CN107489168A - A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system - Google Patents

A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system Download PDF

Info

Publication number
CN107489168A
CN107489168A CN201710881320.6A CN201710881320A CN107489168A CN 107489168 A CN107489168 A CN 107489168A CN 201710881320 A CN201710881320 A CN 201710881320A CN 107489168 A CN107489168 A CN 107489168A
Authority
CN
China
Prior art keywords
plate
pipe
anchorage
prestress
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710881320.6A
Other languages
Chinese (zh)
Inventor
雷明锋
林越翔
林大涌
施成华
曹豪荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Publication of CN107489168A publication Critical patent/CN107489168A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Flanged Joints, Insulating Joints, And Other Joints (AREA)

Abstract

The invention discloses a kind of staggered joint erection comprehensive pipe gallery structure based on prestress system, including piping lane agent structure prefabricated components system, the functional space of piping lane is formed for assembling;Component prestressing force connects system, for connecting each prefabricated components of piping lane agent structure;Waterproof sealing system, for water passage inside and outside isolation structure, keep drying in piping lane space.The staggered joint erection Pipe rack based on prestress system that the present invention designs employs blocking criteria design, it is easy to engineering to produce, precision is high, it is light to be easy to lift, pass through prestressing force linked system and staggered joint erection method, the rigidity of structure is set to be evenly distributed, cracking resistance or non-deformability enhancing, while prestressing force connected mode cooperation waterproof sealing system can also improve the water proof anti-seepage ability of Pipe rack.

Description

A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
Technical field
The present invention relates to a kind of Urban Underground comprehensive pipe gallery structure, more particularly to a kind of fissure of displacement based on prestress system is spelled Fill comprehensive pipe gallery structure.
Background technology
The laying method of the pipelines such as conventional electric power, communication and combustion gas is method of directly burring, due to the same road of the laying of various pipelines Construction is difficult to synchronization, causes existing road to be subjected to excavating landfill repeatedly, not only produces traffic and hinders, noise pollution, environmental disruption Deng livelihood issues, the waste of resource and the increase of quantities also result in.
Pipe gallery, can be by a series of municipal pipeline collection such as electric power, heating power, communication as a kind of Underground Extra-long linear structure In in one, by setting the facilities such as special access hole, dog-house, realize management and construction for pipeline integrated system. Quantities and cost are greatly reduced, more effectively make use of city space to optimize urban life environment.State Council in 2014 General office puts into effect《On strengthening the instruction of City Buried Pipeline implementation management》, indicate steady propulsion underground synthesis The construction of piping lane, and will progressively carry out corresponding pilot project.
The technology relative maturity of fluting method cast in situs Pipe rack at present, but simultaneously there is also earthwork it is big, Occupied ground is wide, construction is complicated and efficiency is low, it is long in time limit the defects of.And prefabricated piping lane can realize the concentration metaplasia of piping lane structure Production, improve the quality and producing efficiency of component.The floor space of live windrow is decreased simultaneously, ensure that speed of application.
Existing prefabricated piping lane uses integrated precast Pipe rack more, but integrated precast Pipe rack often volume It is huge and very heavy, it is all more inconvenient during transport and lifting, while also give transporting equipment and hanging device Higher requirement is proposed, there is more potential safety hazard.In consideration of it, the prefabricated piping lane of pin-connected panel has come into engineering site.
Domestic prefabricated assembled Pipe rack has accumulated certain achievement in research at present, such as Chinese publication number CN105256838A discloses a kind of piping lane prefabricated component and prefabricated pipe gallery.It is prefabricated that Pipe rack is decomposed into three groove profiles Part.The horizontal cast in situs upwardly through reserved reinforcement is attached, and is attached on longitudinal direction using prestressed cable.Take into account The structural intergrity of prefabricated component and the convenience of assembling.It is prefabricated that Chinese invention publication number CN105256837A discloses a kind of piping lane Part and assembled pipe gallery.Piping lane is decomposed into chassis prefabricated component and cover plate prefabricated component, and setting is recessed at contact surface respectively Groove and projection, are easily installed fixation.It is attached by stressing equipment.Chinese invention publication number CN105625471A is disclosed A kind of prefabricated pipe gallery.Pipe rack is divided into bottom plate, side plate, divides storehouse plate and top plate.By in contact surface Bellmouth is set to realize the interim fixation of structure with socket.Interconnection between respective component is realized by steel pipe embedded part.
The existing assembled Pipe rack of comprehensive analysis is visible, and the component of most of assembled piping lanes is still more huge stupid Weight, still there is improved space in the dividing mode of component.Existing assembled piping lane uses straight joint formula splicing structure more, by Rigidity in joint is relatively small, and the assembling of straight joint formula will cause integrally-built Stiffness Distribution uneven, influence the entirety of structure Rigidity, it is impervious to structure unfavorable.It is most that prestress anchoraging means are only taken on longitudinally connected in terms of the connection of component, it is horizontal Connection between section upper member is relatively weak, have impact on the globality of structure.Simultaneously existing assembled Pipe rack for The setting of joint waterproof details does not provide detailed specification.
The content of the invention
Pin of the present invention devises a kind of staggered joint erection comprehensive pipe gallery structure based on prestress system, and it is an object of the present invention to provide one Kind structure is more succinct light, is easy to lifting construction, the prefabricated piping lane system of element type of good integrity.Spelled by the rational fissure of displacement Dress and vertically and horizontally prestressing force connection system, are more uniformly distributed the Stiffness Distribution of piping lane, improve piping lane entirety anti-deformation;Pass through The waterstop sealing system that each element joints are set, coordinate prestressing force connected mode, improve the leakage resistance energy of Pipe rack.
In order to realize above-mentioned technical purpose, the technical scheme is that,
A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system, including form piping lane functional space for assembling Piping lane agent structure prefabricated components system;The component prestressing force of each prefabricated components for connecting piping lane agent structure connects system System;For water passage inside and outside isolation structure, the waterproof sealing system dried in piping lane space is kept;
Described piping lane agent structure prefabricated components system includes bottom plate, intermediate plate and top plate, and described intermediate plate is set To form Pipe rack between the bottom plate of bottom and the top plate at top;Described component prestressing force connection system includes connector And prestress wire, described connector are arranged in prefabricated panel, intermediate plate and top plate, and by penetrating prestress steel twist Line is to interconnect;Described waterproof sealing system includes seal, described seal be arranged at prefabricated panel, intermediate plate and To realize waterproof sealing on joint face between top plate.
A kind of described staggered joint erection comprehensive pipe gallery structure based on prestress system, described piping lane agent structure are prefabricated In construction system, bottom plate 11 is double " U " groove patterns, is placed in the bottom of Pipe rack;Described intermediate plate includes left plate 12, the right side Side plate 14 and median septum 13, described left plate 12 and right plate 14 are respectively arranged at the both sides of Pipe rack, and median septum 13 is set It is placed in the center of Pipe rack;Top plate 15 is double " n " groove patterns, is placed in the top of Pipe rack, and bottom plate, intermediate plate and top plate are spelled It is connected in the Pipe rack with two parallel channels.
A kind of described staggered joint erection comprehensive pipe gallery structure based on prestress system, described left plate 12 and right plate 14 be the sphenoid that the face that is vertically connected with is inclined-plane;Dividing plate 13 is to be vertically connected with the cuboid that face is arranged to horizontal plane;Bottom plate 11 It is all provided with being set to the inclined-plane to match with left plate 12, right plate 14 and median septum 13 or plane with 15 each joint face of top plate.
A kind of described staggered joint erection comprehensive pipe gallery structure based on prestress system, bottom plate, intermediate plate are connected with top plate The mode of Shi Caiyong staggered joint erections is attached.
A kind of described staggered joint erection comprehensive pipe gallery structure based on prestress system, described component prestressing force connection system Connector in system includes the closed anchorage 21, shuttle pipe 22 and opening being embedded in advance in each bottom plate, intermediate plate and top plate Formula anchorage 24, every group of connector is including closed 21, open type anchorage devices 24 of anchorage on same straight line and extremely Few two shuttle pipes 22, and closed anchorage 21 in every group of connector and open type anchorage device 24 are embedded in two adjacent bottom plates Or in two intermediate plates or two top plates, one end of steel strand wires is fixed in closed anchorage, and the other end is in open type anchorage device 24 Operation is fixed in place.
A kind of described staggered joint erection comprehensive pipe gallery structure based on prestress system, the envelope in every group of described connector In the embedding component formerly laid of enclosed anchorage 21, in the component that open type anchorage device 24 is laid after being embedded in, and managed by shuttling 22 connections, steel strand wires are reached in closed anchorage 21 from open type anchorage device 24 through shuttle pipe 22 with fixation, the component first laid In shuttle pipe in tail end be horn mouth 23, the shuttle pipe in the component laid afterwards is straight tube in front end in order to be aligned to loudspeaker Mouthful.
A kind of described staggered joint erection comprehensive pipe gallery structure based on prestress system, every piece of bottom plate, intermediate plate or top plate An open type anchorage device being inside at least embedded with horizontal direction and a closed anchorage, an open type on vertical direction Anchorage and a closed anchorage, and the shuttle pipe to match with corresponding anchorage.
A kind of described staggered joint erection comprehensive pipe gallery structure based on prestress system, described waterproof sealing system it is close Sealing includes sealing rod and lays the groove of sealing rod, and groove 32 sets along each component connection surface edge, and sealing rod 31 is along recessed Groove 32 is arranged.
The technical effects of the invention are that:
(1) present invention has drawn Software Component Design thinking, and whole Pipe rack is reasonably divided into some calibrated bolcks, from And can realize that batch production is prefabricated, improve element precast precision, while each component is relatively small, and single component is light and handy, be easy to lifting, Transport and installation.
(2) present invention employs closed anchorage first, realizes the automatic anchoring of presstressed reinforcing steel, solves well Continuous assembled condition, which places an order, holds effective anchoring operation of working face, and it is empty pre- in Pipe rack to have evaded existing anchorage method needs Anchor mouth is stayed, destroys the risk of structural integrity.
(3) present invention employs staggered joint erection mode and vertical, horizontal prestressing force linked system first so that whole piping lane The vertical, horizontal Stiffness Distribution of structure is uniform, improves the non-deformability of Pipe rack.
(4) present invention devises comprehensively and effectively waterproof sealing system, coordinates prestressing force effect so that each component contact is close Patch, improve the water proof anti-seepage ability of Pipe rack.
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to figure, the present invention is further detailed explanation.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the piping lane agent structure prefabricated components system schematic in Fig. 1;
Fig. 3 is the component prestressing force connection system schematic in Fig. 1;
Fig. 4 is the anchoring system detail structure schematic diagram in Fig. 3;
Fig. 5 is the waterproof sealing system schematic in Fig. 1;
Fig. 6 is the waterproof sealing system detail structure schematic diagram in Fig. 1;
Wherein, 1, piping lane agent structure prefabricated components system;11st, bottom plate;12nd, left plate;13rd, median septum;14th, right side Plate;15th, top plate;2nd, component prestressing force connection system;21st, closed anchorage;22nd, shuttle pipe;23rd, flared end;24th, open type Anchorage;25th, steel strand wires;26th, straight tube end;3rd, waterproof sealing system;31st, rubber water-proof bar;32nd, groove.
Embodiment
Embodiments of the invention are described in detail below in conjunction with accompanying drawing, but the present invention can be defined by the claims Implement with the multitude of different ways of covering.
As shown in figure 1, pin of the present invention devises a kind of staggered joint erection comprehensive pipe gallery structure based on prestress system, including Piping lane agent structure prefabricated components system 1, the functional space of piping lane is formed for assembling;Component prestressing force connects system 2, is used for Connect each prefabricated components of piping lane agent structure;Waterproof sealing system 3, for water passage inside and outside isolation structure, keep piping lane Dried in space.
In this embodiment, as shown in Fig. 2 piping lane agent structure prefabricated components system 1 is by prefabricated panel 11, left plate 12nd, 15 5 right plate 14, median septum 13 and top plate component compositions.
Specifically, as shown in Fig. 2 bottom plate 11 is double " U " groove patterns, it is placed in the bottom of Pipe rack;Left plate 12, right side Plate 14 and median septum 13 are located at the middle part side and centre position of Pipe rack respectively, pass through prestress wire 25 and bottom plate 11 It is connected;Top plate 15 is double " n " groove patterns, is placed in the top of Pipe rack, again by prestress wire 25 and left plate 12, Right plate 14 is connected with median septum 13.
Further, as shown in Fig. 2 left plate 12, right plate 14 are sphenoid, the face of being vertically connected with is disposed as inclined-plane; Median septum 13 is cuboid, and the face of being vertically connected with is arranged to horizontal plane;Bottom plate 11 and 15 each joint face of top plate is all provided with being set to and left side The inclined-plane or plane that plate 12, right plate 14 and median septum 13 match.Left plate 12, right plate 14, median septum 13 and top plate 15 When being connected with bottom plate 11 by the way of staggered joint erection.Each component connection surface is equipped with the groove 32 for laying sealing rod, groove 32 are evenly arranged along surface surrounding.
Further, as shown in Figure 3, Figure 4, component prestressing force connects system 2 by closed anchorage 21, shuttle pipe 22, steel Twisted wire 25, open type anchorage device 24 form.Closed anchorage 21, shuttle pipe 22 and open type anchorage device 24 are embedded in each component in advance In, after corresponding piping lane agent structure prefabricated components are laid in place, then steel strand wires 25 are penetrated out of open type anchorage device 24, through shuttling Pipe 22 is reached in closed anchorage 21, then carries out the operations such as prestressed stretch-draw, locking and sealing off and covering anchorage from the end of open type anchorage device 24.Envelope Enclosed anchorage is using patent " a kind of closed automatic anchorage ", the device that is referred in the patent No. " 201621069293.X ", To realize prestressed structural systems using the effect in the structure or condition when can not provide working space to one end.Open type Anchorage can be common at present open type anchorage device device realized.
Specifically, as shown in figure 4, closed anchorage 21 be embedded in advance in the component laid in advance, open type anchorage device 24 It is embedded in advance in the component of later stage placement, both are connected by shuttle pipe 22, and are consolidated with shuttle pipe 22 by modes such as screw threads Fixed connection.Shuttle pipe 22 is designed as access type flexible connection, i.e., the component shuttle pipe 22 laid in advance at adjacent members contact surface Non-anchor fixed end, it is arranged to the pattern of horn mouth 23, and the 22 non-anchor fixed end of component shuttle pipe that the later stage lays is arranged to the pattern of straight tube 26, During placement, the alignment of straight tube end 26 is placed in flared end 23, in this way, then can ensure that follow-up steel strand wires 25 shuttle smooth arrival In closed anchorage 21.
Further, as shown in figure 3, being respectively provided with 2~3 groups of anchor connection bodies on each adjacent members axial direction or cross-sectional direction System, the adjacent members mode of anchor connection successively two-by-two is taken, piping lane agent structure prefabricated components system 1 is formed firm group Close structure.
In this embodiment, as shown in Figure 5, Figure 6, waterproof sealing system, 3 by being fixed in each component connection surface groove 32 Sealing rod 31 form, sealing rod 31 is arranged along the uniformly continuous of groove 32, component lay it is in place after, sealing rod 31 contacts two-by-two, Closely connected anti-, sealing is realized under prestressing force effect.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (8)

1. a kind of staggered joint erection comprehensive pipe gallery structure based on prestress system, it is characterised in that including forming pipe for assembling The piping lane agent structure prefabricated components system of corridor functional space;The component of each prefabricated components for connecting piping lane agent structure is pre- Stress connects system;For water passage inside and outside isolation structure, the waterproof sealing system dried in piping lane space is kept;
Described piping lane agent structure prefabricated components system includes bottom plate, intermediate plate and top plate, and described intermediate plate is arranged at bottom To form Pipe rack between the bottom plate in portion and the top plate at top;Described component prestressing force connection system is including connector and in advance Prestress steel strand, described connector are arranged in prefabricated panel, intermediate plate and top plate, and by penetrate prestress wire with Interconnect;Described waterproof sealing system includes seal, and described seal is arranged at prefabricated panel, intermediate plate and top plate Between joint face on to realize waterproof sealing.
A kind of 2. staggered joint erection comprehensive pipe gallery structure based on prestress system according to claim 1, it is characterised in that In described piping lane agent structure prefabricated components system, bottom plate (11) is double " U " groove patterns, is placed in the bottom of Pipe rack;Institute The intermediate plate stated includes left plate (12), right plate (14) and median septum (13), described left plate (12) and right plate (14) The both sides of Pipe rack are respectively arranged at, median septum (13) is arranged at the center of Pipe rack;Top plate (15) is double " n " groove profiles Formula, is placed in the top of Pipe rack, and bottom plate, intermediate plate and top plate are spliced into the Pipe rack with two parallel channels.
A kind of 3. staggered joint erection comprehensive pipe gallery structure based on prestress system according to claim 2, it is characterised in that Described left plate (12) and right plate (14) is the sphenoid that the face that is vertically connected with is inclined-plane;Dividing plate (13) is to be vertically connected with face It is arranged to the cuboid of horizontal plane;Bottom plate (11) and top plate (15) each joint face are all provided with being set to and left plate (12), right plate And the inclined-plane that matches of median septum (13) or plane (14).
A kind of 4. staggered joint erection comprehensive pipe gallery structure based on prestress system according to claim 1, it is characterised in that: Bottom plate, intermediate plate are attached when being connected with top plate by the way of staggered joint erection.
A kind of 5. staggered joint erection comprehensive pipe gallery structure based on prestress system according to claim 1, it is characterised in that Connector in described component prestressing force connection system is closed in each bottom plate, intermediate plate and top plate including being embedded in advance Anchorage (21), shuttle pipe (22) and open type anchorage device (24), and every group of connector is closed including one on same straight line Anchorage (21), an open type anchorage device (24) and at least two, which shuttle, manages (22), and the closed anchorage in every group of connector (21) it is embedded in open type anchorage device (24) in two adjacent bottom plates or two intermediate plates or two top plates, one end of steel strand wires It is fixed in closed anchorage, operation is fixed at open type anchorage device (24) place in the other end.
A kind of 6. staggered joint erection comprehensive pipe gallery structure based on prestress system according to claim 5, it is characterised in that In the embedding component formerly laid of closed anchorage (21) in every group of described connector, after open type anchorage device (24) is embedded in In the component of placement, and connected by the pipe (22) that shuttles, steel strand wires reach envelope from open type anchorage device (24) through the pipe (22) that shuttles With fixation in enclosed anchorage (21), shuttle pipe in the component first laid is horn mouth (23) in tail end, in the component laid afterwards Shuttle pipe in front end be straight tube in order to being aligned to horn mouth.
A kind of 7. staggered joint erection comprehensive pipe gallery structure based on prestress system according to claim 5, it is characterised in that An open type anchorage device being at least embedded with every piece of bottom plate, intermediate plate or top plate in horizontal direction and a closed anchorage, An open type anchorage device and a closed anchorage on vertical direction, and the shuttle pipe to match with corresponding anchorage.
A kind of 8. staggered joint erection comprehensive pipe gallery structure based on prestress system according to claim 1, it is characterised in that The seal of described waterproof sealing system includes sealing rod and lays the groove of sealing rod, and groove (32) is along each component connection table Face edge is set, and sealing rod (31) is arranged along groove (32).
CN201710881320.6A 2017-06-20 2017-09-26 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system Pending CN107489168A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2017104678224 2017-06-20
CN201710467822 2017-06-20

Publications (1)

Publication Number Publication Date
CN107489168A true CN107489168A (en) 2017-12-19

Family

ID=60652835

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710881320.6A Pending CN107489168A (en) 2017-06-20 2017-09-26 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN201721243276.8U Active CN207176738U (en) 2017-06-20 2017-09-26 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201721243276.8U Active CN207176738U (en) 2017-06-20 2017-09-26 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system

Country Status (1)

Country Link
CN (2) CN107489168A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560587A (en) * 2018-06-01 2018-09-21 西安交通大学 A kind of cave type prefabrication and assembly construction pipe gallery and installation method
CN109779268A (en) * 2019-02-25 2019-05-21 上海城建建设实业(集团)有限公司 The construction method of fragment integrated form T plate
CN110284519A (en) * 2019-06-17 2019-09-27 湖北建科国际工程有限公司 A kind of pipe gallery assembling structure and pipe gallery
CN110822166A (en) * 2019-11-11 2020-02-21 常州工学院 Pressure pipeline deep-grooving-free outer enclosing structure and construction method
CN111501823A (en) * 2020-04-20 2020-08-07 中冶京诚工程技术有限公司 Community pipeline co-structure

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489168A (en) * 2017-06-20 2017-12-19 中南大学 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN111251448A (en) * 2020-01-19 2020-06-09 上海建工四建集团有限公司 Pouring method of prefabricated tunnel structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070042125A (en) * 2007-03-06 2007-04-20 백경종 The connection and waterproof method of the assembly p.c culvert which applies the fixation system
KR20070111431A (en) * 2007-10-29 2007-11-21 백경종 The connection method of the assembly p.c culvert which applies the inner fixation system
CN204098065U (en) * 2014-08-29 2015-01-14 上海市政工程设计研究总院(集团)有限公司 A kind of can the precast assembly pipe gallery of stretch-draw in body
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN105421489A (en) * 2015-11-11 2016-03-23 东南大学 Mortise type prefabricated comprehensive pipe gallery longitudinal connector
CN206091080U (en) * 2016-09-21 2017-04-12 中南大学 Closed automatic ground tackle
CN106759485A (en) * 2017-01-18 2017-05-31 贾登忠 A kind of prefabricated piping lane of two-piece unit formula and installation method
CN207176738U (en) * 2017-06-20 2018-04-03 中南大学 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070042125A (en) * 2007-03-06 2007-04-20 백경종 The connection and waterproof method of the assembly p.c culvert which applies the fixation system
KR20070111431A (en) * 2007-10-29 2007-11-21 백경종 The connection method of the assembly p.c culvert which applies the inner fixation system
CN204098065U (en) * 2014-08-29 2015-01-14 上海市政工程设计研究总院(集团)有限公司 A kind of can the precast assembly pipe gallery of stretch-draw in body
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN105421489A (en) * 2015-11-11 2016-03-23 东南大学 Mortise type prefabricated comprehensive pipe gallery longitudinal connector
CN206091080U (en) * 2016-09-21 2017-04-12 中南大学 Closed automatic ground tackle
CN106759485A (en) * 2017-01-18 2017-05-31 贾登忠 A kind of prefabricated piping lane of two-piece unit formula and installation method
CN207176738U (en) * 2017-06-20 2018-04-03 中南大学 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
穆保岗等: "《地下结构工程(第2版)》", 28 February 2012, 东南大学出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560587A (en) * 2018-06-01 2018-09-21 西安交通大学 A kind of cave type prefabrication and assembly construction pipe gallery and installation method
CN109779268A (en) * 2019-02-25 2019-05-21 上海城建建设实业(集团)有限公司 The construction method of fragment integrated form T plate
CN109779268B (en) * 2019-02-25 2021-04-16 上海城建建设实业(集团)有限公司 Construction method of large-span segmented integrated double-T plate
CN110284519A (en) * 2019-06-17 2019-09-27 湖北建科国际工程有限公司 A kind of pipe gallery assembling structure and pipe gallery
CN110822166A (en) * 2019-11-11 2020-02-21 常州工学院 Pressure pipeline deep-grooving-free outer enclosing structure and construction method
CN111501823A (en) * 2020-04-20 2020-08-07 中冶京诚工程技术有限公司 Community pipeline co-structure

Also Published As

Publication number Publication date
CN207176738U (en) 2018-04-03

Similar Documents

Publication Publication Date Title
CN207176738U (en) A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN101761344B (en) Preparation method of prefabricated pipe section for shield tunnel
CN201599040U (en) Prefabricated segments for shield tunneling
CN106759420B (en) A kind of prefabricated assembled transformer substation foundation structure
CN106013235A (en) City utility tunnel of arch cross section steel buckled plate
CN105971018A (en) Tubular cross section steel buckled plate city utility tunnel
CN104410031B (en) A kind of pre-fabricated electric cables comb
CN205297593U (en) Prefabricated cable tunnel module of combined type
CN107134660A (en) Underground pipe gallery electrical grounding net
CN104993440A (en) Lightning-protection manual grounding system and construction method by utilizing structure steel bar externally-connected downlead wire
CN110424447A (en) A kind of assembled substation integration foundation structure and its construction method
CN207453225U (en) A kind of superstructure unit and assembly concrete integrated floor
CN210562276U (en) Integrated foundation structure of assembled transformer substation
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
CN207122021U (en) Assembled bolt connection concrete-filled steel tube shear wall
CN205917728U (en) City utility tunnel of arch cross section steel buckled plate
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN109469099A (en) Assembled underground pipe gallery
CN105089024B (en) Underground workshop outgoing line arrangement mode and structure
CN106451169A (en) Box module combined transformer substation and installation method thereof
CN209975578U (en) Prefabricated utility tunnel of three cabin symmetries
CN111980065A (en) Assembled underground pipe gallery and connecting method thereof
CN212427205U (en) Assembled underground pipe gallery is connected to dry-type
CN205917730U (en) Tubular cross section steel buckled plate city utility tunnel
CN206438537U (en) underground pipe gallery structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171219

RJ01 Rejection of invention patent application after publication