CN106006980B - A kind of combined type center Landscape Park water treatment device and method - Google Patents

A kind of combined type center Landscape Park water treatment device and method Download PDF

Info

Publication number
CN106006980B
CN106006980B CN201610506421.0A CN201610506421A CN106006980B CN 106006980 B CN106006980 B CN 106006980B CN 201610506421 A CN201610506421 A CN 201610506421A CN 106006980 B CN106006980 B CN 106006980B
Authority
CN
China
Prior art keywords
water
treatment device
kickboard
ecological kickboard
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610506421.0A
Other languages
Chinese (zh)
Other versions
CN106006980A (en
Inventor
周静霞
斯梦龙
黄钦阳
缪操
张卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Urban Land Development Co Ltd
Original Assignee
Hangzhou Urban Land Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Urban Land Development Co Ltd filed Critical Hangzhou Urban Land Development Co Ltd
Priority to CN201610506421.0A priority Critical patent/CN106006980B/en
Publication of CN106006980A publication Critical patent/CN106006980A/en
Application granted granted Critical
Publication of CN106006980B publication Critical patent/CN106006980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • C02F3/327Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae characterised by animals and plants
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2203/00Apparatus and plants for the biological treatment of water, waste water or sewage
    • C02F2203/006Apparatus and plants for the biological treatment of water, waste water or sewage details of construction, e.g. specially adapted seals, modules, connections
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Biotechnology (AREA)
  • Botany (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Cultivation Of Plants (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of combined type center Landscape Park water treatment device and methods, the device includes positioning device, ecological kickboard and water circulation treatment device, kind is implanted with water plant in ecological kickboard, water circulation treatment device is equipped with water pipe, water pipe is equipped with spray equipment, and positioning device includes pedestal, control device and telescopic rod;This method includes (a) surveying setting-out;(b) drawing water reduces water surface elevation;(c) side slope is handled;(d) mounting and positioning device;(e) ecological kickboard is set;(f) water circulation processing system is set;(g) maintenance work is periodically carried out.Absorption, accumulation and conversion of the water plant to inorganic nutrients salt in the present invention, the wire netting of ecological kickboard bottom provides growth, the nutriment of breeding and good environment for biology, and ecological kickboard can carry out position adjustment according to water level, be conducive to the growth of the water plant in ecological kickboard, with easy to operate, at low cost, water treatment effect is good, quick feature.

Description

A kind of combined type center Landscape Park water treatment device and method
Technical field
The invention belongs to water treatment technical fields, and in particular to a kind of combined type center Landscape Park water treatment device And method.
Background technique
Social economy, cultural development have all effectively driven the raising of living standards of the people, accordingly to living environment It is also had higher requirement with city integrated environment, and landscape water becomes one of the important means of improvement urban environment.But due to Starting evening, development are slow, and especially management measure is not in place, and the water quality of landscape water is caused to have gradually changed, some water quality become Change more serious place, influences the normal life of neighbouring resident.
Water environment is closely related with people's lives quality, as the deterioration of water environment is faced with increasingly severeer shape Gesture, natural black-odor riverway are difficult to administer, and new river is constantly contaminated.The water quality of artificial lake water will face huge examine It tests.Due to the influence of natural environment and hydrological environment, all there is more or less problem in many artificial Lake Waters, and cause dirt , mainly there is the following aspects in the reason of dye: 1, rainwash and underground percolation;2, initial rainwater;3, breeding pollution;4, aquatic Plant;5, bed mud;6, dissolved oxygen in water body.
But central Landscape Park quality problem still fails to the attention for causing relevant departments, and existing processing mode is most of It is also only limitted to artificial hillock, fountain, and these processing modes easily cause the vigorous breeding of algae, and there is smelly situation.
Summary of the invention
Above-mentioned technical problem present in present invention aims to solve the prior art provides a kind of combined type center landscape Park water treatment device and method, device planting aquatic plants in ecological kickboard, water plant is to inorganic nutrients salt Absorption, accumulation and conversion, the wire netting of ecological kickboard bottom provides the nutriment and good ring of growth, breeding for biology Border, water circulation treatment device, which can be recycled, is filtered processing, biological treatment and aerobic treatment to water quality, increases water body flow, Increase the dissolved oxygen in water quality, reduce the solid particulate matter in water quality, water quality is purified, and provides sufficient water to plant Point, while total installation is stablized, and a kind of affine environmental benefit of natural style ecology is integrally built;This method can be improved and be applied The safety and stability of work process, and ecological kickboard can carry out position adjustment according to water level, be conducive in ecological kickboard The growth of water plant, have it is easy to operate, at low cost, water treatment effect is good, quick feature.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of combined type center Landscape Park water treatment device, it is characterised in that: including positioning device, ecological kickboard and Water circulation treatment device, ecological kickboard are equipped with ecologic planting slot, are equipped with planting pot in ecologic planting slot, planting pot kind is implanted with aquatic Plant, the bottom of ecological kickboard are equipped with crane, and crane is equipped with frame, wire netting is equipped in frame, is stored on wire netting There is fertilizer, is equipped with clamping close device between adjacent two pieces ecological kickboards;Water circulation treatment device is equipped with water pipe, clamping close device limit Water pipe, water pipe are equipped with spray equipment, and spray equipment is set to the top of ecological kickboard;Positioning device includes pedestal, control device And telescopic rod, telescopic rod are fixedly connected with clamping close device.
Further, crane includes fixed plate and guide rod, and guide rod is longitudinally set to the bottom of fixed plate, sets on guide rod There are adjusting rod, adjusting rod connection framework, adjusting rod can carry out lengthwise position adjustment on the guide bar, and adjustment frame is in water body Depth so that wire netting is that biology provides one and normal grows and the environment of breeding.
Further, clamping close device includes the first clamping block and the second clamping block, between the first clamping block and the second clamping block Equipped with fixing bolt, the first clamping block is equipped with the first limit hole, and the second clamping block is equipped with the second limit hole, the first limit hole and the Two limit holes limit water pipe, so that clamping close device is fixed conveniently simply.
Further, pedestal is equipped with the first positioning plate, and the first positioning plate is fixedly connected with telescopic rod, and the first positioning plate can be whole It determines height of the telescopic rod apart from pedestal, telescopic rod position can be adjusted, facilitate and be fixedly connected with telescopic rod with clamping close device.
Further, pedestal is equipped with the second positioning plate, and the second positioning plate is equipped with supporting table, and supporting table is equipped with setting circle Disk, telescopic rod are set in positioning disc, and the second positioning plate plays the role of supporting telescopic rod, when telescopic rod adjusts stretching length When spending, telescopic rod can be fastened with positioning disc, improve stability of the telescopic rod to clamping close device when fixed.
A method of with combined type center Landscape Park water treatment device, it is characterised in that include the following steps:
(a) coordinate, base surveying setting-out: are arranged according to the central Landscape Park water treatment being arranged on overall construction site plan Line, basic data and elevation control point carry out site survey with theodolite, level and steel ruler and set, in central Landscape Park water Matter processing region establishes construction control points, and column is set up at construction control points;
(b) drawing water reduces water surface elevation;
(c) it handles side slope: first removing the stone at the side slope of central Landscape Park construction area and weeds, then use high pressure water Small of the stock graininess mud and deposit are broken up, and the sundries cleaned out and spoir are transported with truck, and then side slope carries out soil Earth is backfilled and is tamped, and then carries out hand-packed rockfill in the side slope of compacting, jackstone process follow it is first up and then down, it is close after first remote, first Shallow sequence carries out layering jackstone after depth;
(d) mounting and positioning device: the setting area of positioning device is first marked with red paint on bank, then in positioning device Casting concrete in setting area, then conserves concrete foundation, and reference line is then pulled out in concrete foundation, then It is punched in concrete foundation according to reference line, then positioning device is arranged at preset hole location, be then passed through fixation Bolt fixes positioning device, then controls the control device in positioning device, adjusts the length of telescopic rod, until telescopic rod When protruding at water body 1.2-2.0m, telescopic rod is fastened using positioning disc;
(e) ecological kickboard is set: ecological kickboard being placed on erecting bed, then is floated adjacent two pieces of ecology with clamping close device Plate is connected with each other, and is then put into planting pot in the ecologic planting slot of ecological kickboard, then insert soil in planting pot, is then existed Then ecological kickboard interconnected is transported in central Landscape Park water body by planting aquatic plants in soil with trolley, Traction rope is fastened at the ecological kickboard for being located at outermost end again, and the other end of traction rope is tied up on column, then to ecology Kickboard carries out position adjustment, and then the end of clamping close device and telescopic rod in the ecological kickboard for being located at outermost end is fixed Connection;
(f) water circulation processing system is set: water circulation treatment device is arranged at the bottom, then on water circulation treatment device Water pipe is accessed, vertical water pipe is passed into clamping close device, then spray equipment is accessed on water pipe, then trial operation water circular treatment Device, and hydraulic pressure adjustment is carried out, then traction rope is removed;
(g) periodically carry out maintenance work: staff conserved water plant every 15-20 days, remove dead leaf and Sundries, and fertilizer is put on wire netting.
Further, in step (c), selected block stone uses double-layer structure in hand-packed rockfill construction, and bottom uses sandstone It is accumulated, bulk density is controlled in 1200-1400kg/m3, top layer accumulated using rubble, and bulk density control exists 1600-1800kg/m3
Further, in step (d), concreting concrete operations are first wooden in the setting area boundary of positioning device Plate formwork, while one center line is set in setting area middle position, basis is then built in setting area, using machinery Mortar is stirred, brick consistency from top to bottom is built, and a layer concrete is then poured above brick, at center when pouring It is inserted into the auxiliary plank of 20cm wide at line, after the completion of pouring, auxiliary plank is removed.
The present invention is by adopting the above-described technical solution, have the advantages that
1, the water treatment device of the invention planting aquatic plants in ecological kickboard, water plant mainly pass through root, stem, Leaf absorbs the pollutant in water and bed mud, and the absorption, accumulation and conversion to inorganic nutrients salt be the base of phytoremediation Plinth has the characteristics that Low investment, pollution-free, good purification;The wire netting of ecological kickboard bottom provides good life for biology Length breeds environment, and the fertilizer on wire netting can improve effects of purification quality as biological growth, the nutriment of breeding;Water follows Ring processing unit, which can be recycled, is filtered processing, biological treatment and aerobic treatment to water quality, increases water body flow, increases water quality In dissolved oxygen, reduce water quality in solid particulate matter, water quality is purified, and recycle to plant provide adequate water;Phase Adjacent two pieces ecological kickboards are connected by clamping close device between each other, and the clamping close device in the ecological kickboard in outermost end with Telescopic rod in positioning device is fixed, and by the length adjustment of telescopic rod, controls ecological kickboard and water circulation treatment device is in Position in water body, such total installation are stablized, and a kind of affine environmental benefit of natural style ecology is integrally built.
2, of the invention to be handled using the method side slope of water treatment device, and thrown in the enterprising pedestrian's work of side slope Stone, jackstone process follow first up and then down, and close after first remote, shallow sequence carries out layering jackstone after first depth, so in the construction process To walk and transport provides channel, there is anti-skidding effect, the safety of work progress can be improved;The present invention installs positioning device Onto the concrete poured, the stability of positioning device is improved, so that positioning device more steadily draws ecological kickboard;Together When the adjustable telescopic rod of the present invention length fastened and stretched using positioning disc when telescopic rod protrudes into water body 1.2-2.0m at Contracting bar, and position adjustment is carried out to ecological kickboard according to water level by traction rope, be conducive to the water plant in ecological kickboard Growth, have it is easy to operate, at low cost, water treatment effect is good, quick feature.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is a kind of structural schematic diagram of combined type center Landscape Park water treatment device of the present invention;
Fig. 2 is structural schematic diagram when ecological kickboard is connected with water circulation treatment device in the present invention;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the structural schematic diagram of ecological kickboard in the present invention;
Fig. 5 is the structural schematic diagram of clamping close device in the present invention;
Fig. 6 is the structural schematic diagram of positioning device in the present invention.
Specific embodiment
The scope of application of the invention: it is suitable for central Landscape Park water treatment.
As shown in Figures 1 to 6, a kind of combined type center Landscape Park water treatment device, including positioning device 1, ecology Kickboard 2 and water circulation treatment device 3, ecological kickboard 2 are equipped with ecologic planting slot 4, planting pot 5, plantation are equipped in ecologic planting slot 4 5 kinds of basin are implanted with water plant.The bottom of ecological kickboard 2 is equipped with crane 6, and crane 6 is equipped with frame 7, and frame 7 is carried out in advance Antirust treatment.Wire netting 8 is equipped in frame 7, storage has fertilizer on wire netting 8.Crane 6 includes fixed plate 15 and guide rod 16, the longitudinal bottom for being set to fixed plate 15 of guide rod 16, guide rod 16 is equipped with adjusting rod 17, and 17 connection framework 7 of adjusting rod is adjusted Pole 17 can carry out lengthwise position adjustment on guide rod 16, and adjustment frame 7 is in the depth in water body, so that wire netting 8 is Biology provides the normal environment grown and breed.Clamping close device 9, water circulation are equipped between adjacent two pieces ecological kickboards 2 Processing unit 3 is equipped with water pipe 10, and clamping close device 9 limits water pipe 10, and water pipe 10 is equipped with spray equipment 11, and spray equipment 11 is set In the top of ecological kickboard 2.Clamping close device 9 includes the first clamping block 18 and the second clamping block 19, the first clamping block 18 and second Fixing bolt 20 is equipped between clamping block 19, the first clamping block 18 is equipped with the first limit hole 21, and the second clamping block 19 is equipped with second Limit hole 22, the first limit hole 21 and the second limit hole 22 limit water pipe 10, so that clamping close device 9 is fixed conveniently simply.
Positioning device 1 includes pedestal 12, control device 13 and telescopic rod 14, and telescopic rod 14 is fixedly connected with clamping close device 9. Pedestal 12 is equipped with the first positioning plate 23, and the first positioning plate 23 is fixedly connected with telescopic rod 14, and the first positioning plate 23 can be determined entirely by Height of the telescopic rod 14 apart from pedestal 12 can adjust 14 position of telescopic rod, facilitate telescopic rod 14 and the fixed company of clamping close device 9 It connects.Pedestal 12 is equipped with the second positioning plate 24, and the second positioning plate 24 is equipped with supporting table 25, and supporting table 25 is equipped with positioning disc 26, telescopic rod 14 is set in positioning disc 26, and the second positioning plate 24 plays the role of supporting telescopic rod 14, when telescopic rod 14 is adjusted When whole good extension elongation, telescopic rod 14 can be fastened with positioning disc 26, improve stabilization of the telescopic rod 14 to clamping close device 9 when fixed Property.
The water treatment device of the invention planting aquatic plants in ecological kickboard 2, water plant mainly pass through root, stem, Leaf absorbs the pollutant in water and bed mud, and the absorption, accumulation and conversion to inorganic nutrients salt be the base of phytoremediation Plinth has the characteristics that Low investment, pollution-free, good purification;The wire netting 8 of ecological 2 bottom of kickboard provides good for biology Environment is bred in growth, and the fertilizer on wire netting 8 can improve effects of purification quality as biological growth, the nutriment of breeding; Water circulation treatment device 3, which can be recycled, is filtered processing, biological treatment and aerobic treatment to water quality, increases water body flow, increases Add the dissolved oxygen in water quality, reduce the solid particulate matter in water quality, water quality is purified, and recycles and provide sufficient water to plant Point;Adjacent two pieces ecological kickboards 2 are connected by clamping close device 9 between each other, and the card in the ecological kickboard 2 in outermost end It is fixed to attach together the telescopic rod 14 set in 9 and positioning device 1, by the length adjustment of telescopic rod 14, controls ecological kickboard 2 and water follows Ring processing unit 3 is in the position in water body, and such total installation is stablized, and integrally builds a kind of parent of natural style ecology And environmental benefit.
A method of with combined type center Landscape Park water treatment device, include the following steps:
(a) coordinate, base surveying setting-out: are arranged according to the central Landscape Park water treatment being arranged on overall construction site plan Line, basic data and elevation control point carry out site survey with theodolite, level and steel ruler and set, in central Landscape Park water Matter processing region establishes construction control points, and column is set up at construction control points.
(b) drawing water reduces water surface elevation: carrying out work of drawing water using multistage suction pump.Before starting, multistage pump two should be checked Whether end bearing lubricating grease is insufficient, pays attention to playing butter in time, while detecting rotating joint and should gently slide uniformly.In pump process, Operator should be every 20-30 minutes inspection suction pump working conditions, it is ensured that normal work of drawing water, work of drawing water is until can be carried out Next constructing operation can stop.It after drawing water, should cut off the power, while cleaning work is carried out to scene.
(c) it handles side slope: first removing the stone at the side slope of central Landscape Park construction area and weeds, then use high pressure water Small of the stock graininess mud and deposit are broken up, and the sundries cleaned out and spoir are transported with truck, and then side slope carries out soil Earth is backfilled and is tamped, and then carries out hand-packed rockfill in the side slope of compacting, jackstone process follow it is first up and then down, it is close after first remote, first Shallow sequence carries out layering jackstone after depth.Selected block stone uses double-layer structure in hand-packed rockfill construction, and bottom uses sandstone It is accumulated, bulk density is controlled in 1200-1400kg/m3, top layer accumulated using rubble, and bulk density control exists 1600-1800kg/m3
(d) mounting and positioning device: the setting area of positioning device is first marked with red paint on bank, then in positioning device Casting concrete in setting area, concreting concrete operations are the first setting area boundary plank branch in positioning device Mould, while one center line is set in setting area middle position, basis is then built in setting area, using machinery to sand Slurry is stirred, and brick consistency from top to bottom is built, and a layer concrete is then poured above brick, in centerline when pouring It is inserted into the auxiliary plank of 20cm wide, after the completion of pouring, auxiliary plank is removed.Then concrete foundation is conserved, to mixed Solidifying soil carries out watering and moistens, and removes stone surface soil, keeps concrete foundation surface clean.Then it is pulled up in concrete foundation Reference line out is punched in concrete foundation further according to reference line, then positioning device is arranged at preset hole location, is connect Be passed through fixing bolt and fix positioning device, then control the control device in positioning device, adjust the length of telescopic rod, Until fastening telescopic rod using positioning disc when telescopic rod is protruded at water body 1.2-2.0m.
(e) ecological kickboard is set: ecological kickboard being placed on erecting bed, then is floated adjacent two pieces of ecology with clamping close device Plate is connected with each other, and is then put into planting pot in the ecologic planting slot of ecological kickboard, then insert soil in planting pot, is then existed Then ecological kickboard interconnected is transported in central Landscape Park water body by planting aquatic plants in soil with trolley, Traction rope is fastened at the ecological kickboard for being located at outermost end again, and the other end of traction rope is tied up on column, then to ecology Kickboard carries out position adjustment, and then the end of clamping close device and telescopic rod in the ecological kickboard for being located at outermost end is fixed Connection.
(f) water circulation processing system is set: water circulation treatment device is arranged at the bottom, then on water circulation treatment device Water pipe is accessed, vertical water pipe is passed into clamping close device, then spray equipment is accessed on water pipe, then trial operation water circular treatment Device, and hydraulic pressure adjustment is carried out, then traction rope is removed.
(g) periodically carry out maintenance work: staff conserved water plant every 15-20 days, remove dead leaf and Sundries, and fertilizer is put on wire netting.
Of the invention is handled using the method side slope of water treatment device, and hand-packed rockfill is carried out in side slope, Jackstone process follows first up and then down, and close after first remote, shallow sequence carries out layering jackstone after first depth, is in the construction process in this way row It walks and transports to provide channel, there is anti-skidding effect, the safety of work progress can be improved;Positioning device is installed to and pours by the present invention On the concrete built, the stability of positioning device is improved, so that positioning device more steadily draws ecological kickboard;Simultaneously originally The length for inventing adjustable telescopic rod fastens telescopic rod using positioning disc when telescopic rod protrudes at water body 1.2-2.0m, And position adjustment is carried out to ecological kickboard according to water level by traction rope, be conducive to the growth of the water plant in ecological kickboard, With easy to operate, at low cost, water treatment effect is good, quick feature.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (8)

1. a kind of combined type center Landscape Park water treatment device, it is characterised in that: including positioning device, ecological kickboard and water Cyclic processing device, the ecology kickboard are equipped with ecologic planting slot, are equipped with planting pot, the planting pot in the ecologic planting slot Kind is implanted with water plant, and the bottom of the ecology kickboard is equipped with crane, and the crane is equipped with frame, sets in the frame There is wire netting, storage has fertilizer on the wire netting, is equipped with clamping close device between the adjacent two pieces ecological kickboards;The water follows Ring processing unit is equipped with water pipe, and the clamping close device limits the water pipe, and the water pipe is equipped with spray equipment, the spray Device is set to the top of the ecological kickboard;The positioning device includes pedestal, control device and telescopic rod, the telescopic rod with The clamping close device is fixedly connected.
2. a kind of combined type center Landscape Park water treatment device according to claim 1, it is characterised in that: the liter Drop frame includes fixed plate and guide rod, and the guide rod is longitudinally set to the bottom of the fixed plate, and the guide rod, which is equipped with, to be adjusted Pole, the adjusting rod connect the frame.
3. a kind of combined type center Landscape Park water treatment device according to claim 1, it is characterised in that: the card It attaches together and sets including the first clamping block and the second clamping block, fixed spiral shell is equipped between first clamping block and second clamping block Bolt, first clamping block be equipped with the first limit hole, second clamping block be equipped with the second limit hole, first limit hole and Second limit hole limits the water pipe.
4. a kind of combined type center Landscape Park water treatment device according to claim 1, it is characterised in that: the bottom Seat is equipped with the first positioning plate, and first positioning plate is fixedly connected with the telescopic rod.
5. a kind of combined type center Landscape Park water treatment device according to claim 1, it is characterised in that: the bottom Seat is equipped with the second positioning plate, and second positioning plate is equipped with supporting table, and the supporting table is equipped with positioning disc, described flexible Bar is set in the positioning disc.
6. a kind of method with combined type center Landscape Park water treatment device described in claim 1, it is characterised in that packet Include following steps:
(a) coordinate, baseline, base surveying setting-out: are arranged according to the central Landscape Park water treatment being arranged on overall construction site plan Plinth data and elevation control point carry out site survey with theodolite, level and steel ruler and set, in central Landscape Park water treatment Construction control points are established in region, and column is set up at construction control points;
(b) drawing water reduces water surface elevation;
(c) it handles side slope: first removing the stone at the side slope of central Landscape Park construction area and weeds, then with giant handle Graininess mud and deposit are broken up, and the sundries cleaned out and spoir are transported with truck, and then side slope carries out soil time Fill out and tamp, then carry out hand-packed rockfill in the side slope of compacting, jackstone process follow it is first up and then down, it is close after first remote, after first depth Shallow sequence carries out layering jackstone;
(d) setting area of positioning device, then the setting in positioning device first mounting and positioning device: are marked with red paint on bank Casting concrete in region, then conserves concrete foundation, and reference line is then pulled out in concrete foundation, further according to Reference line is punched in concrete foundation, then positioning device is arranged at preset hole location, is then passed through fixing bolt Positioning device is fixed, the control device in positioning device is then controlled, adjusts the length of telescopic rod, until telescopic rod protrudes into When at water body 1.2-2.0m, telescopic rod is fastened using positioning disc;
(e) ecological kickboard is set: ecological kickboard is placed on erecting bed, then will adjacent two pieces of ecology kickboard phases with clamping close device It connects, then planting pot is put into the ecologic planting slot of ecological kickboard, then insert soil in planting pot, then in soil Then ecological kickboard interconnected is transported in central Landscape Park water body by middle planting aquatic plants with trolley, then Traction rope is fastened at the ecological kickboard of outermost end, and the other end of traction rope is tied up on column, then to ecological kickboard Position adjustment is carried out, company then is fixed in the end of clamping close device and telescopic rod in the ecological kickboard for being located at outermost end It connects;
(f) water circulation processing system is set: water circulation treatment device being arranged and is accessed at the bottom, then on water circulation treatment device Water pipe, vertical water pipe is passed into clamping close device, then spray equipment is accessed on water pipe, and then trial operation water circular treatment fills It sets, and carries out hydraulic pressure adjustment, then remove traction rope;
(g) periodically carry out maintenance work: staff conserved water plant every 15-20 days, removed dead leaf and sundries, And fertilizer is put on wire netting.
7. a kind of method with combined type center Landscape Park water treatment device according to claim 6, feature exist In: in step (c), selected block stone uses double-layer structure in hand-packed rockfill construction, and bottom is accumulated using sandstone, accumulates Density domination is in 1200-1400kg/m3, top layer accumulated using rubble, and bulk density is controlled in 1600-1800kg/m3
8. a kind of method with combined type center Landscape Park water treatment device according to claim 6, feature exist In: in step (d), concreting concrete operations are the first setting area boundary plank formwork in positioning device, simultaneously One center line is set in setting area middle position, basis is then built in setting area, mortar is carried out using machinery Stirring, brick consistency from top to bottom are built, and a layer concrete is then poured above brick, are inserted into when pouring in centerline After the completion of pouring, auxiliary plank is removed for the auxiliary plank of 20cm wide.
CN201610506421.0A 2016-06-27 2016-06-27 A kind of combined type center Landscape Park water treatment device and method Active CN106006980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610506421.0A CN106006980B (en) 2016-06-27 2016-06-27 A kind of combined type center Landscape Park water treatment device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610506421.0A CN106006980B (en) 2016-06-27 2016-06-27 A kind of combined type center Landscape Park water treatment device and method

Publications (2)

Publication Number Publication Date
CN106006980A CN106006980A (en) 2016-10-12
CN106006980B true CN106006980B (en) 2019-11-15

Family

ID=57104905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610506421.0A Active CN106006980B (en) 2016-06-27 2016-06-27 A kind of combined type center Landscape Park water treatment device and method

Country Status (1)

Country Link
CN (1) CN106006980B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102557269A (en) * 2012-03-01 2012-07-11 复旦大学 Landscape park type surface runoff treatment system
KR101250819B1 (en) * 2013-02-20 2013-04-05 (주)동일캔바스엔지니어링 Microbubble nozzle for dissolved air floatation
CN105417849A (en) * 2015-11-17 2016-03-23 河海大学 Bottom photocatalytic floating island suitable for still water lake

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102557269A (en) * 2012-03-01 2012-07-11 复旦大学 Landscape park type surface runoff treatment system
KR101250819B1 (en) * 2013-02-20 2013-04-05 (주)동일캔바스엔지니어링 Microbubble nozzle for dissolved air floatation
CN105417849A (en) * 2015-11-17 2016-03-23 河海大学 Bottom photocatalytic floating island suitable for still water lake

Also Published As

Publication number Publication date
CN106006980A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN204112347U (en) Rock side slope self filling type grass planting device
CN106193247B (en) Integral rain system and its construction method for sponge city
CN102322066A (en) Three-in-one slope collapse managing method employing slope management, slope lowering and slope stabilization
CN105625443A (en) High-steep soil nail grass planting slope protection structure system and construction method thereof
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN1177523C (en) Method for transplanting old and noble trees
CN214940278U (en) Highway rock side slope ecological protection structure
CN107500412A (en) A kind of campus rainwater ecological purifies integrated processing system
CN209584917U (en) A kind of sponge Greening Urban Road isolation strip
CN204982778U (en) High -efficient artifical lake system that adjusts that purifies
CN106006980B (en) A kind of combined type center Landscape Park water treatment device and method
CN112694230A (en) Comprehensive treatment method for high-garbage-content rotten and aged sludge pond
CN106115922B (en) A kind of construction method of the clean water treatment for Landscape Park
CN208472740U (en) A kind of cast-in-place eco-concrete of lightweight
CN115125880B (en) Adjustable storage ecological drainage box culvert and construction method thereof
CN213390174U (en) Green side slope protective structure
CN206128258U (en) Garden greens rainwater recycle system
CN112144469A (en) Bank slope water purification wetland structure combined with ecological revetment
CN109423937A (en) A kind of residential quarters system for reclaiming rainwater
CN106006979B (en) Water quality treatment method and device for central landscape park
CN104863209B (en) A kind of precipitation of collecting is used for the device of the lower soil water recharge of earth's surface covering firmly
CN207659813U (en) A kind of pervious concrete pavement constructing structure
CN112997732A (en) Dredger fill sludge mud flat structure and rapid greening and planting method thereof
JP2010115183A (en) Planting base for greening construction, and greening construction method using the same
CN213653342U (en) Bank slope water purification wetland structure combined with ecological revetment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant