CN105951893A - Uplift pile head node waterproof structure and construction method thereof - Google Patents

Uplift pile head node waterproof structure and construction method thereof Download PDF

Info

Publication number
CN105951893A
CN105951893A CN201610482819.5A CN201610482819A CN105951893A CN 105951893 A CN105951893 A CN 105951893A CN 201610482819 A CN201610482819 A CN 201610482819A CN 105951893 A CN105951893 A CN 105951893A
Authority
CN
China
Prior art keywords
waterproof
layer
pile crown
pile
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610482819.5A
Other languages
Chinese (zh)
Inventor
谢婷蜓
周兵
蒋烨
董俊
娄英豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610482819.5A priority Critical patent/CN105951893A/en
Publication of CN105951893A publication Critical patent/CN105951893A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides an uplift pile head node waterproof structure. The uplift pile head node waterproof structure comprises a pile head, the top of the pile head and the side surfaces, exposed out of a base soil layer, of the pile head are respectively coated with a waterproof material layer, the side surfaces, exposed out of the base soil layer, of the pile head are coated with waterproof mortar layers on the outer sides of the waterproof material layers, the parts, adjacent to the pile head, of the base soil layer are coated with waterproof mortar layers, and the waterproof mortar layers around the pile head are provided with waterproof coiled material layers; the gaps between the waterproof coiled material layers and the waterproof mortar layers are filled with sealants, polysulfide sealing layers are arranged on the outer sides of the waterproof mortar layers on the tops of the side surfaces of the pile head and on the upper surfaces of the waterproof coiled material layers near a pile, and sealing hoops which are arranged with the pile head as the center and the circle center and make close contact with the polysulfide sealing layers are arranged on the outer sides of the polysulfide sealing layers; continuous fine aggregate concrete protection layers are arranged on the upper surfaces of the waterproof coiled material layers, and a bottom plate is arranged above the fine aggregate concrete protection layers and above the waterproof material layer on the top of the pile head. The uplift pile head node waterproof structure can guarantee the waterproof effect and improve the construction progress.

Description

Uplift pile pile crown node waterproof structure and construction method thereof
Technical field
The invention belongs to the underground engineering field such as building construction, track traffic, be specifically related to one Plant uplift pile pile crown node waterproof structure.
Background technology
Traditional pile crown waterproofing process is to use coiled material to be directly routed to pile crown side to block, so Seal in coiled material and pile crown junction by sealing compound afterwards, then above coiled material and uplift pile stake Head covers 20mm solid cement mortar waterproof layer.This waterproofing node has a following drawback: 1, stake Head separates with base plate cement mortar so that uplift pile is with structure base slab the most not Can cooperative bearing.2, to indulge muscle numerous in uplift pile, pierce through pea gravel concreten protective layer and waterproof Layer, waterproof effect is the best.3, coiled material is combined imprecision with pile body, easily seeps water.
Summary of the invention
The purpose of the present invention is aiming at the defect of prior art, it is provided that a kind of uplift pile pile crown Node waterproof structure and construction method thereof, both can guarantee that waterproof effect, improve again construct into Degree.
The invention provides a kind of uplift pile pile crown node waterproof structure, including pile crown, described Pile crown top and inside are equipped with reinforcing bar, and the reinforcing bar at described pile crown top is the most outward-dipping, institute State pile crown bottom to be embedded in foundation bed, it is characterised in that described foundation bed surface is equipped with Concrete cushion, the top of pile crown exposes to concrete cushion;The top of described pile crown and exposing Be painted with one layer of waterproof layer in the side of concrete cushion, described pile crown exposes to coagulation Soil padding side concrete cushion external coating outside waterproof layer and near pile crown Waterproof mortar course, the waterproof mortar course around described pile crown is had to be provided with waterproof roll layer and prolong Reach on the sidewall of pile crown, outside the waterproof roll of pile crown side, closing ring is set, by waterproof volume Sheet material layers banding is in pile crown;The waterproof roll layer upper surface of described concrete cushion is equipped with continuously Pea gravel concreten protective layer, above described pea gravel concreten protective layer and pile crown end face and Concrete floor has been poured above the waterproof layer of top outer;Described waterproof roll layer bag Include waterproof layer and the enhancement Layer of integration connection;Enhancement Layer is covered in table outside waterproof mortar course Face;Waterproof layer is covered in the concrete cushion near enhancement Layer outer surface and waterproof mortar course Surface.
Waterproof roll outside the waterproof mortar course of described pile crown side top and near stake Layer upper surface is provided with continuous print polysulfide sealant, and closing ring is arranged at described polysulfide sealant Outside and centered by pile crown as the center of circle and with polysulfide sealant close contact.
Gap between described waterproof roll layer and waterproof mortar course is filled with fluid sealant.
Described closing ring is ferrule or rubber ferrule.
The invention provides a kind of uplift pile pile crown node waterproof construction method, its feature It is to comprise the following steps:
The first step, excavation pit and substrate construct concrete cushion;
Second step, carries out dabbing, and brushing cementitious capillary waterproofing material to pile crown Layer, in uplift pile pile crown top rebars and uplift pile concrete seam construction water-stop glue;
3rd step, is close to uplift pile and neighbouring concrete cushion performs thick waterproof mortar Layer;
4th step, after waterproof mortar course maintenance is good, smears fluid sealant at its inner corner trim and presses Strike off in fact;
5th step, lays pre-in pile crown side and extending on the concrete cushion near pile crown The waterproof layer of paving waterproof roll layer and and enhancement Layer;
6th step, concrete cushion above waterproof roll layer and about is laid microlith and mixes Solidifying protective soil layer, it is ensured that the waterproof roll being positioned at pile crown top-side exposes to pea gravel concreten Protective layer;
7th step, specifies position to package closing cranse outside the waterproof roll layer of pile crown;So After muscle indulged in uplift pile be bent to specified angle.
8th step, is applied in the waterproof volume exposing to pea gravel concreten protection by polysulfide sealant Material, and extrude compacting and strike off, complete shell nosing treatment.
9th step, sets up baseplate reinforcing bar, at pile crown top and side thereof and pea gravel concreten Underplate concrete is poured to designed elevation above protective layer.
After the described first step includes excavation of foundation pit, require to understand on foundation bed according to design Foreign material, are compacted foundation bed, and substrate is levelling, pours C20 concrete to designed elevation;Treat On energy after people, discrepancy in elevation larger part spade is evened out, then with wood floated, then smears pressure with ferrum Real press polish.
Described second step includes that rejecting stake top concrete epidermis, to exposing air-free concrete, removes Loose stone, separates the main muscle of stake, peels off stake core and also hangs pile crown, then with wire brush, height Setting-out rifle cleaning roughening concrete surface and stake side, concrete chisel hair side is required to be air-free concrete, table Face moist but without open fire.Then with the nylon bruss brushing cement-base infiltration crystallization type water-proof of semihard Material is to design thickness, and brushing should be the strongest, it is ensured that concavo-convex place fills, and thickness is uniform, Muscle and uplift pile concrete seam construction water-stop glue is indulged again in uplift pile stake.
Described 5th step includes cleaning out concrete cushion, brush 2 on concrete cushion Road adhesive bitument primer, treats that concrete cushion inorganic agent is dried, can brushing adhesive stick and being once coated with Brush is uniformly;Lay by cold bonding method and overlay waterproof roll enhancement Layer, re-lay and overlay waterproof roll Waterproof layer;Ensure to overlay the scope of waterproof roll enhancement Layer.
Described 6th step includes waterproof roll layer removing surface clean, pours pea gravel concreten Protective layer is to designed elevation, and after going up people, discrepancy in elevation larger part spade is evened out, then uses Wood floated, then smear compacting press polish with ferrum
The present invention has that seal is strong, easy construction, feature that durability is strong.In the present invention One layer of waterproof material of uplift pile pile crown end face brushing replace pea gravel concreten so that uplift pile Can combine closely with base plate, can effectively provide seal by cooperative bearing simultaneously.The present invention uses Closing ring pile crown waterproof roll can be closed, can effectively cut off flow path, carry High water resistance.The waterproof roll layer of the present invention expose to pea gravel concreten protective layer and with the end Plate contacts, and base plate is waterproof with waterproof roll layer, and to arrange form consistent, forms unified airtight preventing Water layer.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Wherein, 1-base plate, 2-pea gravel concreten protective layer, 3-concrete cushion, 4-pile crown, 5-reinforcing bar, 6-water-stop glue, 7-waterproof layer, 8-polysulfide sealant, 9-closing ring, 10- Fluid sealant, 11-waterproof mortar course, 12-waterproof layer, 13-enhancement Layer, 14-foundation bed.
Detailed description of the invention
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, just In being well understood to the present invention, but they do not constitute restriction to the present invention.
As it is shown in figure 1, the invention provides a kind of uplift pile pile crown node waterproof structure, bag Including pile crown 4, described pile crown 4 top and inside are equipped with reinforcing bar 5, described pile crown 4 top Reinforcing bar 5 all tilt upward and reinforcing bar 5 upper horizontal is outside, described pile crown 4 bottom is embedded in In foundation bed 14, foundation bed 14 pours concrete cushion 3;The top of pile crown 4 Portion exposes to concrete cushion 3;The top of described pile crown 4 and expose to foundation bed 14 Side is painted with one layer of waterproof layer 7, and waterproof material replaces pea gravel concreten so that anti- Pile pulling can be combined closely with base plate, can effectively provide seal by cooperative bearing simultaneously.Described stake 4 expose to the side of concrete cushion 3 outside waterproof layer 7 and near pile crown 4 Concrete cushion 3 external coating have waterproof mortar course 11, waterproof around described pile crown 4 Screed 11 is provided with waterproof roll layer;Between waterproof roll layer and waterproof mortar course 11 Gap is filled with fluid sealant 10, outside the waterproof mortar course 11 of described pile crown 4 side top And the waterproof roll layer upper surface near stake is provided with continuous print polysulfide sealant 8, described It is provided with outside polysulfide sealant 8 centered by pile crown 4 as the center of circle and tight with polysulfide sealant 8 Contiguity touch closing ring 9;Described waterproof roll layer upper surface is equipped with continuous print microlith and mixes Solidifying protective soil layer 2, preventing of above described pea gravel concreten protective layer 2 and pile crown 4 top Water material layer 7 is arranged over base plate 1.
Described closing ring 9 is ferrule or rubber ferrule, can effectively cut off flow path, Improve water resistance..
Described waterproof roll layer includes waterproof layer 12 and the enhancement Layer 13 of integration connection;Add Strong layer 13 is covered in waterproof mortar course 11 outer surface;Waterproof layer 12 is covered in enhancement Layer Foundation bed 14 surface of 13 outer surfaces and waterproof mortar course 11 adnexa.Described be provided with poly- The waterproof roll layer of sulfur sealant 8 exposes to pea gravel concreten protective layer 2.Base plate and waterproof Coiled material layer is waterproof arranges form unanimously, forms unified airtight waterproof layer.Described pile crown 4 pushes up It is coated with water-stop glue 6 bottom the reinforcing bar 5 in portion.
When closing ring uses ferrule, its construction procedure is as follows:
1, after excavation of foundation pit, require to understand the foreign material on substrate soil according to design, be compacted base Subsoil, substrate is levelling, pours C20 concrete to designed elevation;After going up people, the discrepancy in elevation Larger part spade is evened out, then with wood floated, then smears compacting press polish with ferrum.
2, pile crown is carried out dabbing, and brushing cementitious capillary waterproofing material layer, Muscle and uplift pile concrete seam construction water-stop glue is indulged in uplift pile stake;Reject stake top coagulation Soil epidermis, to exposing air-free concrete, removes loose stone, separates the main muscle of stake, peels off stake Core also hangs pile crown, then with wire brush, giant cleaning roughening concrete surface and stake side, mixed Solidifying soil roughened surface is required to be air-free concrete, surface moisture but without open fire.Then with the Buddhist nun of semihard Dragon brushes brush cementitious capillary waterproofing material should be had back and forth to design thickness, brushing Power, it is ensured that concavo-convex place fills, and thickness is uniform, then it is mixed with uplift pile to indulge muscle in uplift pile stake Solidifying soil seam construction water-stop glue.
3, it is close to uplift pile and performs 11-10mm thickness waterproof mortar;Before waterproof mortar construction, Concrete bed course basal plane should be cleaned out, be close to uplift pile and in the range of stake week 200mm Concrete bed course smears 10mm thickness waterproof mortar, smears twice with steel trowel, every floating all over being compacted, Catch up with light second time.
4, after waterproof mortar maintenance is good, the fluid sealant ash cutter stirred or plastic squeeze Rifle is by the extruding compacting of diagram slope, 45 degree of angles and strikes off.
5, the waterproof layer of laying water-proof coiled material layer and enhancement Layer;Base cleaning is clean, Brush 2 road adhesive bitument primer on concrete cushion, treats that concrete cushion inorganic agent is dried, can be coated with Brush coating stick (chloroprene rubber adhesive agent or SBS binding agent), should once brush uniformly.Use cold bonding Method is laid and is overlay waterproof roll enhancement Layer, re-lays and overlays waterproof roll waterproof layer.Should ensure that Overlay the scope of waterproof roll enhancement Layer.
6, waterproof roll layer removing surface is clean, pour pea gravel concreten protective layer to setting Meter absolute altitude, after going up people, discrepancy in elevation larger part spade is evened out, then with wood floated, Compacting press polish is smeared again with ferrum.
7, in appointment position, stake top with the ferrule (steel of the design designated diameter of two semicircles Matter, it is reserved with bolt hole at two ends) the waterproof layer of waterproof roll layer and enhancement Layer banding, And will be tight with bolt bolt at ferrule joint bolt hole.Pile crown top rebars can be in ferrule Perform front or be bent to specified angle after performing.
8, stir polysulfide sealant ash cutter or glue spraying gun at waterproof roll edge Upper extruding compacting also strikes off, and shell nosing treatment is good.
9, set up baseplate reinforcing bar, pour underplate concrete to designed elevation.
When closing ring uses rubber ferrule, its construction procedure is as follows:
1, after excavation of foundation pit, require to understand the foreign material on substrate soil according to design, be compacted base Subsoil, substrate is levelling, pours C20 concrete to designed elevation;After going up people, the discrepancy in elevation Larger part spade is evened out, then with wood floated, then smears compacting press polish with ferrum.
2, rejecting stake top concrete epidermis is to exposing air-free concrete, removes loose stone, Separate the main muscle of stake, peel off stake core and hang pile crown, then clear up with wire brush, giant Roughening concrete surface and stake side, concrete chisel hair side is required to be air-free concrete, surface moisture but nothing Open fire.Then with the nylon bruss brushing cementitious capillary waterproofing material of semihard to design Thickness, brushing should be the strongest, it is ensured that concavo-convex place fills, and thickness is uniform, then at resistance to plucking Muscle and uplift pile concrete seam construction water-stop glue are indulged in stake stake.
3, before waterproof mortar course construction, concrete cushion basal plane should be cleaned out, be close to Uplift pile and the concrete bed course in the range of stake week 200mm smear 10mm thickness waterproof mortar, use Steel trowel is smeared twice, every floating all over being compacted, and catches up with light second time.
4, after waterproof mortar course maintenance is good, the fluid sealant ash cutter or crowded stirred Glue rifle is by the extruding compacting of diagram slope, 45 degree of angles and strikes off.
5, base cleaning is clean, on concrete cushion, brush 2 road adhesive bitument primer, waits to mix Solidifying soil padding inorganic agent is dried, can brushing adhesive stick (chloroprene rubber adhesive agent or SBS bonding Agent), should once brush uniformly.With the enhancement Layer of cold bonding method laying water-proof coiled material layer, repave Set up defences the waterproof layer of water coiled material layer.Should ensure that the scope of enhancement Layer.
6, waterproof roll layer removing surface is clean, pour pea gravel concreten protective layer to setting Meter absolute altitude, after going up people, discrepancy in elevation larger part spade is evened out, then with wood floated, Compacting press polish is smeared again with ferrum.
7, after being inserted in rubber ferrule, uplift pile stake is indulged the muscle i.e. reinforcing bar at pile crown top and is bent to full The position that foot design requires;
8, constructing structure base plate;Set up baseplate reinforcing bar, pour underplate concrete to designing mark High.
The content that this specification is not described in detail belongs to known in professional and technical personnel in the field Prior art.

Claims (10)

1. a uplift pile pile crown node waterproof structure, including pile crown (4), described pile crown (4) top and inside are equipped with reinforcing bar (5), the reinforcing bar (5) at described pile crown (4) top The most outward-dipping, described pile crown (4) bottom is embedded in foundation bed (14), its feature It is that described foundation bed surface is equipped with concrete cushion (3), the top of pile crown (4) Expose to concrete cushion (3);The top of described pile crown (4) and expose to concrete mats The side of layer (3) is painted with one layer of waterproof layer (7), and described pile crown (4) exposes to Concrete cushion (3) side is near waterproof layer (7) outside and pile crown (4) Concrete cushion (3) external coating has waterproof mortar course (11), described pile crown (4) week The waterproof mortar course (11) enclosed is provided with waterproof roll layer and extends on the sidewall of pile crown, The waterproof roll layer of pile crown side is outside equipped with closing ring, by waterproof roll layer banding in stake Head;The waterproof roll layer upper surface being positioned on concrete cushion is equipped with continuous print microlith coagulation Protective soil layer (2), described pea gravel concreten protective layer (2) top and pile crown (4) end face And waterproof layer (7) top of top outer has poured concrete floor (1);Institute State waterproof roll layer and include waterproof layer (12) and the enhancement Layer (13) of integration connection;Add Strong layer (13) is covered in waterproof mortar course (11) outer surface;Waterproof layer (12) covers Concrete cushion (3) near enhancement Layer (13) outer surface and waterproof mortar course (11) Surface.
Uplift pile pile crown node waterproof structure the most according to claim 1, its feature It is near waterproof mortar course (11) outside and the stake of described pile crown (4) side top Waterproof roll layer upper surface be provided with continuous print polysulfide sealant (8), closing ring (9) Be arranged at described polysulfide sealant (8) outside and centered by pile crown (4) as the center of circle and with Polysulfide sealant (8) is in close contact.
Uplift pile pile crown node waterproof structure the most according to claim 1, its feature The gap being between waterproof roll layer and waterproof mortar course (11) is filled with fluid sealant (10); Reinforcing bar (5) bottom at pile crown (4) top is coated with water-stop glue (6)..
Uplift pile pile crown node waterproof structure the most according to claim 1, its feature It is that closing ring (9) is ferrule or rubber ferrule.
Uplift pile pile crown node waterproof structure the most according to claim 1, its feature It is that the waterproof roll layer being provided with polysulfide sealant (8) exposes to pea gravel concreten protective layer (2)。
6. a uplift pile pile crown node waterproof construction method, it is characterised in that include Following steps:
The first step, excavation pit and substrate construct concrete cushion;
Second step, carries out dabbing, and brushing cementitious capillary waterproofing material to pile crown Layer, in uplift pile pile crown top rebars and uplift pile concrete seam construction water-stop glue;
3rd step, is close to uplift pile and neighbouring concrete cushion performs thick waterproof mortar Layer;
4th step, after waterproof mortar course maintenance is good, smears fluid sealant at its inner corner trim and presses Strike off in fact;
5th step, lays pre-in pile crown side and extending on the concrete cushion near pile crown The waterproof layer of paving waterproof roll layer and and enhancement Layer;
6th step, concrete cushion above waterproof roll layer and about is laid microlith and mixes Solidifying protective soil layer, it is ensured that the waterproof roll being positioned at pile crown top-side exposes to pea gravel concreten Protective layer;
7th step, specifies position to package closing cranse outside the waterproof roll layer of pile crown;So After muscle indulged in uplift pile be bent to specified angle.
8th step, is applied in the waterproof volume exposing to pea gravel concreten protection by polysulfide sealant Material, and extrude compacting and strike off, complete shell nosing treatment.
9th step, sets up baseplate reinforcing bar, at pile crown top and side thereof and pea gravel concreten Underplate concrete is poured to designed elevation above protective layer.
Uplift pile pile crown node waterproof construction method the most according to claim 7, After it is characterized in that the first step includes excavation of foundation pit, understand on foundation bed according to design requirement Foreign material, be compacted foundation bed, substrate is levelling, pours C20 concrete to designed elevation; After going up people, discrepancy in elevation larger part spade is evened out, then with wood floated, then smears with ferrum Compacting press polish.
Uplift pile pile crown node waterproof construction method the most according to claim 7, It is characterized in that second step includes that rejecting stake top concrete epidermis, to exposing air-free concrete, removes Remove loose stone, separate the main muscle of stake, peel off stake core and also hang pile crown, then with wire brush, Giant cleaning roughening concrete surface and stake side, concrete chisel hair side is required to be air-free concrete, Surface moisture but without open fire;Then prevent with the nylon bruss brushing cement-base infiltration crystallization type of semihard Water material is to design thickness, and brushing should be the strongest, it is ensured that concavo-convex place fills, and thickness is equal Even, then indulge muscle and uplift pile concrete seam construction water-stop glue in uplift pile stake.
Uplift pile pile crown node waterproof construction method the most according to claim 7, It is characterized in that the 5th step to include concrete cushion to clean out, concrete cushion is brushed 2 road adhesive bitument primers, treat that concrete cushion inorganic agent is dried, can brushing adhesive stick and once Brushing is uniformly;Lay by cold bonding method and overlay waterproof roll enhancement Layer, re-lay and overlay waterproof volume Material waterproof layer;Ensure to overlay the scope of waterproof roll enhancement Layer.
Uplift pile pile crown node waterproof construction method the most according to claim 7, It is characterized in that the 6th step includes waterproof roll layer removing surface clean, pour microlith coagulation Protective soil layer is to designed elevation, and after going up people, discrepancy in elevation larger part spade is evened out, then With wood floated, then smear compacting press polish with ferrum.
CN201610482819.5A 2016-06-27 2016-06-27 Uplift pile head node waterproof structure and construction method thereof Pending CN105951893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610482819.5A CN105951893A (en) 2016-06-27 2016-06-27 Uplift pile head node waterproof structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610482819.5A CN105951893A (en) 2016-06-27 2016-06-27 Uplift pile head node waterproof structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN105951893A true CN105951893A (en) 2016-09-21

Family

ID=56905266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610482819.5A Pending CN105951893A (en) 2016-06-27 2016-06-27 Uplift pile head node waterproof structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN105951893A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759308A (en) * 2016-11-30 2017-05-31 中国冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN107386336A (en) * 2017-06-27 2017-11-24 中国二十冶集团有限公司 Pile crown node waterproof processing unit and its construction method
CN108517898A (en) * 2018-03-26 2018-09-11 中交路桥北方工程有限公司 The construction method of uplift pile and bottom plate seam crossing waterproof construction
CN110644431A (en) * 2019-09-19 2020-01-03 北京华昊水利水电工程有限责任公司 River channel pier anti-seepage structure and construction method thereof
CN111350282A (en) * 2020-03-13 2020-06-30 科顺防水科技股份有限公司 Pre-laid waterproof coiled material construction process for welding and gluing combined construction
CN111456108A (en) * 2020-04-11 2020-07-28 广东建兴基础工程有限公司 Waterproof structure of foundation bearing platform and construction method thereof
CN115288195A (en) * 2022-09-15 2022-11-04 中国十七冶集团有限公司 Waterproof construction method for foundation pile top of uplift pipe pile with basement
CN115341586A (en) * 2022-08-08 2022-11-15 中国建筑第四工程局有限公司 Waterproof construction operation method for CFG pile uplift pile head

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201915399U (en) * 2010-12-28 2011-08-03 中国建筑第六工程局有限公司 Rigid-flexible waterproof structure of head of prestressed pipe pile
CN202809660U (en) * 2012-07-31 2013-03-20 中天建设集团有限公司天津分公司 Waterproof structure for pile head of engineering pile
CN203256816U (en) * 2013-04-08 2013-10-30 中国建筑第七工程局有限公司 Pile foundation bottom plate pile head waterproof structure
CN104153400A (en) * 2014-08-22 2014-11-19 中国建筑第二工程局有限公司 Soft soil foundation cast-in-place pile head waterproof and construction method thereof
JP5752524B2 (en) * 2011-08-22 2015-07-22 大成建設株式会社 Waterproof structure around the pile
CN104975617A (en) * 2015-07-15 2015-10-14 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN206070602U (en) * 2016-06-27 2017-04-05 中铁第四勘察设计院集团有限公司 Resistance to plucking pile head node waterproof structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201915399U (en) * 2010-12-28 2011-08-03 中国建筑第六工程局有限公司 Rigid-flexible waterproof structure of head of prestressed pipe pile
JP5752524B2 (en) * 2011-08-22 2015-07-22 大成建設株式会社 Waterproof structure around the pile
CN202809660U (en) * 2012-07-31 2013-03-20 中天建设集团有限公司天津分公司 Waterproof structure for pile head of engineering pile
CN203256816U (en) * 2013-04-08 2013-10-30 中国建筑第七工程局有限公司 Pile foundation bottom plate pile head waterproof structure
CN104153400A (en) * 2014-08-22 2014-11-19 中国建筑第二工程局有限公司 Soft soil foundation cast-in-place pile head waterproof and construction method thereof
CN104975617A (en) * 2015-07-15 2015-10-14 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN206070602U (en) * 2016-06-27 2017-04-05 中铁第四勘察设计院集团有限公司 Resistance to plucking pile head node waterproof structure

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759308A (en) * 2016-11-30 2017-05-31 中国冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN106759308B (en) * 2016-11-30 2019-04-23 中国一冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN107386336A (en) * 2017-06-27 2017-11-24 中国二十冶集团有限公司 Pile crown node waterproof processing unit and its construction method
CN108517898A (en) * 2018-03-26 2018-09-11 中交路桥北方工程有限公司 The construction method of uplift pile and bottom plate seam crossing waterproof construction
CN108517898B (en) * 2018-03-26 2019-09-13 中交路桥北方工程有限公司 The construction method of uplift pile and bottom plate seam crossing waterproof construction
CN110644431A (en) * 2019-09-19 2020-01-03 北京华昊水利水电工程有限责任公司 River channel pier anti-seepage structure and construction method thereof
CN111350282A (en) * 2020-03-13 2020-06-30 科顺防水科技股份有限公司 Pre-laid waterproof coiled material construction process for welding and gluing combined construction
CN111456108A (en) * 2020-04-11 2020-07-28 广东建兴基础工程有限公司 Waterproof structure of foundation bearing platform and construction method thereof
CN111456108B (en) * 2020-04-11 2021-09-14 广东建兴基础工程有限公司 Waterproof structure of foundation bearing platform and construction method thereof
CN115341586A (en) * 2022-08-08 2022-11-15 中国建筑第四工程局有限公司 Waterproof construction operation method for CFG pile uplift pile head
CN115341586B (en) * 2022-08-08 2024-05-03 中国建筑第四工程局有限公司 Waterproof construction operation method for anti-pulling pile head of CFG pile
CN115288195A (en) * 2022-09-15 2022-11-04 中国十七冶集团有限公司 Waterproof construction method for foundation pile top of uplift pipe pile with basement
CN115288195B (en) * 2022-09-15 2023-08-25 中国十七冶集团有限公司 Waterproof construction method for foundation pile top of anti-pulling pipe pile with basement

Similar Documents

Publication Publication Date Title
CN105951893A (en) Uplift pile head node waterproof structure and construction method thereof
CN107190844B (en) The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall
CN206070602U (en) Resistance to plucking pile head node waterproof structure
CN101787742B (en) Planted roof soil lower deformation joint construction structure and construction method thereof
CN102776897B (en) Wash apron anti-settling anti-cracking construction method and structure
CN108755983A (en) A kind of waterproof technology
CN205776886U (en) Concrete composite wall body structure
CN102852290A (en) Roof parapet flashing position structure and construction method thereof
CN106894431B (en) Hypogee pit body waterproof construction precipitation processing method under a kind of water resource enriched environment
CN109750758A (en) The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN109184253A (en) A kind of method for repairing and mending of exterior wall leakage
CN207775948U (en) Pulling-Resistant Anchor Rod root waterproofing node structure
CN106499066A (en) A kind of method that utilization FS101 mortar waterproof agents carry out building waterproof layer construction
CN101560777A (en) Waterproof construction method for bottom plate of basement with anti-float anchor rod
CN106758644A (en) Light-weight foamed concrete road surface structure and its construction method
CN207194353U (en) A kind of prefabricated thermal insulation water-proof decorative external wall panel structure
CN207194343U (en) The tapestry brick paving structure of autoclave aerated concrete building block exterior wall
CN203373918U (en) Waterproofing work construction structure of pseudo-classic architecture roof cornice
CN108385614A (en) A kind of concrete facing board construction method of anti-floating towing force
CN111535368A (en) Basement waterproof construction process
CN207063141U (en) A kind of thermal-insulating waterproof building structure
CN109881794A (en) A kind of swimming pool waterproof construction
CN101586367B (en) Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water
CN110439016A (en) A kind of pile foundation waterproof construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xie Tingdian

Inventor after: Zhou Bing

Inventor after: Jiang Ye

Inventor after: Dong Jun

Inventor after: Lou Yinghao

Inventor after: Li Jianjun

Inventor before: Xie Tingdian

Inventor before: Zhou Bing

Inventor before: Jiang Ye

Inventor before: Dong Jun

Inventor before: Lou Yinghao

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160921