CN205875173U - Assembled work well structure - Google Patents

Assembled work well structure Download PDF

Info

Publication number
CN205875173U
CN205875173U CN201620853342.2U CN201620853342U CN205875173U CN 205875173 U CN205875173 U CN 205875173U CN 201620853342 U CN201620853342 U CN 201620853342U CN 205875173 U CN205875173 U CN 205875173U
Authority
CN
China
Prior art keywords
joint
steel
soil
well
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620853342.2U
Other languages
Chinese (zh)
Inventor
刘全林
宋伟民
丁勇春
刘斐然
张衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qiangjin Foundation Engineering Co Ltd
Original Assignee
Shanghai Qiangjin Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qiangjin Foundation Engineering Co Ltd filed Critical Shanghai Qiangjin Foundation Engineering Co Ltd
Priority to CN201620853342.2U priority Critical patent/CN205875173U/en
Application granted granted Critical
Publication of CN205875173U publication Critical patent/CN205875173U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an assembled work well structure, assembled work well is formed from congealing to flow to implant and assemble in moulding the soil body in outside that stirring in advance or replacement formed by a plurality of board components and stake component, the flow state from congeal flow mould the soil body fill in the cavity of component with assemble the seam. Prefabricated component passes through the erection support and implants and assemble to connect through hydraulic -coupling, vertical joint, guan liang and waist rail and assemble into whole, cut the earth in the well and the inside working space of precipitation formation. Work well structure is reserved the wall at the wall of a well and is worn the wall door opening, wears wall door opening periphery and presets the injected hole and seal the hole through dismantling the steel sheet. The utility model discloses no open caisson structure sinks to being under construction, has overcome traditional open caisson structure and has sunk and the influence of open cut foundation ditch to all ring edge borders, and maneuverability is strong in the construction, component assembly ization degree height, and construction work efficiency is high, and engineering implementation is respond well.

Description

A kind of assembled active well structure
Technical field
This utility model relates to technical field of civil engineering, relates in particular to the underground piping such as urban transportation, plumbing And a kind of export & import assembled active well structure in city integrated piping lane field and construction method.
Background technology
When city tunnel, piping lane non-excavating construction, the speed of application pair of the export & import active well of shield and pipe jacking equipment The progress impact of whole engineering is very big, and especially for heavy traffic, densely populated, above ground structure is numerous, underground structure The complicated urban environment condition complicated with pipeline.
Caisson structure, as end well or a kind of common structure of active well, reaches extensively to apply.This structure is usually Floor manufacture, sinks to predetermined absolute altitude by fetching earth in well thus forms underground structure.This structure has particular advantages: put ground Area is little, and excavation fetches earth and need not foundation pit enclosure;Without special professional equipment, easy and simple to handle;Both can be as underground structure Leg, open caisson inner space also can be made full use of.In recent years, along with construction technology and the continuous innovation of construction machinery, Open caisson is at home and abroad obtained for and is widely applied and develops.
Traditional caisson structure be by a kind of cut the soil body by the way of sink, rely on dead load or vibrating drag reduction technology Measure overcomes the frictional resistance between the soil body and the borehole wall and cutting shoe counter-force, slowly sinks, and fetches earth in down-hole, reaches designed elevation, in well Back cover.In caisson structure sinking watching, in order to drag reduction is by relatively big to the soil disturbance of borehole wall periphery, cause open caisson outer periphery Environment be a greater impact, especially in dense population areas or downtown, open caisson periphery is embedded with a large amount of pipeline, and distribution is each Class important building and structures.In soft clay area, working as well sinking, in well, the soil body excavates process, produces the water and soil inside and outside well When pressure differential is bigger, the water and soil cognition outside well is walked around the cutting shoe of open caisson and is flowed in well, the stratum settlement outside well can be made to increase, cause Building and pipeline outside well produce damage and even destroy.Simultaneous is cut the earth and Precipitation Process, often leads to open caisson knot Structure is prominent heavy or tilts, and makes the speed of open caisson construction suffer significant impact.Additionally, current caisson structure many employings cast in situs side Method is made, and needs maintenance, thus needs the longer construction period.For fall in the stratum of phreatic high, the well of digging process Water, the impact on well external environment can be bigger.Therefore, use the method for drop shaft sinking construction working well by stratum characteristic, subsoil water Compose and deposit and the restriction of the condition such as surrounding enviroment protection.Existing caisson structure can be overcome to execute to this end, engineering circles needs searching one badly Deficiency that work exists, eliminate open caisson construction new construction that surrounding enviroment affects and new method, improve speed of application, shorten and construct Duration.
In the higher area of level of ground water and soft stratum, the method construction working that the most conventional open-cut foundation ditch is gone along with sb. to guard him Well, vertical building enclosure of first constructing, then limit excavation, facility in limit construction level supporting construction and mounting shaft.Due to existing Foundation pit enclosure structure speed of application is relatively slow, has had a strong impact on the construction period of subterranean tunnel or piping lane.The building enclosure of active well, Pass through for the ease of shield machine, replace conventional reinforcing bar to manufacture building enclosure frequently with glass fiber-reinforced polymer, but cost is higher.Especially It punches wall from going along with sb. to guard him passing in and out doorway positions through walls, not only have impact on the safety of building enclosure and surrounding enviroment, Er Qieshi Work process is longer, and this is also a difficult problem anxious to be resolved in subterranean tunnel and piping lane construction.
Utility model content
Technical problem to be solved in the utility model is, overcomes existing caisson structure and open-cut foundation ditch building enclosure to execute Work cycle length, big on surrounding enviroment impact, easily occur quicksand to cause inclination of open caisson or the deficiency of difficulty etc. of sinking, it is provided that a kind of fast Speed assembly work well construction, it is possible to effectively control member is implanted with shoveling process in well surrounding enviroment adverse effect, it is ensured that well Punch on wall safe technology and method.
For reaching above-mentioned purpose, the technical solution adopted in the utility model is:
A kind of assembled active well structure, including prefabricated components, described prefabricated components are implanted to self-solidifying stream and mould in soil, are formed There is gear soil and the shaft wall structure of water stopping function;Reserved dismountable door opening plate through walls on prefabricated components;Prefabricated components end face is pre- Being embedded with the connecting device connecting Guan Liang, prefabricated components sidewall is embedded with the connecting device connecting waist rail.
Described component is board member;Board member is Prefabricated hollow reinforced concrete member, section configuration be in-line, L-shaped, Sector or the one of circular arc, the multiple vertical cavity of board member intermediate distribution, in upper and lower connected state after assembling.
Described board member is at depth direction by horizontal joint spreading, and horizontal joint is to wait strong ties joint, including steel plate Screwed joint and steel bushing bell and spigot joint, steel plate screwed joint is connected by end face epoxy glue and bolt by steel jigsaw and joint end plate Integral, steel bushing bell and spigot joint is inserted socket joint steel bushing two ends and is connected main muscle and end face epoxy glue and connect into entirety by connecting inserted link; Described board member connects occlusion by vertical joint in the horizontal direction, and vertical joint is recess type, including broken line type recess and arc Shape recess, inserts RC pile tube, RC square pile, H profile steel or square steel and is engaged between recess.
Described component is pile element;Pile element section configuration is I-shaped, hollow circular or hollow, rectangular, for Steel section member Or reinforced concrete precast member, the strong ties joint spreading such as having at depth direction, Steel section member joint is by welding or bolt even Connecing, reinforced concrete precast member sets ring steel plate steel bushing bell and spigot joint, two ends the socket joint steel bushing connecting main muscle is inserted into socket joint Epoxy glue smeared by joint, end face side, annular steel bushing plate connects into entirety.
Described self-solidifying stream mould soil for stake position undisturbed soil through churning, stir or hole displacement mix firming agent formed soil cement Body, the solidification soil body, cement mortar body or self-solidifying slurry body, form continuous wallboard wall body, and there are cylinder occlusion shape or equal thickness in cross section Rectangle.
Described reserved dismountable door opening shrouding through walls, is to preset the circular or door opening through walls of rectangle in the borehole wall, through walls Door opening periphery presets injected hole, seals hole by dismountable stiffened steel plates, and is bolted on component installation or removal.
It is embedded with connection Guan Liang, the connecting device of waist rail at component end face and side, can quickly Guan Liang and waist rail be connected Install, make component form integrated well wall construction, it is ensured that the safety of active well.
The construction method of a kind of assembled active well structure, is characterized in that, comprise the following steps:
(1) at the scene or prefabrication plate or pile element;
(2) form self-solidifying stream in borehole wall position and mould soil:
Multi-shaft stirring or two-wheel milling stirring means is used to form fluidised form Soil-cement body, fluidised form solidified earth stirring body, Or use grab chute forming to form self-solidifying mud ditch, form continuous wallboard wall body;
(3) mould soil at self-solidifying stream and be implanted into and assemble single width plate or single pile element:
Component hangs location and is located on erection support, is beaten by deadweight, damping device or dither, overcomes resistance Transfer in soil cement or self-solidifying mud, part of cement soil or mud are cemented out simultaneously;Upper end when prefabricated components When transferring to erection support height, utilize erection support to fix this prefabricated components, hang in the preceding paragraph component, spell with next section of component Connect, continue after splicing to hang;Repeat splicing until bottom land, complete the implantation construction of vertical single width plate or single stake;
(4) mould soil at self-solidifying stream and be implanted into and assemble next former or a pile component:
Fixing with erection support location, repeat (2), the method for (3) step, implant next former or a pile;
(5) Guan Liang and waist rail are installed, fetch earth in well and back cover:
Prefabricated components are implanted and after assembling, and the self-solidifying stream removing solidification at component end face moulds soil, connects at top Refute device and Guan Liang is installed;Guan Liang fetches earth and precipitation after being formed in well, after reaching certain depth, is plugged into dress by component side Put installation waist rail, support or outer anchor are set simultaneously, then proceed to excavation with precipitation to projected depth, then pouring reinforcement mixes in well Solidifying soil base plate;
(6) in the preformed hole of borehole wall doorway positions through walls, carry out rotary jet grouting, reinforce the soil layer of door opening neighboring through walls With closing subsoil water;
(7) dismantle door opening shrouding through walls, open door opening through walls reserved in the borehole wall;In well, shield is installed or push pipe sets Standby, the construction of tunnel or pipe culvert is carried out by door opening through walls.
Described erection support by fixing girder steel, clamp system, jack, bearing dolly form, prefabricated components are from clamping machine Transferring in structure, fixing girder steel supports clamp system, and jack is supported on fixing girder steel both sides, and bearing dolly is used for accepting very heavy Top.When implanting with buck plate component or pile element, adjustment means subsidence velocity, position and perpendicularity, adjust component assembly precision And prevent component from tilting and prominent heavy.
Described damping device is positioned at prefabricated components cavity, is made up of drilling rod and nozzle, when penetration resistance is bigger, logical Crossing and transfer damping device in prefabricated components, the bottom position at the borehole wall sprays gases at high pressure, and the self-solidifying stream of agitating member bottom is moulded Soil, the cavity being allowed to be smoothly through prefabricated component flows up discharge, so that the smooth sinking of component puts in place.
Beneficial effect: this utility model, by stirring in advance or grooving, is filled self-solidifying stream and moulded soil, by prefabricated in groove Component is implanted in groove, by level and, come of age beam and waist rail of vertical joint form active well integrated well wall construction, overcome biography System caisson structure sinks and the open-cut foundation ditch impact on surrounding enviroment, and site operation is workable, and component assemblingization degree is high, The cavity member effectively save engineering material of energy, construction operation efficiency is high, has good economy and engineering construction effect.
Accompanying drawing explanation
The utility model is described in further detail with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 is this utility model assembled active well rectangular configuration floor map;
Fig. 2 is this utility model assembled active well circular configuration floor map;
Fig. 3 is the prefabricated component vertical joint schematic diagram of this utility model assembled active well;
Fig. 4 is the prefabricated pile component vertical joint schematic diagram of this utility model assembled active well;
Fig. 5 is that this utility model assembled active well prefabricated pile member planar arranges schematic diagram;
Fig. 6 is this utility model assembled active well prefabricated component horizontal joint schematic diagram;
Fig. 7 is this utility model assembled active well door opening through walls elevational schematic view;
Fig. 8 is this utility model assembled active well door opening through walls generalized section;
Fig. 9 is this utility model assembled active well erection support and damping device schematic diagram.
In figure: board member 1, pile element 2, standard component 3, customization part 4, cylinder occlusion shape self-solidifying stream mould soil 5, equal thickness rectangle Self-solidifying stream moulds soil 6, vertical joint 7, horizontal joint 8, hollow circular stake 9, hollow, rectangular stake 10, I-shaped stake 11, cavity 12, folding Line style recess joint 13, arc-shaped notch joint 14, RC pipe pile joint 15, RC square pile joint 16, H profile steel joint stake 17, square steel Joint 18, connecting device 19, joint steel jigsaw 20, joint end plate 21, bolt 22, epoxy glue 23, built-in connection 24, door through walls Hole 25, steel bushing 26 of putting more energy in hole week, envelope hole steel plate 27, channel-section steel 28 of putting more energy into, preset injected hole 29, erection support 30, fixing girder steel 31, Jack 32, bearing dolly 33, damping device 34, drilling rod 35, nozzle 36, clamp system 37, main muscle 38, socket joint steel bushing 39, company Patch bar 40, steel plate screwed joint 42, steel bushing bell and spigot joint 43, annular steel bushing plate 44, hinge 45.
Detailed description of the invention
For the technological means making this utility model realize, creation characteristic, reach purpose and be easy to understand with effect, under Face combines and is specifically illustrating, and this utility model is expanded on further.
See Fig. 1 to Fig. 8.
The shaft wall structure of assembled active well structure is assembled by board member 1 and pile element 2, is implanted in and stirs shape in advance The cylinder occlusion shape self-solidifying streams such as the self-solidifying mud of the fluidised form soil cement become or grab chute forming displacement mould soil 5 or equal thickness rectangle self-solidifying Stream is moulded in soil 6, including: assembled active well structure has rectangle assembled active well structure and circular assembled active well structure etc. Plane horizontal layout form (see Fig. 1 and Fig. 2);Prefabricated components are made up of standard component 3 and customization part 4, centre have multiple vertically Cavity 12, vertical empty 12 in connecting up and down, component end face and the pre-buried connecting device of sidewall 19 and built-in connection 24 and Guan Liang and Waist rail is connected;Prefabricated component 1 is spliced by horizontal joint 8 and vertical joint 7, and the horizontal joint 8 of prefabricated component 1 is wrapped Including steel plate screwed joint 42 and steel bushing bell and spigot joint 43, steel plate screwed joint 42 is passed through end face by steel jigsaw 20 and joint end plate 21 Epoxy glue 23 and bolt 22 connect into entirety, and steel bushing bell and spigot joint 43 is inserted socket joint steel bushing 39 two ends connection master by connecting inserted link 40 Muscle 38 and end face epoxy glue 23 connect into entirety, and the vertical joint 7 section packing line style recess 13 of prefabricated component 1 and arc are recessed Mouth 14, inserts RC pile tube 15, RC square pile 16, H profile steel 17 or square steel 18 and is engaged between recess;Prefabricated pile component sets annulus Steel plate steel bushing bell and spigot joint, is connected by two ends that the socket joint steel bushing 39 of main muscle 38 is inserted into bell and spigot joint 43, ring is smeared in end face side Oxygen glue 23, annular steel bushing plate 44 connect into entirety, and annular steel bushing plate 44 is passed through hinge 45 He by two blocks of semicircle steel bushing plates Bolt 22 forms annulus;Prefabricated components carry out assembled by erection support 30 and implant construction, and bearing 30 is by fixing girder steel 31, thousand Jin top 32, bearing dolly 33 and clamp system 37 are constituted;Circular or rectangle door opening through walls 25 preset by the borehole wall, and door opening 25 through walls passes through Steel bushing 26 of putting more energy in hole week is strengthened, and hole week presets injected hole 29, and by dismountable stiffened steel plates 27 envelope hole, steel plate 27 two sides are welded Connecing channel-section steel 28 of putting more energy into, steel plate 27 is connected with prefabricated components by spiral shell 22;When component penetration resistance is bigger, at prefabricated components cavity Inside transferring damping device 34, damping device 34 sprays pressure-air by drilling rod 35 and nozzle 36.
In embodiment, Specific construction step is as follows:
(1) at the construction field (site) or prefabrication reinforced concrete member.
(2) form self-solidifying stream in borehole wall position and mould soil: use multi-shaft stirring or two-wheel milling to stir at the borehole wall and partition wall position Method of mixing forms fluidised form Soil-cement body, fluidised form solidified earth stirring body, or uses grab chute forming to form self-solidifying mud ditch.
(3) mould soil at self-solidifying stream and be implanted into and assemble single width plate or single pile element: implant and assemble prefabricated components: be prefabricated Component hangs location, is beaten overcome resistance to transfer in soil cement or self-solidifying mud by deadweight, drag reduction or dither, will simultaneously Part of cement soil or mud cement out;When the upper end of prefabricated components is transferred to fluting end face, solid by erection support These prefabricated components fixed, are hung in another prefabricated components, are spliced by horizontal joint with next section, continue to hang after splicing; Repeating splicing until bottom land, the assembling completing a vertical width borehole wall or partition wall is constructed with implanting.
(4) mould soil at self-solidifying stream and be implanted into and assemble next former or a pile component: be fixing with erection support location, weight Multiple (2), the method for (3) step, implant next former or a pile.
(5) Guan Liang and waist rail are installed, fetch earth in well and back cover: prefabricated components are implanted and after assembling, at component end face The self-solidifying stream removing solidification moulds soil, installs Guan Liang at top connecting device;Guan Liang fetches earth and precipitation after being formed in well, when After reaching certain depth, by component side connecting device install waist rail, simultaneously arrange support or outer anchor, then proceed to excavate with Precipitation is to projected depth, then pouring reinforcement concrete base plate in well.
(6) in the preformed hole of borehole wall doorway positions through walls, carry out rotary jet grouting, reinforce the soil layer of door opening neighboring through walls With closing subsoil water;
(7) dismantle door opening shrouding through walls, open door opening through walls reserved in the borehole wall;In well, shield is installed or push pipe sets Standby, the construction of tunnel or pipe culvert is carried out by door opening through walls.
This utility model, by stirring in advance or grooving, is filled self-solidifying stream and is moulded soil, implanted by prefabricated component in groove In groove, by level and, come of age beam and waist rail of vertical joint form active well integrated well wall construction, overcome tradition open caisson knot Structure sinks and the open-cut foundation ditch impact on surrounding enviroment, and site operation is workable, and component assemblingization degree is high, cavity member The effectively save engineering material of energy, construction operation efficiency is high, has good economy and engineering construction effect.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.One's own profession Skilled person will appreciate that of industry, this utility model is not restricted to the described embodiments, described in above-described embodiment and description Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model also can There are various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model is wanted Protection domain is asked to be defined by appending claims and equivalent thereof.

Claims (6)

1. an assembled active well structure, is characterized in that, including prefabricated components, described prefabricated components are implanted to self-solidifying stream and mould soil In, formed and there is gear soil and the shaft wall structure of water stopping function;Reserved dismountable door opening plate through walls on prefabricated components;Prefabricated components End face is embedded with the connecting device connecting Guan Liang, and prefabricated components sidewall is embedded with the connecting device connecting waist rail.
A kind of assembled active well structure the most according to claim 1, is characterized in that, described component is board member;Plate structure Part is Prefabricated hollow reinforced concrete member, and section configuration is the one of in-line, L-shaped, sector or circular arc, in board member Between be distributed multiple vertical cavity, in upper and lower connected state after assembling.
A kind of assembled active well structure the most according to claim 2, is characterized in that, described board member leads at depth direction Crossing horizontal joint spreading, horizontal joint is to wait strong ties joint, including steel plate screwed joint and steel bushing bell and spigot joint, steel plate bolt Joint is connected into entirety by steel jigsaw and joint end plate by end face epoxy glue and bolt, and steel bushing bell and spigot joint is inserted by connecting inserted link Enter the socket joint steel bushing two ends main muscle of connection and end face epoxy glue connects into entirety;Described board member is in the horizontal direction by vertical joint Connect occlusion, vertical joint is recess type, including broken line type recess and arc-shaped notch, between recess insert RC pile tube, RC square pile, H profile steel or square steel are engaged.
A kind of assembled active well structure the most according to claim 1, is characterized in that, described component is pile element;Stake structure Part section configuration is I-shaped, hollow circular or hollow, rectangular, for Steel section member or reinforced concrete precast member, at depth direction The strong ties joint spreading such as having, Steel section member joint is connected by welding or bolt, and reinforced concrete precast member sets ring steel plate Steel bushing bell and spigot joint, is connected by two ends that the socket joint steel bushing of main muscle is inserted into bell and spigot joint, epoxy glue, annular are smeared in end face side Steel bushing plate connects into entirety.
A kind of assembled active well structure the most according to claim 1, is characterized in that, it is former for stake position that described self-solidifying stream moulds soil Shape soil through churning, stir or displacement of holing mixes soil-cement body that firming agent formed, the solidification soil body, cement mortar body or self-solidifying mud Slurry;Self-solidifying stream is moulded soil and is formed continuous wallboard wall body, and there are cylinder occlusion shape or equal thickness rectangle in its cross section.
A kind of assembled active well structure the most according to claim 1, is characterized in that, described door opening plate through walls, is at well Presetting the circular or door opening through walls of rectangle in wall, door opening periphery through walls presets injected hole, seals hole by dismountable stiffened steel plates, And it is bolted on component installation or removal.
CN201620853342.2U 2016-08-09 2016-08-09 Assembled work well structure Active CN205875173U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620853342.2U CN205875173U (en) 2016-08-09 2016-08-09 Assembled work well structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620853342.2U CN205875173U (en) 2016-08-09 2016-08-09 Assembled work well structure

Publications (1)

Publication Number Publication Date
CN205875173U true CN205875173U (en) 2017-01-11

Family

ID=57700690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620853342.2U Active CN205875173U (en) 2016-08-09 2016-08-09 Assembled work well structure

Country Status (1)

Country Link
CN (1) CN205875173U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120812A (en) * 2016-08-09 2016-11-16 上海强劲地基工程股份有限公司 A kind of assembled active well structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120812A (en) * 2016-08-09 2016-11-16 上海强劲地基工程股份有限公司 A kind of assembled active well structure and construction method

Similar Documents

Publication Publication Date Title
CN106120812A (en) A kind of assembled active well structure and construction method
CN106049506B (en) A kind of APS assembleds supporting pile structure and construction method
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN107542108A (en) A kind of reverse construction method of building basement structure
CN109778992A (en) A kind of ride well device and its construction method for pipeline construction
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN110130363A (en) Assembled is implanted into foundation pit enclosure stake and pile wall interaction structure and its construction method
CN109826630A (en) A kind of precast concrete open caisson device and its construction method for jacking construction
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN113174988A (en) Double-wall concrete open caisson structure and construction method
CN105735323B (en) The inverse deep footing groove enclosing structure for making to combine with Percussion Piles of spray anchor and its construction method
CN107956220A (en) A kind of prefabricated construction method for diaphragm walls based on TRD grooving
CN105369800B (en) One-time forming construction method for inserting steel pipe column into cast-in-situ bored pile in pilot tunnel
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
CN205975628U (en) APS assembled retaining pile structure
CN213143117U (en) Assembled keyway basis retaining wall structure
CN205875173U (en) Assembled work well structure
CN109137986A (en) Urban road inspection shaft walling crib green promotes reinforced construction method
CN104695446A (en) Basement support construction method
CN217053672U (en) Large-diameter inspection well pile drilling method construction system
CN215906845U (en) Large-span vestibule mounting structure in foundation pit
CN105178356A (en) Setting-up construction method for vertical joint bars of columns in reverse building method
CN108149694A (en) A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN105986830A (en) Underground-excavation building method for roadside strip-shaped underground garage
CN114592581A (en) Large-diameter inspection well pile drilling method construction method

Legal Events

Date Code Title Description
GR01 Patent grant