A kind of piping lane
Technical field
The present invention relates to piping lane fields, more specifically, it relates to a kind of piping lane.
Background technology
Pipe gallery is exactly underground urban duct synthesis corridor.A tunnel space is built in Urban Underground, it will be electric
The various utilities pipelines such as power, communication, combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring
System implements unified planning, Uniting, unified construction and management, is the important infrastructure and " life for ensureing city operations
Line ".
Natural gas line is typically mounted at piping lane and faces subaerial side, by elder generation on ground since quality, volume are larger
Upper punching passes through setscrew fixing bracket;Then gas pipeline is placed on holder, using adjustment, makes adjacent two
Gas pipeline is coaxial, then by rotary clamping after the two grafting, is finally welded and fixed.
But when two adjacent pipelines are docked, since the transport pipeline quality and volume of natural gas are all bigger,
And holder has certain height error during the installation process, so operator is difficult the mobile transport pipeline on holder, it will
The two is aligned, cause two adjacent transport pipelines be difficult after grafting rotary clamping connect to together, there are two transport pipelines
Difficult problem.
Invention content
It is a kind of new by designing in view of the deficiencies of the prior art, the present invention intends to provide a kind of piping lane
Holder, being readily transported pipeline more can also effortlessly connect together two transport pipelines while being moved on holder,
Solve the problems, such as that bulk transport pipeline is not easy to connect in piping lane.
The present invention above-mentioned technical purpose technical scheme is that:A kind of piping lane, including shell, peace
Further include being installed on the frame body that installation and transportation pipeline is used in shell, the frame body includes position loaded on the transport pipeline in shell
The first frame body below transport pipeline and the second frame body, first frame body includes bottom plate, the screw thread that is fixed at the top of bottom plate
Column is threadedly connected to the saddle of cylinder setting in threaded post, the arc pallet for being installed on saddle top, is distributed in arc support
Ball one on plate;Second frame body includes supporting rack, is installed on support frame bottom for movable supporting frame directional wheel, peace
Loaded on the support plate of arc-shaped setting at the top of supporting rack, the ball two being distributed at the top of support plate, it is symmetricly set on supporting rack two
The fixed seat of side, the mounting hole being opened in fixed seat, the fixed seat is slidably connected with support frame as described above and the cunning of fixed seat
Dynamic direction is vertical direction.
By using above-mentioned technical proposal, the height of the first frame body is first adjusted to transport pipeline peace when connection transportation pipeline
Then first frame body is fixed in shell by the designated position of dress;Then transport pipeline one end is lifted and is fixed to by rope
It on saddle, then the second frame body is put in saddle closes on transport pipeline and land below one end so that support plate is contradicted with transport pipeline;
Then to another Slideslip first body of transport pipeline, transport pipeline is held up, it is sliding after the first frame body is moved to distance to a declared goal
Supporting rack is fixed on by fixed frame on piping lane ground by lower fixed seat;Finally unlock the rope of fixed transport pipeline and promotion
Transport pipeline makes itself and upper transport pipeline grafting, and then rotary transport pipeline is by its clamping again, and by transport pipeline junction
It is welded together, completes the installation of transport pipeline, ball can reduce the frictional force between transport pipeline and holder, make operator
It is more effortless when pushing transport pipeline on holder;Arc pallet and the support plate of arc-shaped setting can increase frame body and delivery tube
The contact area in road.
The present invention is further arranged to:The saddle is rotatablely connected with arc pallet, and the support plate is rotated with supporting rack
Connection.
By using above-mentioned technical proposal, when transport pipeline one end is fixed on the other end is placed on ground on saddle when, can
So that the contact area bigger of supporting plate face and support plate and transport pipeline, more effortless when movable supporting frame props up transport pipeline.
The present invention is further arranged to:The arc pallet side wall is equipped with the level whether horizontal for observing transport pipeline
Ruler.
By using above-mentioned technical proposal, can by observing horizon rule, to judge transport pipeline, whether holding is horizontal, into
And judge whether the bearing height before and after frame body is identical.
The present invention is further arranged to:Support frame as described above includes pedestal and jack, piston rod one end of the jack
It is rotatablely connected with support plate, the pedestal is fixedly connected with directional wheel.
By using above-mentioned technical proposal, when anterior and posterior height is inconsistent, the height of supporting rack can be adjusted by jack
Degree, keeps the front and back bearing height of frame body identical, former and later two transport pipelines is made to be coaxially disposed, convenient for former and later two transport pipelines
Connection.
The present invention is further arranged to:The axial moving mechanism for installation and transportation pipeline, week are additionally provided in the shell
To rotating mechanism, the mechanism that circumferentially rotates includes auxiliary frame, the cross bar that is fixedly connected on auxiliary frame side, is installed on cross bar
Pulley blocks one;The axial moving mechanism includes column, is fixedly connected at the top of column guide plate, along guide plate length side
To the guide groove opened up, the guide pad being slidably connected in guide groove, the cunning being fixedly connected far from guide groove one end with guide pad
Wheel group two.
By using above-mentioned technical proposal, axial moving mechanism is fixed on the one of transport pipeline and former transport pipeline grafting
Drawstring in pulley blocks one, is then fixedly attached on transport pipeline by end lower section;Delivery tube is fixed in circumferential mobile mechanism
Road closes on the lower section of former pipeline one end, and the drawstring of pulley blocks two is fixedly attached on transport pipeline, pull pulley blocks with cunning
The drawstring of the drawstring of wheel group two, pulley blocks two drives transport pipeline and former transport pipeline grafting;The drawstring of pulley blocks one drives fortune
Defeated pipeline rotation is connect with former transport pipeline, is welded later to transport pipeline and former transport pipeline connecting sewing.
The present invention is further arranged to:It is additionally provided in the shell for connection transportation pipeline and pulley blocks one and pulley blocks
Two connector, the connector includes clamping plate one, the clamping plate two, connecting cleat one and the clamping plate that are rotationally connected with one one end of clamping plate
Two turnbuckle stretcher.
By using above-mentioned technical proposal, when needing connection transportation pipeline, two sets of clamping plate one and clamping plate are first connected to transport
On pipeline, then the two is fixed on transport pipeline by turnbuckle stretcher.Pulley blocks one are connected to pulley blocks two
Mobile transport pipeline, is more convenient when pulley blocks one being made to be connect with transport pipeline with pulley blocks two on connector.
The present invention is further arranged to:It is fixedly connected with stress ring on the clamping plate one.
By using above-mentioned technical proposal, pulley blocks one are connected to the rotation that transport pipeline is controlled in stress ring, pulley blocks
Two are connected to the movement that transport pipeline is controlled on turnbuckle stretcher, can be twined to avoid pulley blocks one and the drawstring of pulley blocks two
Around influence use together.
The present invention is further arranged to:The turnbuckle stretcher includes framework, is threadedly connected to the two of framework both ends
A lead screw, two lead screws are located at one end outside framework and are arranged in hook-type, and two lead screws are in respectively plus thread with framework
Connection is connected with left-hand thread.
By using above-mentioned technical proposal, can rotate framework makes two lead screws away from each other or closes on each other, in turn
Achieve the purpose that clamping plate one and clamping plate two being fixed on transport pipeline.
The present invention is further arranged to:Two one end of the threaded rod far from framework are arranged with fastener, the fastener
Including be opened on threaded rod sliding groove, with the mating inserting column of sliding groove, be fixed on inserting column fixture block, be opened in silk
The card slot being engaged by clamping with fixture block on bar.
By using above-mentioned technical proposal, after lead screw is hooked onto snap-gauge one and snap-gauge two, the fixture block on inserting column is clamped
The opening of one end is set in hook-type to card slot inner sealing lead screw, avoids one end in hook-type of the lead screw when rotating framework from snap-gauge
One or snap-gauge two on fall off.
The present invention is further arranged to:The fixing piece for fixing transport pipeline, the fixation are additionally provided on the frame body
The fixing bolt that part includes the fixed plate of arc-shaped setting, is threadedly connected in fixed plate, the fixed plate exist with fixing bolt
One group is respectively provided on arc pallet and support plate, described fixing bolt one end passes through fixed plate and arc pallet and support plate thread
Connection.
By using above-mentioned technical proposal, after the completion of transport pipeline connection, transport pipeline both ends are divided by fixing piece
It is not fixed with saddle and cross bar, achievees the effect that prevent transport pipeline mobile on frame body.
In conclusion the invention has the advantages that:
1. the height-adjustable axis that may insure two adjacent transport pipelines of frame body is on the same line, fortune is avoided the occurrence of
Defeated pipeline junction gap is larger, the problem of being not easy to connect;
2. arc pallet can increase the contact area of frame body and transport pipeline, ball one and ball two with support plate rotation connection
Transport pipeline movement on frame body can be made more effortless;
3. auxiliary body can be such that operator more effortlessly moves and rotary transport pipeline.
Description of the drawings
Fig. 1 is the overall structure figure of the present embodiment;
Fig. 2 is the structure chart of the first frame body in the present embodiment;
Fig. 3 is the structure chart of the second frame body in the present embodiment;
Fig. 4 is the present embodiment middle pulley group structure chart;
Fig. 5 is the structure sectional view of axial moving mechanism in the present embodiment;
Fig. 6 is the structure chart of connector in the present embodiment;
Fig. 7 is the structure chart of turnbuckle stretcher in the present embodiment;
Fig. 8 is the portions the A enlarged drawing of Fig. 7;
Fig. 9 is the structure chart of fixing piece in the present embodiment.
In figure:1, the first frame body;11, bottom plate;12, threaded post;13, saddle;14, arc pallet;15, ball one;16, water
Leveling ruler;2, the second frame body;21, supporting rack;211, pedestal;212, jack;22, directional wheel;23, support plate;24, ball two;
25, fixed seat;251, sliding slot;252, sliding block;26, mounting hole;3, shell;4, mechanism is circumferentially rotated;41, auxiliary frame;42, horizontal
Bar;43, pulley blocks one;431, connecting plate one;432, wheel body one;433, wheel body two;434, connecting plate two;435, wheel body three;
436, wheel body four;44, drawstring;5, axial moving mechanism;51, column;52, guide plate;53, guide groove;54, guide pad;55, sliding
Wheel group two;6, connector;61, clamping plate one;611, stress ring;62, clamping plate two;63, turnbuckle stretcher;631, framework;
632, lead screw;64, fastener;641, sliding groove;642, inserting column;643, fixture block;644, card slot;7, fixing piece;71, fixed plate;72、
Fixing bolt;8, transport pipeline.
Specific implementation mode
With reference to the accompanying drawings and examples, the present invention will be described in detail.
Embodiment:A kind of piping lane, as depicted in figs. 1 and 2, including shell 3, the transport pipeline 8 and frame that are installed in shell 3
Body, frame body include the first frame body 1 and the second frame body 2, and the first frame body 1 includes bottom plate 11, and threaded post is fixed at 11 top of bottom plate
12, threaded post 12 is arranged perpendicular to bottom plate 11;It is connected with cylinder setting in threaded one end of the threaded post 12 far from bottom plate 11
Saddle 13, the one end of saddle 13 far from threaded post 12 is rotatably connected to arc pallet 14;The wherein rotation axis of arc pallet 14
Line is horizontally disposed, and multiple balls 1 are evenly equipped on the upper surface of arc pallet 14, are readily transported pipeline 8 in arc pallet 14
Upper movement;14 top of arc pallet, which is fixedly connected, is useful for judging the whether horizontal horizon rule 16 of transport pipeline 8.
As shown in figures 1 and 3, the second frame body 2 includes supporting rack 21, and supporting rack 21 includes pedestal 211, is pushed up in pedestal 211
Portion is fixedly connected with jack 212, and one end of 212 piston rod of jack is rotatably connected to the support plate 23 of arc-shaped setting, branch
The pivot center of fagging 23 is horizontally disposed;It is evenly equipped with multiple balls 2 24 on one side far from jack 212 in support plate 23, is convenient for
Transport pipeline 8 moves in support plate 23.It is fixed with directional wheel 22 below pedestal 211, is used for movable supporting frame 21;Very heavy
It pushes up 212 both sides and symmetrically offers sliding slot 251, sliding block 252 is slidably connected in sliding slot 251, sliding slot 251 is along 212 axis of jack
Line direction opens up;The fixed seat 25 for being useful for fixing support rack 21 is fixedly connected in the one end of sliding block 252 far from sliding slot 251, Gu
Mounting hole 26 is offered in reservation 25, and for being passed through for setscrew, fixed seat 25 is fixed on ground.
As shown in Figure 1 and Figure 4, for the ease of the installation of transport pipeline 8, the peace of assistant conveyance pipeline 8 is additionally provided in shell 3
The axial moving mechanism 5 of dress and mechanism 4 is circumferentially rotated, it includes auxiliary frame 41 to circumferentially rotate mechanism 4, is fixed in 41 side of auxiliary frame
It is connected with cross bar 42, cross bar 42 is vertical with auxiliary frame 41 fixed;Pulley blocks 1, pulley blocks are also fixedly connected on cross bar 42
One 43 include wheel body 1, wheel body 2 433, wheel body 3 435, wheel body 4 436, connecting plate 1, connecting plate 2 434, wherein
Wheel body 1 is rotatablely connected with connecting plate 1 with wheel body 2 433, and wheel body 1 and the axis of wheel body 2 433 are mutually equal
Row;Wheel body 3 435 is rotatablely connected with connecting plate 2 434 with wheel body 4 436, and wheel body 3 435 and the axis of wheel body 4 436 are mutual
It is parallel.A drawstring 44 is equipped in pulley blocks 1, drawstring 44 bypasses wheel body 1, wheel body 2 433, wheel body three successively
435, wheel body 4 436, and one end that drawstring 44 is located in pulley blocks 1 is fixedly connected with connecting plate 2 434, the other end is free
Extend to one 43 outside of pulley blocks.
As shown in Figure 1 and Figure 5, axial moving mechanism 5 includes the column 51 being fixed in shell 3, solid at 51 top of column
There are guide plate 52, the arc-shaped setting of guide plate 52 and guide plate 52 to be socketed on 8 outside of transport pipeline surely;It is opened up on guide plate 52
There are guide groove 53, guide groove 53 to be opened up along the length direction of guide plate 52;Guide pad 54 is slidably connected in guide groove 53,
Guide pad 54 is fixedly connected with pulley blocks 2 55 far from 53 side one end of guide groove;Wherein pulley blocks 2 55 and one 43 structure of pulley blocks
Identical only fixed position is different, and the connecting plate 1 in pulley blocks 2 55 is fixedly connected with guide pad 54, in pulley blocks two
Drawstring 44 is equally equipped in 55(Such as Fig. 4), 44 one end of drawstring is fixedly connected with connecting plate 2 434, and the other end freely extends to
2 55 outside of pulley blocks.When pulling transport pipeline 8 with pulley blocks 2 55, pulley blocks 2 55 follow guide pad 54 in guide groove 53
Interior sliding keeps the pull direction of drawstring 44 identical as the moving direction of transport pipeline 8 always.
As shown in figures 1 to 6, it is fixed on transport pipeline 8 for connecting pulley blocks 1, pulley blocks 2 55, transport
The connector 6 of pipeline 8, connector 6 include clamping plate 1, are rotationally connected with the clamping plate 2 62 of one 61 one end of clamping plate, clamping plate 1
Circle can be formed with the cooperation of clamping plate 2 62;It is connected with turnbuckle in clamping plate 1 and the one end of clamping plate 2 62 away from each other
Tight device 63, for connecting cleat 1 and clamping plate 2 62;It is fixedly connected with stress ring 611 in one 61 outside of clamping plate, is convenient for pulley
Group 1 is connected on connector 6.
As shown in fig. 7, turnbuckle stretcher 63 includes framework 631, in 631 both sides of framework, there are two lead screws for threaded connection
632, two lead screws 632 connect respectively in plus thread with framework 631 and left-hand thread connection, two lead screws 632 away from each other one
End is in that hook-type is arranged, and the hook portion of two lead screws 632 is connect with clamping plate 1 with clamping plate 2 62 respectively.
As shown in figure 8, being equipped with fastener 64 in one end of hook-type setting in two lead screws 632, fastener 64 includes being opened in silk
Sliding groove 641 on bar 632,641 both ends of sliding groove are penetrating;Be slidably connected an inserting column 642 in sliding groove 641, inserting column 642
It can be rotated in 641 inner circumferential of sliding groove;642 one end of inserting column is fixedly connected with fixture block 643, is further opened with and blocks on lead screw 632
The card slot 644 that block 643 is engaged by clamping, one end that inserting column 642 fixes fixture block 643 are rotatably inserted into card slot 644, make inserting column 642 not
It can be slided along own axes direction.
As shown in Fig. 1 and Fig. 9, in order to which transport pipeline 8 to be fixed in support plate 23 and arc pallet 14, in arc pallet
14 with support plate 23 on be additionally provided with fixing piece 7, fixing piece 7 includes the fixed plate 71 of arc-shaped setting, at 71 both ends pair of fixed plate
Title, which is set, wears a fixing bolt 72, and fixing bolt 72 is threadedly coupled across fixed plate 71 with support plate 23 and arc pallet 14.
When installation:
1)First frame body 1 is adjusted and bottom plate 11 is fixed on shell 3 after height;
2)8 one end of transport pipeline is placed on arc pallet 14 and transport pipeline 8 is fixed on arc pallet 14 with rope, so
The second frame body 2 is put in bottom plate 11 afterwards to close below the landing of transport pipeline 8 one end, the support plate 23 and delivery tube of the second frame body 2
Road 8 is inconsistent;
3)The second frame body 2 is moved along one end that 8 axis direction of transport pipeline is landed to transport pipeline 8, when the second frame body 2 is moved to
Transport pipeline 8 close on landing one end when, put down fixed seat 25, supporting rack 21 be fixed on ground, prevent supporting rack 21 from after
Continuous movement;
4)The height that supporting rack 21 is adjusted by jack 212 keeps 8 axis holding of transport pipeline horizontal;
5)Fixed transport pipeline 8 closes on the rope of 13 one end of saddle before removing, and is then socketed clamping plate 1 and clamping plate 2 62
Onto transport pipeline 8, with 63 connecting cleat 1 of turnbuckle stretcher and clamping plate 2 62, inserting column 642 is then plugged into card
It in slot 644 and rotates, prevents turnbuckle stretcher 63 from being fallen from clamping plate 1 on clamping plate 2 62, then rotate framework 631,
Connector 6 is fixed on transport pipeline 8;
6)Bogie is fixed on 8 middle part lower section of transport pipeline, so that guide plate 52 is socketed on 8 outside of transport pipeline, then will slide
Connecting plate 2 434 in wheel group 2 55 is fixed on turnbuckle stretcher 63;
7)Mechanism 4 will be circumferentially rotated and be fixed on one end lower section that transport pipeline 8 fixes fixing piece 7, make cross bar 42 perpendicular to transport
Then one 43 connecting plate 2 434 of pulley blocks is fixed in stress ring 611 by the axis of pipeline 8;
8)Axial moving mechanism 5 is fixedly connected on 8 middle part lower section of transport pipeline, then pulley blocks 2 55 are fixedly attached to and are led
To on block 54;
9)The drawstring 44 on pulley blocks 1, the transport pipeline 8 that will be connected and upper 8 grafting of a transport pipeline are pulled, is then drawn
Firmly the drawstring 44 on pulley blocks 1 is not put, then pulls the drawstring 44 on pulley blocks 2 55, by two 8 rotary clampings of transport pipeline
To together;
10)Transport pipeline 8 is welded;
11)Pulley blocks 1 and pulley blocks 2 55 are removed from connector 6, connector 6 are then removed from transport pipeline 8, most
Auxiliary frame 41 and bogie are removed from piping lane ground afterwards;
12)Two fixed plates 71 are put in the both ends of transport pipeline 8 respectively, are then fixed fixed plate 71 by fixing bolt 72
Onto support plate 23 and arc pallet 14.
It circumferentially rotates mechanism 4 to reuse in piping lane with axial moving mechanism 5, economize on resources.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.