Crane operation room mounting structure Download PDFInfo
- Publication number
- CN106006390A CN106006390A CN201610459364.5A CN201610459364A CN106006390A CN 106006390 A CN106006390 A CN 106006390A CN 201610459364 A CN201610459364 A CN 201610459364A CN 106006390 A CN106006390 A CN 106006390A
- Authority
- CN
- China
- Prior art keywords
- operating room
- mounting structure
- steel wire
- hole
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/52—Details of compartments for driving engines or motors or of operator's stands or cabins
- B66C13/54—Operator's stands or cabins
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C15/00—Safety gear
Abstract
The invention discloses a crane operation room mounting structure. The crane operation room mounting structure comprises an operation room, a front door, a mounting top plate, fixing blocks, tying rings, a connecting base, a fixing shaft, a through hole, a steel wire rope, hinged blocks and a hinged plate. The mounting top plate is connected with the operation room through the fixing blocks. The through hole extending vertically is formed in the middle of the mounting top plate. The mounting base is fixedly connected with the middle of the mounting top plate by being correspond to the through hole. The fixing shaft extending horizontally is fixedly connected with the upper portion of the connecting base. The tying rings are fixedly connected to the upper end face of the operation room and are connected with the fixing shaft through the steel wire rope. The lower ends of the steel wire rope are tied to the tying rings. The upper end of the steel wire rope penetrates through the through hole and is tied to the middle of the fixing shaft. The right side of the lower end face of the mounting top plate and the right end face of the operation room are each fixedly connected with one hinged block. The hinged plate is connected between the two hinged blocks. The crane operation room mounting structure has the advantages of being good in safety and long in service life.
Description
Technical field
The present invention relates to a kind of crane-men's house mounting structure, be applied to hoisting and hanging security technology area.
Background technology
Build based on crane and the special equipment in logistics transportation industry, along with economic fast development, be applied the most widely;But in practical operation, crane can run into working environment miscellaneous, road conditions that the road surface that such as tilts, road are bumpy etc., the mode that the operating room majority of conventional hoist is with bolts is connected on top board, life-time service can cause bolt looseness or fracture, operating room falls, and causes personnel to injure, and therefore the safety of operator can not get ensureing.
Summary of the invention
For solving the defect of prior art, the invention discloses a kind of crane-men's house mounting structure, there is safety height, the advantage of stable operation.
nullThe invention discloses a kind of crane-men's house mounting structure,Including: operating room、Qianmen、Top board is installed、Fixed block、It it is ring、Connect seat、Fixing axle、Through hole、Steel wire rope、Hinged block、Articulated slab,The installed in front of described operating room has Qianmen,Described installation top board is arranged on the top of operating room,It is connected by fixed block between described installation top board and operating room,Described fixed block is vertically arranged,The middle part of described installation top board has the through hole of vertically extension,Described connection seat correspondence through hole is fixed in the middle part installing top board,The affixed horizontal-extending fixing axle in top of described connection seat,Described system ring is fixed on the upper surface of operating room,It is connected between described system ring and fixing axle and has steel wire rope,The lower end of described steel wire rope ties up on ring,The upper end of described steel wire rope ties up to the middle part of fixing axle through through hole,The most affixed hinged block on the right side of described installation top board lower surface and on operating room right side,Said two hinged block is on same perpendicular,Described articulated slab is connected between two hinged blocks.
Described fixed block totally four be respectively welded at both sides before and after operating room.
The middle part of described fixing axle 7 has groove.
Described system ring is four.
Described four is that ring line between any two constitutes a rectangle, and the vertical projection of through hole falls in rectangle in the heart.
Owing to using technique scheme, the present invention has a following advantageous benefits:
1, novel structure;
2, safety is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention a kind of crane-men's house mounting structure.
Wherein: 1-operating room;2-Qianmen;3-installs top board;4-fixed block;5-system ring;6-connects seat;7-fixes axle;8-through hole;9-steel wire rope;10-hinged block;11-articulated slab.
Detailed description of the invention
nullAs shown in Figure 1,The invention discloses a kind of crane-men's house mounting structure,Including: operating room 1、Qianmen 2、Top board 3 is installed、Fixed block 4、It it is ring 5、Connect seat 6、Fixing axle 7、Through hole 8、Steel wire rope 9、Hinged block 10、Articulated slab 11,The installed in front of described operating room 1 has Qianmen 2,Described installation top board 3 is arranged on the top of operating room 1,It is connected by fixed block 4 between described installation top board 3 and operating room 1,Described fixed block 4 is vertically arranged,The middle part of described installation top board 3 has the through hole 8 of vertically extension,The corresponding through hole 8 of described connection seat 6 is fixed in the middle part installing top board 3,The affixed horizontal-extending fixing axle 7 in top of described connection seat 6,Described system ring 5 is fixed on the upper surface of operating room 1,It is connected between described system ring 5 with fixing axle 7 and has steel wire rope 9,The lower end of described steel wire rope 9 ties up on ring 5,The upper end of described steel wire rope 9 ties up to the middle part of fixing axle 7 through through hole 8,The most affixed hinged block 10 on the right side of described installation top board 3 lower surface and on operating room 1 right side,Said two hinged block 10 is on same perpendicular,Described articulated slab 11 is connected between two hinged blocks 10.
Described fixed block 4 totally four be respectively welded at both sides before and after operating room 1.
The middle part of described fixing axle 7 has groove, facilitates steel wire rope 9 to tie up on axle.
Described system ring 5 is four.
Described four is that ring 5 line between any two constitutes a rectangle, and the vertical projection of through hole 8 falls in rectangle in the heart.
The present invention is implemented: operating room 1 is rigidly connected with installing top board 3 by fixed block 4 usually, operator make regular check on, steel wire rope 9 is not at tensioned state usually, when operating in the case of road conditions are bad at crane, when there is fracture in fixed block 4, fixed block 4 can not rupture simultaneously, the steel wire rope 9 of that side of fracture is tightened, the fixed block 4 replacing fracture holds operating room 1, even if extreme case occurs, four steel wire rope 9 coordination hinge plates 11 also can guarantee that operating room 1 will not fall, and substantially increases safety coefficient.
Last it is noted that above example only in order to the present invention is described and and unrestricted technical scheme described in the invention;Therefore, although this specification with reference to each above-mentioned embodiment to present invention has been detailed description, but, it will be understood by those within the art that, still the present invention can be modified or equivalent;And all are without departing from the technical scheme of the spirit and scope of the present invention and improvement thereof, it all should be contained in scope of the presently claimed invention.
Claims (5)
- null1. a crane-men's house mounting structure,Including: operating room、Qianmen、Top board is installed、Fixed block、It it is ring、Connect seat、Fixing axle、Through hole、Steel wire rope、Hinged block、Articulated slab,The installed in front of described operating room has Qianmen,Described installation top board is arranged on the top of operating room,It is connected by fixed block between described installation top board and operating room,Described fixed block is vertically arranged,It is characterized in that: the middle part of described installation top board has the through hole of vertically extension,Described connection seat correspondence through hole is fixed in the middle part installing top board,The affixed horizontal-extending fixing axle in top of described connection seat,Described system ring is fixed on the upper surface of operating room,It is connected between described system ring and fixing axle and has steel wire rope,The lower end of described steel wire rope ties up on ring,The upper end of described steel wire rope ties up to the middle part of fixing axle through through hole,The most affixed hinged block on the right side of described installation top board lower surface and on operating room right side,Said two hinged block is on same perpendicular,Described articulated slab is connected between two hinged blocks.
- 2. according to a kind of crane-men's house mounting structure described in claim 1, it is characterised in that: described fixed block totally four be respectively welded at both sides before and after operating room.
- 3. according to a kind of crane-men's house mounting structure described in claim 1, it is characterised in that: the middle part of described fixing axle 7 has groove.
- 4. according to a kind of crane-men's house mounting structure described in claim 1, it is characterised in that: described system ring is four.
- 5. according to a kind of crane-men's house mounting structure described in claim 4, it is characterised in that: described four is that ring line between any two constitutes a rectangle, and the vertical projection of through hole falls in rectangle in the heart.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610459364.5A CN106006390A (en) | 2016-06-23 | 2016-06-23 | Crane operation room mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610459364.5A CN106006390A (en) | 2016-06-23 | 2016-06-23 | Crane operation room mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106006390A true CN106006390A (en) | 2016-10-12 |
Family
ID=57086380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610459364.5A Pending CN106006390A (en) | 2016-06-23 | 2016-06-23 | Crane operation room mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106006390A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4955049A (en) * | 1972-02-16 | 1974-05-28 | ||
US7070060B1 (en) * | 1995-05-26 | 2006-07-04 | Mi-Jack Products, Inc. | Gantry crane with elevating operator cab |
CN204057739U (en) * | 2014-09-02 | 2014-12-31 | 河南重工起重机集团有限公司 | A kind of hoisting crane fall arrest operator's compartment |
CN204727482U (en) * | 2015-06-19 | 2015-10-28 | 河南宝起华东起重机有限公司 | A kind of hoisting crane fall arrest operator's compartment |
CN204727481U (en) * | 2015-06-19 | 2015-10-28 | 河南宝起华东起重机有限公司 | A kind of connection structure of crane cab |
-
2016
- 2016-06-23 CN CN201610459364.5A patent/CN106006390A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4955049A (en) * | 1972-02-16 | 1974-05-28 | ||
US7070060B1 (en) * | 1995-05-26 | 2006-07-04 | Mi-Jack Products, Inc. | Gantry crane with elevating operator cab |
CN204057739U (en) * | 2014-09-02 | 2014-12-31 | 河南重工起重机集团有限公司 | A kind of hoisting crane fall arrest operator's compartment |
CN204727482U (en) * | 2015-06-19 | 2015-10-28 | 河南宝起华东起重机有限公司 | A kind of hoisting crane fall arrest operator's compartment |
CN204727481U (en) * | 2015-06-19 | 2015-10-28 | 河南宝起华东起重机有限公司 | A kind of connection structure of crane cab |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102975818A (en) | Aluminum alloy superstructure block hoisting method | |
CN105152033A (en) | Integral hoisting process of ship unloader | |
CN204745416U (en) | Railway landing stage safety belt lift kits | |
CN201217612Y (en) | Aerial rail U shaped beam hoisting device | |
CN204626921U (en) | A kind of fixed working platform without scaffold construction elevator | |
CN107190990A (en) | Factory building steel column installation method under a kind of confined space | |
CN206308626U (en) | Operating platform for installing bridge pier pier shaft top hanging basket | |
CN106144832A (en) | A kind of special extended type wall-attached frame and preparation method thereof | |
CN106315426A (en) | Block form tower crane mounting and jacking method for assembled building | |
CN106006390A (en) | Crane operation room mounting structure | |
CN205204672U (en) | Two hook crane | |
CN103848333B (en) | Door frame Lift-on/Lift-off System and using method thereof | |
CN203639831U (en) | Special lifting apparatus for quickly hoisting steel trussed beam rod piece | |
CN205532717U (en) | Tunnel guard gate anti -overturning device and tunnel guard gate system | |
CN102328739A (en) | Erection-free combined scaffold device for ship | |
CN207932933U (en) | A kind of crane electric block fall protection equipment | |
CN211815662U (en) | Cable force conversion device for replacing suspender | |
CN109896407A (en) | The guard method of CLTS Gray bus for crane girder replacement | |
CN205769307U (en) | A kind of tramcar bogie uplifting device | |
CN205381585U (en) | Storage tank lug device and storage tank hoist and mount system | |
CN205565514U (en) | Change specialized tool of overhead earth wire suspension clamp and gold utensil | |
CN203419665U (en) | Support beam device for hoisting heavy equipment | |
CN102241381B (en) | Hoist frame high-altitude grouping operation platform hanging bracket and using method thereof | |
CN205419422U (en) | No computer lab fag end linkage | |
CN204753298U (en) | Cement covers worker's board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161012 |
|
WD01 | Invention patent application deemed withdrawn after publication |