CN106013235A - City utility tunnel of arch cross section steel buckled plate - Google Patents

City utility tunnel of arch cross section steel buckled plate Download PDF

Info

Publication number
CN106013235A
CN106013235A CN201610569391.8A CN201610569391A CN106013235A CN 106013235 A CN106013235 A CN 106013235A CN 201610569391 A CN201610569391 A CN 201610569391A CN 106013235 A CN106013235 A CN 106013235A
Authority
CN
China
Prior art keywords
pipe gallery
piping lane
partition wall
main body
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610569391.8A
Other languages
Chinese (zh)
Inventor
赵贺
白聚会
崔海龙
王立军
向琴琴
李沛
马炳成
王瑀
邓成云
张金文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Capital Engineering & Research Inc Ltd
Original Assignee
Capital Engineering & Research Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Capital Engineering & Research Inc Ltd filed Critical Capital Engineering & Research Inc Ltd
Priority to CN201610569391.8A priority Critical patent/CN106013235A/en
Publication of CN106013235A publication Critical patent/CN106013235A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to an urban underground comprehensive pipe gallery with steel corrugated plates with arched cross sections, which comprises a pipe gallery foundation structure arranged at the bottom, wherein a pipe gallery main body formed by surrounding steel corrugated plates is fixed above the pipe gallery foundation structure, the cross section of the pipe gallery main body is arched, an inner partition wall structure arranged along the longitudinal direction of the pipe gallery main body is arranged in the pipe gallery main body, the inner partition wall structure partitions the interior of the pipe gallery main body into a plurality of chambers which are sealed and isolated from each other, and a support structure for erecting underground pipelines is arranged in the plurality of chambers. This city utility tunnel overcomes the big, slow, the high scheduling problem of cost of construction of weight that exists among the prior art, has realized light in weight, construction speed is fast, the purpose that the cost is low to the compartment that separates the piping lane inner space for a plurality of mutual sealed isolations is carried out water, heat, electric pipeline partition with its inside interior partition wall structure that sets up and lays, is convenient for lay and has improved the security when managing.

Description

A kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery
Technical field
The present invention relates to Urban Underground facility technology field, particularly relate to a kind of arched cross-section Steel Corrugated Pipes for Making plate city City's underground pipe gallery.
Background technology
Jiang Shui that pipe gallery refers to build at Urban Underground, heat, combustion gas, electric power, the municipal public use pipeline such as communication Concentration is laid in structures, the pubilc utility tunnel space implement unified planning, designing, construct and managing. Pipe gallery can realize once excavating, and concentrates construction, it is to avoid same section is repeated construction, repeated excavation.Existing Piping lane generally uses reinforced concrete structure, but traditional reinforced concrete structure weight is big, speed of application slow, Ensure that load intensity must increase the thickness of concrete and the density of reinforcing bar and diameter, thus improve cost, very The difficult needs adapting to modern municipal construction.
Thus, the present inventor relies on experience and the practice being engaged in relevant industries for many years, proposes a kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery, to overcome the defect of prior art.
Summary of the invention
It is an object of the invention to provide a kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery, overcome Present in prior art, weight is big, speed of application slow, high cost problem, it is achieved that lightweight, construction speed The purpose that degree is fast, cost is low.
Another object of the present invention is to provide a kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery, Piping lane inner space is divided into multiple bin sealing against each other isolation by its internal internal partition wall structure arranged, will Water, heat, electric line carry out subregion laying, it is simple to improve safety while laying and managing.
The object of the present invention is achieved like this, a kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground integrated pipe Corridor, described arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery includes the piping lane basis knot being arranged at bottom Structure, being fixedly arranged above to be enclosed by Steel Corrugated Pipes for Making plate of described piping lane base structure sets the piping lane main body constituted, described pipe The cross section of corridor main body is domed, be provided with in described piping lane main body along described piping lane main body longitudinally disposed in every Wall construction, the inside of described piping lane main body is divided into multiple storehouse sealing against each other isolation by described internal partition wall structure Room, is provided with the supporting structure setting up underground utilities in multiple described bins.
In a better embodiment of the present invention, described internal partition wall structure includes that multiple parallel interval is vertically arranged Internal partition wall structure pilaster, be sealedly connected with internal partition wall structure between adjacent two described internal partition wall structure pilaster Plate.
In a better embodiment of the present invention, described supporting structure includes in described internal partition wall structure pilaster solid The cable bearer of fixed mounting, described supporting structure also includes the fixing pipeline set up in described internal partition wall structure pilaster The pipeline elevator arranged on the inwall of support and described piping lane main body, described support of pipelines is provided with multiple parallel Spaced conduit saddle, described supporting structure also includes that be arranged in described piping lane base structure, multiple parallel Spaced Support bracket.
In a better embodiment of the present invention, the surfaces externally and internally of described piping lane main body is coated with anti-corrosion material Layer, the preserving timber bed of material of the inner surface of described piping lane main body is also coated with fireproof material layer, and described internal partition wall is tied The two sides of structure are coated with fireproof material layer.
In a better embodiment of the present invention, described piping lane base structure is reinforced concrete structure, described It is provided with gutter in piping lane base structure.
In a better embodiment of the present invention, the bottom of described piping lane base structure is fixedly installed downwards many The individual pile foundation being inserted in ground.
In a better embodiment of the present invention, described piping lane main body is sealed by the corrugated cardboard sheet of multiple arcs and spells Connect composition.
In a better embodiment of the present invention, multiple described corrugated cardboard sheets are connected by high-strength bolt.
In a better embodiment of the present invention, described internal partition wall structure is by described arched cross-section Steel Corrugated Pipes for Making The inside of plate Urban Underground pipe gallery is divided into three bins sealing against each other isolation, and three bins are respectively water Hot storehouse, electricity storehouse and combustion gas storehouse.
In a better embodiment of the present invention, described internal partition wall structure is by described arched cross-section Steel Corrugated Pipes for Making The inside of plate Urban Underground pipe gallery is divided into two bins sealing against each other isolation, and two bins are respectively water Hot storehouse and electricity storehouse.
From the above mentioned, a kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery that the present invention provides, adopt Be spliced with Steel Corrugated Pipes for Making plate, Steel Corrugated Pipes for Making plate have dead load light, can be with prefabrication, freight Low, on-the-spot carry out the advantages such as modular splicing, it is possible to reduce difficulty of construction, shorten construction period, reduce cost Low and bigger car load can be born, it is suitable for the extensive application of Urban Underground pipe gallery;Arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery arranges internal partition wall structure, multiple the closeest by being divided into inside piping lane Insulate from bin, Jiang Shui, heat, electric line carry out subregion laying, it is simple to while laying and managing improve peace Quan Xing;The bottom of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery arranges reinforced concrete foundation conduct Walkway board, bracket basis, and anti-floating counterweight can be doubled as.
Accompanying drawing explanation
The following drawings is only intended to, in schematically illustrating the present invention and explaining, not delimit the scope of the invention. Wherein:
Fig. 1: for the structural representation of the arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery of the present invention.
Fig. 2: for the structural representation of the internal partition wall structure of the present invention.
Fig. 3: for the corrugated cardboard sheet connection diagram of the present invention.
In figure:
100, arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery;
1, piping lane base structure;
11, gutter;12, pile foundation;
2, piping lane main body;
21, corrugated cardboard sheet;22, high-strength bolt;
3, internal partition wall structure;
31, internal partition wall structure pilaster;32, internal partition wall structure plate;
4, supporting structure;
41, cable bearer;42, support of pipelines;421, conduit saddle;43, pipeline elevator;44, Support bracket;
51, hydro-thermal storehouse;52, electricity storehouse;
61, electric power and communication cable;62, piping lane illumination and communication line;63, water-feeding drainaging line;64, in Water pipeline;65, heating pipeline;66, sewer line.
Detailed description of the invention
In order to the technical characteristic of the present invention, purpose and effect are more clearly understood from, now comparison accompanying drawing explanation The detailed description of the invention of the present invention.
As it is shown in figure 1, a kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery that the present invention provides 100, including the piping lane base structure 1 bottom being arranged at, being fixedly arranged above by steel ripple of piping lane base structure 1 Card encloses the piping lane main body 2 setting composition, and the cross section of piping lane main body 2 is domed, and piping lane main body 2 is internal to be arranged Having the longitudinally disposed internal partition wall structure 3 along piping lane main body 2, internal partition wall structure 3 is by the inside of piping lane main body 2 It is divided into multiple bin sealing against each other isolation, multiple bins is provided with the supporting structure 4 setting up underground utilities, Underground utilities generally comprise electric power and communication cable 61, piping lane illumination and communication line 62, water-feeding drainaging line 63, Middle water line 64, heating pipeline 65, sewer line 66, burning line, type and the position of underground utilities can It is adjusted according to engineering practice.Piping lane main body 2 lightweight, speed of application block, cost are low, can Bearing bigger car load, internal partition wall structure 3 is by arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery The internal zone dividing of 100, Jiang Shui, heat, electric line carry out subregion laying, it is simple to lay and manage.
Further, as in figure 2 it is shown, internal partition wall structure 3 includes the internal partition wall knot that multiple parallel interval is vertically arranged Structure pilaster 31, is sealedly connected with internal partition wall structure plate 32 between adjacent two internal partition wall structure pilaster 31.In every Wall construction plate 32 can use the material such as Light trabs or steel plate rock wool sandwich type wall panel.Internal partition wall structure pilaster 31 are subject to internal partition wall structure plate 32 weight and ensure the primary structure member that internal partition wall structure plate 32 does not falls, internal partition wall Structural stud 31 parallel interval is vertically arranged, and internal partition wall structure plate 32 is embedded in adjacent two internal partition wall structure walls Between post 31, it is necessary to assure be completely embedded, to guarantee the fire-proof function with internal partition wall structure 3.
Further, as it is shown in figure 1, supporting structure 4 includes the electricity of fixing mounting in internal partition wall structure pilaster 31 Cable support 41, cable bearer 41 quantity is multiple, is used for supporting electric power and communication cable 61;Supporting structure 4 Also include arranging on the inwall of the fixing support of pipelines 42 set up and piping lane main body 2 in internal partition wall structure pilaster 31 Pipeline elevator 43, support of pipelines 42, pipeline elevator 43 can be single layer structure can also be multiple structure, Concrete structure determines according to actually used demand.The pipe that multiple parallel interval is arranged it is provided with on support of pipelines 42 Torr 421, conduit saddle 421 is fixedly installed heating pipeline 65, and pipeline elevator 43 higher slice is fixed with piping lane illumination And communication line 62, water-feeding drainaging line 63, middle water line 64, support of pipelines 42, pipeline elevator 43 can roots Position and size according to pipeline are adjusted.Supporting structure 4 also include being arranged in piping lane base structure 1, The Support bracket 44 that multiple parallel interval are arranged, Support bracket 44 is fixed with sewer line 66.Each support is tied Underground utilities type fixing on structure can be adjusted according to engineering is actual.Each supporting structure can use hot rolling Shaped steel, welding shaped steel make.
Further, the surfaces externally and internally of piping lane main body 2 is coated with the preserving timber bed of material, the inner surface of piping lane main body 2 The preserving timber bed of material on be also coated with fireproof material layer, the two sides of internal partition wall structure 3 are coated with fire proofing material Layer, effective fire retardant anticorrosion, improve the service life of piping lane main body 2.
Further, as it is shown in figure 1, piping lane base structure 1 is reinforced concrete structure, piping lane base structure 1 As the walkway board within piping lane, also it is the soleplate of supporting structure 4, also serves as the anti-floating counterweight of piping lane simultaneously; Being provided with gutter 11 in piping lane base structure 1, the position in gutter 11 can be adjusted according to the actual requirements Whole.
Further, as it is shown in figure 1, require when piping lane base structure 1 counterweight is unsatisfactory for anti-floating or runs into weak soil During ground, the bottom of piping lane base structure 1 is fixedly installed downwards multiple pile foundation 12 being inserted in ground.Stake The Main Function of base 12 is resistant to buoyancy or processes differential settlement, and the type and size of pile foundation 12 are by calculating Determine with soil property situation.
Further, as it is shown on figure 3, piping lane main body 2 is sealed sequential concatenation by the corrugated cardboard sheet 21 of multiple arcs Constitute.The corrugated cardboard sheet 21 of the arc that multiple length are identical is first spliced to form arcuate segment, and each arcuate segment is along length Direction order is tightly connected composition piping lane main body 2.In the present embodiment, the edge of each corrugated cardboard sheet 21 Being provided with splicing hole (connecting hole), multiple corrugated cardboard sheets 21 are connected by high-strength bolt 22.Corrugated cardboard sheet 21 Junction use encapsulant seal, in order to ensure piping lane main body 2 use quality and use the time.
Further, in one particular embodiment of the present invention, internal partition wall structure 3 is by arched cross-section steel ripple The inside of card Urban Underground pipe gallery 100 is divided into three bins sealing against each other isolation, and three bins divide Wei hydro-thermal storehouse, electricity storehouse and combustion gas storehouse.Hydro-thermal storehouse can be laid piping lane illumination and communication line 62, supplying drainage Line 63, middle water line 64, sewer line 66, heating pipeline 65, laying electric power and communication cable 61 in electricity storehouse, Combustion gas storehouse is laid burning line.Pipeline type and position in each bin are adjusted according to requirement of engineering.
Further, as it is shown in figure 1, in another specific embodiment of the present invention, internal partition wall structure 3 will arch The inside of shape cross section steel corrugated plating Urban Underground pipe gallery 100 is divided into two storehouses sealing against each other isolation Room, two bins are respectively hydro-thermal storehouse 51 and electricity storehouse 52.Hydro-thermal storehouse 51 can be laid piping lane illumination and communication tube Line 62, water-feeding drainaging line 63, middle water line 64, heating pipeline 65, sewer line 66, electricity sets in storehouse 52 Put electric power and communication cable 61.Pipeline type and position in each bin are adjusted according to requirement of engineering.
From the above mentioned, a kind of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery that the present invention provides, adopt Be spliced with Steel Corrugated Pipes for Making plate, Steel Corrugated Pipes for Making plate have dead load light, can be with prefabrication, freight Low, on-the-spot carry out the advantages such as modular splicing, it is possible to reduce difficulty of construction, shorten construction period, reduce cost Low and bigger car load can be born, it is suitable for the extensive application of Urban Underground pipe gallery;Arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery arranges internal partition wall structure, multiple the closeest by being divided into inside piping lane Insulate from bin, Jiang Shui, heat, electric line carry out subregion laying, it is simple to while laying and managing improve peace Quan Xing;The bottom of arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery arranges reinforced concrete foundation conduct Walkway board, bracket basis, and anti-floating counterweight can be doubled as.
The foregoing is only the schematic detailed description of the invention of the present invention, be not limited to the scope of the present invention. Any those skilled in the art, equivalent done on the premise of without departing from the design of the present invention and principle becomes Change and amendment, the scope of protection of the invention all should be belonged to.

Claims (10)

1. an arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery, it is characterised in that: described arch Cross section steel corrugated plating Urban Underground pipe gallery includes the piping lane base structure being arranged at bottom, described piping lane Being fixedly arranged above to be enclosed by Steel Corrugated Pipes for Making plate of base structure sets the piping lane main body constituted, described piping lane main body transversal Face is domed, is provided with the longitudinally disposed internal partition wall structure along described piping lane main body in described piping lane main body, described The inside of described piping lane main body is divided into multiple bin sealing against each other isolation, multiple described storehouses by internal partition wall structure Room is provided with the supporting structure setting up underground utilities.
2. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 1, its feature It is: described internal partition wall structure includes the internal partition wall structure pilaster that multiple parallel interval is vertically arranged, adjacent two It is sealedly connected with internal partition wall structure plate between described internal partition wall structure pilaster.
3. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 2, its feature It is: described supporting structure includes the cable bearer of fixing mounting, described support in described internal partition wall structure pilaster Structure also includes the fixing support of pipelines set up and the inwall of described piping lane main body in described internal partition wall structure pilaster The pipeline elevator of upper setting, described support of pipelines is provided with the conduit saddle that multiple parallel interval is arranged, described support Structure also includes being arranged in described piping lane base structure, the Support bracket of multiple parallel interval setting.
4. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 2, its feature It is: the surfaces externally and internally of described piping lane main body is coated with the preserving timber bed of material, the inner surface of described piping lane main body Being also coated with fireproof material layer on the preserving timber bed of material, the two sides of described internal partition wall structure are coated with fire proofing material Layer.
5. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 1, its feature It is: described piping lane base structure is reinforced concrete structure, described piping lane base structure is provided with gutter.
6. the arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as described in claim 1 or 5, its It is characterised by: the bottom of described piping lane base structure is fixedly installed downwards multiple pile foundation being inserted in ground.
7. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 1, its feature It is: described piping lane main body is sealed by the corrugated cardboard sheet of multiple arcs and is spliced to form.
8. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 7, its feature It is: multiple described corrugated cardboard sheets are connected by high-strength bolt.
9. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 1 or 2, its It is characterised by: described internal partition wall structure is by described arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery Part is divided into three bins sealing against each other isolation, and three bins are respectively hydro-thermal storehouse, electricity storehouse and combustion gas storehouse.
10. arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery as claimed in claim 1 or 2, its It is characterised by: described internal partition wall structure is by described arched cross-section Steel Corrugated Pipes for Making plate Urban Underground pipe gallery Part is divided into two bins sealing against each other isolation, and two bins are respectively hydro-thermal storehouse and electricity storehouse.
CN201610569391.8A 2016-07-19 2016-07-19 City utility tunnel of arch cross section steel buckled plate Pending CN106013235A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610569391.8A CN106013235A (en) 2016-07-19 2016-07-19 City utility tunnel of arch cross section steel buckled plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610569391.8A CN106013235A (en) 2016-07-19 2016-07-19 City utility tunnel of arch cross section steel buckled plate

Publications (1)

Publication Number Publication Date
CN106013235A true CN106013235A (en) 2016-10-12

Family

ID=57115881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610569391.8A Pending CN106013235A (en) 2016-07-19 2016-07-19 City utility tunnel of arch cross section steel buckled plate

Country Status (1)

Country Link
CN (1) CN106013235A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893911A (en) * 2017-10-30 2018-04-10 广州地铁设计研究院有限公司 The booster monitoring system of feed pipe
CN108277821A (en) * 2017-12-13 2018-07-13 苍南县交通建设工程有限公司 A kind of piping lane
CN108286267A (en) * 2018-04-23 2018-07-17 哈尔滨工业大学 Assembled corrugated steel Combined concrete pipe gallery
CN108532630A (en) * 2018-05-25 2018-09-14 衡水益通管业股份有限公司 Assembled steel structure piping lane with concrete bed
WO2019153719A1 (en) * 2018-02-09 2019-08-15 南京联众建设工程技术有限公司 Underground comprehensive utility tunnel having multi-compartment structure
WO2019153716A1 (en) * 2018-02-09 2019-08-15 南京联众建设工程技术有限公司 Combined pipe gallery substrate
CN111379273A (en) * 2018-12-29 2020-07-07 中冶京诚工程技术有限公司 Construction method of corrugated steel comprehensive pipe gallery
CN112900496A (en) * 2021-04-01 2021-06-04 中冶京诚工程技术有限公司 Steel comprehensive pipe gallery with fire-resistant and weather-resistant functions and manufacturing method thereof
CN113683138A (en) * 2021-09-10 2021-11-23 广州资源环保科技股份有限公司 Water treatment equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1221467A (en) * 1996-06-12 1999-06-30 迈克尔·W·威尔逊 Composite concrete metal encased stiffeners for metal plate arch-type structures
KR101469603B1 (en) * 2014-09-05 2014-12-05 김동세 Pipe for piperoof with multipurpose solidarizing tube and construction method using this pipe
CN104294845A (en) * 2014-10-29 2015-01-21 沈晓铃 City comprehensive pipe gallery
CN204491666U (en) * 2015-03-06 2015-07-22 衡水益通金属制品有限责任公司 A kind of steel corrugated sheet Urban Underground pipe gallery
CN105673021A (en) * 2016-03-28 2016-06-15 北京市政建设集团有限责任公司 Comprehensive pipe rack of shield tunnel and construction method of comprehensive pipe rack
CN205917728U (en) * 2016-07-19 2017-02-01 中冶京诚工程技术有限公司 City utility tunnel of arch cross section steel buckled plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1221467A (en) * 1996-06-12 1999-06-30 迈克尔·W·威尔逊 Composite concrete metal encased stiffeners for metal plate arch-type structures
KR101469603B1 (en) * 2014-09-05 2014-12-05 김동세 Pipe for piperoof with multipurpose solidarizing tube and construction method using this pipe
CN104294845A (en) * 2014-10-29 2015-01-21 沈晓铃 City comprehensive pipe gallery
CN204491666U (en) * 2015-03-06 2015-07-22 衡水益通金属制品有限责任公司 A kind of steel corrugated sheet Urban Underground pipe gallery
CN105673021A (en) * 2016-03-28 2016-06-15 北京市政建设集团有限责任公司 Comprehensive pipe rack of shield tunnel and construction method of comprehensive pipe rack
CN205917728U (en) * 2016-07-19 2017-02-01 中冶京诚工程技术有限公司 City utility tunnel of arch cross section steel buckled plate

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893911A (en) * 2017-10-30 2018-04-10 广州地铁设计研究院有限公司 The booster monitoring system of feed pipe
CN108277821A (en) * 2017-12-13 2018-07-13 苍南县交通建设工程有限公司 A kind of piping lane
CN108277821B (en) * 2017-12-13 2020-06-30 苍南县交通建设工程有限公司 Pipe gallery
WO2019153719A1 (en) * 2018-02-09 2019-08-15 南京联众建设工程技术有限公司 Underground comprehensive utility tunnel having multi-compartment structure
WO2019153716A1 (en) * 2018-02-09 2019-08-15 南京联众建设工程技术有限公司 Combined pipe gallery substrate
CN108286267A (en) * 2018-04-23 2018-07-17 哈尔滨工业大学 Assembled corrugated steel Combined concrete pipe gallery
CN108286267B (en) * 2018-04-23 2019-08-02 哈尔滨工业大学 Assembled corrugated steel Combined concrete pipe gallery
CN108532630A (en) * 2018-05-25 2018-09-14 衡水益通管业股份有限公司 Assembled steel structure piping lane with concrete bed
CN111379273A (en) * 2018-12-29 2020-07-07 中冶京诚工程技术有限公司 Construction method of corrugated steel comprehensive pipe gallery
CN112900496A (en) * 2021-04-01 2021-06-04 中冶京诚工程技术有限公司 Steel comprehensive pipe gallery with fire-resistant and weather-resistant functions and manufacturing method thereof
CN113683138A (en) * 2021-09-10 2021-11-23 广州资源环保科技股份有限公司 Water treatment equipment

Similar Documents

Publication Publication Date Title
CN106013235A (en) City utility tunnel of arch cross section steel buckled plate
CN105971018A (en) Tubular cross section steel buckled plate city utility tunnel
RU132461U1 (en) COMMUNICATION COLLECTOR MODULE, MAIN TUNNEL AND INPUT CAMERA MODULE
CN110158646B (en) Double-pipe prefabricated waterproof comprehensive pipe gallery and installation method
CN107489168A (en) A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN206189685U (en) Integrated floor of modularization and house
US20180223520A1 (en) Prefabricated Modular Constructive System
CN207062988U (en) A kind of pipe gallery
US9404251B2 (en) Method for providing a fire safe penetration in building element
CN109137965A (en) A kind of pipe gallery
CN205917728U (en) City utility tunnel of arch cross section steel buckled plate
CN105821903B (en) Frame type combined structure pipe gallery
CN206376277U (en) The structure of underground pipe gallery
CN105275145A (en) Assembly type multifunctional composite wallboard
CN106368358A (en) Modular integrated slabs and house
CN205917730U (en) Tubular cross section steel buckled plate city utility tunnel
CN106760059A (en) A kind of assembled arthitecutral structure system
CN208650912U (en) Heat distribution pipeline fixing force transfer bracket system in heating power shield tunnel
CN208280171U (en) A kind of city integrated piping lane
CN109469099A (en) Assembled underground pipe gallery
CN216041748U (en) Rural box integrally assembled building
CN215253841U (en) Picatinny floor
CN205875472U (en) A concrete inside casing partition wall installation node for steel frame
CN210134455U (en) Integral utility tunnel of environment-friendly prefabricated assembly
CN210134453U (en) Integral utility tunnel of environment-friendly prefabricated assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication