CN105421236A - Closing method for cable-stayed and suspension composite bridge - Google Patents

Closing method for cable-stayed and suspension composite bridge Download PDF

Info

Publication number
CN105421236A
CN105421236A CN201510716506.7A CN201510716506A CN105421236A CN 105421236 A CN105421236 A CN 105421236A CN 201510716506 A CN201510716506 A CN 201510716506A CN 105421236 A CN105421236 A CN 105421236A
Authority
CN
China
Prior art keywords
oblique pull
cable
closing
district
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510716506.7A
Other languages
Chinese (zh)
Other versions
CN105421236B (en
Inventor
张永涛
陈鸣
游新鹏
彭成明
黄灿
潘桂林
陈少林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510716506.7A priority Critical patent/CN105421236B/en
Publication of CN105421236A publication Critical patent/CN105421236A/en
Application granted granted Critical
Publication of CN105421236B publication Critical patent/CN105421236B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a closing method for a cable-stayed and suspension composite bridge, which belongs to the technical field of bridges. With an overlapping region, close to an cable-stayed region, of the cable-stayed and suspension composite bridge as the position of a closing opening, the form of the closing opening is compositely adjusted through a deck derrick crane and a cable loading crane so as to realize closing of a cable-stayed region cantilever end girder and a suspension region cantilever end girder. For the closing construction of the cable-stayed and suspension composite bridge, the invention discloses a construction method for compositely adjusting the form of the closing opening through the reasonable closing opening position, the deck derrick crane and the cable loading crane; on the one hand, a problem that great horizontal force is burdened on a tower-girder temporary consolidation can be solved; and on the other hand, the adjustment of the closing opening can be finished by using the traditional construction equipment. Therefore, the working efficiency is effectively increased and the labor intensity of construction personnel is reduced.

Description

A kind of folding method of oblique pull suspension cable co-operative system bridge
Technical field
The present invention relates to a kind of folding method of bridge, belong to technical field of bridge construction, particularly relate to a kind of folding method of oblique pull suspension cable co-operative system bridge.
Background technology
The advantage of the comprehensive cable stayed bridge of oblique pull suspension cable co-operative system bridge and suspension bridge two kinds of bridge types, Jin Ta district adopts cable-stayed system, and span centre region adopts cable-cabin structure.For ensureing the reasonable transition between the different system bridge of two kinds of rigidity, can arrange overlay region within the specific limits, namely the suspension cable of existing cable stayed bridge in a part of section, has again the hoist cable of suspension bridge, is conducted oneself with dignity and mobile load by suspension cable and hoist cable shared girder.
Usual Longspan Bridge selects to close up mouth all in the position of span centre or nearly tower.For oblique pull suspension cable co-operative system bridge, close up mouth and be arranged on the length that span centre then can add great cantilever, greatly increase the design difficulty of tower beam temporary consolidation, select in nearly tower position, then oblique pull part-structure is stressed cannot ensure.Therefore, first oblique pull suspension cable co-operative system closure of bridge structure method should comprise the selection of rationally closing up mouthful position.
In addition, because the rigidity of structure of two kinds of systems is inconsistent, and the suspension cable of overlay region does not also set up, and will produce the larger discrepancy in elevation and corner irregularity closing up mouth, therefore, folding method also needs to comprise and closes up regulating measures to ensure to close up smoothly.
A kind of self-anchored stayed cable-suspension combined bridge is disclosed in Chinese invention patent manual CN1676753A, this invention is by cable stayed bridge part of first constructing, hang main push-towing rope again, in the frame construction temporarily main push-towing rope anchor formed at multiple abutment pier, then the firm girder of suspension bridge part is lifted, after girder closes up, complete the conversion of earth anchor system to self-anchoring system, form permanent self-anchoring system.Although this invention has the advantages such as construction costs is low, the construction period is short, but it does not disclose a kind of folding method being applicable to oblique pull-suspension cable cooperation bridge, thus the design difficulty of the tower beam temporary consolidation existed when effectively cannot solve the co-operative system closure of bridge structure of oblique pull suspension cable is large, oblique pull part-structure stressedly cannot ensure, close up mouth produces the problem such as the larger discrepancy in elevation and corner irregularity.
Disclose in Chinese invention patent manual CN102154990B the suspention of a kind of end bay-in across the erection method of oblique pull three tower self-anchoring type combination cable bridge, the step of its erection method is: the girder that in 1. being formed, the cable stayed bridge of tower and limit tower crane draw; 2. girder is closed up; 3. limit tower cable crane system is set up; Remove suspention section support; 5. oblique pull dorsal funciculus, hoist cable, cable stayed bridge is adjusted; 6. Cheng Qiao.This invention eliminates the working procedure of temporary consolidation construction and releasing between Bian Ta and girder, and the working procedure of " erection of limit tower cable crane system " is moved to girder and all close up after mouth closes up and carry out, therefore the duration is shortened, save material consumption and mechanical one-shift expends, avoid the security risk removed the temporary consolidation that bears powerful horizontal force and bring.But, not complete open a kind of of this invention determines that oblique pull suspension cable co-operative system closure of bridge structure mouth position is determined and the method for closed configuration adjustment, and the design difficulty of the tower beam temporary consolidation existed when therefore effectively cannot solve the co-operative system closure of bridge structure of oblique pull suspension cable is large, oblique pull part-structure stressedly cannot ensure, close up problem such as mouth the generation larger discrepancy in elevation and corner irregularity etc.
Summary of the invention
The present invention is directed to above-mentioned prior art Problems existing and propose improvement, namely the technical problem to be solved in the present invention is to provide a kind of folding method of oblique pull suspension cable co-operative system bridge, reasonably can be determined the closed position of oblique pull suspension cable co-operative system bridge by the method, the adjustment of oblique pull suspension cable co-operative system closure of bridge structure state can be realized to ensure to close up smoothly simultaneously.
The technical scheme of technical solution problem of the present invention is to provide a kind of folding method of oblique pull suspension cable co-operative system bridge, it is using the overlay region of oblique pull suspension cable co-operative system bridge as closing up a mouthful position, and closes up degree of lip-rounding state by erection crane and deck unit erection gantry corrdinated adjustment and realize oblique pull district cantilever end girder and suspention the closing up of district's cantilever end girder.
In a kind of preferred embodiment of the present invention, described in close up the intersection that mouthful position is arranged on oblique pull district and overlay region.
In a kind of preferred embodiment of the present invention, described in close up the intersection that mouthful position is arranged on oblique pull district (A) and overlay region (B), and near oblique pull district (A).
In a kind of preferred embodiment of the present invention, being positioned at position on girder by changing described erection crane, realizing the adjustment of elevation to oblique pull district cantilever end girder and corner.
In a kind of preferred embodiment of the present invention, being positioned at position on main push-towing rope by changing described deck unit erection gantry, realizing the adjustment of elevation to suspention district cantilever end girder and corner.
In a kind of preferred embodiment of the present invention, the main depth of beam of described oblique pull district cantilever end after closing up and the main depth of beam of described suspention district cantilever end after closing up between the two difference within 1-2cm.
In a kind of preferred embodiment of the present invention, the corner of the corner of the described oblique pull district cantilever end girder after closing up and the described suspention district cantilever end girder after closing up is equal.
The invention has the beneficial effects as follows: the closure construction that the present invention is directed to oblique pull suspension cable co-operative system bridge, propose a kind of construction method of reasonably closing up mouthful position and erection crane and deck unit erection gantry corrdinated adjustment and closing up degree of lip-rounding state.The method can avoid on the one hand tower beam temporary consolidation to bear problem compared with large horizontal force, utilize existing construction equipment (two kinds of loop wheel machines) that the adjustment of closing up mouth can be completed on the other hand, simultaneously the present invention can ensure that the measure amount of loop wheel machine on girder or the required adjustment of other devices is minimum, when also closing up, the required position adjustment amount to girder is minimum, thus effectively improve work efficiency, reduce the labour intensity of constructor.
Accompanying drawing explanation
Fig. 1 is the schematic diagram rationally closing up mouthful position of the folding method of a kind of oblique pull suspension cable of the present invention co-operative system bridge;
To be that the erection crane of the folding method of a kind of oblique pull suspension cable of the present invention co-operative system bridge and deck unit erection gantry are collaborative carry out closing up a mouthful experiment material schematic diagram Fig. 2;
In figure: 1-erection crane; 2-deck unit erection gantry; 3-main push-towing rope; 4-girder; A-oblique pull district; B-overlay region; C-suspends district in midair.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
From closed position schematic diagram (as shown in Figure 1) and closed configuration signal (as shown in Figure 2) of the folding method of a kind of oblique pull suspension cable of the present invention co-operative system bridge, the present invention proposes a kind of folding method being applicable to oblique pull suspension cable co-operative system bridge, comprise the selection of reasonable closed position and close up the regulating measures of degree of lip-rounding state, reasonable closed position selects the transition region (near oblique pull district) in oblique pull and suspension cable, and regulating measures mainly adopts erection crane 1 and deck unit erection gantry 2 corrdinated adjustment; Specifically comprise the following steps: 1, determine rationally to close up a mouthful position: the reasonable closed position of oblique pull suspension cable co-operative system bridge should be selected overlay region (existing suspension cable, has hoist cable again), and near oblique pull district; If because a mouthful position will be closed up be arranged on span centre, jib-length can be strengthened, increase the design difficulty of tower beam temporary consolidation; If will close up a mouthful position to arrange selection in nearly tower position, then cable stayed bridge is stressed cannot ensure.Therefore, close up mouth can select within overlay region.Meanwhile, for reducing the length of oblique pull district cantilever erection, closed position selects the position, boundary in oblique pull district and overlay region, and near oblique pull district.2, adjustment is closed up degree of lip-rounding state and is carried out girder 4 and close up; Close up the position that mouthful position is determined in overlay region near oblique pull district, before girder 4 closes up, still have part suspension cable and hoist cable not to install.Adopt erection crane 1 and deck unit erection gantry 2 to work in coordination with and carry out the adjustment of closing up degree of lip-rounding state, the adjustment of erection crane 1 pair of girder 4 elevation and corner is direct, by toward end bay or in across mobile erection crane 1, change the position of erection crane 1 on girder 4, elevation and the corner of kingpost cantalever end can be changed; The adjustment of deck unit erection gantry 2 pairs of girder 4 elevations and corner is indirectly, by toward end bay or in across mobile deck unit erection gantry 2, change the position of deck unit erection gantry 2 on main push-towing rope 3, the linear of main push-towing rope 3 is had a direct impact, thus indirectly realize the adjustment to kingpost cantalever end elevation and corner; 3, girder completes checking and accepting after closing up.The target that girder closes up adjustment is that cantilever end can mate smoothly, and close up the girder top highness change of mouthful both sides within 1 to 2cm, corner is equal as far as possible, and the corner of its middle girder is the angle that girder and horizontal plane are formed.
The present invention is directed to the closure construction of oblique pull suspension cable co-operative system bridge, propose a kind of construction method of reasonably closing up mouthful position and erection crane and deck unit erection gantry corrdinated adjustment and closing up degree of lip-rounding state.Tower beam temporary consolidation can be avoided on the one hand to bear problem compared with large horizontal force, utilize existing construction equipment (two kinds of loop wheel machines) that the adjustment of closing up mouth can be completed on the other hand, improve work efficiency.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any those of ordinary skill in the art are in the technical scope disclosed by the present invention; the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention.

Claims (7)

1. the folding method of an oblique pull suspension cable co-operative system bridge, it is characterized in that: using the overlay region (B) of oblique pull suspension cable co-operative system bridge as closing up a mouthful position, and close up degree of lip-rounding state by erection crane (1) and deck unit erection gantry (2) corrdinated adjustment and realize oblique pull district (A) cantilever end girder and suspention the closing up of district's (C) cantilever end girder.
2. the folding method of a kind of oblique pull suspension cable co-operative system bridge as claimed in claim 1, is characterized in that: described in close up the intersection that mouthful position is arranged on oblique pull district (A) and overlay region (B).
3. the folding method of a kind of oblique pull suspension cable co-operative system bridge as claimed in claim 2, is characterized in that: described in close up the intersection that mouthful position is arranged on oblique pull district (A) and overlay region (B), and near oblique pull district (A).
4. the folding method of a kind of oblique pull suspension cable co-operative system bridge as claimed in claim 1, it is characterized in that: be positioned at position on girder by changing described erection crane (1), realizing the adjustment of elevation to oblique pull district (A) cantilever end girder and corner.
5. the folding method of a kind of oblique pull suspension cable co-operative system bridge as claimed in claim 1, it is characterized in that: be positioned at position on main push-towing rope (3) by changing described deck unit erection gantry (2), realizing the adjustment of elevation to suspention district (C) cantilever end girder and corner.
6. the folding method of a kind of oblique pull suspension cable co-operative system bridge as claimed in claim 1, is characterized in that: the main depth of beam of described oblique pull district (A) cantilever end after closing up and the main depth of beam of described suspention district (C) cantilever end after closing up between the two difference within 1-2cm.
7. the folding method of a kind of oblique pull suspension cable co-operative system bridge as claimed in claim 1, is characterized in that: the corner of the corner of described oblique pull district (A) the cantilever end girder after closing up and described suspention district (C) the cantilever end girder after closing up is equal.
CN201510716506.7A 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge Active CN105421236B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510716506.7A CN105421236B (en) 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510716506.7A CN105421236B (en) 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge

Publications (2)

Publication Number Publication Date
CN105421236A true CN105421236A (en) 2016-03-23
CN105421236B CN105421236B (en) 2017-04-12

Family

ID=55499751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510716506.7A Active CN105421236B (en) 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge

Country Status (1)

Country Link
CN (1) CN105421236B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107022958A (en) * 2017-06-02 2017-08-08 广西路桥工程集团有限公司 The method in cable-stayed bridge across girder is installed using cable crane
CN109371805A (en) * 2018-11-14 2019-02-22 西南交通大学 A kind of large span multitower cable-cabin structure bridge and its construction method
CN110939067A (en) * 2019-12-09 2020-03-31 中铁大桥勘测设计院集团有限公司 Method for determining position of bridge closure section of collaboration system
CN111973290A (en) * 2020-06-30 2020-11-24 温州医科大学附属第二医院、温州医科大学附属育英儿童医院 Operation rack for transforaminal endoscope
CN113174863A (en) * 2021-04-30 2021-07-27 中铁大桥勘测设计院集团有限公司 Construction method of cable-stayed suspension cable cooperation system bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1676753A (en) * 2005-04-20 2005-10-05 大连理工大学 Self-anchored stayed cable-suspension combined bridge
CN101418543A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Self-anchored rope-suspension bridge inclined drawing construction method
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
CN104631326A (en) * 2014-12-22 2015-05-20 广东省公路勘察规划设计院股份有限公司 Main beam cable-stayed suspension forming technological method for self-anchorage type suspension bridge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1676753A (en) * 2005-04-20 2005-10-05 大连理工大学 Self-anchored stayed cable-suspension combined bridge
CN101418543A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Self-anchored rope-suspension bridge inclined drawing construction method
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
CN104631326A (en) * 2014-12-22 2015-05-20 广东省公路勘察规划设计院股份有限公司 Main beam cable-stayed suspension forming technological method for self-anchorage type suspension bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邱景: "斜拉-悬吊组合体系桥梁的力学及施工过程分析", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107022958A (en) * 2017-06-02 2017-08-08 广西路桥工程集团有限公司 The method in cable-stayed bridge across girder is installed using cable crane
CN107022958B (en) * 2017-06-02 2019-04-16 广西路桥工程集团有限公司 Use the method across girder in cable crane installation cable-stayed bridge
CN109371805A (en) * 2018-11-14 2019-02-22 西南交通大学 A kind of large span multitower cable-cabin structure bridge and its construction method
CN110939067A (en) * 2019-12-09 2020-03-31 中铁大桥勘测设计院集团有限公司 Method for determining position of bridge closure section of collaboration system
CN110939067B (en) * 2019-12-09 2021-08-03 中铁大桥勘测设计院集团有限公司 Method for determining position of bridge closure section of collaboration system
CN111973290A (en) * 2020-06-30 2020-11-24 温州医科大学附属第二医院、温州医科大学附属育英儿童医院 Operation rack for transforaminal endoscope
CN111973290B (en) * 2020-06-30 2023-03-14 温州医科大学附属第二医院、温州医科大学附属育英儿童医院 Operating frame for transforaminal endoscope
CN113174863A (en) * 2021-04-30 2021-07-27 中铁大桥勘测设计院集团有限公司 Construction method of cable-stayed suspension cable cooperation system bridge

Also Published As

Publication number Publication date
CN105421236B (en) 2017-04-12

Similar Documents

Publication Publication Date Title
CN105421236A (en) Closing method for cable-stayed and suspension composite bridge
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN107724226B (en) Four-rope-surface homodromous rotary stay cable-suspension cable cooperation system bridge
CN105274941A (en) General construction method for partially ground-anchored cable-stayed suspension bridge
CN103911956A (en) Long-span cable stayed bridge steel truss girder mounting method
CN109487912A (en) A kind of construction method of super-span truss-string-structure
CN202131563U (en) Combined gate type bridge pier for one-step suspension in position of steel crossbeam
CN108978499A (en) A kind of oblique pull suspension cable co-operative system bridge erection method
CN103628416B (en) Stiffening girder of suspension bridge is to pulling type pier side bracket
CN110528392A (en) A kind of erection method of the full welding steel purlin stiff girder of large-scale suspension bridge
CN104477791B (en) Novel tower crane attached wall attachment lattice bracing frame auxiliary device
CN201809961U (en) Triangular diagonal bracing operation platform for elevator shaft
CN103541300B (en) Based on the construction method of the railway concrete continuous beam that flat stacking is implemented
CN203188133U (en) Super-tonnage rotary body flat-hinge structure
CN102381438B (en) Wholly lifting mounting method for wholly built upstairs stem section of large-size semi-submerged ship
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN203238925U (en) Net rack work platform erected by utilizing factory building crane
CN203781677U (en) Trial mass device of crane
CN204282391U (en) A kind of heel foundation formwork erecting structure
CN203530864U (en) Large-span concrete continuous beam bridge side span folding device
CN203716062U (en) Integral type pier body decorating hanging basket
CN202913338U (en) Steel truss full-welded truss piece

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant