CN207659813U - A kind of pervious concrete pavement constructing structure - Google Patents

A kind of pervious concrete pavement constructing structure Download PDF

Info

Publication number
CN207659813U
CN207659813U CN201721594623.1U CN201721594623U CN207659813U CN 207659813 U CN207659813 U CN 207659813U CN 201721594623 U CN201721594623 U CN 201721594623U CN 207659813 U CN207659813 U CN 207659813U
Authority
CN
China
Prior art keywords
pervious concrete
pitch
grain formula
pervious
formula pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721594623.1U
Other languages
Chinese (zh)
Inventor
韩瑛
张建军
常彦妮
杨海峰
王续东
郭关良
顾必竖
郑永春
王科晰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN201721594623.1U priority Critical patent/CN207659813U/en
Application granted granted Critical
Publication of CN207659813U publication Critical patent/CN207659813U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to municipal pavement construction field, solve the problems, such as municipal road surface bad hydraulic permeability, the utility model provides a kind of pervious concrete pavement constructing structure, the fur stone being laid with including pressing layer from the bottom to top, sandstone, it bankets, steady layer of water, coarse grain formula pitch pervious concrete, middle grain formula pitch pervious concrete and SBS modified stone mastic asphalt pervious concretes, emulsification pitch penetration oil is equipped between steady layer of water and coarse grain formula pitch pervious concrete, Sub-sealing Course at pitch table is equipped with below coarse grain formula pitch pervious concrete, modified emulsifying asphalt sticking layer oil three is equipped between coarse grain formula pitch pervious concrete and middle grain formula pitch pervious concrete, two layers of modified emulsifying asphalt sticking layer oil is equipped between middle grain formula pitch pervious concrete and SBS modified stone mastic asphalt pervious concretes.The pavement structure effective recharge of groundwater and can effectively eliminate the harm of the environmental pollutions such as oil compounds on ground.

Description

A kind of pervious concrete pavement constructing structure
Technical field
The utility model belongs to municipal pavement construction field, and in particular to a kind of pervious concrete pavement constructing structure.
Background technology
With the continuous development of China's urban construction, the waterlogging of urban pavement is frequently presented, noise pollution and urban heat island Effect increasingly aggravates more and more lives and trip for influencing the masses.The flood control capacity for how improving urban pavement, changes Philanthropist's habitat environment and quality of residents'life etc. become the problem of whole society pays close attention to, and solve road surface drainage, Antiskid noise, reduce road The problems such as face temperature, reduction driving accident, is extremely urgent.
Water permeable concrete is the defect for the road surface of former urban road, and developing use a kind of can allow rainwater to flow into underground, have Imitate recharge of groundwater;And the harm of the environmental pollutions such as the oil compounds on ground can be effectively eliminated;Meanwhile being to protect certainly So, maintaining ecological balance, the excellent pavement material of urban heat land effect can be alleviated.
Invention content
The utility model provides a kind of pervious concrete pavement to solve the problems, such as municipal road surface bad hydraulic permeability Constructing structure.
The utility model adopts the following technical solution:
A kind of pervious concrete pavement constructing structure, including from the bottom to top by layer be laid with fur stone, sandstone, banket, water Steady layer, coarse grain formula pitch pervious concrete, middle grain formula pitch pervious concrete and the permeable coagulation of SBS modified stone mastic asphalts Soil, it is oily equipped with emulsification pitch penetration between steady layer of water and coarse grain formula pitch pervious concrete, under coarse grain formula pitch pervious concrete Side is equipped with Sub-sealing Course at pitch table, and modified milk is equipped between coarse grain formula pitch pervious concrete and middle grain formula pitch pervious concrete Change pitch sticking layer oil three, is equipped between middle grain formula pitch pervious concrete and SBS modified stone mastic asphalt pervious concretes Two layers of modified emulsifying asphalt sticking layer oil.
Water penetration >=2mm/s of the SBS modified stone mastic asphalts pervious concrete, ranging from the 12% of porosity ~20%.Ensure that road surface water can effectively permeate downwards discharge.
Ballast grain sizes used by the SBS modified stone mastic asphalts pervious concrete need to consider permeable effect simultaneously And supporting effect, if ballast grain sizes are too big, the gap between rubble is excessive, and bearing capacity can be impacted, if grain size is too small, with water Gap is insufficient after the mixing such as mud, can influence permeable effect, therefore using the Gao Shi of seconds standard, high stone grain diameter ranging from 2.4 ~13.2mm.
The fur stone is pinner layer, the rubble that grain size should not be used too small, but grain size can not be more than 6mm, otherwise broken The problems such as gap between stone is excessive, and the later stage is susceptible to crack, sedimentation.
The utility model is directed to the road surface defect of former urban road, and it is saturating to develop a kind of multilayer that rainwater can be allowed to flow into underground Water coagulation soil surface structure, can effective recharge of groundwater;And the oil compounds on ground can be effectively eliminated etc. to environment dirt The harm of dye, conservation of nature, alleviate urban heat land effect, the different color of matching design, for different rings at maintaining ecological balance Border and individual demand carry out laying construction.Tradition is mated formation can not achieve with general water-permeable brick, be conducive to the good of environment for human survival Sexual development and the work such as urban rainwater management and water prevention and cure of pollution.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
In figure:1-SBS modified stone mastic asphalts pervious concrete, 2- modified emulsifying asphalts sticking layer oil one, 3- are modified Grain formula pitch pervious concrete, 5- modified emulsifying asphalts sticking layer oil three, 6- coarse grain formula pitches are saturating in emulsified asphalt sticking layer oil two, 4- Water coagulation soil, Sub-sealing Course at 7- pitch tables, 8- emulsification pitch penetrations oil, 9- steady layer of water, 10- bankets, 11- sandstones, 12- furs Stone.
Specific implementation mode
In conjunction with attached drawing, specific embodiment of the present utility model is described further:
1. the technique preparation before construction:
1.1 surveying setting-out:
1.1.1 it measures work by special messenger to be responsible for, control line and axis is laid in strict accordance with Design Requirement Drawing;
1.1.2 survey crew is familiar with drawing and performs delivery receiving stake work first before going into operation, and traverse point and level are provided to Party A Point reinforcement protection, carries out deadman, and make better label, and check in time baseline, such as has a greater change and ask management work Cheng Shi is used after approving.
1.2 formwork erection:
Live physical condition unwrapping wire formwork supporting plate is combined according to Design Requirement Drawing.When being installed using bamboo slab rubber or steel form, Back cord is done with flitch, it is ensured that on the inside of template and upper surface is in line, and supporting reinforcing bar insertion base depth must not be less than behind 200mm, inside reinforcing bar are forbidden to be higher by template upper surface, and supporting bar spacing is not greater than 500mm, must after template has all been propped up The flatness and absolute altitude of a template must be reexamined.
Base layer construction
On rammed earth layer, the base material of adapted, other than having intensity appropriate, it is necessary to have preferable permeable Property.Graded gravel or graded broken stone etc. can be used, when using graded broken stone, the maximum particle diameter of rubble should be less than 0.7 times of base Thickness, and it is no more than 50mm;Bed course generally uses natural rubble, grain size to be less than 6mm, be commonly called as melon seeds piece, paving thickness will meet Uniform ground is wanted in design requirement, laying.
Pervious concrete match ratio controls
The foundation at 3.1 Site stations
Conventionally feeding, most saving space are that principle is placed for the stacking of raw material.Blender takes up an area about 20m2, water Mud, stone deposit quantity be construction 3 times of quantity daily, various auxiliary agents have special storehouse to store, and mixing plant takes up an area about 300m2, set up closure construction canopy and carry out antinoise and anti-dust pollution measure.
The control of 3.2 match ratios
Pervious concrete is made of the special cementitious matter of pervious concrete, rubble, water;Control parameter is:Water penetration >=2mm/ S, ranging from the 12%~20% of porosity;Cementing material dosage is in 360~450kg/m3.
3.2.1 the rubble of pervious concrete use seconds standard Gao Shi, by its granular size range divide 1#, 2#, 3# tri-.
Rubble presses particle branch(2 grades)
The branch of rubble 1# 2# 3#
Particle size range(mm) 2.4~4.75 4.75~9.5 9.6~13.2
3.2.2 water:Drinking public water supply.The underground water or used impure water of the filtered muddiness in end, cannot utilize.
3.2.3 after pervious concrete special cementing and rubble, water is mixed in a certain ratio, the permeable mixed of different color is formed Solidifying soil face layer.
4. the stirring of water permeable concrete
Pervious concrete cannot use artificial stirring, be stirred using normal concrete Mixing Machine, and when stirring presses object Material is put into blender by the regulated proportion and feeding sequence of material, after cementitious matter and rubble stir about 30S, will first make it tentatively mixed It closes, then the 2-3 addition of moisture of specified amount is continued into stir about 1.5-2min, should not stir for a long time excessively.
Water permeable concrete paves, vibrates
5.1 water permeable concrete coefficient of loose laying are that the material height that paves is higher than the ratio of actual height, by the humidity of pervious concrete, Between generally using 1.1, soon, uniformly to be spread out and put on when paving, excessive descendant must not be accumulated and carefully and neatly put down;
5.2 first use tablet polishing vibrator to be compacted the pervious concrete under empty paving free state when vibrating, then It vibrates, vibrating time cannot be long, prevents excessively closely knit, segregation phenomenon occurs;
5.3 when smoothing out operation, should have certain dynamics and enough rigidity using the patter for smoothing out machinery;
5.4 since pervious concrete porosity is big, and moisture loss is fast, and when temperature is higher than 35 DEG C, the construction time should be avoided Noon constructs sooner or later.
The layer control of water permeable concrete face
It is also different according to the different application surface thickness on road surface, to pavement, the light loading ground such as cycle track, general face Layer thickness is not less than 7cm;To loading ground in parking lot, square etc., surface thickness is not less than 10 cm(Face layer can be divided into two Layer, i.e. surface layer are colorful water-permeable concrete layer, and thickness is generally not less than 3 cm, and lower layer is plain color pervious concrete layer).
The health of water permeable concrete
After spreading out and putting on, after examining absolute altitude, flatness to reach requirement.When temperature is higher, to reduce the steaming of moisture Hair, preferably plastic covering film immediately, to keep moisture.Watering health can also be used, all preserving periods must not be less than 7d,(Health Time should be depending on construction temperature, and general preserving period is 14-21 days, no less than 14 days when high temperature, no less than 21 when low temperature It, 5 DEG C or less constructions, preserving period is no less than 28 days.)Its intensity in preserving period is set gradually to improve.Watering health, it is permeable mixed Solidifying soil starts watering maintenance for 1 day after being cast, and when high temperature starts to conserve after 8 hours, but while sprinkling water should not use pressure water direct Shower concrete surface, should directly water drenching from top to bottom, enclosing should be set during health around road surface, forbid upper people, get on the bus.
Road surface joint-cutting, joint filling
Pervious concrete pavement starts to cut expansion joint after conserving 5 days, and related request is as follows:
8.1. contracting seam face interlamellar spacing≤6m, slit width 5-8mm, seam is deep to be through to entire surface layer;
8.2. expansion joint (E.J.) face interlamellar spacing≤12m or 18m, slit width 20-30mm, seam is deep to be through to entire surface layer;
8.3. expansion joint base spacing≤6m, slit width 20-30mm, seam is deep to be through to entire base;
8.4. with other working faces(It is basic different), the three-dimensional junction of building, subsiding crack is set, and slit width 15-20mm, seam is deep Through concrete, reach graded sand rock layers;It is same as the junction of kerbstone that cross expansion joint is set, use 4 before permeable concrete placings ㎜ cystosepiments paste facade in kerbstone.
8.5. plain color substrate portion is filled using extruded sheet, colorful surface layer first uses foam rods to fill bottom, table It is filled using polyurethane gluing stone in face.
Brushing sealer
In 3d or so after surface concrete shaping and drying, the surface of pervious concrete is carried out using jetting machine clear It washes, dry tack free brushing transparent confinement agent afterwards for 24 hours prevents overlong time from pervious concrete hole can be made to get dirty and block hole, Should be arranged around the road surface just brushed protection column or it is eye-catching express warning clause, do not make in pedestrian, vehicle enter, to avoid causing surface Pollution or damage, pervious concrete intensity can pass use after meeting the requirements.

Claims (4)

1. a kind of pervious concrete pavement constructing structure, it is characterised in that:The fur stone being laid with including pressing layer from the bottom to top(12)、 Sandstone(11), banket(10), steady layer of water(9), coarse grain formula pitch pervious concrete(6), middle grain formula pitch pervious concrete(4)With SBS modified stone mastic asphalt pervious concretes(1), steady layer of water(9)With coarse grain formula pitch pervious concrete(6)Between be equipped with Emulsification pitch penetration oil(8), coarse grain formula pitch pervious concrete(6)Lower section is equipped with Sub-sealing Course at pitch table(7), coarse grain formula pitch Pervious concrete(6)With middle grain formula pitch pervious concrete(4)Between be equipped with modified emulsifying asphalt sticking layer oil three(5), middle grain formula Pitch pervious concrete(4)With SBS modified stone mastic asphalt pervious concretes(1)Between be equipped with two layers of modified emulsifying asphalt Sticking layer oil.
2. pervious concrete pavement constructing structure according to claim 1, it is characterised in that:The SBS modified pitch agate Hoof fat crushed stones pervious concrete(1)Water penetration >=2mm/s, porosity ranging from 12%~20%.
3. pervious concrete pavement constructing structure according to claim 2, it is characterised in that:The SBS modified pitch agate Hoof fat crushed stones pervious concrete(1)Using the Gao Shi of seconds standard, high stone grain diameter ranging from 2.4~13.2mm.
4. pervious concrete pavement constructing structure according to claim 3, it is characterised in that:The fur stone(12)Grain Diameter is less than 6mm.
CN201721594623.1U 2017-11-25 2017-11-25 A kind of pervious concrete pavement constructing structure Expired - Fee Related CN207659813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721594623.1U CN207659813U (en) 2017-11-25 2017-11-25 A kind of pervious concrete pavement constructing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721594623.1U CN207659813U (en) 2017-11-25 2017-11-25 A kind of pervious concrete pavement constructing structure

Publications (1)

Publication Number Publication Date
CN207659813U true CN207659813U (en) 2018-07-27

Family

ID=62946472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721594623.1U Expired - Fee Related CN207659813U (en) 2017-11-25 2017-11-25 A kind of pervious concrete pavement constructing structure

Country Status (1)

Country Link
CN (1) CN207659813U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809474A (en) * 2020-08-04 2020-10-23 中建八局第二建设有限公司 Garden road color asphalt pervious concrete construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809474A (en) * 2020-08-04 2020-10-23 中建八局第二建设有限公司 Garden road color asphalt pervious concrete construction method

Similar Documents

Publication Publication Date Title
CN106759825B (en) Construction method of sponge urban green land water storage system
CN105735082B (en) It is permeable to plant framed and multi-functional porous pavement structural system and its method for paving
CN106638918A (en) Construction method for sponge city rainwater collection system
CN207277119U (en) A kind of colorful water permeable concrete pavement structure
CN106193245B (en) A kind of paddy field underground reservoir and its construction method for sponge city
CN107034767A (en) A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN205711609U (en) Framed and the multi-functional porous pavement structural system of permeable plantation
CN108396771A (en) Raw earth-retaining wall construction method is planted from embedded reinforcement
CN201087334Y (en) Reservoir bottom and dam body integrated anti-seepage structure
CN202627166U (en) Novel water-discharging ecological zone for town road
CN114606823B (en) Cement-based permeable concrete pavement structure and paving method thereof
CN207244376U (en) A kind of creepage concrete compression-resistance pavement structure
CN104110009A (en) Water body purification seepage prevention structure and method
CN207659813U (en) A kind of pervious concrete pavement constructing structure
CN202519561U (en) Urban road permeable cement concrete pavement structure
CN111549603A (en) Pavement considering water load coupling and construction method thereof
CN105484125B (en) A kind of step of Collection utilization rainwater
CN208995858U (en) A kind of sponge urban road using ventilation anti-seepage sand
CN206828912U (en) A kind of full pervious concrete pavement structure of regeneration aggregate
CN109989474B (en) Construction method of rainwater collection system
CN207176431U (en) A kind of permeable pavement structure based on sponge the idea of the city
CN109555135A (en) A kind of non-sintered haydite concrete of dredging silt plants raw building block and roadbed slope ecological protection construction method
CN106320126B (en) One kind cutting dirty road surface water-permeable brick
CN214301064U (en) Rainwater infiltration system based on ecological parking lot
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180727