CN108560587A - A kind of cave type prefabrication and assembly construction pipe gallery and installation method - Google Patents

A kind of cave type prefabrication and assembly construction pipe gallery and installation method Download PDF

Info

Publication number
CN108560587A
CN108560587A CN201810557279.1A CN201810557279A CN108560587A CN 108560587 A CN108560587 A CN 108560587A CN 201810557279 A CN201810557279 A CN 201810557279A CN 108560587 A CN108560587 A CN 108560587A
Authority
CN
China
Prior art keywords
partition board
pipe gallery
cradle
assembly construction
curved roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810557279.1A
Other languages
Chinese (zh)
Inventor
宋丽
武朋飞
马建勋
张勇勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Jiaotong University
Original Assignee
Xian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Jiaotong University filed Critical Xian Jiaotong University
Priority to CN201810557279.1A priority Critical patent/CN108560587A/en
Publication of CN108560587A publication Critical patent/CN108560587A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of cave type prefabrication and assembly construction pipe gallery of present invention offer and installation method, include by the prefabricated curved roof of water-proof concrete, partition board, bottom plate and cradle;The free end of the curved roof is overlapped in the groove of corresponding partition board top setting, and fixation is poured by water-proof concrete;The bottom of the partition board is plugged in cradle pours fixation by water-proof concrete;Bottom plate upper end and composition integrated member are determined in the cradle setting;The integrated member of curved roof, partition board and the bottom plate and cradle composition, surrounds to form a tube coupling from top, both sides and lower part, tube coupling connects to forming piping lane successively respectively.Facilitate prefabrication, be readily transported, using cave type prefabrication and assembly construction pipe gallery excellent globality and stability, waterproof effect etc. performance can be more preferable.

Description

A kind of cave type prefabrication and assembly construction pipe gallery and installation method
Technical field
The present invention relates to underground pipe gallery field, specially a kind of cave type prefabrication and assembly construction pipe gallery and installation side Method.
Background technology
With the fast development in city, the problem of causing " road slide fastener ", is more and more severeer, is increasingly influencing civic just The often aesthetic feeling of life and city.In order to the various overhead lines of successive elimination street cobweb formula, urban ground landscape is made to become Finer, city integrated piping lane comes into being.City integrated piping lane is electric power, communication, radio and television, water supply, draining, heat The municipal pipelines such as power, combustion gas are all included, concentrate laying, play the role of " heart " in Modern Urban Development, can Urban carrying capacity is effectively improved, the development process in city is promoted.
Since the 1950s, the research of prefabricated assembled pipe gallery has been set about in China.But due to prefabricated structure The reasons such as the seam crossing sealing performance of part is poor, and drainage happens occasionally, in a very long time after this, prefabricated dress Construction with formula pipe gallery is just nearly at dead state.
And at this stage, in the process of city integrated piping lane development, precast splice type pipe gallery is obtained because of its superiority It is fast-developing.Many problems are also encountered simultaneously, if structure type is excessively complicated, are unfavorable for prefabrication;Gap is excessive, waterproof Effect is poor or because of prefabricated components heaviness, the problems such as being unfavorable for transporting.The above various reasons limit precast splice type integrated pipe The development of corridor technology, so being badly in need of a kind of generation for the novel precast splice type pipe gallery overcoming problem above.
Invention content
Hold for prefabricated assembled pipe gallery globality existing in the prior art and stability difference and waterproof system The problems such as easily collapsing, a kind of cave type prefabrication and assembly construction pipe gallery of present invention offer and installation method, the prefabricated assembled synthesis Pipe rack form is simple, facilitates prefabrication, is readily transported, and utilizes the excellent globality of cave type prefabrication and assembly construction pipe gallery And stability, waterproof effect etc. performance can be more preferable.
The present invention is to be achieved through the following technical solutions:
A kind of cave type prefabrication and assembly construction pipe gallery includes by the prefabricated curved roof of water-proof concrete, partition board, bottom plate And cradle;
The free end of the curved roof is overlapped in the groove of corresponding partition board top setting, is poured by water-proof concrete solid It is fixed;The bottom of the partition board is plugged in cradle pours fixation by water-proof concrete;Bottom is determined in the cradle setting Plate upper end and composition integrated member;
Curved roof, partition board and the bottom plate and cradle composition integrated member, respectively from top, both sides and Lower part is surrounded to form a tube coupling, and tube coupling connects to forming piping lane successively.
Preferably, the curved roof is formed by water-proof concrete through prefabrication, and internal arrangement upper layer and lower layer is equal In the reinforced mesh of criss-cross fashion.
Further, the curved roof uses domes, the reinforcing bar of double steel bar mesh sheet respectively curved roof from It is stretched out by end.
Preferably, the partition board includes being located at the outermost left clapboard of piping lane and right clapboard, and/or be located in the middle part of piping lane Middle partition board;The top of left clapboard and right clapboard extends inwardly, the prefabricated formation groove in top;Prolong to both sides on middle partition board top It stretches, and groove is formed at top, fixation is poured for both sides curved roof overlap joint grouting behind shaft or drift lining.
Preferably, overlapped curved roof quantity is corresponded at the top groove of the partition board, is provided with double amount Reinforcing bar stretches out.
Further, the length that reinforcing bar stretches out prefabricated component is 6-8 ㎝.
Preferably, the depth of groove at the top of partition board is 18-22 ㎝;Curved roof insertion partition board top groove depth be 12-14㎝。
Preferably, the prefabricated component is using additive water-proof concrete, fibre crack-resistance water-proof concrete, high performance water proof Concrete or ultra-high performance concrete are prefabricated.
Preferably, the bottom flute profile support outer slope surface angle is 65 ° -70 °, and inside slope surface angle is 3 ° -5 °;Bottom The vertical height of portion's cradle is not less than 1/10th of divider height.
A kind of installation method of cave type prefabrication and assembly construction pipe gallery, includes the following steps:
Step 1, using by cradle and bottom plate form integrated member as the bottom of pipe gallery arrange ground it On;
Step 2 is lifted on pipe gallery partition board within corresponding bottom cradle, between cradle and partition board Gap carried out pouring fixation with water-proof concrete;
Step 3 lifts curved roof, is overlapped on the groove at the top of respective sides partition board, in the anti-water coagulation in gap Soil cast is fixed, and the installation of the tube coupling is completed;
Step 4, repeat step 1 to three be sequentially completed phase union formed piping lane.
Compared with prior art, the present invention has technique effect beneficial below:
It is whole that the present invention by curved roof, partition board and bottom flute profile abutment member is connected to become one by slip casting measure Body has superiority outstanding using the section form of northern Shensi cave dwelling in terms of structural stability and water resistance.Its interval Plate is embedded on cradle, and then slip casting forms an entirety, to make its molding entire tube coupling not have gap, institute With material and water-proof concrete, so waterproof effect is more preferable.As long as bottom cradle and bottom plate are prefabricated into the cabin number of needs Specification, top can form the city in the single cabin needed, double cabins, the even more cabins in three cabins by installing partition board and curved roof Pipe gallery, it is versatile and flexible, it is easy for installation.The water-proof concrete component that the present invention uses all is prefabrication, assembled in situ group Dress, then fill and starch, economical rationality, component making is simple, light, is convenient to transport, the efficiency of work progress can obtain pole Big to improve, construction quality is controllable.
Further, the domed structure of curved roof, pours with partition board and builds up an entirety, and domes can be good at holding Carry the compressive loads such as the top soil body.
Further, it is in 65 ° -70 ° of slope angle on the outside of cradle, partition board " can be blocked " well, enhance its stability.
Description of the drawings
Fig. 1 is the dimensional structure diagram of the double cabin prefabrication and assembly construction pipe galleries of cave type described in present example.
Fig. 2 is the front view of the double cabin prefabrication and assembly construction pipe galleries of cave type described in present example.
Fig. 3 is pipe gallery bottom plate described in present example and cradle entirety perspective view.
Fig. 4 is dimensional structure diagram at the top of pipe gallery arc described in present example.
Fig. 5 is pipe gallery left, center, right partition board stereochemical structure contrast schematic diagram described in present example.
Fig. 6 is that pipe gallery left, center, right diaphragm structure described in present example compares front view.
Fig. 7 is the dimensional structure diagram of three cabin prefabrication and assembly construction pipe gallery of cave type described in present example.
Fig. 8 is the front view of three cabin prefabrication and assembly construction pipe gallery of cave type described in present example.
Fig. 9 is the dimensional structure diagram of cave type list cabin prefabrication and assembly construction pipe gallery described in present example.
Figure 10 is the front view of cave type list cabin prefabrication and assembly construction pipe gallery described in present example.
Figure 11 is a-quadrant enlarged diagram in Fig. 8.
In figure, 1 is curved roof, and 2 be middle partition board, and 3 be left clapboard, and 4 be right clapboard, and 5 be reinforcing bar, and 6 be bottom plate, and 7 be slot Shape bearing.
Specific implementation mode
With reference to specific embodiment, the present invention is described in further detail, it is described be explanation of the invention and It is not to limit.
A kind of cave type prefabrication and assembly construction pipe gallery of the present invention is arc as shown in Figure 1, by taking double cabin piping lanes as an example The integrated member that top plate 1, middle partition board 2, left clapboard 3, right clapboard 4 and cradle 7 and bottom plate 6 form, by these component groups At a tube coupling, tube coupling and tube coupling connect to forming piping lane two-by-two, and the concrete used in these prefabricated components is anti-water coagulation Soil.Wherein 1 inside arrangement double steel bar mesh sheet of curved roof, forms through prefabrication;2 top of middle partition board extends to both sides, and Groove is formed at top, overlaps and fixes for both sides curved roof 1, then slip casting pours connection;Left clapboard 3 and right clapboard 4 are complete Equally, all it is to extend inwardly on top, the prefabricated formation groove in top;The bottom of piping lane is made of cradle 7 and bottom plate 6 An entirety.Middle partition board 2, left clapboard 3, right clapboard 4 is inserted into cradle 7, along with slip casting measure is fixed, to form one A entirety tube coupling.
Wherein using domes, double steel bar 5 preferably extends in 1 both sides of curved roof the curved roof 1 6-8㎝.As shown in figure 4, curved roof 1 divides upper layer and lower layer bar-mat reinforcement, the arrangement of every layer of bar-mat reinforcement is all criss-cross fashion.
Wherein as shown in Figure 5 and Figure 6, there is the stretching of two placing of reinforcements 5 at the top groove of the left clapboard 3, right clapboard 4, Length is preferably 6-8 ㎝;Two curved roofs 1 are overlapped at the top groove of middle partition board 2, so there is the stretching of four placing of reinforcements 5, stretch out length Degree is preferably 6-8 ㎝.As shown in figure 11, curved roof 1 is overlapped on partition board, and the depth of embedded partition board top groove is preferably 12- 14 ㎝, wherein 1 both sides reinforcing bar of curved roof, 5 extension elongation are 6-8 ㎝, and the depth of groove at the top of the partition board of left, center, right is 18- 22 ㎝, the reinforcing bar extension elongation at partition groove are also preferably 6-8 ㎝, and the position of arranging of reinforcing bar 5 should in right amount be deviated to both sides, avoid with Curved roof 1 stretches out reinforcing bar 5 and collides situation, at partition board top groove slip casting should fill up corresponding recesses.
The wherein described water-proof concrete including but not limited to additive water-proof concrete, fibre crack-resistance water-proof concrete, High performance water proof concrete, ultra-high performance concrete.
Wherein as shown in Figures 2 and 3, the 7 outside slope surface angle of bottom cradle is 65 ° -70 °, cradle 7 Inside slope surface angle is 3 ° -5 °;/ 10th of the vertical height of bottom cradle 7 not less than divider height are advisable.Flute profile Slip casting at bearing 7 should fill up the gap of cradle 7 and the junction of partition board, and highly being flushed with 7 top of cradle is advisable.
A kind of installation method of cave type prefabrication and assembly construction pipe gallery of the present invention, includes the following steps:
One, it will be arranged on ground by the integral pipe gallery bottom of 6 groups of cradle 7 and bottom plate;
Two, pipe gallery left, center, right partition board 4 is lifted within corresponding bottom cradle 7, then cradle 7 Both ends are blocked with template, and the gap ultra-high performance concrete (UHPC) between cradle 7 and partition board is carried out as material Slip casting, slurries pour the height that should reach and be flushed with cradle 7, wait until ultra-high performance concrete slurry consolidation, then remove The template at 7 both ends of cradle;
Three, at this point, after piping lane substructure integrally consolidates, curved roof 1 is lifted, is overlapped on two at the top of respective diaphragms On the groove of side, partition board top groove both ends then are blocked with template, in gap slip casting, material therefor is that very-high performance is mixed Solidifying soil (UHPC) slurries, after ultra-high performance concrete consolidates, form removal, the pipe gallery civilian dress of this tube coupling is with completion , next tube coupling installs according to this.
As shown in Figure 7 and Figure 8, it is the cave type prefabrication and assembly construction pipe gallery in three cabins, is single as shown in Figure 9 and Figure 10 The cave type prefabrication and assembly construction pipe gallery list cabin in cabin, the installation method of the two is as specific implementation mode.

Claims (10)

1. a kind of cave type prefabrication and assembly construction pipe gallery, which is characterized in that include by the prefabricated curved roof of water-proof concrete (1), partition board, bottom plate (6) and cradle (7);
The free end of the curved roof (1) is overlapped in the groove of corresponding partition board top setting, is poured by water-proof concrete solid It is fixed;The bottom of the partition board is plugged in cradle (7) and pours fixation by water-proof concrete;The cradle (7) is set It sets and determines bottom plate (6) upper end and composition integrated member;
Curved roof (1), partition board and the bottom plate (6) and cradle (7) composition integrated member, respectively from top, Both sides and lower part are surrounded to form a tube coupling, and tube coupling connects to forming piping lane successively.
2. cave type prefabrication and assembly construction pipe gallery according to claim 1, which is characterized in that the curved roof (1) It is formed through prefabrication by water-proof concrete, internal arrangement upper layer and lower layer is in the reinforced mesh of criss-cross fashion.
3. cave type prefabrication and assembly construction pipe gallery according to claim 2, which is characterized in that the curved roof (1) Using domes, the reinforcing bar (5) of double steel bar mesh sheet is stretched out in curved roof (1) free end respectively.
4. cave type prefabrication and assembly construction pipe gallery according to claim 1, which is characterized in that the partition board includes being located at The outermost left clapboard of piping lane (3) and right clapboard (4), and/or the middle partition board (2) in the middle part of piping lane;Left clapboard (3) and it is right every The top of plate (4) extends inwardly, the prefabricated formation groove in top;Middle partition board (2) top extends to both sides, and is formed at top Groove pours fixation for both sides curved roof (1) overlap joint grouting behind shaft or drift lining.
5. cave type prefabrication and assembly construction pipe gallery according to claim 1, which is characterized in that the top of the partition board is recessed Overlapped curved roof (1) quantity is corresponded at slot, the reinforcing bar (5) for being provided with double amount stretches out.
6. the cave type prefabrication and assembly construction pipe gallery according to claim 3 or 5, which is characterized in that reinforcing bar (5) stretches out prefabricated The length of part is 6-8 ㎝.
7. cave type prefabrication and assembly construction pipe gallery according to claim 1, which is characterized in that the depth of groove at the top of partition board For 18-22 ㎝;The depth of the embedded partition board top groove of curved roof (1) is 12-14 ㎝.
8. cave type prefabrication and assembly construction pipe gallery according to claim 1, which is characterized in that the prefabricated component is using outer Add agent water-proof concrete, fibre crack-resistance water-proof concrete, high performance water proof concrete or ultra-high performance concrete prefabricated.
9. cave type prefabrication and assembly construction pipe gallery according to claim 1, which is characterized in that the bottom cradle (7) outside slope surface angle is 65 ° -70 °, and inside slope surface angle is 3 ° -5 °;The vertical height of bottom cradle (7) is not less than / 10th of divider height.
10. a kind of installation method of cave type prefabrication and assembly construction pipe gallery, which is characterized in that include the following steps:
Step 1, by by cradle (7) and bottom plate (6) form integrated member as the bottom of pipe gallery arrange ground it On;
Step 2 is lifted on pipe gallery partition board within corresponding bottom cradle (7), cradle (7) and partition board it Between gap carried out pouring fixation with water-proof concrete;
Step 3, lifting curved roof (1), is overlapped on the groove at the top of respective sides partition board, in the anti-water coagulation in gap Soil cast is fixed, and the installation of the tube coupling is completed;
Step 4, repeat step 1 to three be sequentially completed phase union formed piping lane.
CN201810557279.1A 2018-06-01 2018-06-01 A kind of cave type prefabrication and assembly construction pipe gallery and installation method Pending CN108560587A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810557279.1A CN108560587A (en) 2018-06-01 2018-06-01 A kind of cave type prefabrication and assembly construction pipe gallery and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810557279.1A CN108560587A (en) 2018-06-01 2018-06-01 A kind of cave type prefabrication and assembly construction pipe gallery and installation method

Publications (1)

Publication Number Publication Date
CN108560587A true CN108560587A (en) 2018-09-21

Family

ID=63552904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810557279.1A Pending CN108560587A (en) 2018-06-01 2018-06-01 A kind of cave type prefabrication and assembly construction pipe gallery and installation method

Country Status (1)

Country Link
CN (1) CN108560587A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685454A (en) * 2019-10-22 2020-01-14 陕西省建筑科学研究院有限公司 Loess cave dwelling earthquake-resistant reinforcing method adopting replacement of vault sheared area earthing
CN110965578A (en) * 2019-11-19 2020-04-07 重庆大学 Assembled type steel-concrete combined structure underground comprehensive pipe gallery component and construction method thereof
CN111042194A (en) * 2019-12-20 2020-04-21 广东嘉泰建设有限公司 Pipe gallery channel and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204530757U (en) * 2015-01-22 2015-08-05 济南轨道交通集团有限公司 A kind of assembled concrete arch top board
CN205116221U (en) * 2015-11-03 2016-03-30 深圳华瀚管廊物业服务有限公司 Piping lane prefab and assembled utility tunnel
CN205954678U (en) * 2016-02-05 2017-02-15 青岛润国生态科技发展有限公司 Prefabricated utility tunnel hoisting point structure of assembled
CN107489168A (en) * 2017-06-20 2017-12-19 中南大学 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN208563374U (en) * 2018-06-01 2019-03-01 西安交通大学 A kind of cave type prefabrication and assembly construction pipe gallery

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204530757U (en) * 2015-01-22 2015-08-05 济南轨道交通集团有限公司 A kind of assembled concrete arch top board
CN205116221U (en) * 2015-11-03 2016-03-30 深圳华瀚管廊物业服务有限公司 Piping lane prefab and assembled utility tunnel
CN205954678U (en) * 2016-02-05 2017-02-15 青岛润国生态科技发展有限公司 Prefabricated utility tunnel hoisting point structure of assembled
CN107489168A (en) * 2017-06-20 2017-12-19 中南大学 A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN208563374U (en) * 2018-06-01 2019-03-01 西安交通大学 A kind of cave type prefabrication and assembly construction pipe gallery

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
闫富有: "《地下工程施工》", 黄河水利出版社, pages: 240 - 242 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685454A (en) * 2019-10-22 2020-01-14 陕西省建筑科学研究院有限公司 Loess cave dwelling earthquake-resistant reinforcing method adopting replacement of vault sheared area earthing
CN110685454B (en) * 2019-10-22 2021-10-01 陕西省建筑科学研究院有限公司 Loess cave dwelling earthquake-resistant reinforcing method adopting replacement of vault sheared area earthing
CN110965578A (en) * 2019-11-19 2020-04-07 重庆大学 Assembled type steel-concrete combined structure underground comprehensive pipe gallery component and construction method thereof
CN111042194A (en) * 2019-12-20 2020-04-21 广东嘉泰建设有限公司 Pipe gallery channel and construction method thereof

Similar Documents

Publication Publication Date Title
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN103015719B (en) Preliminary work for spudding steel concrete wastewater disposal basin monobloc cast technique
CN106930777B (en) The construction method that Bored Section of Metro main track assembled two serves as a contrast
CN105839666A (en) Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN108560587A (en) A kind of cave type prefabrication and assembly construction pipe gallery and installation method
CN205742265U (en) Complete prefabricated overlapping assembled underground pipe gallery and connection node thereof
CN106638671A (en) High and low bin assembling integrated utility tunnel or draining canal
CN110158645A (en) Prefabricated components Hybrid connections assembly concrete pipe gallery
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN108086353A (en) A kind of hollow wallboard spliced with cast-in-place hidden girder mixes prefabricated assembled pipe gallery and its construction method
CN108589767A (en) A kind of turnbuckle single side formwork erection tiltedly throws support arrangement and its construction method
CN201943093U (en) Settlement joint water-proof structure for basement with drainage channel
CN208563374U (en) A kind of cave type prefabrication and assembly construction pipe gallery
CN110042865A (en) Box top board structure for large span city tunnel
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN109853625A (en) Hybrid mode is linked and packed integral concrete pipe gallery
CN109137983A (en) Assembled integral solid exposed wall plate pipe gallery and its construction method
CN108560589A (en) The sedimentation crack structure and its construction method of assembled pipe gallery
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN207672609U (en) A kind of foundation pit supporting construction also serves as the pipe gallery of main body
CN208563367U (en) A kind of single side formwork erection tiltedly throws support arrangement
CN110130934A (en) The construction method of city tunnel bifurcation mouth with box top board structure
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN105926665A (en) Large block assembled type prefabricated concrete drainage pipeline base and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination