CN106049524A - Composite cylinder type foundation with auxiliary piles added in later period - Google Patents

Composite cylinder type foundation with auxiliary piles added in later period Download PDF

Info

Publication number
CN106049524A
CN106049524A CN201610618677.0A CN201610618677A CN106049524A CN 106049524 A CN106049524 A CN 106049524A CN 201610618677 A CN201610618677 A CN 201610618677A CN 106049524 A CN106049524 A CN 106049524A
Authority
CN
China
Prior art keywords
auxiliary
auxiliary pile
cylindrical foundation
foundation
top cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610618677.0A
Other languages
Chinese (zh)
Inventor
练继建
刘润
燕翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Frontier Technology Research Institute of Tianjin University Co Ltd
Original Assignee
Frontier Technology Research Institute of Tianjin University Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frontier Technology Research Institute of Tianjin University Co Ltd filed Critical Frontier Technology Research Institute of Tianjin University Co Ltd
Priority to CN201610618677.0A priority Critical patent/CN106049524A/en
Publication of CN106049524A publication Critical patent/CN106049524A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts

Abstract

A composite cylinder type foundation with auxiliary piles added in the later period is composed of a cylindrical foundation body, a transition section, reinforcing ribs, auxiliary pile fixing ring sleeves and the auxiliary piles. The center of a cylindrical foundation body top cover is fixedly connected with the transition section. The transition section is connected with a fan tower cylinder through a flange. The reinforcing ribs are evenly distributed on the transition section and the cylindrical foundation body top cover annularly and radially. The reinforcing ribs, the transition section and the cylindrical foundation body top cover are prefabricated into a whole. The auxiliary pile ring sleeves are arranged at the bottom ends of the outer sides of the reinforcing ribs. After a cylindrical foundation structure is sunk, the auxiliary piles are driven into the cylindrical foundation structure, and the auxiliary piles are driven into a seabed through the auxiliary pile ring sleeves; and the auxiliary piles are fixedly connected with the auxiliary pile ring sleeves. The composite cylinder type foundation has the beneficial effects that due to the fact that auxiliary pile structures radially distributed on the edge of the composite cylinder type foundation have large pulling-resistant bearing capacity, the composite cylinder type foundation can resist the higher transverse load and the bending moment load; and by means of the cylinder type foundation, the standardized production and one-step type installation of the structure can be achieved, production and installation efficiency is improved greatly, and the production cost is lowered.

Description

A kind of later stage adds the compound bucket foundation of auxiliary pile
Technical field
The present invention relates to offshore wind power foundation structure, a kind of later stage adds the compound bucket foundation of auxiliary pile.
Background technology
In recent years, offshore wind farm quickly grows as a kind of green clean reproducible energy, and its market is almost with every year The speed of more than 40% increases swift and violent.Offshore wind farm has that wind field quality is good, turbulivity is little, be not take up ploughing, utilize in year little The significant advantages such as Shi Gao.But maritime environment is complicated, stormy waves stream is complicated to the coupling of basis and pylon structure, and sea water is to basis Wash away obvious with corrosion function.Simultaneously as maritime environment is complicated, the difficulty of construction of base structure is relatively big, relatively costly, and Later stage monitoring and maintenance is costly.Therefore, how to improve the bearing capacity of base structure, and to reduce cost be offshore wind farm The key issue of technology development.
In numerous offshore wind power foundation structures, compound cylindrical foundation is shown as a kind of emerging base structure It is at the superiority of wind power foundation technical field.Compound tubular base structure has good bearing capacity and transportation by driving ability. But, due to the difference of the geological conditions of different wind fields, the geological conditions difference of the most identical wind field different regions so that tubular The size on basis differs greatly with the design of structure.This significantly limit the mass of cylindrical foundation structure, standardized life Producing, its design is of a relatively high with the cost manufactured.Simultaneously as the design of cylindrical foundation structure is decided by the geology of addressing substantially Condition, relative transportation by driving condition considers less with sinking condition, thus adds being constructed into of cylindrical foundation to a certain extent This.Most importantly, due to compound cylindrical foundation is that single structure carries, once bearing capacity deficiency, entirety can be caused Structural damage, risk is bigger.Proposing a kind of later stage for this application and add the compound bucket foundation of auxiliary pile, this basis is by cylinder Jointly carry with auxiliary pile, reduce the risk that entirety is destroyed, improve bearing capacity so that the design of cylindrical foundation structure is cleverer Live, thus the standardized production that can realize cylindrical foundation is installed with single step, reduces cost, improves efficiency.
Summary of the invention
It is an object of the invention to for above-mentioned existing problems, it is provided that a kind of later stage adds the compound bucket foundation of auxiliary pile, should Compound bucket foundation can realize the compound cylinder-shaped foundation structure that standardized production is installed with single step, and ensures that cylindrical foundation is not With the bearing capacity under foundation condition.
Technical scheme:
A kind of later stage adds the compound bucket foundation of auxiliary pile, by cylindrical foundation, changeover portion, ribs, auxiliary pile retainer ring Set and auxiliary pile are constituted, and cylindrical foundation top cover is reinforced concrete structure, and sidewall is steel construction;Cylindrical foundation top cap central and mistake The section of crossing is fixing to be connected;Changeover portion is steel construction, and diameter and blower fan tower barrel lower end diameter quite and pass through flange and blower fan tower barrel phase Even;Changeover portion and cylindrical foundation top cover arrange 4-8 the radial equally distributed ribs of hoop;Ribs is steel construction, with Changeover portion and cylindrical foundation top cover are made as unified entirety in advance;Ribs outer lower end arranges 4-8 auxiliary pile ring set;Auxiliary anchor ear Set is steel construction, is welded and fixed with ribs;Squeezing into auxiliary pile after cylindrical foundation structure is sunk, auxiliary pile number is with auxiliary Help anchor ear set number identical;Auxiliary pile squeezes into sea bed by auxiliary pile ring set respectively;Auxiliary pile is steel construction, with auxiliary pile ring set Fixing connection.
The invention has the beneficial effects as follows:
This compound bucket foundation has bigger resistance to plucking bearing capacity because of the auxiliary pile structure of the radial distribution in its edge, makes Obtain this base structure and can resist higher, more complicated lateral load and moment load;Simultaneously because structure bending resistance, shear resistance Raising so that the design of tubular construction can be wholly constrained to the factor of geological conditions, and more consideration structure is made Cost, the optimum transportation by driving degree of depth and optimum sinking condition;This cylindrical foundation can realize the standardized production of structure and install with single step, Greatly improve the efficiency producing with installing, reduce production cost.
Accompanying drawing explanation
Fig. 1 is this compound bucket foundation facade structures schematic diagram.
Fig. 2 is this compound bucket foundation plan structure schematic diagram.
In figure 1, standardization cylindrical foundation;2, changeover portion;3, ribs;4, auxiliary pile Fixing shrink ring;5, auxiliary pile.
Detailed description of the invention
Embodiment:
A kind of later stage adds the compound bucket foundation of auxiliary pile, as shown in Figure 1-2, by cylindrical foundation 1, changeover portion 2, ribs 3, auxiliary pile Fixing shrink ring 4 and auxiliary pile 5 are constituted, and cylindrical foundation 1 top cover is reinforced concrete structure, and sidewall is steel construction;Cylinder Shape basis 1 top cap central is fixing with changeover portion 2 to be connected;Changeover portion 2 is steel construction, and diameter is with blower fan tower barrel lower end diameter the most also It is connected with blower fan tower barrel by flange;Changeover portion 2 and cylindrical foundation 1 top cover arrange six radial equally distributed reinforcements of hoop Rib 3;Ribs 3 is steel construction, is made as unified entirety in advance with changeover portion 2 and cylindrical foundation 1 top cover;Ribs 3 outer lower end sets Put six auxiliary pile ring sets 4;Auxiliary pile ring set 4 is steel construction, with being welded and fixed of ribs 3;When cylindrical foundation structure is sunk After squeeze into auxiliary pile 5, six auxiliary piles 5 squeeze into sea bed by six auxiliary pile ring sets 4 respectively;Auxiliary pile 5 is steel construction, Fix with auxiliary pile ring set 4 and be connected.
In this embodiment: cylindrical foundation 1 external diameter 20m, top cover thickness 0.7m, wall thickness 0.05m, wall height 6m;Changeover portion 2 external diameter 6m, wall thickness 0.05m;Ribs 3 height 6m, thickness 0.1m;Auxiliary pile ring set 4 internal diameter 1m, thickness 0.03m;Auxiliary pile 6 external diameter 1m, wall thickness 0.03m.
The work progress of this compound bucket foundation, step is as follows:
1) complete cylindrical foundation 1, changeover portion 2, ribs 3 and the standardization of auxiliary pile Fixing shrink ring 4, integration produces;
2) by prefabricated profiled structure towage to sinking place, sinking work is carried out subsequently;
3), after sinking completes, the construction of auxiliary pile 5 is carried out according to the geological conditions being obtained ahead of time and wind direction condition;
4) auxiliary pile 5 and auxiliary pile ring set 4 are fixedly connected the globality of guarantee composite construction.

Claims (1)

1. later stage adds the compound bucket foundation of auxiliary pile, it is characterised in that: by cylindrical foundation, changeover portion, ribs, auxiliary Stake Fixing shrink ring and auxiliary pile are constituted, and cylindrical foundation top cover is reinforced concrete structure, and sidewall is steel construction;Cylindrical foundation top cover Center is fixing with changeover portion to be connected;Changeover portion is steel construction, and diameter and blower fan tower barrel lower end diameter quite and pass through flange and wind Machine tower is connected;Changeover portion and cylindrical foundation top cover arrange 4-8 the radial equally distributed ribs of hoop;Ribs is steel Structure, is made as unified entirety in advance with changeover portion and cylindrical foundation top cover;Ribs outer lower end arranges 4-8 auxiliary pile ring set; Auxiliary pile ring set is steel construction, is welded and fixed with ribs;Auxiliary pile, auxiliary pile is squeezed into after cylindrical foundation structure is sunk Number is identical with auxiliary pile ring set number;Auxiliary pile squeezes into sea bed by auxiliary pile ring set respectively;Auxiliary pile is steel construction, with auxiliary Help the fixing connection of anchor ear set.
CN201610618677.0A 2016-07-27 2016-07-27 Composite cylinder type foundation with auxiliary piles added in later period Pending CN106049524A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610618677.0A CN106049524A (en) 2016-07-27 2016-07-27 Composite cylinder type foundation with auxiliary piles added in later period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610618677.0A CN106049524A (en) 2016-07-27 2016-07-27 Composite cylinder type foundation with auxiliary piles added in later period

Publications (1)

Publication Number Publication Date
CN106049524A true CN106049524A (en) 2016-10-26

Family

ID=57196094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610618677.0A Pending CN106049524A (en) 2016-07-27 2016-07-27 Composite cylinder type foundation with auxiliary piles added in later period

Country Status (1)

Country Link
CN (1) CN106049524A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104151A (en) * 2017-12-20 2018-06-01 中国能源建设集团广东省电力设计研究院有限公司 Jacket changeover portion
CN109403368A (en) * 2018-09-06 2019-03-01 李敬 A kind of load basis and its design method
CN110397071A (en) * 2019-07-01 2019-11-01 天津大学 A kind of conduit stake and barrel combined offshore wind power foundation
CN110593298A (en) * 2019-09-30 2019-12-20 天津大学 Composite foundation for improving bearing performance of cylindrical foundation by using auxiliary piles and construction method thereof
CN110847215A (en) * 2019-12-18 2020-02-28 长江勘测规划设计研究有限责任公司 Full-paved long and short pile composite foundation-barrel offshore wind power foundation and construction method
CN114482114A (en) * 2022-01-28 2022-05-13 天津大学 Spiral pile-cylinder composite foundation structure based on fixed support and construction method thereof
CN114517489A (en) * 2022-01-18 2022-05-20 天津大学 Offshore wind power barrel type foundation structure with pile pier

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120074047A (en) * 2010-12-27 2012-07-05 재단법인 포항산업과학연구원 Suction pile for rapid construction
CN104234069A (en) * 2013-06-07 2014-12-24 刘红静 Offshore wind turbine foundation with plug-in honeycomb structure chassis
CN204370469U (en) * 2014-12-24 2015-06-03 广州华申建设工程管理有限公司 A kind of drilled pile long leg jacket offshore wind turbine foundation
CN205857228U (en) * 2016-07-27 2017-01-04 天津大学前沿技术研究院有限公司 A kind of later stage adds the compound bucket foundation of auxiliary pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120074047A (en) * 2010-12-27 2012-07-05 재단법인 포항산업과학연구원 Suction pile for rapid construction
CN104234069A (en) * 2013-06-07 2014-12-24 刘红静 Offshore wind turbine foundation with plug-in honeycomb structure chassis
CN204370469U (en) * 2014-12-24 2015-06-03 广州华申建设工程管理有限公司 A kind of drilled pile long leg jacket offshore wind turbine foundation
CN205857228U (en) * 2016-07-27 2017-01-04 天津大学前沿技术研究院有限公司 A kind of later stage adds the compound bucket foundation of auxiliary pile

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104151A (en) * 2017-12-20 2018-06-01 中国能源建设集团广东省电力设计研究院有限公司 Jacket changeover portion
CN108104151B (en) * 2017-12-20 2020-12-15 中国能源建设集团广东省电力设计研究院有限公司 Jacket transition section
CN109403368A (en) * 2018-09-06 2019-03-01 李敬 A kind of load basis and its design method
CN110397071A (en) * 2019-07-01 2019-11-01 天津大学 A kind of conduit stake and barrel combined offshore wind power foundation
CN110593298A (en) * 2019-09-30 2019-12-20 天津大学 Composite foundation for improving bearing performance of cylindrical foundation by using auxiliary piles and construction method thereof
CN110847215A (en) * 2019-12-18 2020-02-28 长江勘测规划设计研究有限责任公司 Full-paved long and short pile composite foundation-barrel offshore wind power foundation and construction method
CN114517489A (en) * 2022-01-18 2022-05-20 天津大学 Offshore wind power barrel type foundation structure with pile pier
CN114482114A (en) * 2022-01-28 2022-05-13 天津大学 Spiral pile-cylinder composite foundation structure based on fixed support and construction method thereof

Similar Documents

Publication Publication Date Title
CN106049524A (en) Composite cylinder type foundation with auxiliary piles added in later period
CN205857228U (en) A kind of later stage adds the compound bucket foundation of auxiliary pile
EP2837554A1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN103225315A (en) Offshore wind power foundation consisting of single pile, cylindrical foundations and anchor cable
KR101318111B1 (en) Substructure of hybrid offshore wind turbine with multi-pile for reducing wave forces, and constructing method for the same
CN109339092A (en) A kind of more sleeve joint reinforcement formula cylinder-shaped foundation structures of offshore wind turbine and its construction method
CN202689022U (en) Offshore wind power truss single pile base structure with negative pressure tube
CN110055995A (en) A kind of offshore power generator foundation structure and its construction method
CN103362113B (en) Offshore wind farm, bridge and marine works local buoyancy ocean platform and construction method
CN110453714B (en) Offshore wind power jacket gravity type cylindrical foundation structure and construction method thereof
CN102995655A (en) Cylindrical structure and pile group combined type offshore wind turbine foundation
CN102400469A (en) Secant pile drum type foundation and construction method thereof
CN103255752B (en) Support the buoyant support fixed platform of offshore wind turbine, marine works
CN103590415A (en) Prefabricated bearing platform suitable for large-diameter tubular column foundation of sea bridge and construction method thereof
CN110155264B (en) Marine fan composite cylinder foundation towing structure and towing method
KR101665979B1 (en) Concrete base of offshore wind substructure and the construction method therefor
CN110453715A (en) Can gas-liquid displacement combined type cartridge type jacket frame foundation structure and its construction method
CN210766855U (en) Multi-barrel combined foundation system connected with offshore wind power box-shaped beams
CN116161175A (en) Anchoring system for shared foundation
CN202247927U (en) Barrel-shaped foundation with occlusive piles
CN102606408B (en) Wind generation set at sea
CN204491567U (en) Pre-manufactured steel pile tube wind power generation platform
CN105155573A (en) Offshore wind turbine barrel-in-barrel foundation
CN110670618A (en) Prefabricated gravity type suction caisson foundation with wing plates
CN212561601U (en) Wind power foundation newly built and expanded on soft foundation shallow covering layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161026