CN106081872A - 一种保温坑盖吊起结构 - Google Patents

一种保温坑盖吊起结构 Download PDF

Info

Publication number
CN106081872A
CN106081872A CN201610681791.8A CN201610681791A CN106081872A CN 106081872 A CN106081872 A CN 106081872A CN 201610681791 A CN201610681791 A CN 201610681791A CN 106081872 A CN106081872 A CN 106081872A
Authority
CN
China
Prior art keywords
lid
arranges
screw rod
hole
locking device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610681791.8A
Other languages
English (en)
Inventor
李生栋
王海峰
赵达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengang Steel Plates Co Ltd
Original Assignee
Bengang Steel Plates Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengang Steel Plates Co Ltd filed Critical Bengang Steel Plates Co Ltd
Priority to CN201610681791.8A priority Critical patent/CN106081872A/zh
Publication of CN106081872A publication Critical patent/CN106081872A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明公开一种保温坑盖吊起结构,包括盖体,所述盖体为四边形,所述盖体的四角设置锁紧装置;4根链条的一端固定在锁紧装置上,另外一端固定在吊座上;吊座的中央设置吊耳;所述锁紧装置包括固定在盖体上的支撑架,所述支撑架设置通孔,螺杆穿过所述通孔,螺杆的前端设置挂环;螺杆穿过所述通孔处的两端设置锁紧螺母,在螺杆后端的锁紧螺母外侧还设置配重块,所述配重块设置螺孔,螺杆与所述螺孔配合。本发明的优点是:由于采用了链条结构,因此,可尽早发现缺陷;由于设置了长度调节装置及配置调整装置,可保证起吊过程中盖体的平衡,保证了生产安全。

Description

一种保温坑盖吊起结构
技术领域
本发明涉及机械领域,具体说是一种起吊结构。
背景技术
保温坑是特钢厂铸钢车间根据钢材生产工艺要求,在铸钢生产区域内建设的保温设施,一般为多个。因坑内有大量保温钢坯,每天调运的钢材量大,频率高,因此对其起吊要求较高。
现有的结构是采用钢丝绳将盖体起吊,仅仅是将钢丝绳绑在盖体上,用吊车起吊。因此,不能保证盖体的平衡,而且不易发现钢丝绳中出现的断裂情况,无法保证安全生产。
发明内容
为解决上述技术问题,本发明的目的是提供一种可调整平衡,且具有补偿调节功能及配置功能的吊起结构,具体技术方案如下:
一种保温坑盖吊起结构,包括盖体,其特征在于:所述盖体为四边形,所述盖体的四角设置锁紧装置;4根链条的一端固定在锁紧装置上,另外一端固定在吊座上;吊座的中央设置吊耳;所述锁紧装置包括固定在盖体上的支撑架,所述支撑架设置通孔,螺杆穿过所述通孔,螺杆的前端设置挂环;螺杆穿过所述通孔处的两端设置锁紧螺母,在螺杆后端的锁紧螺母外侧还设置配重块,所述配重块设置螺孔,螺杆与所述螺孔配合。
本发明的优点是:由于采用了链条结构,因此,可尽早发现缺陷;由于设置了长度调节装置及配置调整装置,可保证起吊过程中盖体的平衡,保证了生产安全。
附图说明
图1为本发明的结构示意图;
图2为图1的A向视图;
图3为图1的仰视图。
具体实施方式
下面结合附图具体说明本发明,如图1-3所示,本发明包括盖体1,所述盖体1为四边形,所述盖体1的四角设置锁紧装置2;4根链条3的一端固定在锁紧装置2上,另外一端固定在吊座4上;吊座4的中央设置吊耳5;所述锁紧装置2包括固定在盖体1上的支撑架6,所述支撑架6设置通孔,螺杆7穿过所述通孔,螺杆7的前端设置挂环8;所述挂环8与链条3的一端连接;螺杆7穿过所述通孔处的两端设置锁紧螺母9、10,在螺杆后端的锁紧螺母10外侧还设置配重块11,所述配重块11设置螺孔,螺杆7与所述螺孔配合。
使用过程中,由于链条是由一个个圆环套接而成,由于受力不均,不可能4根链条的长度始终保持一致,为保证起吊时盖体与水平面的角度不变,可通过螺栓进行某一根链条长度的调整,还可以通过配重块进行调整。

Claims (1)

1.一种保温坑盖吊起结构,包括盖体,其特征在于:所述盖体为四边形,所述盖体的四角设置锁紧装置;4根链条的一端固定在锁紧装置上,另外一端固定在吊座上;吊座的中央设置吊耳;所述锁紧装置包括固定在盖体上的支撑架,所述支撑架设置通孔,螺杆穿过所述通孔,螺杆的前端设置挂环;螺杆穿过所述通孔处的两端设置锁紧螺母,在螺杆后端的锁紧螺母外侧还设置配重块,所述配重块设置螺孔,螺杆与所述螺孔配合。
CN201610681791.8A 2016-08-17 2016-08-17 一种保温坑盖吊起结构 Pending CN106081872A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610681791.8A CN106081872A (zh) 2016-08-17 2016-08-17 一种保温坑盖吊起结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610681791.8A CN106081872A (zh) 2016-08-17 2016-08-17 一种保温坑盖吊起结构

Publications (1)

Publication Number Publication Date
CN106081872A true CN106081872A (zh) 2016-11-09

Family

ID=58069738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610681791.8A Pending CN106081872A (zh) 2016-08-17 2016-08-17 一种保温坑盖吊起结构

Country Status (1)

Country Link
CN (1) CN106081872A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202089674U (zh) * 2011-04-27 2011-12-28 广西玉柴机器股份有限公司 一种可调节平衡的吊具
CN102336360A (zh) * 2011-10-18 2012-02-01 荣成锻压机床有限公司 大型压力机横梁专用吊具
CN202379590U (zh) * 2011-12-27 2012-08-15 沪东重机有限公司 用于中速柴油机机架起吊的工具
CN203602213U (zh) * 2013-10-21 2014-05-21 郑州欧邦窑炉设备有限公司 炉门起吊装置
CN203922433U (zh) * 2014-06-12 2014-11-05 国家电网公司 水轮机过流部件的顶盖吊具
CN204434076U (zh) * 2014-12-11 2015-07-01 中冶天工集团有限公司 盾构机下井吊装过程中可调节盾构机部件姿态的吊钩
CN205873668U (zh) * 2016-08-17 2017-01-11 本钢板材股份有限公司 一种保温坑盖吊起结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202089674U (zh) * 2011-04-27 2011-12-28 广西玉柴机器股份有限公司 一种可调节平衡的吊具
CN102336360A (zh) * 2011-10-18 2012-02-01 荣成锻压机床有限公司 大型压力机横梁专用吊具
CN202379590U (zh) * 2011-12-27 2012-08-15 沪东重机有限公司 用于中速柴油机机架起吊的工具
CN203602213U (zh) * 2013-10-21 2014-05-21 郑州欧邦窑炉设备有限公司 炉门起吊装置
CN203922433U (zh) * 2014-06-12 2014-11-05 国家电网公司 水轮机过流部件的顶盖吊具
CN204434076U (zh) * 2014-12-11 2015-07-01 中冶天工集团有限公司 盾构机下井吊装过程中可调节盾构机部件姿态的吊钩
CN205873668U (zh) * 2016-08-17 2017-01-11 本钢板材股份有限公司 一种保温坑盖吊起结构

Similar Documents

Publication Publication Date Title
CN103738834B (zh) 一种可调式三点吊装方法
CN206624553U (zh) 构件吊装系统
CN204454235U (zh) 一种新型多吊点平衡梁装置
CN208964364U (zh) 一种装配式叠合楼板自动吊具
CN101284626A (zh) 一种配重吊装的方法
CN205873668U (zh) 一种保温坑盖吊起结构
CN203877731U (zh) Phc管桩施工现场的吊运拖拽装置
CN109160434A (zh) 吊装装置
CN201614227U (zh) 一种吊装索具装置
CN207090837U (zh) 一种移动式轻型吊装装置
CN110409803B (zh) 拆卸液压提模装置中心鼓圈的吊装方法
CN106081872A (zh) 一种保温坑盖吊起结构
CN201027135Y (zh) 一种用于吊运55mPHC管桩的吊具机构
JP2024508194A (ja) 桁吊り上げ装置のブームトレイ及びブームナットの取り付け装置
CN207293906U (zh) 用于吊装预制构件的起重工具
CN116605746A (zh) 一种大型产品翻转方法、翻转装置及起重设备
CN206654663U (zh) 一种安装精轧机锥箱的平衡吊具
CN105905780B (zh) 一种组合式起重平衡梁
CN203112332U (zh) 一种穹顶偏心吊装装置
CN205772789U (zh) 一种预制桩的运输吊装装置
CN202744175U (zh) 用于吊装预制混凝土柱的吊具
CN202558444U (zh) 压力钢管吊装平衡梁装置
CN205590207U (zh) 跌落试验时使用的提升装置
CN204689351U (zh) 一种h型钢结构构件吊具
CN104481148B (zh) 一种超长薄壁彩钢瓦屋面施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication