CN106081532A - The high efficiency dregs induction system used for interim switching and construction method thereof - Google Patents

The high efficiency dregs induction system used for interim switching and construction method thereof Download PDF

Info

Publication number
CN106081532A
CN106081532A CN201610622280.9A CN201610622280A CN106081532A CN 106081532 A CN106081532 A CN 106081532A CN 201610622280 A CN201610622280 A CN 201610622280A CN 106081532 A CN106081532 A CN 106081532A
Authority
CN
China
Prior art keywords
frame
conveyer
dregs
screw machine
high efficiency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610622280.9A
Other languages
Chinese (zh)
Other versions
CN106081532B (en
Inventor
杨金钟
李文峰
张玉奇
曹慧
田利峰
马军英
张卫健
轩井龙
余东方
郭清阳
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201610622280.9A priority Critical patent/CN106081532B/en
Publication of CN106081532A publication Critical patent/CN106081532A/en
Application granted granted Critical
Publication of CN106081532B publication Critical patent/CN106081532B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G15/00Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration
    • B65G15/60Arrangements for supporting or guiding belts, e.g. by fluid jets
    • B65G15/64Arrangements for supporting or guiding belts, e.g. by fluid jets for automatically maintaining the position of the belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G39/00Rollers, e.g. drive rollers, or arrangements thereof incorporated in roller-ways or other types of mechanical conveyors 
    • B65G39/10Arrangements of rollers
    • B65G39/12Arrangements of rollers mounted on framework
    • B65G39/16Arrangements of rollers mounted on framework for aligning belts or chains
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G45/00Lubricating, cleaning, or clearing devices
    • B65G45/10Cleaning devices
    • B65G45/24Cleaning devices comprising plural diverse cleaning devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/02Devices for feeding articles or materials to conveyors
    • B65G47/16Devices for feeding articles or materials to conveyors for feeding materials in bulk
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles
    • B65G67/04Loading land vehicles
    • B65G67/08Loading land vehicles using endless conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk
    • B65G2201/045Sand, soil and mineral ore

Abstract

A kind of high efficiency dregs induction system used for interim switching, including the screw machine and the dregs bucket that are positioned at down-hole, also include the conveyer being arranged between the soil outlet of screw machine and dregs bucket, the front end of described conveyer is for entering soil end, being positioned at below screw machine, and removably connect with screw machine, the end of conveyer is the end that is unearthed, is positioned on dregs bucket, and the unearthed end of conveyer is higher than into soil end.The present invention solve dregs bucket body amass the lifting of little, dregs bucket often, efficiency of construction is low, be unearthed and measure uppity problem.

Description

The high efficiency dregs induction system used for interim switching and construction method thereof
Technical field
The present invention relates to shield machine switching construction field, a kind of high efficiency dregs for interim switching use is defeated Send system and construction method thereof.
Background technology
In traditional construction, conveyer is connected on stand, and stand is the biggest, and During Initial Stage Construction cannot be located at down-hole, therefore at shield Structure machine switching construction field, in the separate launching of shield machine is constructed, the most only main frame of shield machine is dug under active well Entering, rear supporting chassis is located on active well, so the original-pack conveyer of shield machine cannot be installed, can only use the dregs that little side measures Bucket follow-up driving transport dregs, conventional dregs bucket body long-pending generally 1~2m, and shield machine advances a ring need to go out 10~12 buckets Soil, often bucket is required to lift once, thus results in that efficiency of construction is low, construction speed requires and construction quality cannot be protected Card;Meanwhile, the wayward unearthed amount of soil bucket using little side to measure, it is impossible to ensure soil discharge quantity.
Summary of the invention
It is an object of the invention to provide a kind of high efficiency dregs induction system used for interim switching and execute
Work method, dregs bucket body to be solved amass the lifting of little, dregs bucket often, efficiency of construction is low, amount of being unearthed is wayward Problem.
For achieving the above object, the present invention adopts the following technical scheme that
A kind of high efficiency dregs induction system used for interim switching, including being positioned at screw machine and the dregs bucket of down-hole, also Including the conveyer being arranged between the soil outlet of screw machine and dregs bucket, the front end of described conveyer is for entering soil end, being positioned at spiral shell Below rotation machine, and removably connecting with screw machine, the end of conveyer is the end that is unearthed, is positioned on dregs bucket, and the going out of conveyer Soil end is higher than into soil end.
Preferably, described conveyer include frame, along frame length direction arrange idler machining, be connected on idler machining Belt conveyor and the walking mechanism being connected under frame.
Preferably, the front end of described frame is provided with follower rollers, the end of frame is provided with driving cylinder.
Preferably, it is provided with preposition sweeper before described driving cylinder, is provided with rearmounted sweeper below.
Preferably, described walking mechanism includes being connected to the door shape supporting leg below frame to interval along frame length and being connected to The road wheel of door shape supporting leg bottom.
Preferably, described door shape supporting leg is welded by shaped steel, and beam width is more than frame width.
Preferably, described frame includes continuous tilt section and terminal horizontal section, the wherein angle between tilting section and horizontal plane It it is 8 °~15 °.
Preferably, frame includes being enclosed the rectangular frame being formed by connecting by metallic plate and along frame length direction parallel interval Arrange girder, wherein the upper end of rectangular frame both sides slope inwardly the two ends with idler machining be connected, the offside of its rectangular frame Between Zhong Bu, parallel interval connects idler machining support.
Preferably, described frame is formed in long upwards docking by rack unit, and adjacent rack unit passes through first Connecting plate connects.
Preferably, described first connecting plate is rectangular steel plates, is connected with the rack unit of both sides by connector.
Preferably, described idler machining includes being positioned at the grooved impact idler group below frame front end, screw machine, uniform intervals Be connected to remaining position of frame grooved upper supporting roller group and below impact idler group and grooved upper supporting roller group uniform intervals row The lower flat carrier roller group of cloth;Wherein the arrangement of impact idler group is more intensive than the arrangement of grooved upper supporting roller group.
Preferably, the width of described belt conveyor be 600mm~700mm, fed distance be 10~12m;
Described belt conveyor sequentially pass through follower rollers, impact idler group, grooved upper supporting roller group, drive cylinder, preposition sweeper, Rearmounted sweeper and lower flat carrier roller group form complete transportation route, and be wherein positioned in impact idler group and grooved upper supporting roller group is defeated Send the two ends of belt along frame length to being provided with elongated blend stop, lateral bend contact belt conveyor upper surface, upper end under described blend stop It is connected with blend stop support by connector.
Preferably, described blend stop support includes the pole being connected with idler machining support, the flat board being connected horizontally on pole And the swash plate bent to idler machining by flat board end, swash plate is 45 °~75 ° with the angle of inclination of flat board, the wherein end of swash plate Portion is connected with blend stop.
Preferably, the front end of described conveyer is also associated with side block and supports, and described side block is supported for strip structure, symmetry even On the flat board of the blend stop support being connected on impact idler group both sides, it is connected to incline including hang plate, horizontal plate, long upwards parallel interval Reinforcing plate between swash plate and horizontal plate and be vertically connected on the floor between hang plate, horizontal plate and reinforcing plate, described in incline Swash plate is coplanar with the swash plate of blend stop support;The front end that described side block supports is connected by connecting plate.
Preferably, the two ends of described lower flat carrier roller group through the rectangular frame of frame and are connected by the second connecting plate (18) Connect.
Preferably, described frame has the U-lag through lower flat carrier roller group end.
Preferably, described second connecting plate is stripe board, and middle part has the connecting hole through lower flat carrier roller group termination, connects Hole lateral symmetry has the slotted hole being connected with frame.
A kind of construction method applying the described high efficiency dregs induction system used for interim switching, construction procedure is such as Under:
Step one, is transported to conveyer below screw machine.
Step 2, adjust conveyer to enter soil end corresponding with the soil outlet position of screw machine and connect conveyer and spiral Machine.
Step 3, is transported to the unearthed end of conveyer by dregs bucket.
Step 4, opens conveyer.
Step 5, assigns starting-up signal, starts driving and is unearthed.
Step 6, screw machine is unearthed and falls on conveyer and be delivered in dregs bucket with belt conveyor 3.
Step 6, until dregs bucket fill a pipeful of after, assign stopping signal.
Step 7, after screw machine stops being unearthed, closes conveyer.
Step 8, is transported to dregs bucket active well position and carries out unloading, completes being unearthed of a pipeful of soil.
Step 9, repeat the above steps two to step 7 to shield machine advances a ring.
Step 10, conveyer advances with screw machine, and repetition step 3, to step 9, has been constructed to shield launching.
Compared with prior art the invention have the characteristics that and beneficial effect:
The present invention uses Integration Design, simple in construction, easy to use, convenient transport;Efficiency of construction is high, meets engineering construction and enters The requirement of degree.
Owing to the bottom of door shape supporting leg is provided with road wheel, facilitate the transport of conveyer;Frame arranges blend stop, blend stop One end is compressed on belt conveyor, prevents belt conveyor from moving, and the transport of dregs is effectively ensured;The continuous tilt Duan Yushui of frame Interplanar angle is 8 °~15 °, and this angle both can guarantee that the quick conveying of dregs, can guarantee that again dregs does not rolls to frame front end Fall;Use the dregs bucket of large volume, improve efficiency of construction;Use electromobile transport dregs bucket, convenient transport.
The composite can be widely applied in the adapting system of shield machine.
Accompanying drawing explanation
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the planar structure schematic diagram of conveyer.
Fig. 3 is the structural representation of A-A section in Fig. 1.
Fig. 4 is the structural representation of B-B section in Fig. 1.
Fig. 5 is the structural representation of C-C section in Fig. 1.
Fig. 6 is the structural representation driving cylinder.
Fig. 7 is the structural representation of conveyer.
Fig. 8 is the structure for amplifying schematic diagram of aminoacyl site in Fig. 7.
Fig. 9 is the structure for amplifying schematic diagram at B position in Fig. 7.
Figure 10 is the structure for amplifying schematic diagram at C position in Fig. 7.
Reference: 1-frame, 2-grooved upper supporting roller group, 3-belt conveyor, 4-drive cylinder, 5-follower rollers, The preposition sweeper of 6-, 7-door shape supporting leg, 8-screw machine, 9-dregs bucket, the rearmounted sweeper of 10-, 11-road wheel, 12- Flat carrier roller group, 14-impact idler group, 15-the first connecting plate, 16-blend stop, 17-blend stop support, 18-under girder, 13- Second connecting plate, 19-side block support.
Detailed description of the invention
Embodiment sees shown in Fig. 1, Fig. 2, Fig. 3, Fig. 6, Fig. 7, Fig. 8, Fig. 9 and Figure 10, a kind of use of transferring for temporarily High efficiency dregs induction system, including being positioned at screw machine 8 and the dregs bucket 9 of down-hole, also include being arranged on being unearthed of screw machine 8 Conveyer between mouth and dregs bucket 9, conveyer advances with screw machine 8, uses connecting rod to connect, uses pin-and-hole structure, it is simple to tear open Solving and install, the front end of described conveyer is for entering soil end, being positioned at below screw machine 8, and the end of conveyer is the end that is unearthed, is positioned at dregs On bucket 9, and the unearthed end of conveyer is higher than into soil end;The conveying capacity of conveyer is 280m/h;Described dregs bucket 9 is placed on electricity On bottle car, the volume of dregs bucket is 9m.
Described conveyer includes frame 1, the idler machining arranged along frame 1 length direction, the conveying that is connected on idler machining Belt 3 and the walking mechanism being connected under frame 1;The front end of described frame 1 is provided with follower rollers 5, the end of frame 1 is arranged There is driving cylinder 4;It is provided with preposition sweeper 6 before described driving cylinder 4, is sticky on belt conveyor 3 in order to clean The dregs fallen, after be provided with rearmounted sweeper 10, in order to clear up belt conveyor 3, it is ensured that belt conveyor 3 runs smoothly;Preposition Sweeper 6 and rearmounted sweeper 10 all use polyurethane material to make, and wearability is strong, is hardly damaged, belt the most easy to wear, preposition Sweeper 6 its elasticity of spring tightener scalable below and there is cushioning effect;Described belt conveyor 3 uses polyester material Being made, the width of belt conveyor 3 is 650mm, fed distance is 11.7m, and the height that dregs promotes is by belt conveyor 3 1.7m;Described walking mechanism includes growing along frame 1 being connected to the door shape supporting leg 7 below frame 1 to interval and be connected to a shape prop up The road wheel 11 of lower limb 7 bottom;Described door shape supporting leg 7 is welded by shaped steel, and beam width is more than frame width.
Described frame 1 includes continuous tilt section and terminal horizontal section, and wherein the angle between tilting section and horizontal plane is 11 °; Frame 1 includes the girder 12 being enclosed the rectangular frame being formed by connecting by metallic plate and arranging along frame 1 length direction parallel interval, Wherein the upper end of rectangular frame both sides slope inwardly the two ends with idler machining be connected, its rectangular frame to flat between middle side part Between-line spacing connects has idler machining support, the top of the both sides of described rectangular frame to be also associated with the collar, and the described collar is used for fixing Cable;Described frame 1 is formed in long upwards docking by rack unit, and adjacent rack unit passes through the first connecting plate 15 Connect;Described first connecting plate 15 is rectangular steel plates, is connected with the rack unit of both sides by connector.
Described idler machining includes being positioned at the grooved impact idler group 14 below frame 1 front end, screw machine 8, uniform intervals even Be connected on remaining position of frame 1 grooved upper supporting roller group 2 and below impact idler group 14 and grooved upper supporting roller group 2 uniform intervals The lower flat carrier roller group 13 of arrangement, also includes being disposed on block roller and interval on the belt conveyor between grooved upper supporting roller group 2 and sets Put block roller under the belt conveyor between lower flat carrier roller group 13;Wherein impact idler group 14 is arranged and is arranged close than grooved upper supporting roller group 2 Collection;The two ends of described lower flat carrier roller group 13 through the rectangular frame of frame 1 and are connected by the second connecting plate 18;Described frame 1 On have the U-lag through lower flat carrier roller group 13 end;Described second connecting plate 18 is stripe board, middle part have through under lift The connecting hole of roller group 13 termination, connecting hole lateral symmetry has the slotted hole being connected with frame;On described belt conveyor, block roller sets Putting the upper end of rectangular frame in frame 1, under described belt conveyor, block roller is arranged on the lower end of the rectangular frame of frame 1, conveying On belt, under block roller and belt conveyor, block roller all can rotate, and in order to block belt conveyor 3, prevents belt conveyor 3 sideslip.
Seeing shown in Fig. 4 and Fig. 5, described belt conveyor 3 sequentially passes through follower rollers 5, impact idler group 14, grooved pop-up Roller group 2, driving cylinder 4, preposition sweeper 6, rearmounted sweeper 10 and lower flat carrier roller group 13 form complete transportation route.
The two ends of the belt conveyor 3 being positioned in impact idler group 14 and grooved upper supporting roller group 2 are long elongated to being provided with along frame 1 Blend stop 16,16 times lateral bends of described blend stop contact belt conveyor 3 upper surfaces, upper ends are by connector with blend stop support 17 even Connect;Described blend stop support 17 includes the pole being connected with idler machining support, the flat board being connected horizontally on pole and by flat board The swash plate that end bends to idler machining, swash plate is 45 °~75 ° with the angle of inclination of flat board, wherein the end of swash plate and blend stop 16 Connect.
The front end of described conveyer is also associated with side block and supports 19, and described side block is supported for strip structure, is symmetrically connected to On the flat board of the blend stop support 17 of impact idler group 14 both sides, it is connected to incline including hang plate, horizontal plate, long upwards parallel interval Reinforcing plate between swash plate and horizontal plate and be vertically connected on the floor between hang plate, horizontal plate and reinforcing plate, described in incline Swash plate is coplanar with the swash plate of blend stop support 17;Described side block is supported the front end of 19 and is connected by connecting plate.
The work process of the present invention:
Step one, is transported to conveyer below screw machine 8;
Step 2, adjust conveyer to enter soil end corresponding with the soil outlet position of screw machine 8 and connect conveyer and screw machine 8;
Step 3, is transported to the unearthed end of conveyer by dregs bucket 9;
Step 4, opens conveyer;
Step 5, assigns starting-up signal, starts driving and is unearthed;
Step 6, screw machine 8 is unearthed and falls on conveyer and be delivered in dregs bucket with belt conveyor 3;
Step 6, until dregs bucket 9 fill a pipeful of after, assign stopping signal;
Step 7, after screw machine 8 stops being unearthed, closes conveyer;
Step 8, is transported to dregs bucket 9 active well position and carries out unloading, completes being unearthed of a pipeful of soil;
Step 9, repeat the above steps two to step 7 to shield machine advances a ring.
Step 10, conveyer advances with screw machine 8, and repetition step 3, to step 9, has been constructed to shield launching.

Claims (10)

1. the high efficiency dregs induction system used for interim switching, including the screw machine (8) and the dregs that are positioned at down-hole Bucket (9), it is characterised in that: also include the conveyer being arranged between the soil outlet of screw machine (8) and dregs bucket (9), described defeated Sending the front end of machine for entering soil end, being positioned at screw machine (8) lower section and removably connect with screw machine (8), the end of conveyer is for going out Soil end, be positioned on dregs bucket (9), and the unearthed end of conveyer be higher than into soil end.
The high efficiency dregs induction system used for interim switching the most according to claim 1, it is characterised in that: described Conveyer include frame (1), along frame (1) length direction arrange idler machining, the belt conveyor (3) being connected on idler machining and It is connected to the walking mechanism under frame (1);
The front end of described frame (1) is provided with follower rollers (5), the end of frame (1) is provided with driving cylinder (4);
It is provided with preposition sweeper (6) before described driving cylinder (4), is provided with rearmounted sweeper (10) below;
Described walking mechanism includes being connected to following door shape supporting leg (7) of frame (1) to interval along frame (1) is long and being connected to door The road wheel (11) of shape supporting leg (7) bottom;
Described door shape supporting leg (7) is welded by shaped steel, and beam width is more than frame width.
The high efficiency dregs induction system used for interim switching the most according to claim 2, it is characterised in that: described Frame (1) includes continuous tilt section and terminal horizontal section, and wherein the angle between tilting section and horizontal plane is 8 °~15 °;
Frame (1) includes being enclosed the rectangular frame being formed by connecting by metallic plate and arranging along frame (1) length direction parallel interval Girder (12), wherein the upper end of rectangular frame both sides slope inwardly the two ends with idler machining be connected, the offside of its rectangular frame Between Zhong Bu, parallel interval connects idler machining support.
The high efficiency dregs induction system used for interim switching the most according to claim 3, it is characterised in that: described Frame (1) is formed in long upwards docking by rack unit, and adjacent rack unit is connected by the first connecting plate (15);
Described first connecting plate (15) is rectangular steel plates, is connected with the rack unit of both sides by connector.
The high efficiency dregs induction system used for interim switching the most according to claim 4, it is characterised in that: described Idler machining includes being positioned at frame (1) front end, grooved impact idler group (14) of screw machine (8) lower section, uniform intervals are connected to machine Grooved upper supporting roller group (2) of frame (1) remaining position and impact idler group (14) and grooved upper supporting roller group (2) lower section uniformly between Lower flat carrier roller group (13) every arrangement;Wherein impact idler group (14) arrangement is arranged intensive than grooved upper supporting roller group (2).
The high efficiency dregs induction system used for interim switching the most according to claim 5, it is characterised in that: described The width of belt conveyor (3) is 600mm~700mm, fed distance is 10~12m;
Described belt conveyor (3) sequentially passes through follower rollers (5), impact idler group (14), grooved upper supporting roller group (2), drives rolling Cylinder (4), preposition sweeper (6), rearmounted sweeper (10) and lower flat carrier roller group (13) form complete transportation route, are wherein positioned at slow The two ends rushing the belt conveyor (3) on idler machining (14) and grooved upper supporting roller group (2) are grown to being provided with elongated blend stop along frame (1) (16), under described blend stop (16), lateral bend contact belt conveyor (3) upper surface, upper end are connected with blend stop support (17) by connector Connect.
The high efficiency dregs induction system used for interim switching the most according to claim 6, it is characterised in that: described Blend stop support (17) include the pole being connected with idler machining support, the flat board being connected horizontally on pole and by flat board end to The swash plate of idler machining bending, swash plate is 45 °~75 ° with the angle of inclination of flat board, and wherein the end of swash plate is connected with blend stop (16).
The high efficiency dregs induction system used for interim switching the most according to claim 7, it is characterised in that: described The front end of conveyer is also associated with side block and supports (19), and described side block is supported for strip structure, is symmetrically connected to impact idler group (14) on the flat board of the blend stop support (17) of both sides, including hang plate, horizontal plate, long upwards parallel interval be connected to hang plate and Reinforcing plate between horizontal plate and be vertically connected on the floor between hang plate, horizontal plate and reinforcing plate, described hang plate with The swash plate of blend stop support (17) is coplanar;Described side block is supported the front end of (19) and is connected by connecting plate.
The high efficiency dregs induction system used for interim switching the most according to claim 8, it is characterised in that: described The two ends of lower flat carrier roller group (13) through the rectangular frame of frame (1) and are connected by the second connecting plate (18);
The U-lag through lower flat carrier roller group (13) end is had in described frame (1);
Described second connecting plate (18) is stripe board, and middle part has the connecting hole through lower flat carrier roller group (13) termination, connecting hole Lateral symmetry has the slotted hole being connected with frame.
10. the construction method of the described high efficiency dregs induction system used for interim switching of application, it is characterised in that Construction procedure is as follows:
Step one, is transported to screw machine (8) lower section by conveyer;
Step 2, adjust conveyer to enter soil end corresponding with the soil outlet position of screw machine (8) and connect conveyer and screw machine (8);
Step 3, is transported to the unearthed end of conveyer by dregs bucket (9);
Step 4, opens conveyer;
Step 5, assigns starting-up signal, starts driving and is unearthed;
Step 6, screw machine (8) is unearthed and falls on conveyer and be delivered in dregs bucket with belt conveyor (3);
Step 6, until dregs bucket (9) fill a pipeful of after, assign stopping signal;
Step 7, after screw machine (8) stops being unearthed, closes conveyer;
Step 8, is transported to active well position by dregs bucket (9) and carries out unloading, completes being unearthed of a pipeful of soil;
Step 9, repeat the above steps two to step 7 to shield machine advances a ring;
Step 10, conveyer advances with screw machine (8), and repetition step 3, to step 9, has been constructed to shield launching.
CN201610622280.9A 2016-08-02 2016-08-02 For the high efficiency dregs induction system and its construction method that use of transferring temporarily Active CN106081532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610622280.9A CN106081532B (en) 2016-08-02 2016-08-02 For the high efficiency dregs induction system and its construction method that use of transferring temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610622280.9A CN106081532B (en) 2016-08-02 2016-08-02 For the high efficiency dregs induction system and its construction method that use of transferring temporarily

Publications (2)

Publication Number Publication Date
CN106081532A true CN106081532A (en) 2016-11-09
CN106081532B CN106081532B (en) 2018-02-13

Family

ID=57479037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610622280.9A Active CN106081532B (en) 2016-08-02 2016-08-02 For the high efficiency dregs induction system and its construction method that use of transferring temporarily

Country Status (1)

Country Link
CN (1) CN106081532B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269291A (en) * 2017-07-25 2017-10-20 北京建工土木工程有限公司 Material and dregs transportation system in shield separate launching tunnel
CN110949952A (en) * 2019-12-10 2020-04-03 中铁十四局集团隧道工程有限公司 Belt conveyor system
CN111846832A (en) * 2020-07-28 2020-10-30 南通联科机械制造有限公司 Method for solving problem of large turning radius of belt conveyor for shield machine
CN112374070A (en) * 2020-11-06 2021-02-19 中铁山河工程装备股份有限公司 Belt type conveying and discharging device for shield machine
CN113682761A (en) * 2021-09-01 2021-11-23 中建交通建设集团有限公司 Use method of movable belt unearthing rack for split starting of shield

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014173228A (en) * 2013-03-06 2014-09-22 Maeda Corp Apparatus for discharging harmful gas-containing excavated soil in shield method
CN203891887U (en) * 2014-05-27 2014-10-22 中铁十九局集团轨道交通工程有限公司 Split starting shield tunneling machine
CN203925507U (en) * 2014-03-21 2014-11-05 中铁二十二局集团第一工程有限公司 A kind of metro shield assembling and the system of going into the well
CN204783041U (en) * 2015-07-06 2015-11-18 中铁工程装备集团有限公司 Shield that satisfies low -angle belt feeder constructs supporting structure in back
CN105673034A (en) * 2016-04-18 2016-06-15 中铁六局集团有限公司 Split starting shield tunneling machine and temporary deslagging system
CN205952922U (en) * 2016-08-02 2017-02-15 北京城建集团有限责任公司 A high efficiency dregs conveying system for interim switching is used

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014173228A (en) * 2013-03-06 2014-09-22 Maeda Corp Apparatus for discharging harmful gas-containing excavated soil in shield method
CN203925507U (en) * 2014-03-21 2014-11-05 中铁二十二局集团第一工程有限公司 A kind of metro shield assembling and the system of going into the well
CN203891887U (en) * 2014-05-27 2014-10-22 中铁十九局集团轨道交通工程有限公司 Split starting shield tunneling machine
CN204783041U (en) * 2015-07-06 2015-11-18 中铁工程装备集团有限公司 Shield that satisfies low -angle belt feeder constructs supporting structure in back
CN105673034A (en) * 2016-04-18 2016-06-15 中铁六局集团有限公司 Split starting shield tunneling machine and temporary deslagging system
CN205952922U (en) * 2016-08-02 2017-02-15 北京城建集团有限责任公司 A high efficiency dregs conveying system for interim switching is used

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269291A (en) * 2017-07-25 2017-10-20 北京建工土木工程有限公司 Material and dregs transportation system in shield separate launching tunnel
CN110949952A (en) * 2019-12-10 2020-04-03 中铁十四局集团隧道工程有限公司 Belt conveyor system
CN111846832A (en) * 2020-07-28 2020-10-30 南通联科机械制造有限公司 Method for solving problem of large turning radius of belt conveyor for shield machine
CN112374070A (en) * 2020-11-06 2021-02-19 中铁山河工程装备股份有限公司 Belt type conveying and discharging device for shield machine
CN112374070B (en) * 2020-11-06 2022-07-19 中铁山河工程装备股份有限公司 Belt type conveying and discharging device for shield machine
CN113682761A (en) * 2021-09-01 2021-11-23 中建交通建设集团有限公司 Use method of movable belt unearthing rack for split starting of shield

Also Published As

Publication number Publication date
CN106081532B (en) 2018-02-13

Similar Documents

Publication Publication Date Title
CN106081532A (en) The high efficiency dregs induction system used for interim switching and construction method thereof
CN205952922U (en) A high efficiency dregs conveying system for interim switching is used
CN103818679B (en) Holding means and include its induction system
CN107344677A (en) A kind of automatic feed mechanism
CN101985887B (en) End supporting, filling and transshipping system of coal face
CN110697397A (en) Conveying line capable of bidirectionally transferring materials
CN101943024B (en) Whole pulling and moving type whole-process unloading belt conveyor for coal mine underground filling
CN105480643B (en) A kind of the movable belt holder device and its application method of mining anti-scatter coal
CN218242806U (en) Tunnel cable laying device
CN203903429U (en) Material receiving belt conveyer of tripper car
CN110813779A (en) Intelligent robot beneficiation device and beneficiation method thereof
CN209889614U (en) Telescopic inverted arch landing stage belt car
CN206068728U (en) A kind of ribbon conveyer
CN210854149U (en) Conveying arm and cantilever type tunnel boring machine
CN211385849U (en) Intelligent robot ore dressing device
CN206613861U (en) Rod feeding-distribution device on a kind of Extrusion Process of Aluminum Alloy Profile stub
CN106964662A (en) Rod feeding-distribution device on a kind of Extrusion Process of Aluminum Alloy Profile stub
CN201165428Y (en) Charging apparatus
CN212668265U (en) Annular forging conveying equipment
CN204549519U (en) Gate-type unloading machine with chain buckets
CN217024084U (en) Concrete conveying and discharging device
CN216612833U (en) Bottom feeding device of telescopic belt conveyor
CN203450709U (en) Retaining device and conveying system comprising retaining device
CN1876527B (en) Moveable belt type transfer system
CN204021893U (en) A kind of buffering transition frame of ship unloaders

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yang Jinzhong

Inventor after: Guo Qingyang

Inventor after: Liu Lei

Inventor after: Li Wenfeng

Inventor after: Zhang Yuqi

Inventor after: Cao Hui

Inventor after: Tian Lifeng

Inventor after: Ma Junying

Inventor after: Zhang Weijian

Inventor after: Xuan Jinglong

Inventor after: Yu Dongfang

Inventor before: Yang Jinzhong

Inventor before: Guo Qingyang

Inventor before: Liu Lei

Inventor before: Li Wenfeng

Inventor before: Zhang Yuqi

Inventor before: Cao Hui

Inventor before: Tian Lifeng

Inventor before: Ma Junying

Inventor before: Zhang Weijian

Inventor before: Xuan Jinglong

Inventor before: Yu Dongfang