invention additionally comprises:
Step 3: the pontic of lifting first and the second pontic are so that erection support, completion are set up thereunder.
The pedestal is provided with winding plant, and the second pontic is pushed on the first pontic for having set up by winding plant,
The other end for controlling the second pontic by winding plant is gradually reduced.
In the step 2 after the second pontic has been overturn, the connection of the first pontic and the second pontic is released, by the second bridge
Body translates setpoint distance.
The beneficial effects of the invention are as follows:It is very low to counterweight requirements when the second pontic is set up in above-mentioned erection method, second
Pontic erection method is very ingenious, and the center of gravity of the second pontic remains at relatively low position during its erection, can be big
Width consumes energy when reducing its erection, and stability when lifting erection, has the advantages of low-energy-consumption high-efficiency.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples:
Fig. 1 is the schematic diagram one of step 1 in the present invention;
Fig. 2 is the schematic diagram two of step 1 in the present invention;
Fig. 3 is the schematic diagram three of step 1 in the present invention;
Fig. 4 is the schematic diagram of step 2 in the present invention.
Embodiment
1~Fig. 4 of reference picture, the present invention are a kind of erection methods of the second pontic 4 of split type level bridges, the split type steelframe
Bridge includes pedestal 1, folding first pontic 3 and at least one foldable second pontic 4, it is characterised in that including following step
Suddenly:
First, after having set up the first pontic 3, the second pontic 4 is pushed on the first pontic 3 for having set up, the second pontic 4 is in place
Afterwards, one end of the second pontic 4 is connected with the first pontic 3, the second pontic 4 carries folding-unfolding mechanism, and exhibition is driven by folding-unfolding mechanism
Open, the other end of the second pontic 4 of control gradually decreases down to be bonded with the first pontic 3;
2nd, the connection between the first pontic 3 and the second pontic 4 is released, by the first pontic 3 and the second pontic 4 in side pivot
Connect, be then lifted out the second pontic 4 so that the second pontic 4 rotates relative to the first pontic 3, the second pontic 4 and the first bridge after having rotated
Body 3 is in parallel arranged on same plane;
Step 3: lifting the first pontic 3 and the second pontic 4 are so that erection support, completion are set up thereunder.In step 2
After the second pontic 4 has been overturn, the connection of the first pontic 3 and the second pontic 4 is released, the second pontic 4 is translated into setpoint distance.On
State in erection method very low to counterweight requirements when the second pontic 4 is set up, the erection method of the second pontic 4 is very ingenious, the second bridge
The center of gravity of body 4 remains at relatively low position during its erection, is consumed energy when its erection can be greatly reduced, and hoisting frame
If when stability, there is the advantages of low-energy-consumption high-efficiency.
As Figure 1-Figure 4, pedestal 1 is provided with winding plant 2, is pushed into set up by the second pontic 4 by winding plant 2
The first pontic 3 on, by winding plant 2 control the second pontic 4 the other end be gradually reduced.The working stability of winding plant 2, can
Carry out the control of big stroke.
Above-described embodiment is the preferred scheme of the present invention, and the present invention can also have other embodiments.The technology of this area
Personnel can also make equivalent variations or replacement on the premise of without prejudice to spirit of the invention, and these equivalent modifications or replacement are wrapped
It is contained in the scope set by the application claim.
Claims (4)
1. a kind of the second pontic erection method of split type level bridges, the split type level bridges include pedestal, one folding the
One pontic and at least one foldable second pontic, it is characterised in that comprise the following steps:
First, after having set up the first pontic, the second pontic is pushed on the first pontic for having set up, the second pontic in place after, by
One end of two pontics is connected with the first pontic, and the second pontic carries folding-unfolding mechanism, is driven and deployed by folding-unfolding mechanism, control second
The other end of pontic gradually decreases down to be bonded with the first pontic;
2nd, the connection between the first pontic and the second pontic is released, the first pontic and the second pontic are pivotally connected in side, Ran Houti
Rise the second pontic so that the second pontic rotates relative to the first pontic, and the second pontic and the first pontic are in same plane after having rotated
Upper parallel arranged.
2. the second pontic erection method of a kind of split type level bridges as claimed in claim 1, it is characterised in that it also includes:
Step 3: the pontic of lifting first and the second pontic are so that erection support, completion are set up thereunder.
A kind of 3. the second pontic erection method of split type level bridges as claimed in claim 1, it is characterised in that the pedestal
Winding plant is provided with, the second pontic is pushed on the first pontic for having set up by winding plant, controlled by winding plant
The other end of second pontic is gradually reduced.
A kind of 4. the second pontic erection method of split type level bridges as claimed in claim 1, it is characterised in that the step
In two after the second pontic has been overturn, the connection of the first pontic and the second pontic is released, the second pontic is translated into setpoint distance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610454340.0A CN106087776B (en) | 2016-06-20 | 2016-06-20 | A kind of second pontic erection method of split type level bridges |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610454340.0A CN106087776B (en) | 2016-06-20 | 2016-06-20 | A kind of second pontic erection method of split type level bridges |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106087776A CN106087776A (en) | 2016-11-09 |
CN106087776B true CN106087776B (en) | 2017-12-05 |
Family
ID=57238668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610454340.0A Active CN106087776B (en) | 2016-06-20 | 2016-06-20 | A kind of second pontic erection method of split type level bridges |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106087776B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938518A (en) * | 2017-11-21 | 2018-04-20 | 中铁四局集团钢结构建筑有限公司 | One kind is first turned across busy railway freely-supported steel truss girder translates erection construction method again |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2556175A (en) * | 1945-06-12 | 1951-06-12 | Lester P Frost | Bridge and mobile launching structure therefor |
US3837027A (en) * | 1972-03-11 | 1974-09-24 | H Gehlen | Vehicle with depositable ramp for the forming of bridges, particularly floating bridges and ferries |
EP0280626A1 (en) * | 1987-02-27 | 1988-08-31 | Constructions Industrielles De La Mediterranee C.N.I.M. | System for unfolding and placing a bridge from a vehicle such as a bridge-laying tank for passing an obstacle |
CN101949127A (en) * | 2010-09-29 | 2011-01-19 | 王贵宣 | Movable type rescue auxiliary bridge vehicle |
CN203514172U (en) * | 2013-10-21 | 2014-04-02 | 贾针 | Emergency rescue device |
CN204023395U (en) * | 2014-08-20 | 2014-12-17 | 青岛理工大学 | A kind of rescue bridge layer |
CN104499417A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Gravity self-balance type emergency rehabilitation rapid self-erection bridge |
CN104495638A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Portable hydraulic auxiliary erected automobile obstacle crossing device |
CN104499419A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Steel structure emergency traffic-repairing and traffic-keeping integrated bridge |
CN104499418A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Folding assembly type vehicle-mounted bridge |
-
2016
- 2016-06-20 CN CN201610454340.0A patent/CN106087776B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2556175A (en) * | 1945-06-12 | 1951-06-12 | Lester P Frost | Bridge and mobile launching structure therefor |
US3837027A (en) * | 1972-03-11 | 1974-09-24 | H Gehlen | Vehicle with depositable ramp for the forming of bridges, particularly floating bridges and ferries |
EP0280626A1 (en) * | 1987-02-27 | 1988-08-31 | Constructions Industrielles De La Mediterranee C.N.I.M. | System for unfolding and placing a bridge from a vehicle such as a bridge-laying tank for passing an obstacle |
CN101949127A (en) * | 2010-09-29 | 2011-01-19 | 王贵宣 | Movable type rescue auxiliary bridge vehicle |
CN203514172U (en) * | 2013-10-21 | 2014-04-02 | 贾针 | Emergency rescue device |
CN204023395U (en) * | 2014-08-20 | 2014-12-17 | 青岛理工大学 | A kind of rescue bridge layer |
CN104499417A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Gravity self-balance type emergency rehabilitation rapid self-erection bridge |
CN104495638A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Portable hydraulic auxiliary erected automobile obstacle crossing device |
CN104499419A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Steel structure emergency traffic-repairing and traffic-keeping integrated bridge |
CN104499418A (en) * | 2014-12-03 | 2015-04-08 | 中山市公路钢结构制造有限公司 | Folding assembly type vehicle-mounted bridge |
Also Published As
Publication number | Publication date |
---|---|
CN106087776A (en) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201729632U (en) | Hydraulic lifter | |
CN106087776B (en) | A kind of second pontic erection method of split type level bridges | |
CN201942481U (en) | Scissors type lifting platform arm support mechanism | |
CN105421236A (en) | Closing method for cable-stayed and suspension composite bridge | |
CN207296344U (en) | It is a kind of to carry the construction platform automatically moved with material delivery functions | |
CN207725577U (en) | Stepping on by device between a kind of wind turbine O&M ship and fan platform | |
CN105926462B (en) | A kind of erection method of split type level bridges | |
CN205943360U (en) | Portable energy -conserving garden publicity column | |
CN203021255U (en) | Mechanical linkage platform | |
CN105386425A (en) | Hydraulic dam supporting mechanism capable of being limited in folded mode | |
CN205472522U (en) | Electrical urgent repair frame | |
CN203428799U (en) | Annular jacking crossbeam device of tower crane | |
CN203912780U (en) | Irrigation sprinkler supporting mechanism | |
CN205575474U (en) | Cavity upset lift integration platform | |
CN201717244U (en) | Acid pouring mechanism of diode | |
CN204825655U (en) | Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place | |
CN208544729U (en) | A kind of adjustable continuity material lift equipment of architectural engineering | |
CN203568661U (en) | Built-in tail-sliding lifting lug | |
CN203910437U (en) | Oil-immersed transformer provided with self hoisting core | |
CN203983316U (en) | A kind of semi-automatic sun energy cell panel frame loader | |
CN202688996U (en) | Pile driver with hydraulic folding oil cylinder | |
CN203626267U (en) | Building roof lifting device | |
CN206590457U (en) | A kind of stepless elevation device of drag conveyor | |
CN205771289U (en) | A kind of pressure head structure of garbage compression station | |
CN206538147U (en) | A kind of mobile lifting platform of convenient use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |