CN203891887U - Split starting shield tunneling machine - Google Patents

Split starting shield tunneling machine Download PDF

Info

Publication number
CN203891887U
CN203891887U CN201420274636.0U CN201420274636U CN203891887U CN 203891887 U CN203891887 U CN 203891887U CN 201420274636 U CN201420274636 U CN 201420274636U CN 203891887 U CN203891887 U CN 203891887U
Authority
CN
China
Prior art keywords
shield
slag
tunneling machine
shield machine
slag case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420274636.0U
Other languages
Chinese (zh)
Inventor
王立光
张�杰
蒋应省
解健康
王琮清
徐艳洋
萧雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201420274636.0U priority Critical patent/CN203891887U/en
Application granted granted Critical
Publication of CN203891887U publication Critical patent/CN203891887U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a split starting shield tunneling machine and solves the problem that shield starting construction cannot be performed normally since the length of a shield shaft is limited is solved. The split starting shield tunneling machine comprises the shield shaft (3) arranged on one side of a pre-dig tunnel (9), a shield tunneling machine head (2), a slag conveying belt (4) and a slag box (5) are arranged in the shield shaft (3), the shield tunneling machine head (2) is connected together with the slag box (5) through the slag conveying belt (4), a shield tunneling machine control part (1), a slag box hoist gantry crane (6) and a slag pit (7) are arranged on the ground above the mouth of the shield shaft (3), the shield tunneling machine control part (1) is connected together with the shield tunneling machine head (2) through a hydraulic pipeline and an electric control line (8), the slag box hoist gantry crane (6) is arranged on one side of the slag box (5), and a hook of the slag box hoist gantry crane (6) is connected together with the slag box (5). The split starting shield tunneling machine is especially suitable for being used under the condition that the area for digging of the shield shaft is limited.

Description

A kind of split shield machine that starts
Technical field
The utility model relates to a kind of shield machine, particularly a kind of shield machine starting in split mode.
Background technology
The excavation of subway tunnel generally has two kinds of patterns, and a kind of mode is Mining Method, and another mode is shield method.If the subway tunnel of construction is in complex geologic conditions and the intensive situation of above ground structure, be generally to adopt shield construction tunnel.Shield method is a kind of construction method of carrying out tunnel entirety driving with shield machine and corollary equipment thereof.Shield launching is a series of set-up procedures before shield machine construction.First, be at the end in pre-driving tunnel excavation shield structure well, the length of shield structure well generally will reach 80-100 rice, then, shield machine entirety is put into shield structure well, last, starts to carry out tunneling construction.In the situation that construction surrounding enviroment are limited, the length that the shield structure well of excavation can occur cannot meet the requirement of normally starting of shield machine, causes shield launching work progress to carry out.
Summary of the invention
The utility model provides a kind of split shield machine that starts, and has solved the technical problem that shield structure well length limited causes shield launching work progress normally to carry out.
The utility model is to solve by the following technical programs above technical problem:
A kind of split shield machine that starts, comprise pre-driving tunnel, a side in pre-driving tunnel is provided with shield structure well, in shield structure well, be provided with shield machine head, dregs feed belt and slag case, shield machine head links together by dregs feed belt and slag case, on the ground above the well head of shield structure well, be provided with shield machine control section, slag case lifting straddle truck and slag collecting pit, shield structure control section links together by fluid pressure line and electrical control circuit and shield machine head, slag case lifting straddle truck is arranged on a side of slag case, suspension hook and the slag case of slag case lifting straddle truck link together.
In shield structure well, be provided with the return pressure strengthening system of shield machine.
The utility model can reduce the excavation area of shield structure well effectively, has saved construction cost, has shortened the construction period.Particularly by increase return pressure strengthening system and slag case in the shaft bottom of shield structure well, what ensured that shield machine split starts normally carries out.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is elaborated:
A kind of split shield machine that starts, comprise pre-driving tunnel 9, a side in pre-driving tunnel 9 is provided with shield structure well 3, in shield structure well 3, be provided with shield machine head 2, dregs feed belt 4 and slag case 5, shield machine head 2 links together by dregs feed belt 4 and slag case 5, on the ground above the well head of shield structure well 3, be provided with shield machine control section 1, slag case lifting straddle truck 6 and slag collecting pit 7, shield structure control section 1 links together with shield machine head 2 by fluid pressure line and electrical control circuit 8, slag case lifting straddle truck 6 is arranged on a side of slag case 5, suspension hook and the slag case 5 of slag case lifting straddle truck 6 link together.
In shield structure well 3, be provided with the return pressure strengthening system of shield machine.
The shield machine split work progress that starts is as follows: complete after shield structure well 3 at excavation, first, shield machine head 2, dregs feed belt 4 and 5 handlings of slag case are arrived to down-hole, and connect with ground shield machine control section 1 by fluid pressure line and electrical apparatus control circuit 8.After all devices Installation and Debugging complete, start the tunneling construction in pre-driving tunnel 9.Slag case lifting straddle truck 6 by the driving slag handling in slag case 5 to ground and be poured in slag collecting pit 7.

Claims (2)

1. the split shield machine that starts, comprise pre-driving tunnel (9), a side in pre-driving tunnel (9) is provided with shield structure well (3), it is characterized in that, in shield structure well (3), be provided with shield machine head (2), dregs feed belt (4) and slag case (5), shield machine head (2) links together by dregs feed belt (4) and slag case (5), on the ground above the well head of shield structure well (3), be provided with shield machine control section (1), slag case lifting straddle truck (6) and slag collecting pit (7), shield structure control section (1) links together with shield machine head (2) by fluid pressure line and electrical control circuit (8), slag case lifting straddle truck (6) is arranged on a side of slag case (5), the suspension hook of slag case lifting straddle truck (6) and slag case (5) link together.
2. a kind of split according to claim 1 shield machine that starts, is characterized in that, is provided with the return pressure strengthening system of shield machine in shield structure well (3).
CN201420274636.0U 2014-05-27 2014-05-27 Split starting shield tunneling machine Active CN203891887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420274636.0U CN203891887U (en) 2014-05-27 2014-05-27 Split starting shield tunneling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420274636.0U CN203891887U (en) 2014-05-27 2014-05-27 Split starting shield tunneling machine

Publications (1)

Publication Number Publication Date
CN203891887U true CN203891887U (en) 2014-10-22

Family

ID=51718303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420274636.0U Active CN203891887U (en) 2014-05-27 2014-05-27 Split starting shield tunneling machine

Country Status (1)

Country Link
CN (1) CN203891887U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533433A (en) * 2014-12-25 2015-04-22 中铁十七局集团第六工程有限公司 Starting method of small-radius curve tunnel
CN105673034A (en) * 2016-04-18 2016-06-15 中铁六局集团有限公司 Split starting shield tunneling machine and temporary deslagging system
CN106081532A (en) * 2016-08-02 2016-11-09 北京城建集团有限责任公司 The high efficiency dregs induction system used for interim switching and construction method thereof
CN108071403A (en) * 2018-01-29 2018-05-25 重庆建工集团股份有限公司 A kind of tunneling separate launching equipment
CN108131148A (en) * 2018-01-22 2018-06-08 中交第二航务工程局有限公司 Extra small starting well shield separate launching construction method
CN108775243A (en) * 2018-06-26 2018-11-09 中铁隧道局集团有限公司 A kind of shield machine narrow space originates construction method
CN108952733A (en) * 2017-05-17 2018-12-07 沈阳市政集团有限公司 Separate launching shield technique application construction method in municipal sewerage engineering
CN109441457A (en) * 2018-09-05 2019-03-08 中交第二航务工程局有限公司 The construction method of the synchronous transfer of shield separate launching pipeline

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533433A (en) * 2014-12-25 2015-04-22 中铁十七局集团第六工程有限公司 Starting method of small-radius curve tunnel
CN105673034A (en) * 2016-04-18 2016-06-15 中铁六局集团有限公司 Split starting shield tunneling machine and temporary deslagging system
CN105673034B (en) * 2016-04-18 2018-05-29 中铁六局集团有限公司 Separate launching shield machine and interim slag-tapping system
CN106081532A (en) * 2016-08-02 2016-11-09 北京城建集团有限责任公司 The high efficiency dregs induction system used for interim switching and construction method thereof
CN108952733A (en) * 2017-05-17 2018-12-07 沈阳市政集团有限公司 Separate launching shield technique application construction method in municipal sewerage engineering
CN108131148A (en) * 2018-01-22 2018-06-08 中交第二航务工程局有限公司 Extra small starting well shield separate launching construction method
CN108071403A (en) * 2018-01-29 2018-05-25 重庆建工集团股份有限公司 A kind of tunneling separate launching equipment
CN108775243A (en) * 2018-06-26 2018-11-09 中铁隧道局集团有限公司 A kind of shield machine narrow space originates construction method
CN108775243B (en) * 2018-06-26 2020-06-26 中铁隧道局集团有限公司 Shield tunneling machine narrow space starting construction method
CN109441457A (en) * 2018-09-05 2019-03-08 中交第二航务工程局有限公司 The construction method of the synchronous transfer of shield separate launching pipeline

Similar Documents

Publication Publication Date Title
CN203891887U (en) Split starting shield tunneling machine
CN204251168U (en) Multi-rope friction hoist head rope changes system without stable car
CN105065044B (en) Hydraulic support removing platform
CN104526324A (en) Pin shaft dismounting device for coal mine hydraulic support
CN202348330U (en) Anti-falling chain
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN107143293A (en) A kind of all-hydraulic coal mine down-hole drilling auxiliary machinery
CN203925307U (en) A kind of turning walking on stage
CN103410539B (en) Coal mine fully-mechanized mining hydraulic support withdrawing mechanical hand
CN101941632A (en) Vertical shaft single rope automatic adjusting and changing lifting gear
CN204947485U (en) A kind of auxiliary tunnel inner cable walks the device of lining trolley
CN201460976U (en) Combined mining working surface half-edge coal seam conveyor anti-slip device
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN204211340U (en) Drilling rod lifting tool
CN103352666B (en) A kind of drilling tool transportation system
CN203959387U (en) A kind of Bunker eye mouth anti-block apparatus
CN203081345U (en) Catwalk device with drill stem supports
CN102199679B (en) Construction method for tuyere
CN206870932U (en) A kind of mountain region pole trailer equipment
CN203891897U (en) Grouting system of split starting shield tunneling machine
CN203426623U (en) Large-diameter steel pipe outside-welding and manual repair-welding lifting platform
CN204508628U (en) The connecting device of crawler crane swing arm and plug-in device
CN103696721A (en) Bottom boulder grab and rotary drilling rig
CN203374225U (en) Drilling tool conveying system
CN204588492U (en) Electric monorail hangs uses lifting beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant