CN105951893A - Uplift pile head node waterproof structure and construction method thereof - Google Patents
Uplift pile head node waterproof structure and construction method thereof Download PDFInfo
- Publication number
- CN105951893A CN105951893A CN201610482819.5A CN201610482819A CN105951893A CN 105951893 A CN105951893 A CN 105951893A CN 201610482819 A CN201610482819 A CN 201610482819A CN 105951893 A CN105951893 A CN 105951893A
- Authority
- CN
- China
- Prior art keywords
- waterproof
- layer
- pile crown
- pile
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610482819.5A CN105951893A (en) | 2016-06-27 | 2016-06-27 | Uplift pile head node waterproof structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610482819.5A CN105951893A (en) | 2016-06-27 | 2016-06-27 | Uplift pile head node waterproof structure and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105951893A true CN105951893A (en) | 2016-09-21 |
Family
ID=56905266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610482819.5A Pending CN105951893A (en) | 2016-06-27 | 2016-06-27 | Uplift pile head node waterproof structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105951893A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759308A (en) * | 2016-11-30 | 2017-05-31 | 中国冶集团有限公司 | A kind of precast hollow pile head waterproof construction method |
CN107386336A (en) * | 2017-06-27 | 2017-11-24 | 中国二十冶集团有限公司 | Pile crown node waterproof processing unit and its construction method |
CN108517898A (en) * | 2018-03-26 | 2018-09-11 | 中交路桥北方工程有限公司 | The construction method of uplift pile and bottom plate seam crossing waterproof construction |
CN110644431A (en) * | 2019-09-19 | 2020-01-03 | 北京华昊水利水电工程有限责任公司 | River channel pier anti-seepage structure and construction method thereof |
CN111350282A (en) * | 2020-03-13 | 2020-06-30 | 科顺防水科技股份有限公司 | Pre-laid waterproof coiled material construction process for welding and gluing combined construction |
CN111456108A (en) * | 2020-04-11 | 2020-07-28 | 广东建兴基础工程有限公司 | Waterproof structure of foundation bearing platform and construction method thereof |
CN115288195A (en) * | 2022-09-15 | 2022-11-04 | 中国十七冶集团有限公司 | Waterproof construction method for foundation pile top of uplift pipe pile with basement |
CN115341586A (en) * | 2022-08-08 | 2022-11-15 | 中国建筑第四工程局有限公司 | Waterproof construction operation method for CFG pile uplift pile head |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201915399U (en) * | 2010-12-28 | 2011-08-03 | 中国建筑第六工程局有限公司 | Rigid-flexible waterproof structure of head of prestressed pipe pile |
CN202809660U (en) * | 2012-07-31 | 2013-03-20 | 中天建设集团有限公司天津分公司 | Waterproof structure for pile head of engineering pile |
CN203256816U (en) * | 2013-04-08 | 2013-10-30 | 中国建筑第七工程局有限公司 | Pile foundation bottom plate pile head waterproof structure |
CN104153400A (en) * | 2014-08-22 | 2014-11-19 | 中国建筑第二工程局有限公司 | Soft soil foundation cast-in-place pile head waterproof and construction method thereof |
JP5752524B2 (en) * | 2011-08-22 | 2015-07-22 | 大成建設株式会社 | Waterproof structure around the pile |
CN104975617A (en) * | 2015-07-15 | 2015-10-14 | 郑贤方 | Waterproof construction method of basement foundation cast-in-place pile head |
CN206070602U (en) * | 2016-06-27 | 2017-04-05 | 中铁第四勘察设计院集团有限公司 | Resistance to plucking pile head node waterproof structure |
-
2016
- 2016-06-27 CN CN201610482819.5A patent/CN105951893A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201915399U (en) * | 2010-12-28 | 2011-08-03 | 中国建筑第六工程局有限公司 | Rigid-flexible waterproof structure of head of prestressed pipe pile |
JP5752524B2 (en) * | 2011-08-22 | 2015-07-22 | 大成建設株式会社 | Waterproof structure around the pile |
CN202809660U (en) * | 2012-07-31 | 2013-03-20 | 中天建设集团有限公司天津分公司 | Waterproof structure for pile head of engineering pile |
CN203256816U (en) * | 2013-04-08 | 2013-10-30 | 中国建筑第七工程局有限公司 | Pile foundation bottom plate pile head waterproof structure |
CN104153400A (en) * | 2014-08-22 | 2014-11-19 | 中国建筑第二工程局有限公司 | Soft soil foundation cast-in-place pile head waterproof and construction method thereof |
CN104975617A (en) * | 2015-07-15 | 2015-10-14 | 郑贤方 | Waterproof construction method of basement foundation cast-in-place pile head |
CN206070602U (en) * | 2016-06-27 | 2017-04-05 | 中铁第四勘察设计院集团有限公司 | Resistance to plucking pile head node waterproof structure |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759308A (en) * | 2016-11-30 | 2017-05-31 | 中国冶集团有限公司 | A kind of precast hollow pile head waterproof construction method |
CN106759308B (en) * | 2016-11-30 | 2019-04-23 | 中国一冶集团有限公司 | A kind of precast hollow pile head waterproof construction method |
CN107386336A (en) * | 2017-06-27 | 2017-11-24 | 中国二十冶集团有限公司 | Pile crown node waterproof processing unit and its construction method |
CN108517898A (en) * | 2018-03-26 | 2018-09-11 | 中交路桥北方工程有限公司 | The construction method of uplift pile and bottom plate seam crossing waterproof construction |
CN108517898B (en) * | 2018-03-26 | 2019-09-13 | 中交路桥北方工程有限公司 | The construction method of uplift pile and bottom plate seam crossing waterproof construction |
CN110644431A (en) * | 2019-09-19 | 2020-01-03 | 北京华昊水利水电工程有限责任公司 | River channel pier anti-seepage structure and construction method thereof |
CN111350282A (en) * | 2020-03-13 | 2020-06-30 | 科顺防水科技股份有限公司 | Pre-laid waterproof coiled material construction process for welding and gluing combined construction |
CN111456108A (en) * | 2020-04-11 | 2020-07-28 | 广东建兴基础工程有限公司 | Waterproof structure of foundation bearing platform and construction method thereof |
CN111456108B (en) * | 2020-04-11 | 2021-09-14 | 广东建兴基础工程有限公司 | Waterproof structure of foundation bearing platform and construction method thereof |
CN115341586A (en) * | 2022-08-08 | 2022-11-15 | 中国建筑第四工程局有限公司 | Waterproof construction operation method for CFG pile uplift pile head |
CN115341586B (en) * | 2022-08-08 | 2024-05-03 | 中国建筑第四工程局有限公司 | Waterproof construction operation method for anti-pulling pile head of CFG pile |
CN115288195A (en) * | 2022-09-15 | 2022-11-04 | 中国十七冶集团有限公司 | Waterproof construction method for foundation pile top of uplift pipe pile with basement |
CN115288195B (en) * | 2022-09-15 | 2023-08-25 | 中国十七冶集团有限公司 | Waterproof construction method for foundation pile top of anti-pulling pipe pile with basement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105951893A (en) | Uplift pile head node waterproof structure and construction method thereof | |
CN107190844B (en) | The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall | |
CN206070602U (en) | Resistance to plucking pile head node waterproof structure | |
CN101787742B (en) | Planted roof soil lower deformation joint construction structure and construction method thereof | |
CN102776897B (en) | Wash apron anti-settling anti-cracking construction method and structure | |
CN108755983A (en) | A kind of waterproof technology | |
CN205776886U (en) | Concrete composite wall body structure | |
CN102852290A (en) | Roof parapet flashing position structure and construction method thereof | |
CN106894431B (en) | Hypogee pit body waterproof construction precipitation processing method under a kind of water resource enriched environment | |
CN109750758A (en) | The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN109184253A (en) | A kind of method for repairing and mending of exterior wall leakage | |
CN207775948U (en) | Pulling-Resistant Anchor Rod root waterproofing node structure | |
CN106499066A (en) | A kind of method that utilization FS101 mortar waterproof agents carry out building waterproof layer construction | |
CN101560777A (en) | Waterproof construction method for bottom plate of basement with anti-float anchor rod | |
CN106758644A (en) | Light-weight foamed concrete road surface structure and its construction method | |
CN207194353U (en) | A kind of prefabricated thermal insulation water-proof decorative external wall panel structure | |
CN207194343U (en) | The tapestry brick paving structure of autoclave aerated concrete building block exterior wall | |
CN203373918U (en) | Waterproofing work construction structure of pseudo-classic architecture roof cornice | |
CN108385614A (en) | A kind of concrete facing board construction method of anti-floating towing force | |
CN111535368A (en) | Basement waterproof construction process | |
CN207063141U (en) | A kind of thermal-insulating waterproof building structure | |
CN109881794A (en) | A kind of swimming pool waterproof construction | |
CN101586367B (en) | Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water | |
CN110439016A (en) | A kind of pile foundation waterproof construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Xie Tingdian Inventor after: Zhou Bing Inventor after: Jiang Ye Inventor after: Dong Jun Inventor after: Lou Yinghao Inventor after: Li Jianjun Inventor before: Xie Tingdian Inventor before: Zhou Bing Inventor before: Jiang Ye Inventor before: Dong Jun Inventor before: Lou Yinghao |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160921 |