CN110295606A - A kind of foundation pit interlocking pile water stop construction method - Google Patents

A kind of foundation pit interlocking pile water stop construction method Download PDF

Info

Publication number
CN110295606A
CN110295606A CN201910604824.2A CN201910604824A CN110295606A CN 110295606 A CN110295606 A CN 110295606A CN 201910604824 A CN201910604824 A CN 201910604824A CN 110295606 A CN110295606 A CN 110295606A
Authority
CN
China
Prior art keywords
interlocking pile
water
foundation pit
pile
interlocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910604824.2A
Other languages
Chinese (zh)
Inventor
王欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Sui Shi Civil Polytron Technologies Inc
Original Assignee
Guangzhou Sui Shi Civil Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Sui Shi Civil Polytron Technologies Inc filed Critical Guangzhou Sui Shi Civil Polytron Technologies Inc
Priority to CN201910604824.2A priority Critical patent/CN110295606A/en
Publication of CN110295606A publication Critical patent/CN110295606A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Abstract

The invention discloses a kind of foundation pit interlocking pile water stop construction methods, specifically includes the following steps: and measuring all data of its position to detecting at the position of required construction interlocking pile first, carrying out pouring interlocking pile then according to data and existing standard;Enhance the intensity of interlocking pile, the present invention relates to interlocking pile technical field of construction.The foundation pit interlocking pile water stop construction method, by first to carrying out exploration detection around the position for needing to build interlocking pile, sealing can effectively can be carried out when interlocking pile pours and easily after pouring, and water-stagnating effect is strong, it greatly avoids because the intervention of water causes the interlocking pile poured not to be available, enable staff is more convenient to work, equally engineering is allowed to make a fault less, reduce use cost, conducive to people's use, it is complex that this solves current existing foundation pit interlocking pile water stop construction method water-stopping method, and not very practical problem.

Description

A kind of foundation pit interlocking pile water stop construction method
Technical field
The present invention relates to interlocking pile technical field of construction, specially a kind of foundation pit interlocking pile water stop construction method.
Background technique
Interlocking pile is that part circumference is mutually embedding between adjacent concrete campshed, and affixes one's name in the stake of the alternate construction of rear order into reinforcing bar Cage is allowed to be formed whole continuous waterproof, earth-retaining building enclosure with good barrier effect, and interlocking pile is the shape between stake and stake At a kind of foundation pit enclosure structure for being mutually twisted arrangement, the arrangement mode of stake is not arrangement of reinforcement and a use extra retarded set plain concrete Stake (A) and reinforced concrete pile (B) (using all casing drill construction) arranged for interval, when construction, first construction A, It constructs B afterwards, B constructions is completed before A pile concrete initial set, A, B are all made of all casing drill construction, cut away The concrete of adjacent A intersection, to realize occlusion.
Current existing foundation pit interlocking pile water stop construction method water-stopping method is complex and not very practical, not It can effectively prevent rainy bring rainwater, it is extremely onerous that this allows construction personnel to work together, and the interlocking pile in foundation pit is allowed to pour change It is dynamic more troublesome, it is affected to project progress, it is extremely disadvantageous to be used in people.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, it the present invention provides a kind of foundation pit interlocking pile water stop construction method, solves at present The complex and not very practical problem of existing foundation pit interlocking pile water stop construction method water-stopping method.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of foundation pit interlocking pile sealing construction Method, specifically includes the following steps:
S1, first to being detected at the position of required construction interlocking pile, and measure all data of its position, connect Carry out pouring interlocking pile according to data and existing standard;
S2, during pouring interlocking pile, some strengthened auxiliary materials are added in concrete, are allowed to and concrete It is sufficiently mixed, enhances the intensity of interlocking pile;
S3, first to exploration detection is carried out around the position for needing to build interlocking pile, detected whether a large amount of water or ground Soil situation in face is extremely soft rotten, and if there is a large amount of water-water reactors product is just taken away it using water pump, and it is extremely soft rotten soil situation occur The case where just top layer soft mud soil is all dug out, filled up after interlocking pile pours with cement;
S4, basset winding isolation film at the top of interlocking pile, while building waterproof in the top position of interlocking pile Paulin prevents rainwater from invading, and several low-lying places are then dug out around interlocking pile, make water flow to lower will not at the top of interlocking pile heap Product, while water level alarm being installed, it is handled immediately to staff's transmission information after detecting a large amount of water;
After S5, interlocking pile completion pour, measures of preventing water after setting completed, is checked whole, passes through measurement apparatus inspection It looks into intensity that interlocking pile pours and whether size meets building standard, while whether in place detecting waterproof measure setting, it can The water such as rainwater are completely cut off with interlocking pile, detects that non-compliant whole be recorded in and feeds back to staff's progress Adjustment.
Preferably, it need to be poured, therefore be first had to pair fully according to measuring size when pouring interlocking pile in the S1 The all data of required interlocking pile measures, and detects its size and intensity, and can not make a fault in casting process, no The interlocking pile then poured out is not available.
Preferably, added material discord is more than 5 the percent of concrete in the S2, not so will affect concrete Intensity, the auxiliary material equally added need to meet requirement, need the use to interlocking pile helpful.
Preferably, just the wet mud soil for accumulating bottom portion is cleared up after drawing water in the S3, is allowed around interlocking pile Soil all controls as drying regime, take the wet mud soil excavating depth in underground need it is consistent with soil material, persistently it is soft it is rotten just It excavates to stopping at drying.
Preferably, take around interlocking pile in the S4 it is low-lying and set up waterproof paulin equally will be according to periphery landform feelings Condition avoids the occurrence of narrow terrain and sets up the case where waterproof paulin influences work, and waterproof paulin need to be formulated according to interlocking pile quantity.
Preferably, detection need to be extremely stringent in the S5, is checked fully according to standard, and according to different situations Interlocking pile carries out detection one by one and avoids the occurrence of fortuitous event.
(3) beneficial effect
The present invention provides a kind of foundation pit interlocking pile water stop construction methods.Have compared with prior art following beneficial to effect Fruit:
(1), foundation pit interlocking pile water stop construction method, by first to being surveyed around the position for needing to build interlocking pile Detection is visited, has detected whether that a large amount of water or ground soil situation are extremely soft rotten, if there is a large amount of water-water reactors product just will using water pump Take away, and there is the extremely soft rotten situation of soil situation and just all dig out top layer soft mud soil, pour and finish in interlocking pile It is filled up afterwards with cement, can effectively can carry out when interlocking pile pours and easily sealing, and sealing after pouring Effect is strong, greatly avoids because the intervention of water causes the interlocking pile poured not to be available, and keeps staff more square Just work, equally engineering is allowed to make a fault less, reduce use cost, be conducive to people use, this solve at present it is existing The complex and not very practical problem of foundation pit interlocking pile water stop construction method water-stopping method.
(2), the foundation pit interlocking pile water stop construction method, by interlocking pile completion pour after, measures of preventing water after setting completed, It checks whole, whether the intensity and size poured by measurement apparatus inspection interlocking pile meets building standard, examines simultaneously It whether in place to survey waterproof measure setting, the water such as rainwater can be completely cut off with interlocking pile, detected non-compliant complete Portion, which be recorded in, to be fed back to staff and is adjusted, and can be carried out repeated detection to interlocking pile, be avoided the occurrence of interlocking pile ruler Very little and intensity and required standard are inconsistent, are thus not in the defect ware of production, increase engineering production compliance rate, thus Construction cost is greatly lowered, similarly reduces the labor intensity of staff, is conducive to people and uses, this solves existing at present Some foundation pit interlocking pile water stop construction methods are easy to produce the problem of not meeting standard figures interlocking pile.
Detailed description of the invention
Fig. 1 is the flow chart of management method of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the embodiment of the present invention provides a kind of technical solution: a kind of foundation pit interlocking pile water stop construction method, tool Body the following steps are included:
S1, first to being detected at the position of required construction interlocking pile, and measure all data of its position, connect Carry out pouring interlocking pile according to data and existing standard;
S2, during pouring interlocking pile, some strengthened auxiliary materials are added in concrete, are allowed to and concrete It is sufficiently mixed, enhances the intensity of interlocking pile;
S3, first to exploration detection is carried out around the position for needing to build interlocking pile, detected whether a large amount of water or ground Soil situation in face is extremely soft rotten, and if there is a large amount of water-water reactors product is just taken away it using water pump, and it is extremely soft rotten soil situation occur The case where just top layer soft mud soil is all dug out, filled up after interlocking pile pours with cement;
S4, basset winding isolation film at the top of interlocking pile, while building waterproof in the top position of interlocking pile Paulin prevents rainwater from invading, and several low-lying places are then dug out around interlocking pile, make water flow to lower will not at the top of interlocking pile heap Product, while water level alarm being installed, it is handled immediately to staff's transmission information after detecting a large amount of water;
After S5, interlocking pile completion pour, measures of preventing water after setting completed, is checked whole, passes through measurement apparatus inspection It looks into intensity that interlocking pile pours and whether size meets building standard, while whether in place detecting waterproof measure setting, it can The water such as rainwater are completely cut off with interlocking pile, detects that non-compliant whole be recorded in and feeds back to staff's progress Adjustment.
It need to be poured, therefore be first had to required fully according to measuring size when pouring interlocking pile in S1 of the present invention The all data of interlocking pile measures, and detects its size and intensity, and can not make a fault in casting process, otherwise pours Interlocking pile out is not available.
Added material discord is more than 5 the percent of concrete in S2 of the present invention, not so will affect the strong of concrete Degree, the auxiliary material equally added need to meet requirement, need the use to interlocking pile helpful.
Just the wet mud soil for accumulating bottom portion is cleared up after drawing water in S3 of the present invention, allow soil around interlocking pile all Control is drying regime, take the wet mud soil excavating depth in underground need it is consistent with soil material, persistently it is soft it is rotten just excavate to Stop at dry.
Take around interlocking pile low-lying in S4 of the present invention and sets up waterproof paulin and equally to be avoided according to periphery topographic features There is narrow terrain and set up the case where waterproof paulin influences work, and waterproof paulin need to be formulated according to interlocking pile quantity.
Detection needs extremely stringent in S5 of the present invention, is checked fully according to standard, and according to the occlusion of different situations Stake carries out detection one by one and avoids the occurrence of fortuitous event:
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of foundation pit interlocking pile water stop construction method, it is characterised in that: specifically includes the following steps:
S1, first to being detected at the position of required construction interlocking pile, and measure all data of its position, then root It carries out pouring interlocking pile according to data and existing standard;
S2, during pouring interlocking pile, some strengthened auxiliary materials are added in concrete, are allowed to abundant with concrete Mixing, enhances the intensity of interlocking pile;
S3, first to exploration detection is carried out around the position for needing to build interlocking pile, detected whether a large amount of water or ground soil Ground situation is extremely soft rotten, if there is a large amount of water-water reactors product is just taken away it using water pump, and the extremely soft rotten feelings of soil situation occurs Condition just all digs out the soft mud soil of top layer, is filled up after interlocking pile pours with cement;
S4, basset winding isolation film at the top of interlocking pile, while building waterproof paulin in the top position of interlocking pile, prevents Only rainwater invades, and several low-lying places are then dug out around interlocking pile, accumulate water flow will not at the top of interlocking pile to lower, together When water level alarm is installed, detect that sending information to staff immediately after a large amount of water is handled;
After S5, interlocking pile completion pour, measures of preventing water after setting completed, is checked whole, is stung by measuring apparatus inspection Whether the intensity and size that conjunction stake pours meet building standard, while whether in place detecting waterproof measure setting, can be by rain The water such as water are completely cut off with interlocking pile, are detected that non-compliant whole be recorded in and are fed back to staff and adjust It is whole.
2. a kind of foundation pit interlocking pile water stop construction method according to claim 1, it is characterised in that: pour and sting in the S1 It need to be poured fully according to measuring size when closing stake, therefore first have to survey all data of required interlocking pile Amount, detects its size and intensity, and can not make a fault in casting process, the interlocking pile otherwise poured out is not available.
3. a kind of foundation pit interlocking pile water stop construction method according to claim 1, it is characterised in that: added in the S2 Material discord be more than concrete 5 percent, not so will affect the intensity of concrete, the auxiliary material equally added need to meet and make With requiring, need the use to interlocking pile helpful.
4. a kind of foundation pit interlocking pile water stop construction method according to claim 1, it is characterised in that: after drawing water in the S3 Just the wet mud soil for accumulating bottom portion is cleared up, allowing the soil around interlocking pile all to control is drying regime, is taking ground Under wet mud soil excavating depth need consistent with soil material, continue soft rotten just excavate to dry place and stop.
5. a kind of foundation pit interlocking pile water stop construction method according to claim 1, it is characterised in that: be engaged in the S4 Take low-lying around stake and sets up waterproof paulin and equally to avoid the occurrence of narrow terrain according to periphery topographic features and set up waterproof paulin shadow The case where ringing work, and waterproof paulin need to be formulated according to interlocking pile quantity.
6. a kind of foundation pit interlocking pile water stop construction method according to claim 1, it is characterised in that: detecting in the S5 needs It is extremely stringent, it is checked fully according to standard, and detection one by one is carried out according to the interlocking pile of different situations and avoids the occurrence of meaning Outer situation.
CN201910604824.2A 2019-07-05 2019-07-05 A kind of foundation pit interlocking pile water stop construction method Pending CN110295606A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910604824.2A CN110295606A (en) 2019-07-05 2019-07-05 A kind of foundation pit interlocking pile water stop construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910604824.2A CN110295606A (en) 2019-07-05 2019-07-05 A kind of foundation pit interlocking pile water stop construction method

Publications (1)

Publication Number Publication Date
CN110295606A true CN110295606A (en) 2019-10-01

Family

ID=68030437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910604824.2A Pending CN110295606A (en) 2019-07-05 2019-07-05 A kind of foundation pit interlocking pile water stop construction method

Country Status (1)

Country Link
CN (1) CN110295606A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1031070A (en) * 1988-04-12 1989-02-15 黑龙江省低温建筑科学研究所 Reinforcer for poured pile base
CN101182140A (en) * 2007-11-02 2008-05-21 浙江工业大学 Super slow-setting cement
CN102587385A (en) * 2011-12-30 2012-07-18 青建集团股份公司 Foundation pit supporting method for sludge-exchanged and filled soft soil
CN103031838A (en) * 2012-12-07 2013-04-10 中铁四局集团第三建设有限公司 Bridge site deep-layer displacement method
CN103485347A (en) * 2012-06-07 2014-01-01 叶强 Batter pile used for building foundation pit support and construction method thereof
CN106049506A (en) * 2016-07-11 2016-10-26 上海强劲地基工程股份有限公司 APS (Assembled Prestressed Soldier Pile Retaining Structure) and construction method thereof
CN107700497A (en) * 2017-09-29 2018-02-16 广州市番禺区第五建筑工程公司 A kind of building basement pattern foundation pit supporting structure and earth excavation construction method
CN207143963U (en) * 2017-07-08 2018-03-27 深圳百勤建设工程有限公司 A kind of foundation ditch supporting construction of pile for prestressed pipe
CN108609957A (en) * 2018-05-23 2018-10-02 云南建投绿色高性能混凝土股份有限公司 Extra retarded set lean concrete for deep basal pit hole-drilling interlocking pile

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1031070A (en) * 1988-04-12 1989-02-15 黑龙江省低温建筑科学研究所 Reinforcer for poured pile base
CN101182140A (en) * 2007-11-02 2008-05-21 浙江工业大学 Super slow-setting cement
CN102587385A (en) * 2011-12-30 2012-07-18 青建集团股份公司 Foundation pit supporting method for sludge-exchanged and filled soft soil
CN103485347A (en) * 2012-06-07 2014-01-01 叶强 Batter pile used for building foundation pit support and construction method thereof
CN103031838A (en) * 2012-12-07 2013-04-10 中铁四局集团第三建设有限公司 Bridge site deep-layer displacement method
CN106049506A (en) * 2016-07-11 2016-10-26 上海强劲地基工程股份有限公司 APS (Assembled Prestressed Soldier Pile Retaining Structure) and construction method thereof
CN207143963U (en) * 2017-07-08 2018-03-27 深圳百勤建设工程有限公司 A kind of foundation ditch supporting construction of pile for prestressed pipe
CN107700497A (en) * 2017-09-29 2018-02-16 广州市番禺区第五建筑工程公司 A kind of building basement pattern foundation pit supporting structure and earth excavation construction method
CN108609957A (en) * 2018-05-23 2018-10-02 云南建投绿色高性能混凝土股份有限公司 Extra retarded set lean concrete for deep basal pit hole-drilling interlocking pile

Similar Documents

Publication Publication Date Title
CN103758084B (en) A kind of ecological riverway interlocking type building block and construct the construction that protects bank
CN107542108B (en) A kind of reverse construction method of building basement structure
CN108894214B (en) Karst cave geological environment cast-in-place pile and pile-forming construction method thereof
CN110617067B (en) Low-risk construction method for full-section boundary advanced pipe shed of extremely-soft surrounding rock tunnel
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN110258658A (en) The leakage anticipation of diaphram wall and the construction method of processing
CN111810198A (en) Tunnel earth surface directional large-caliber deep hole grouting device and grouting method
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN102162253A (en) Precipitation construction method employing pipe embedding in deep foundation pits
CN109594568A (en) A kind of rock slope ecological safeguard structure and its method
CN110453699B (en) Drainage slide-resistant pile structure of 'rice' -shaped pile core and construction method thereof
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN111852515A (en) Tunnel stratum pre-reinforcement comprehensive grouting method
CN208934002U (en) A kind of barrier wall structure
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN109914445A (en) A kind of level of ground water alternately changes the construction method of location expensive soil cutting
CN101691840A (en) Water level observation well and construction method thereof
CN101413269A (en) Vacuum curtain water stop and atmospheric pressure support deep pit digging construction method
CN105155591B (en) Underground aquatic organism expands layering water-stopping method
CN105507348B (en) The waterproof construction method and structure of basement detached column and Vierendeel girder in junction
CN104652427A (en) Construction method of drilling pile
CN109811771B (en) Simple method for preventing anchor rod steel waist beam from bending during tensioning
CN110295606A (en) A kind of foundation pit interlocking pile water stop construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191001