CN106049506A - APS (Assembled Prestressed Soldier Pile Retaining Structure) and construction method thereof - Google Patents

APS (Assembled Prestressed Soldier Pile Retaining Structure) and construction method thereof Download PDF

Info

Publication number
CN106049506A
CN106049506A CN201610539423.XA CN201610539423A CN106049506A CN 106049506 A CN106049506 A CN 106049506A CN 201610539423 A CN201610539423 A CN 201610539423A CN 106049506 A CN106049506 A CN 106049506A
Authority
CN
China
Prior art keywords
pile
soil
crown beam
self
aps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610539423.XA
Other languages
Chinese (zh)
Other versions
CN106049506B (en
Inventor
刘全林
宋伟民
丁勇春
张扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qiangjin Foundation Engineering Co Ltd
Original Assignee
Shanghai Qiangjin Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qiangjin Foundation Engineering Co Ltd filed Critical Shanghai Qiangjin Foundation Engineering Co Ltd
Priority to CN201610539423.XA priority Critical patent/CN106049506B/en
Publication of CN106049506A publication Critical patent/CN106049506A/en
Application granted granted Critical
Publication of CN106049506B publication Critical patent/CN106049506B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an APS (Assembled Prestressed Soldier Pile Retaining Structure). The APS is characterized by comprising rigid piles, wherein the rigid piles are assembled and lengthened by equal-strength mechanical attachment joints and implanted into self-solidifying flow plastic soil or pressed into a soft soil layer to form an assembled soldier pile; and the tops of the rigid piles are connected through a precast top beam or a cast-in-situ beam to form an assembled soldier pile structure. The invention further discloses a construction method of the APS. The APS and the construction method thereof have the advantages that the construction operability is strong, the component assembly degree and the construction operation efficiency are high, engineering materials are saved, the construction cost is low, and the project implementation effect is favorable.

Description

A kind of APS assembled supporting pile structure and construction method
Technical field
The present invention relates to technical field of civil engineering, relate in particular to a kind of assembled fender post and construction method thereof.
Background technology
In base pit engineering or slope project, employing campshed building enclosure is a kind of important feature form of foundation pit enclosure, exists Extensively application from all parts of the world, current campshed is frequently with the shaped steel Soil-cement Wall etc. of bored pile or SMW engineering method.
Bored concrete pile means at engineering site by mechanical hole building, mud off, formation stake holes in foundation soil, and within it Placing steel reinforcement cage, in-site pouring concrete and the stake that formed, different according to forming hole method, bored concrete pile can be divided into again punching to irrigate Several classes such as stake, cast-in-situ bored pile and digging hole filling pile.The construction of cast-in-situ bored pile, because of the difference of forms of protective wall selected by it, has mud Slurry retaining wall mode and full-sleeve are constructed two kinds.Soft soil layer and unstable soil layer use mud off mode construct bored concrete pile pole It is easily generated the common faults such as constriction, collapse hole, stake holes deflection, thus affects concrete placed under water quality, and a large amount of circulation can be produced Mud, causes environmental pollution;Although full-sleeve construction technology can avoid mud off, but because of by casing length and run of steel Impact, difficulty of construction is big, and cost is high, and speed is slow.
The shaped steel Soil-cement Wall of SMW engineering method, H profile steel or steel pipe will be inserted in Soil-cement Wall, will bear Load combines with antiseepage dash, makes the supporting construction simultaneously having carrying with impervious two kinds of functions.For reducing Construction costs, the H profile steel being commonly inserted at present or steel pipe are both needed to extract recovery, the most all at its external coating antifriction material, but Antifriction material have impact on the bond strength of shaped steel and soil cement, can destroy soil cement water-stop curtain during shaped steel is inserted out simultaneously, Produce again the space of certain volume simultaneously, the protection object closed on is produced the impacts such as disadvantageous deformation.
Going along with sb. to guard him after campshed formed, concrete and the soil cement of pile crown need to abolished, at this position assembling reinforcement and formwork erection, water Build concrete Guan Liang, scattered campshed is combined into integration.On-the-spot when abolishing concrete pile head and soil cement, noise will be produced And dust, environment is produced and pollutes.Additionally, hat beam segmentation pours, to take the duration longer, forms more construction joint.Also has excavation Hat beam space forms the environment to periphery of backbreaking and affects greatly, and the sealing of Guan Liangchu is imitated by the soil cement water-stop curtain excavated Fruit produces harmful effect.
Therefore engineering circles needs a kind of advantage that can commonly use campshed building enclosure in conjunction with both the above of searching badly, can overcome again The novel supporting pile structure of its deficiency, but owing to molding and the connectivity problem of precast reinforced concrete pile are solved the most well Certainly, this novel supporting pile structure is made to be difficult to obtain practical application effect.
Summary of the invention
The technical problem to be solved is, overcome hole quality present in existing bored concrete pile technology poor, In situ concrete pile stiffness of the body degree is difficult to control under water, produces a large amount of mud to polluting environment, SMW engineering method Shaped Steel be difficult to reclaim and The problems such as removal process is deformed, construction period is longer, it is provided that a kind of fender post that can assemble at the construction field (site) and executing Work method.
For reaching above-mentioned purpose, the technical solution used in the present invention is:
A kind of APS assembled supporting pile structure, is characterized in that, including rigid pile, described rigid pile use etc. is mechanically connected by force Joint assembling spreading, described rigid pile is implanted in self-solidifying stream moulds the soil body or is pressed in Soft Soil Layer, forming assembled campshed;Institute State rigid pile top to be linked together by prefabricated crown beam or cast-in-place Guan Liang, form assembled piling structure.
Rigid pile pile shaft material is shaped steel, steel and steel concrete or the group of one or both materials of reinforced concrete member Closing, its cross section is annular, hollow, rectangular or I-shaped.
Self-solidifying stream mould the soil body be at stake position undisturbed soil through churning, stir or displacement of holing mixes the water that is mixed to form of firming agent Earth body, the solidification soil body, cement mortar body or self-solidifying slurry body, form continuous piling wall body, or independent pile body, and cross section is cylinder Shape, cylinder occlusion shape or rectangle.
Prefabricated crown beam is reinforced concrete member, rectangular in cross-section, runs through beam what Liang Mianshang was distributed circle or rectangle Body installing hole, rigid pile is connected with Guan Liang by filling real concrete in stake top anchor bar and installing hole;Prefabricated crown beam passes through two End jointing forms entirety, and joint form is joggle;Connection reinforcement component is made by shaped steel at joint area.
The construction method of a kind of APS assembled supporting pile structure, comprises the following steps:
(1) self-solidifying stream of constructing on fender post position moulds the soil body
It is to use churning, stirring or boring method to form Soil-cement body, solidified earth stirring body, cement mortar body or self-solidifying Slurry body, forms cylindrical or cylinder occlusion tee section;
It is to use two-wheel milling stirring or TRD stirring means to form Soil-cement body, solidified earth stirring body, or employing is grabbed After bucket grooving, perfusion forms cement mortar body, self-solidifying slurry body, forms square-section;
(2) prefabricated crown beam is installed
Prefabricated crown beam is hung in the groove section forming self-solidifying stream and moulding the soil body, beaten by deadweight or dither, will hat Beam is installed to precalculated position, and the outrigger laid by ground and regulation bolt location are fixed;
(3) assemble and implant or be pressed into rigid pile
Rigid pile is hung to groove section and is installed in the installing hole that prefabricated crown beam is reserved, by deadweight or dither Beating, the self-solidifying stream overcoming resistance to be implanted to become is moulded in the soil body, and rigid pile is spliced by joint, continues to repeat to hang after splicing Put splicing to self-solidifying stream and mould the bottom of the soil body, and adjust rigid pile plan-position and mark by location, stake top regulation bolt and outrigger High;
(4) stake top anchor bar is installed and in space, junction, fills real concrete
When prefabricated crown beam is first installed, by pasting isolation plastic foil at prefabricated crown beam reserving installation hole hole wall, by Guan Liang Solidified earth in preformed hole is convenient to be removed, and exposes rigid pile stake top, installs anchor bar by stake top anchor hole, then use coagulation Space between prefabricated crown beam and rigid pile top is filled real by soil;
(5) install or cast-in-situ steel reinforced concrete Guan Liang after prefabricated crown beam
After the self-solidifying stream plastomer solidification in rigid pile stake week, remove the solidified earth of rigid pile top certain depth, then will just Property stake through prefabricated crown beam reserving installation hole, and anchor bar is installed, then with concrete by prefabricated crown beam on rigid pile stake top And the space between rigid pile top fills real;
When using cast in situs armored concrete hat beam, also it is installation anchor bar in the reserved anchor hole of stake end, Then assembling reinforcement formwork erection, cast-in-place concrete.
Beneficial effect: the present invention by the outside self-solidifying stream of pile the most in advance mould that the soil body is inserted into vertically assembling firm Property stake, and form overall assembled fender post, alternative existing supporting pile structure by top prefabricated crown beam or cast-in-place Guan Liang With cast-in-place Guan Liang.Site operation of the present invention is workable, component assemblingization degree high, working performance is high, it is possible to ensure structure Globality and construction quality, reduce construction costs, engineering construction is respond well.
Accompanying drawing explanation
The invention will be further described with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 is APS assembled fender post floor map of the present invention;
Fig. 2 is the strong mechanical connecting joint schematic diagrams such as APS assembled fender post rigid pile of the present invention;
Fig. 3-1 lays floor map for APS assembled fender post prefabricated crown beam of the present invention;
Fig. 3-2 lays generalized section for APS assembled fender post prefabricated crown beam of the present invention;
Fig. 4-1 is that APS assembled fender post rigid pile of the present invention implants floor map;
Fig. 4-2 is that APS assembled fender post rigid pile of the present invention implants generalized section;
Fig. 5 is APS assembled fender post prefabricated crown beam jointing floor map of the present invention;
Fig. 6-1 is APS assembled fender post brace type retaining structure generalized section of the present invention;
Fig. 6-2 goes along with sb. to guard him piled anchor pull-type retaining structure generalized section for APS assembled of the present invention.
In figure: 1 outside self-solidifying stream moulds the soil body, 2 internal rigid stakes, 3 prefabricated annular stakes, 4 prefabricated hollow squares Shape stake, 5 prefabricated I-shaped stakes, 6 cylinders occlusion self-solidifying stream moulds the soil body, 7 equal thickness rectangle self-solidifying streams mould the soil body, 8 machines Tool jointing, 9 high-strength steel bars, 10 socket joint steel bushings, 11 connect inserted links, 12 epoxy resin, 13 prefabricated crown beams, 14 installing holes, 15 steel outriggers, 16 regulation bolts, 17 H profile steel, 18 anchor bolts, 19 fill real concrete, 20 Prefabricated crown beam joggle, 21 concavo-convex rectangles, 22 concavo-convex trapezoidal, 23 concavo-convex inverted trapezoidals, 24 concavo-convex arcs, 25 Support, 26 anchor poles, 27 isolation plastic foils.
Detailed description of the invention
For the technological means making the present invention realize, creation characteristic, reach purpose and be easy to understand with effect, below knot Conjunction is specifically illustrating, and the present invention is expanded on further.
See Fig. 1 to Fig. 6.
APS assembled fender post is moulded the soil body 1, internal rigid stake 2 and prefabricated crown beam 13 by outside self-solidifying stream and is combined, bag Include: internal rigid stake 2 is precast reinforced concrete structure, steel or steel concrete member;The strong airborne connections such as rigid pile 2 is provided with connect 8, airborne jointing 8 by high-strength steel bar 9, socket joint steel bushing 10, connect inserted link 11 and form, joint uses epoxy resin 12 to fill Seam;2 tops of rigid pile arrange prefabricated crown beam 13, set rectangle or circular mounting hole 14, prefabricated crown beam 13 two ends in prefabricated crown beam 13 If longitudinal joggle 20, section includes concavo-convex rectangle 21, concavo-convex trapezoidal 22, concavo-convex inverted trapezoidal 23, concavo-convex arc 24 etc.;Prefabricated crown Beam 13 two sides anchoring H profile steel 17, prefabricated crown beam 13 is connected into whole by the bolt 18 being embedded in prefabricated crown beam by H profile steel 17 Body;Regulation bolt 16 location anchored by the steel outrigger 15 and hat back that are placed in ground when prefabricated crown beam 13 is installed is fixed; Rigid pile plan-position and absolute altitude is adjusted by location, stake top regulation bolt 16 and steel outrigger 15 when rigid pile 2 is laid;Work as assembling Formula fender post, when brace type retaining structure, arranges support 25 in hole;When assembled fender post is for the pull-type retaining structure of anchor Time, hole is outer arranges anchor pole 26.
APS (Assembled Prestessed Soldier Pile Retaining Structure abbreviation), in advance should Power Row Piles Supporting Structure.
In embodiment, APS assembled fender post Specific construction step is as follows:
(1) self-solidifying stream moulds soil body construction
Churning, stirring or boring method is used to form cylinder occlusion tee section Soil-cement body, solidified earth stirring body, cement Body or self-solidifying slurry body;
Two-wheel milling stirring or TRD stirring means is used to form square-section Soil-cement body, solidified earth stirring body, or After using grab chute forming, perfusion forms cement mortar body, self-solidifying slurry body.
(2) prefabricated crown beam is installed
In stake position preformed self-solidifying stream moulds the soil body, lift prefabricated crown beam, beaten by deadweight or dither, will hat Beam is installed to precalculated position, and adjusts prefabricated crown beam by the regulation bolt of surface-based steel outrigger and hat back anchoring Absolute altitude and plan-position.
(3) assemble and implant rigid pile
Rigid pile is hung to groove section and is installed in the installing hole that prefabricated crown beam is reserved, by deadweight or dither Beating, the self-solidifying stream transferring to become is moulded in the soil body, part of cement soil, cement mortar or mud is cemented out simultaneously;Rigid pile Spliced by joint, continue after splicing to repeat to hang to splice until outer self-solidifying stream is moulded bottom the soil body, and positioned by stake top Regulation bolt and outrigger adjust rigid pile plan-position and absolute altitude, meet Guan Liang and connect required precision.
(4) repeating above (1), (2), (3) step, construction self-solidifying stream moulds the soil body in advance, and rear prefabricated crown beam of installing, assembling is also Implant internal rigid stake, by the H profile steel of prefabricated crown beam two sides and the bolt being embedded in prefabricated crown beam, prefabricated crown beam is connected It is connected into entirety and goes along with sb. to guard him Guan Liang.
(5) after a Zhou Zining stream moulds soil solidification, remove the solidified earth of rigid pile top certain depth, anchoring is installed on stake top Reinforcing bar, fills real concrete in the installing hole of stake top.
Step described in embodiment (1) peripheral self-solidifying stream is moulded the soil body and is used the stirring of diameter 850mm@1200mm triaxial cement Stake, cement mixing content 10~25%, the ratio of mud 0.6~2.0, degree of depth 18.5m.
Prefabricated crown beam strength grade of concrete C30, depth of section 600mm, width in step described in embodiment (2) 1200mm, during hat top surface of the beam is installed M24 bolt and is suspended to the Two bors d's oeuveres channel-section steel outrigger on ground, every section of prefabricated crown beam is provided with diameter 800mm installing hole, pastes isolation plastic foil at hole wall.
In step described in embodiment (3), internal rigid stake uses the APS stake of diameter 700mm, wall thickness 100mm, strong concrete Degree grade C60, single-unit stake long 10m, 8m, rigid pile joint uses the airborne jointing of equal strength.
In step described in embodiment (3), internal rigid stake stake top arranges anchor bar, and anchorage length is 35 times of bar diameters.
In step described in embodiment (4), prefabricated crown beam uses concavo-convex rectangle joggle, and joint insert depth is 300mm, if Q235 strength grade 300 × 300H shaped steel, H type is just anchored with prefabricated crown beam by 4.6 grades of M20 plain bolts.
Embodiment excavation of foundation pit degree of depth 10m, uses brace type retaining structure, arranges twice horizontal support in foundation ditch.
Excavation of foundation pit deformation monitoring result shows: embodiment foundation ditch cost drops than conventional bored concrete pile building enclosure scheme cost Low by 20%, the foundation ditch implementation cycle reduces 30d, and foundation pit enclosure structure maximum distortion only 1cm, deformation control of foundation pit is respond well, has Effect protects the safety of surrounding enviroment.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description The principle of invention, the present invention also has various changes and modifications without departing from the spirit and scope of the present invention, and these become Change and improvement both falls within scope of the claimed invention.Claimed scope by appending claims and Equivalent defines.

Claims (5)

1. an APS assembled supporting pile structure, is characterized in that, including rigid pile, described rigid pile with etc. connect by force Head assembling spreading, described rigid pile is implanted in self-solidifying stream moulds the soil body or is pressed in Soft Soil Layer, forming assembled campshed;Described Rigid pile top is linked together by prefabricated crown beam or cast-in-place Guan Liang, forms assembled piling structure.
A kind of APS assembled supporting pile structure the most according to claim 1, is characterized in that, rigid pile pile shaft material is type Steel, steel and steel concrete or the combination of one or both materials of reinforced concrete member, its cross section is annular, hollow, rectangular Or it is I-shaped.
A kind of APS assembled supporting pile structure the most according to claim 1, is characterized in that, it is in stake that self-solidifying stream moulds the soil body Position undisturbed soil through churning, stir or hole displacement mix firming agent be mixed to form soil-cement body, solidification the soil body, cement mortar body Or self-solidifying slurry body, forming continuous piling wall body, or independent pile body, cross section is cylindrical, cylinder occlusion shape or rectangle.
A kind of APS assembled supporting pile structure the most according to claim 1, is characterized in that, prefabricated crown beam is reinforced concrete Soil component, rectangular in cross-section, run through beam body installing hole what Liang Mianshang was distributed circle or rectangle, rigid pile is anchored by stake top Fill real concrete in reinforcing bar and installing hole to be connected with Guan Liang;Prefabricated crown beam forms entirety, joint form by two ends jointing For joggle;Connection reinforcement component is made by shaped steel at joint area.
5. a construction method for APS assembled supporting pile structure, is characterized in that, comprises the following steps:
(1) self-solidifying stream of constructing on fender post position moulds the soil body
It is to use churning, stirring or boring method to form Soil-cement body, solidified earth stirring body, cement mortar body or self-solidifying mud Body, forms cylindrical or cylinder occlusion tee section;
It is to use two-wheel milling stirring or TRD stirring means to form Soil-cement body, solidified earth stirring body, or employing is grabbed bucket into After groove, perfusion forms cement mortar body, self-solidifying slurry body, forms square-section;
(2) prefabricated crown beam is installed
Prefabricated crown beam is hung in the groove section forming self-solidifying stream and moulding the soil body, beaten by deadweight or dither, Guan Liang is pacified Install to precalculated position, and the outrigger laid by ground and regulation bolt location are fixed;
(3) assemble and implant or be pressed into rigid pile
Hang rigid pile to groove section and be installed to, in the installing hole that prefabricated crown beam is reserved, to be beaten by deadweight or dither, The self-solidifying stream overcoming resistance to be implanted to become is moulded in the soil body, and rigid pile is spliced by joint, continues to repeat to hang after splicing Splicing to self-solidifying stream moulds the bottom of the soil body, and adjusts rigid pile plan-position and mark by location, stake top regulation bolt and outrigger High;
(4) stake top anchor bar is installed and in space, junction, fills real concrete
When prefabricated crown beam is first installed, by pasting isolation plastic foil at prefabricated crown beam reserving installation hole hole wall, Guan Liang is reserved Solidified earth in hole is convenient to be removed, and exposes rigid pile stake top, installs anchor bar by stake top anchor hole, then will with concrete Space between prefabricated crown beam and rigid pile top fills real;
(5) install or cast-in-situ steel reinforced concrete Guan Liang after prefabricated crown beam
After the self-solidifying stream plastomer solidification in rigid pile stake week, remove the solidified earth of rigid pile top certain depth, then by rigid pile Through prefabricated crown beam reserving installation hole, and anchor bar is installed on rigid pile stake top, then with concrete by prefabricated crown beam with just Property stake top between space fill real;
When using cast in situs armored concrete hat beam, also it is installation anchor bar in the reserved anchor hole of stake end, then Assembling reinforcement formwork erection, cast-in-place concrete.
CN201610539423.XA 2016-07-11 2016-07-11 A kind of APS assembleds supporting pile structure and construction method Active CN106049506B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610539423.XA CN106049506B (en) 2016-07-11 2016-07-11 A kind of APS assembleds supporting pile structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610539423.XA CN106049506B (en) 2016-07-11 2016-07-11 A kind of APS assembleds supporting pile structure and construction method

Publications (2)

Publication Number Publication Date
CN106049506A true CN106049506A (en) 2016-10-26
CN106049506B CN106049506B (en) 2018-08-24

Family

ID=57186502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610539423.XA Active CN106049506B (en) 2016-07-11 2016-07-11 A kind of APS assembleds supporting pile structure and construction method

Country Status (1)

Country Link
CN (1) CN106049506B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759351A (en) * 2017-01-25 2017-05-31 山东大学 A kind of perpendicularity guider and method based on permanent support structure prefabricated tubular pile
CN108222019A (en) * 2018-02-12 2018-06-29 江苏麦廊新材料科技有限公司 Assembled Guan Liang and the ecoscape shore protection with the assembled Guan Liang
CN108643226A (en) * 2018-07-30 2018-10-12 金陵科技学院 A kind of Retaining Wall and construction method
CN110295606A (en) * 2019-07-05 2019-10-01 广州穗岩土木科技股份有限公司 A kind of foundation pit interlocking pile water stop construction method
CN110528503A (en) * 2018-05-23 2019-12-03 杭州南联地基基础工程有限公司 Wall construction method is gone along with sb. to guard him in the implantation prefabricated reinforced concrete stake of deep slot type soil-cement
CN113293778A (en) * 2021-06-16 2021-08-24 泰安市岱宗机电科技开发有限公司 Recoverable steel crown beam
CN113322973A (en) * 2021-06-03 2021-08-31 中铁建工集团有限公司 Deep foundation pit support structure and construction method thereof
CN113404054A (en) * 2020-03-16 2021-09-17 江苏华岩建设有限公司 Cement mixing pile type, cast-in-place pile type crown beam construction method and crown beam system
CN114481711A (en) * 2021-11-26 2022-05-13 同济大学 Assembly type pile-plate structure roadbed connecting structure and construction method thereof
CN114809005A (en) * 2022-04-21 2022-07-29 中交天津港湾工程研究院有限公司 Construction method for double-wheel milling cement-soil wall composite anchor cable supporting structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200946273Y (en) * 2005-09-21 2007-09-12 周兆弟 Plugging-in type pipe-connecting fastener
CN101078216A (en) * 2007-04-25 2007-11-28 严平 Method for embedding cement purdah into prefabricated reinforced concrete anti-lateral-force pile
CN202509505U (en) * 2012-03-28 2012-10-31 浙江绩丰岩土技术股份有限公司 Capping beam
CN202595728U (en) * 2012-04-09 2012-12-12 江苏鼎达建筑新技术有限公司 Prestressed concrete support pilling wall
CN103741697A (en) * 2014-01-16 2014-04-23 杭州南联地基基础工程有限公司 Construction method of precast reinforced concrete hollow lateral force resistant pile enclosure wall
CN103774675A (en) * 2014-01-24 2014-05-07 中国建筑股份有限公司 Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN203855970U (en) * 2014-05-15 2014-10-01 江苏鼎达建筑新技术有限公司 Assembly type foundation pit supporting double-row hollow pile structure
CN205975628U (en) * 2016-07-11 2017-02-22 上海强劲地基工程股份有限公司 APS assembled retaining pile structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200946273Y (en) * 2005-09-21 2007-09-12 周兆弟 Plugging-in type pipe-connecting fastener
CN101078216A (en) * 2007-04-25 2007-11-28 严平 Method for embedding cement purdah into prefabricated reinforced concrete anti-lateral-force pile
CN202509505U (en) * 2012-03-28 2012-10-31 浙江绩丰岩土技术股份有限公司 Capping beam
CN202595728U (en) * 2012-04-09 2012-12-12 江苏鼎达建筑新技术有限公司 Prestressed concrete support pilling wall
CN103741697A (en) * 2014-01-16 2014-04-23 杭州南联地基基础工程有限公司 Construction method of precast reinforced concrete hollow lateral force resistant pile enclosure wall
CN103774675A (en) * 2014-01-24 2014-05-07 中国建筑股份有限公司 Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN203855970U (en) * 2014-05-15 2014-10-01 江苏鼎达建筑新技术有限公司 Assembly type foundation pit supporting double-row hollow pile structure
CN205975628U (en) * 2016-07-11 2017-02-22 上海强劲地基工程股份有限公司 APS assembled retaining pile structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759351A (en) * 2017-01-25 2017-05-31 山东大学 A kind of perpendicularity guider and method based on permanent support structure prefabricated tubular pile
CN108222019A (en) * 2018-02-12 2018-06-29 江苏麦廊新材料科技有限公司 Assembled Guan Liang and the ecoscape shore protection with the assembled Guan Liang
CN110528503A (en) * 2018-05-23 2019-12-03 杭州南联地基基础工程有限公司 Wall construction method is gone along with sb. to guard him in the implantation prefabricated reinforced concrete stake of deep slot type soil-cement
CN108643226A (en) * 2018-07-30 2018-10-12 金陵科技学院 A kind of Retaining Wall and construction method
CN110295606A (en) * 2019-07-05 2019-10-01 广州穗岩土木科技股份有限公司 A kind of foundation pit interlocking pile water stop construction method
CN113404054A (en) * 2020-03-16 2021-09-17 江苏华岩建设有限公司 Cement mixing pile type, cast-in-place pile type crown beam construction method and crown beam system
CN113322973A (en) * 2021-06-03 2021-08-31 中铁建工集团有限公司 Deep foundation pit support structure and construction method thereof
CN113322973B (en) * 2021-06-03 2022-02-11 中铁建工集团有限公司 Deep foundation pit support structure and construction method thereof
CN113293778A (en) * 2021-06-16 2021-08-24 泰安市岱宗机电科技开发有限公司 Recoverable steel crown beam
CN114481711A (en) * 2021-11-26 2022-05-13 同济大学 Assembly type pile-plate structure roadbed connecting structure and construction method thereof
CN114809005A (en) * 2022-04-21 2022-07-29 中交天津港湾工程研究院有限公司 Construction method for double-wheel milling cement-soil wall composite anchor cable supporting structure

Also Published As

Publication number Publication date
CN106049506B (en) 2018-08-24

Similar Documents

Publication Publication Date Title
CN106049506B (en) A kind of APS assembleds supporting pile structure and construction method
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
CN106120812A (en) A kind of assembled active well structure and construction method
JP4392453B2 (en) Method for suppressing levitation of underground buried object and buried structure
CN110130363A (en) Assembled is implanted into foundation pit enclosure stake and pile wall interaction structure and its construction method
CN105649090A (en) Construction method for support combining steel sheet piles and stirring piles
JP2018024982A (en) Reinforcement method and reinforcement structure of existing pile foundation
CN106320322A (en) Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall
CN109972630A (en) A kind of foundation pit enclosure structure and its construction method of the assembly of PC component
CN205975628U (en) APS assembled retaining pile structure
CN106193056A (en) A kind of prefabricated T-shaped sheet pile foundation pit enclosure structure and installation method thereof
CN113174988A (en) Double-wall concrete open caisson structure and construction method
JP4663541B2 (en) Seismic reinforcement method for existing concrete pier
CN1206419C (en) Combined rock-embedding pile and its construction method
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
JP5742058B2 (en) Method for increasing horizontal resistance of precast concrete pile foundation
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
JP4029191B2 (en) Subsidence suppression structure, construction method of settlement suppression structure
CN108149694B (en) A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN206090534U (en) Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall
CN109208623A (en) A kind of steel tube-concrete pile foundation and its construction method as temporary base
CN105178356A (en) Setting-up construction method for vertical joint bars of columns in reverse building method
CN215105392U (en) Retractable prefabricated retaining wall supporting structure for manual hole digging pile
CN104131568A (en) Novel mixed reinforcement H-shaped sheet pile and five (six)-shaft cement soil mixing wall combined building envelope and construction method thereof
CN205875173U (en) Assembled work well structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant