CN105986570B - The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement - Google Patents

The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement Download PDF

Info

Publication number
CN105986570B
CN105986570B CN201510054922.5A CN201510054922A CN105986570B CN 105986570 B CN105986570 B CN 105986570B CN 201510054922 A CN201510054922 A CN 201510054922A CN 105986570 B CN105986570 B CN 105986570B
Authority
CN
China
Prior art keywords
construction
pile
sealing
jet grouting
high pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510054922.5A
Other languages
Chinese (zh)
Other versions
CN105986570A (en
Inventor
范振雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201510054922.5A priority Critical patent/CN105986570B/en
Publication of CN105986570A publication Critical patent/CN105986570A/en
Application granted granted Critical
Publication of CN105986570B publication Critical patent/CN105986570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of Construction of High Pressure Jet Grouting Pile method as diaphram wall interface external reinforcement sealing sealing, using ripe Construction Technique of High Pressure Revolving Spraying, on the outside of underground continuous wall connector plus the form of high-pressure rotary jet grouting pile is done to diaphram wall interface weak link reinforcement reinforcing sealing sealing, it is characterised in that including following technical measures:The determination of a construction parameters and the selection of construction method, the control of b blasting materials, c measurement and positionings, d test piles, e course of injection Construction Technology Controls, f return slurry and observe, g recharges, and slurry sewage discharge is put aside as useless to the observation of surrounding enviroment and i in h course of injection.The Construction of High Pressure Jet Grouting Pile method for being used as diaphram wall interface external reinforcement sealing sealing of the present invention has the construction technology of high-pressure rotary jet grouting pile maturation, method is simple, it is easy for construction, construction quality is safe and reliable, the reinforcing water-stagnating effect of diaphram wall interface is apparent, the advantages of capable of greatly reducing security risk present in foundation pit construction and disclosure satisfy that the economic benefit of engineering construction.

Description

The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement
Technical field
The present invention relates to a kind of Construction of High Pressure Jet Grouting Pile methods, specifically, being a kind of be used as outside diaphram wall interface Reinforce the Construction of High Pressure Jet Grouting Pile method of sealing sealing.
Background technology
Domestic deep basal pit structural support form is varied.In recent years, with the development of production and urban construction scale Expansion, deep foundation engineering is more and more, and execution conditions are also increasingly restricted.Subterranean excavation is more and more deeper, is connected using underground Continuous wall is also all the more ripe as deep foundation pit supporting structure.Diaphram wall as rigid structure its own with it is good reinforcing stop The impervious effect of water, but joint is often the weak link of structure construction between its wall width and wall width, frequently results in reinforcing and stops Water effect is poor, and there is also serious security risks in engineering its low foundation pit construction being especially affected by surrounding enviroment.
Therefore known diaphram wall interface external reinforcement sealing sealing mode there are problems that it is above-mentioned various inconvenient and.
Invention content
The purpose of the present invention is to propose a kind of to jump out connecing as diaphram wall for diaphram wall wall structure itself The Construction of High Pressure Jet Grouting Pile method of mouth external reinforcement sealing sealing.
To achieve the above object, technical solution of the invention is:
A kind of Construction of High Pressure Jet Grouting Pile method as diaphram wall interface external reinforcement sealing sealing, using ripe height Pressure rotary-spraying pile constructing process on the outside of underground continuous wall connector plus does the form of high-pressure rotary jet grouting pile to diaphram wall interface weakness Link is reinforced reinforcing sealing sealing, it is characterised in that including following technical measures:
A, the determination of construction parameter and the selection of construction method
Rational triple-pipe high pressure jet grouting stake is selected to apply according to the construction environment of different engineerings, reinforcing scope, pile depth Work technique, the range and depth of pile should meet sealing requirement, and pile making method does not have an impact surrounding enviroment;
B, blasting materials control
It is constructed using satisfactory cement material, and the Mortar mix proportion of mixing, proportion, continuity, uniform journey Degree, mixing time, standing time should meet construction requirement;
C, measurement and positioning
When determining hole position, in strict accordance with requiring setting-out to determine hole position, timber is used in combination to fix;It is set in high pressure jet grouting axis corner Spud pile, while setting control stake within the scope of construction axis 5-10m, it is ensured that pile position meets the reinforcing of diaphram wall interface and stops Water effect;
D, test pile
Technical testing pile work is performed before formally carrying out high-pressure rotary jet grouting pile pile operation, is determined reasonable grout coordinate ratio, is carried Lifting speed, rotating speed, pressure construction technical data;
E, course of injection Construction Technology Control
Place must meet construction machinery and set up requirement, to control pile body verticality;Before carrying out formal operation, Examination spray is carried out, ensures the continuity of operation process;After jet groutinl parameter reaches specified value, wanted immediately by the technique of churning It asks, promotes injection pipe, from bottom to top rotating-spray slip casting;When there is pressure abrupt change or grout exception during rotary jet grouting It should ascertain the reason and take timely measure;In jet groutinl pipe injection soil, when nozzle reaches designed elevation, i.e. jet groutinl;
F, slurry observation is returned
Return slurry it is normal whether pile quality is influenced very big, if it is abnormal to return slurry amount, to analyze reason, take multiple spray or Adjust churning parameter;If spillage is serious, it is necessary to stop churning, be poured into stabilization with cement mortar or cement and waterglass dual slurry Stratum at this, it is ensured that pile quality;
G, recharge
AEI After End of Injection carries out static pressure filling grouting in spray-hole immediately, until pulp surface is no longer sunk, ensures high Wall top absolute altitude after pressure rotary-spraying stake consolidation, recharge slurries are generally using the height spray grout static pressure filling of adjacent hole;
H, to the observation of surrounding enviroment in course of injection
The periphery soil body, pipeline, road, enclosure wall, temporary facility position are observed in course of injection, are prevented because of spray Penetrate pile slurries cause peripheral conduits block, slurries are excessive, close on soil body rising phenomenon;
I, slurry sewage discharge is put aside as useless
Before being constructed, mud is discharged into special sedimentation basin, and cleaning outward transport in time by setting raceway groove, is prevented from flowing into and be closed on In pipeline, gutter, surrounding enviroment and engineering construction are influenced.
The Construction of High Pressure Jet Grouting Pile method for being used as diaphram wall interface external reinforcement sealing sealing of the present invention can also adopt It is further realized with technical measures below.
Method above-mentioned is selected wherein in the step a according to the construction environment of different engineerings, reinforcing scope, pile depth Select rational dual-pipe high-pressure jet grouting pile construction technique.
Method above-mentioned is selected wherein in the step a according to the construction environment of different engineerings, reinforcing scope, pile depth Select rational general jet grouting pile construction technique.
Method above-mentioned, wherein in the step e, rotating-spray slip casting answers complete opening to be carried out continuously, and injection pipe segmentation is promoted The lap of splice should meet the requirements.
Method above-mentioned, wherein in the step e, rotating-spray slip casting is for starching under normal circumstances, aperture overfall density When becoming smaller and design requirement cannot be met, it should increase into pulp density.
After adopting the above technical scheme, the high-pressure rotary-spray for being used as diaphram wall interface external reinforcement sealing sealing of the present invention Pile construction method has the following advantages:
1, high-pressure rotary jet grouting pile has ripe construction technology, and method is simple, easy for construction;
2, construction quality is safe and reliable, the reinforcing water-stagnating effect of diaphram wall interface is apparent;
3, make large deep foundation pit construction be able to carry out under the advantageous environment of safety, be especially affected by surrounding enviroment Engineering, can greatly reduce security risk present in foundation pit construction.
4, it disclosure satisfy that the economic benefit of engineering construction.
Description of the drawings
Fig. 1 is that the diaphram wall interface external reinforcement of the embodiment of the present invention seals the high-pressure rotary jet grouting pile structural representation of sealing Figure;
Fig. 2 is that the diaphram wall interface external reinforcement of the embodiment of the present invention seals the high-pressure rotary jet grouting pile sectional view of sealing;
Fig. 3 is the general jet grouting pile construction flow chart of the embodiment of the present invention;
Fig. 4 is the dual-pipe high-pressure jet grouting pile construction flow chart of the embodiment of the present invention;
Fig. 5 is the triple-pipe high pressure jet grouting pile driving construction flow chart of the embodiment of the present invention.
In figure:1 excavation face, 2 diaphram walls, 3 upstream faces, 4 high-pressure rotary jet grouting piles, 5 diaphram wall interfaces, 6 underground water Position, 7 foundation pit bottoms.
Specific implementation mode
With reference to embodiments and its attached drawing illustrates further the present invention.
Embodiment 1
Rail traffic command centre of Fuzhou City engineering is located at Fuzhou City Taijiang District Guang Dalu and reaches intersection northeast corner Plot, foundation pit supporting project safe class are level-one, and important coefficient 1.1, foundation pit protection class is level-one, and pattern foundation pit supporting structure uses Time limit is 1 year.Foundation pit uses cut and cover tunneling, cutting depth about 15m(Most deep about 18.2m), foundation pit is about 146m, wide about 48.4-50.2m.The engineering ground-connecting-wall shares 76 width, and width segment number is Q1~Q73(Q11, Q21, Q23 are respectively 2 width), wherein 64 width of line-styled, 6 width of "L" shaped, 4 width of "∧" type, 2 width of " Z " type.Ground-connecting-wall interface is at totally 77.Pit Enclosure uses 800mm thickness separate type diaphram walls are connect after the completion of construction of diaphragm wall before the second operating mode of foundation pit earth excavation Mouth external reinforcement seals sealing, i.e., Pit Enclosure is by+three road reinforced concrete support of 800mm thickness separate types diaphram wall Form, ground-connecting-wall interface external reinforcement seal sealing triple-pipe high pressure jet grouting pile construction method using the present invention.
Fig. 5 is the triple-pipe high pressure jet grouting pile driving construction flow chart of the embodiment of the present invention.
The Construction of High Pressure Jet Grouting Pile method for being used as diaphram wall interface external reinforcement sealing sealing of the present invention, connects in underground The form for doing high-pressure rotary jet grouting pile is added to reinforce diaphram wall interface weak link reinforcing sealing sealing on the outside of continuous wall joint, it is special Sign is to include following technical measures:
A, the determination of construction parameter and the selection of construction method
Rational triple-pipe high pressure jet grouting stake is selected to apply according to the construction environment of different engineerings, reinforcing scope, pile depth Work method, the range and depth of pile should be able to meet sealing requirement, and pile making method cannot have an impact surrounding enviroment;
B, blasting materials control
The materials such as satisfactory cement should be used to construct, and the Mortar mix proportion of mixing, proportion, continuity, Even degree, mixing time, standing time etc. should meet construction requirement;
C, measurement and positioning
When determining hole position, centainly in strict accordance with requiring setting-out to determine hole position, timber is used in combination to fix.It turns round in high pressure jet grouting axis Place should set spud pile, while set control stake in construction axis 5-10m ranges, it is ensured that pile position disclosure satisfy that ground-connecting-wall interface adds Gu water-stagnating effect;
D, test pile
Technical testing pile work should be conscientiously performed before formally carrying out high-pressure rotary jet grouting pile pile operation, determine that reasonable slurries are matched Than, promote the construction technical data of speed, rotating speed, pressure etc.;
E, course of injection Construction Technology Control
Fig. 1 is that the diaphram wall interface external reinforcement of the embodiment of the present invention seals the high-pressure rotary jet grouting pile structural representation of sealing Figure, Fig. 2 are that the diaphram wall interface external reinforcement of the embodiment of the present invention seals the high-pressure rotary jet grouting pile sectional view of sealing.
Place must satisfy construction machinery and set up requirement, to control pile body verticality.Carrying out formal operation Before, examination spray should be carried out, ensures the continuity of operation process.After jet groutinl parameter reaches specified value, the work of churning is pressed immediately Skill requirement, promotes injection pipe, from bottom to top rotating-spray slip casting.High-pressure rotary-spray answers complete opening to be carried out continuously, and injection pipe segmentation is promoted The lap of splice should meet the requirements.For starching under normal circumstances, when aperture overfall density becomes smaller and cannot meet design requirement, answer It increases into pulp density.Occur to ascertain the reason and taking in time when pressure abrupt change or grout exception arranging during rotary jet grouting It applies.In jet groutinl pipe injection soil, when nozzle reaches designed elevation, you can jet groutinl;
F, slurry observation is returned
Return slurry it is normal whether pile quality is influenced very big, if it is abnormal to return slurry amount, to analyze reason, take multiple spray or Adjust churning parameter;If spillage is serious, it is necessary to stop churning, be poured into stabilization with cement mortar or cement and waterglass dual slurry Stratum at this, it is ensured that pile quality;
G, recharge
AEI After End of Injection carries out static pressure filling grouting in spray-hole immediately, until pulp surface is no longer sunk, ensures high Wall top absolute altitude after pressure rotary-spraying stake consolidation, recharge slurries are generally using the height spray grout static pressure filling of adjacent hole;
H, to the observation of surrounding enviroment in course of injection
The positions such as the periphery soil body, pipeline, road, enclosure wall, temporary facility are observed in course of injection, prevent because Phenomena such as injection pile slurries cause peripheral conduits block, slurries are excessive, close on the soil body to float;
I, slurry sewage discharge is put aside as useless
Before being constructed, raceway groove should be set, mud is discharged into special sedimentation basin, and cleaning outward transport in time, prevent from flowing into and face In nearly pipeline, gutter, the normal development of surrounding enviroment and engineering construction is influenced.
Embodiment 2
Fig. 3 is the general jet grouting pile construction flow chart of the embodiment of the present invention, and basic fundamental measure is the same as embodiment 1.
Embodiment 3
Fig. 4 is the dual-pipe high-pressure jet grouting pile construction flow chart of the embodiment of the present invention, the same embodiment of basic fundamental measure 1。
Single pipe method is constructed, and cement, water weighing are stirred mixing, are input to high-pressure pump.
The construction of double tube method, by cement mortar with compression is courteous sprays simultaneously.
Injection pipe in single pipe method and double tube method is thinner(Aperture is within 5cm).It is usually 7 that three tube method, which spray pipe diameter, ~ 9cm, it is complicated, therefore sometimes for the hole of one a diameter of 15cm of pre- subdrilling, be then placed in three pipe inspections and construct. Cement bin, water tank and Weighing system are specially provided in construction.During conveying cement mortar, high pressure water, compressed air, if Monitoring device is set, to ensure construction quality.Grout can in time be absorbed with sewage pump in construction, and be transported to place with Outside.
Single tube spinning-jet:Spraying cement slurries, stake diameter is minimum, and stake diameter is general≤0.6m, it is commonly used in loose, slightly close layer of sand In, the general < 200kg/m of cement consumption(Indicate that stake is long per m cement consumptions), normal construction speed is generally in 20cm/min.
Two-tube churning:Spraying cement slurries and air, the general 0.6m ~ 0.8m of stake diameter, in being commonly used in close layer of sand, cement The general < 300kg/m of dosage, normal construction speed is generally in 10 ~ 20cm/min.
Triple pipe rotary spray:Spraying cement slurries and air and high pressure water, mechanism is to remove cutting soil, cement mortar with high pressure water Then the soil body after going filling to cut again, the general 1.0m ~ 1.2m of stake diameter can construct, cement consumption generally exists in gravel layer 400kg/m, normal construction speed is generally in 10 ~ 20cm/min
Single tube only has one to manage again, can only high-pressure mortar spraying, expanded diameter is smaller, similar with mixing pile,;It is two-tube to be exactly High mud jacking and high pressure gas(Gas blows soil soft again with soil stirring), the drilling rod of two-tube churning is double, a pipe whitewashing again, another Pipe jet again;Three pipes are exactly that the high mud jacking water that adds high pressure is increased and calms the anger, and pile form is by slurries pressure itself in compressed air It under promotion, is stirred by high -pressure water cutting, compressed air, forms vortex under a subterranean formation, and by the permeability shape on stratum itself At a complete pile body.
Single tube is less than three pipes less than two-tube in terms of quality.But single tube is less than three pipes less than two-tube in terms of price.Three kinds suitable What big difference is range be without, and typically economically face considers.Usual two tube method is usually used in muddy The construction of layer etc., three tube method are usually used in the construction in addition to above-mentioned stratum, and three pipes are generally used for water-stop curtain stake.
Single pipe method, two tube method, the slurries that aperture is emerged do not recycle;Three tube method, it is recyclable according to engineering design requirements The slurries emerged using aperture.
It has been shown that, the engineering ground-connecting-wall interface are checked and accepted by inspection during high-pressure rotary jet grouting pile and earth excavation and observation Place does not find leak source, meets design and code requirement, and work progress requires with meeting site construction management and Fujian province-norm chemical industry, The respectively favorable comment for the side of being taken part in building.
The present invention has substantive distinguishing features and significant technological progress, and of the invention is used as diaphram wall interface external reinforcement The Construction of High Pressure Jet Grouting Pile method of sealing sealing jumps out diaphram wall wall structure itself, is applied using ripe high-pressure rotary jet grouting pile Work technique, during ground-connecting-wall interface external reinforcement sealing sealing is constructed using high-pressure rotary jet grouting pile, to ensure pile matter Amount and water-stagnating effect create advantageous operating condition for follow-up earth excavation operation, during Construction of High Pressure Jet Grouting Pile and follow-up In earth excavation construction, by project supervision and owner to critical processes have carried out other station, observation is checked and accepted etc. such as positioning, spraying.
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution should also belong to scope of the invention, should be limited by each claim.

Claims (4)

1. a kind of Construction of High Pressure Jet Grouting Pile method as diaphram wall interface external reinforcement sealing sealing, using ripe high pressure Jet grouting pile construction technique on the outside of underground continuous wall connector plus does the form of high-pressure rotary jet grouting pile to diaphram wall interface weakness ring Section is reinforced reinforcing sealing sealing, it is characterised in that includes the following steps:
A, the determination of construction parameter and the selection of construction method
Rational triple-pipe high pressure jet grouting pile driving construction work is selected according to the construction environment of different engineerings, reinforcing scope, pile depth Skill, the range and depth of pile should meet sealing requirement, and pile making method does not have an impact surrounding enviroment, according to different engineerings Construction environment, reinforcing scope, the rational general jet grouting pile construction technique of pile depth selection;
B, blasting materials control
It is constructed, and the Mortar mix proportion of mixing, proportion, continuity, uniformity coefficient, is stirred using satisfactory cement material It mixes the time, standing time should meet construction requirement;
C, measurement and positioning
When determining hole position, in strict accordance with requiring setting-out to determine hole position, timber is used in combination to fix;Fixation is set in high pressure jet grouting axis corner Stake, while setting control stake within the scope of construction axis 5-10m, it is ensured that pile position meets diaphram wall interface and reinforces sealing effect Fruit;
D, test pile
Technical testing pile work is performed before formally carrying out high-pressure rotary jet grouting pile pile operation, is determined reasonable grout coordinate ratio, is promoted speed Degree, rotating speed, pressure construction technical data;
E, course of injection Construction Technology Control
Place must meet construction machinery and set up requirement, to control pile body verticality;Before carrying out formal operation, carry out Examination spray, ensures the continuity of operation process;After jet groutinl parameter reaches specified value, the technological requirement of churning is pressed immediately, is carried Rise injection pipe, from bottom to top rotating-spray slip casting;Occur to look into when pressure abrupt change or grout exception during rotary jet grouting Bright reason simultaneously takes timely measure;In jet groutinl pipe injection soil, when nozzle reaches designed elevation, i.e. jet groutinl;
F, slurry observation is returned
Return slurry it is normal whether pile quality is influenced very big, if it is abnormal to return slurry amount, to analyze reason, take multiple spray or adjustment Churning parameter;If spillage is serious, it is necessary to stop churning, is poured into good ground with cement mortar or cement and waterglass dual slurry, Ensure pile quality;
G, recharge
AEI After End of Injection carries out static pressure filling grouting in spray-hole immediately, until pulp surface is no longer sunk, ensures high pressure rotation Wall top absolute altitude after stake consolidates is sprayed, recharge slurries are generally using the height spray grout static pressure filling of adjacent hole;
H, to the observation of surrounding enviroment in course of injection
The periphery soil body, pipeline, road, enclosure wall, temporary facility position are observed in course of injection, are prevented because being injected into Stake slurries cause peripheral conduits block, slurries are excessive, close on soil body rising phenomenon;
I, slurry sewage discharge is put aside as useless
Before being constructed, mud is discharged into special sedimentation basin, and cleaning outward transport in time by setting raceway groove, is prevented from flowing into and is closed on pipe In road, gutter, surrounding enviroment and engineering construction are influenced.
2. the Construction of High Pressure Jet Grouting Pile method as described in claim 1 as diaphram wall interface external reinforcement sealing sealing, It is characterized in that, in the step a, it is rational double according to the construction environment of different engineerings, reinforcing scope, the selection of pile depth Pipe Construction Technique of High Pressure Revolving Spraying.
3. the Construction of High Pressure Jet Grouting Pile method as described in claim 1 as diaphram wall interface external reinforcement sealing sealing, It is characterized in that, in the step e, rotating-spray slip casting answers complete opening to be carried out continuously, and the lap of splice that injection pipe segmentation is promoted is answered It meets the requirements.
4. the Construction of High Pressure Jet Grouting Pile method as described in claim 1 as diaphram wall interface external reinforcement sealing sealing, It is characterized in that, in the step e, for starching under normal circumstances, aperture overfall density becomes smaller and cannot expire for rotating-spray slip casting When sufficient design requirement, it should increase into pulp density.
CN201510054922.5A 2015-02-03 2015-02-03 The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement Active CN105986570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510054922.5A CN105986570B (en) 2015-02-03 2015-02-03 The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510054922.5A CN105986570B (en) 2015-02-03 2015-02-03 The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement

Publications (2)

Publication Number Publication Date
CN105986570A CN105986570A (en) 2016-10-05
CN105986570B true CN105986570B (en) 2018-07-13

Family

ID=57036761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510054922.5A Active CN105986570B (en) 2015-02-03 2015-02-03 The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement

Country Status (1)

Country Link
CN (1) CN105986570B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503342A (en) * 2017-08-22 2017-12-22 中建八局第三建设有限公司 A kind of diaphram wall and its construction method
CN107587501A (en) * 2017-09-12 2018-01-16 中铁第四勘察设计院集团有限公司 A kind of new and old ground-connecting-wall T connector structure and its construction method
CN107829440A (en) * 2017-12-06 2018-03-23 上海市机械施工集团有限公司 Reinforcement structure and its construction method at underground continuous wall seam
CN110206339A (en) * 2019-06-14 2019-09-06 北京翔鲲水务建设有限公司 A kind of push pipe passes through construction method of underground continuous wall
CN113336487A (en) * 2021-06-22 2021-09-03 长安大学 Geopolymer and construction method for reinforcing roadbed by high-pressure jet grouting pile
CN114855818B (en) * 2022-05-23 2023-09-12 中铁二十局集团第一工程有限公司 Double-row narrow-distance ground wall high-pressure rotary spraying reinforcement method
CN115324117A (en) * 2022-08-16 2022-11-11 中铁二十局集团南方工程有限公司 Construction method for stopping water of diaphragm wall joint

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1119450A (en) * 1965-12-21 1968-07-10 British Insulated Callenders A method of stabilizing the faces of excavations
KR100513072B1 (en) * 2002-09-03 2005-09-07 권형석 form defense-water
CN101008179A (en) * 2006-01-26 2007-08-01 上海市第二建筑有限公司 Enclosing method for local opening of footing groove
CN201103127Y (en) * 2007-08-24 2008-08-20 上海外高桥地质工程有限公司 Water stop locking notch tube of underground continuous wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
三重管双高压旋喷桩在工程中的应用;裴鸿斌;《天津建设科技》;20120430(第2期);第38-39页 *
地下连续墙及地下管线交叉处高压喷射注浆施工技术;谭远发;《路基工程》;19970215(第1期);第18-23页 *

Also Published As

Publication number Publication date
CN105986570A (en) 2016-10-05

Similar Documents

Publication Publication Date Title
CN105986570B (en) The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement
CN104631470B (en) The large particle diameter sand gravel of high water level geology deep basal pit combination supporting construction method
CN103343544B (en) Construction method for large-scale open caisson
CN101806059B (en) Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN105239563A (en) Dry-method hole forming filling pile structure for post-grouting matched rotary drilling rig and construction method
CN108533278B (en) Large-diameter slurry shield earth covering balance comprehensive receiving construction method under complex environment strong permeable stratum working condition
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN103993603A (en) Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation
CN110185844A (en) Shallow earthing pipe-jacking with large diameter construction method
CN102182199A (en) Construction method of high-pressure swing grouting water-stop curtain
CN101788082A (en) Construction method for abutting jack pipe underground
CN102286981A (en) Waterproof curtain and construction method thereof
CN202194148U (en) Waterproof curtain
CN110258658A (en) The leakage anticipation of diaphram wall and the construction method of processing
CN114808990A (en) High-pressure pre-filling karst cave pile foundation construction method
CN103334772A (en) Slurry capable of stabilizing tunnel face of underground excavation sand layer, slurry preparation method, grouting equipment and grouting process
CN112144559A (en) Well construction method in high water-rich loess sandy gravel stratum transformer tube well
CN107152042A (en) Churning clump of piles occlusion reinforcing engineering method is tilted for wearing the micro-disturbance in house under shield
CN204040021U (en) Large diameter pile construction equipment system in city underground engineering tunneling pilot tunnel
CN211816279U (en) New and old ground is wall interface processing structure even
CN109881696B (en) HPPG (high Performance Poly propylene glycol) bottom sealing construction method
CN211172039U (en) Soft soil region self-sinking steel open caisson structure and supporting system
CN110159866B (en) Construction method for reinforcing and reinforcing buried steel pipe
CN107740425A (en) Revolve cast anchor rope foundation pit supporting construction and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant