CN104153400A - Soft soil foundation cast-in-place pile head waterproof and construction method thereof - Google Patents

Soft soil foundation cast-in-place pile head waterproof and construction method thereof Download PDF

Info

Publication number
CN104153400A
CN104153400A CN201410415983.5A CN201410415983A CN104153400A CN 104153400 A CN104153400 A CN 104153400A CN 201410415983 A CN201410415983 A CN 201410415983A CN 104153400 A CN104153400 A CN 104153400A
Authority
CN
China
Prior art keywords
waterproof
pile
pile head
layer
polyurethane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410415983.5A
Other languages
Chinese (zh)
Other versions
CN104153400B (en
Inventor
刘治国
安凤杰
边可
杨建文
郭强
方鹏
邓云
刘云霁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201410415983.5A priority Critical patent/CN104153400B/en
Publication of CN104153400A publication Critical patent/CN104153400A/en
Application granted granted Critical
Publication of CN104153400B publication Critical patent/CN104153400B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a soft soil foundation cast-in-place pile head waterproof, which comprises a polyurethane waterproof coating, a waterproof coiled material, sealing paste and waterproof mortar, wherein polyurethane waterproof coating reinforcing layers are arranged on the periphery, the top and the periphery of the pile head; double-sided self-adhesive waterproof coiled materials reach the root of the pile head; sealing the periphery of the pile head with sealing paste; and (4) making waterproof mortar on the periphery and the top of the pile head protruding out of the bedding surface. Also discloses a soft soil foundation cast-in-place pile head waterproof construction method, which comprises the following construction procedures: constructing a foundation concrete cushion; rounding the pile head and leveling the pile body to the pile top; making a cement mortar leveling layer on the surface of the cushion layer; brushing a base layer treating agent on the cement mortar leveling layer; the pile head is used as a polyurethane waterproof coating reinforcing layer; double-sided self-adhesive waterproof coiled materials reach the root of the pile head; sealing the periphery of the pile head with sealing paste; making waterproof mortar on the pile head; and a fine stone concrete protective layer is formed on the waterproof roll material layer. Through multiple fortifications, leakage points at the pile head are prevented, and the engineering quality is guaranteed.

Description

A kind of soft foundation pouring pile head waterproof and construction method thereof
Technical field
The present invention relates to a kind of soft foundation pouring pile head waterproof and construction method thereof, is the realm of building construction.
Background technology
The building foundation waterproof problem of complicated geological environment is the tackling key problem emphasis of technical field of buildings always, the present invention is that engineering pile pile crown waterproofing node way taking soft foundation environment is as research object, with the actual problem running into of engineering in conjunction with existing job specfication, atlas, the scientific and technical innovation of carrying out as object to improve engineering foundation waterproof quality.
Summary of the invention
For achieving the above object, the invention discloses a kind of soft foundation pouring pile head waterproof, the technical scheme adopting is: pile crown waterproof comprises polyurethane waterproof coating, waterproof roll, sealing compound and waterproofing mortar, does polyurethane waterproof coating enhancement Layer at pile crown surrounding, top and periphery; Double-sided self-adhesive waterproof coiled materials is to pile crown root; Pile crown surrounding seals by sealing compound; Pile crown protrudes bedding plane surrounding and waterproofing mortar is made at top.
Further, described polyurethane waterproof coating enhancement Layer is that 2 ㎜ are thick, expands to periphery 500 ㎜ scopes; Described double-sided self-adhesive waterproof coiled materials is that 4 ㎜ are thick, affixes to pile crown root; Described waterproofing mortar is thick is 20 ㎜, and proportioning is 1:2.5.
The invention also discloses a kind of soft foundation pouring pile head waterproof construction method, comprise following working procedure: the first step, base concrete cushion construction; Second step, builds one deck pea gravel concreten by pile crown surrounding and top, looks for round pile body levelling stake top; The 3rd step, making cement mortar levelling layer on bedding plane; The 4th step is brushed base treatment agent one time on cement mortar screeding layer; The 5th step, pile crown surrounding, top and periphery do polyurethane waterproof coating enhancement Layer; The 6th step, double-sided self-adhesive waterproof coiled materials is to pile crown root; The 7th step, pile crown surrounding seals by sealing compound; The 8th step, pile crown protrudes bedding plane surrounding and waterproofing mortar is made together in top; The 9th step, does pea gravel concreten topping on waterproof roll layer.
Further, in the first step, the construction process of base concrete bed course is: substrate equating after excavation of foundation pit → put architecture basics sideline adds 300 ㎜ control lines → install bed course limit mould → follow closely in foundation ditch absolute altitude control height reinforcing rod, 4 meters of spacing in length and breadth → according to construction flowing water section, C20 blinding concrete is built in segmentation, thickness is not less than 150 ㎜, before bracing wire is closed flat concrete surface → final set on absolute altitude control reinforcing rod, receive light processing → cover film, water seasoning.
Further, in second step, the pile body that exposes outside base concrete bed course is looked for to circle, the levelling of stake end face.Construction process is: pile concrete epidermis picks cutter, the loose stone in stake top and reject → do circular mode with three-ply board ribbing hoop, adds 30 ㎜ hassock pieces → get rid of the cotton felt water seasoning of the pea gravel concreten that reinforcing bar subscript goes out the high grade of absolute altitude control line → build → cover outward at pile crown between Mo Nei and pile body.
Further, in the 3rd step cement mortar screeding layer construction, according to mat surface planeness and defect situation, concrete cushion is carried out to leveling, mainly concrete mats aspect out-of-flatness of having peeling, dusting, pin nest, crack and flowing water section separated place etc., and lead the foot of a wall portion, the cloudy male trowel circular arc of the well that catchments; Construction process is: cutter cleaning → fault location sprinkle water moistening, trickle mud → the smear thick 1:2 cement mortar screeding of 20 ㎜ → lead the foot of a wall portion, the 50 ㎜ circular arc → compacting maintenances of the cloudy male trowel diameter of the well that catchments are picked in fault location surface.
Further, in the 5th step, pile crown surrounding, top and periphery 500 ㎜ scopes are done the thick polyurethane waterproof coating enhancement Layer of 2 ㎜; Construction process is: the cleaning of concrete mats aspect, clear away the foreign material → 500 ㎜ place setting-outs outside pile body limit such as floating ash, control polyurethane boundary of works area → point three times brushing polyurethane waterproof coatings, the time interval with last all over hand by sticky being advisable not, pile crown gets rid of reinforcing bar place outward and wants emphasis brushing → inspection to have or not omission → be coated with and brush one times polyurethane → evenly shed one deck peastone in stake top bit, constructs in order to stake top waterproofing mortar.
Further, in the 6th step, the thick waterproof roll of large paving of base concrete bed course 4 ㎜, until engineering pile edge at one's side; Construction process is: base mat aspect cleans out → put paving line at base mat aspect bullet, 1 meter of coiled material fabric width, lap width is that 80mm paving line spacing is 920mm → lead the foot of a wall portion, the negative and positive place of the well that catchments carries out extra play → inspect for acceptance → along the large face waterproof roll of the sticky paving of paving, it between coiled material and bed course, is empty paving, it between coiled material, is self-adhesion overlap joint, the careful compacting of lap-joint → coiled material is met engineering pile place, along pile body circular arc cutting coiled material, make waterproof roll prop up pile body, coiled material and pile body spacing are not more than 20mm → coiled material and pile body periphery polyurethane enhancement Layer will cement.
Further, in the 7th step, between waterproof roll and pile body, use the shutoff of Special seal cream; Construction process is: waterproof roll and pile body junction are cleaned out → have or not omission along the gap → compacting sealing compound → inspection between pile body border sealing compound shutoff waterproof roll and pile body.
Further, in the 8th step, pile crown protrudes concrete mats aspect surrounding and 20 ㎜ 1:2.5 waterproofing mortars are made at top; Construction process is: by match ratio mixing waterproofing mortar → waterproofing mortar construction is cleaned out → carried out in waterproofing mortar construction place, and smear and flatten → cover cotton felt water seasoning.
Further, in the 9th step, on waterproof roll layer, do the thick C20 pea gravel concreten of 50 ㎜ topping; Construction process is: waterproofing mortar layer check and accept complete and clean out → copy and survey basis end absolute altitude with level gauge, on waterproofing course, make the segmentation of protective layer thickness control ash cake → according to construction flowing water section and build waterproofing protection layer concrete → receipts face and smear flatten → water seasoning.
Beneficial effect of the present invention is as follows:
The present invention compares with traditional basic pile crown waterproofing node way, polyurethane, waterproof roll, sealing compound, 4 kinds of waterproofing courses of waterproofing mortar have been made respectively at pile crown place, there is rigid waterproofing also to have flexible water, in pile crown joints complexity, distortion more greatly, under the medium unfavorable conditions of influence on groundwater environment, can have good applicability for a long time.By multi-way prevention, prevent that breakthrough from appearring in pile crown place, to ensure workmanship.
Brief description of the drawings
Fig. 1 is soft foundation pouring pile head water proof structure figure;
In figure, 1-pile crown, 2-concrete cushion, 3-agent structure base plate, 4-concrete cover, 51-waterproof coating, 52-waterproof roll, 53-sealing compound, 54-waterproofing mortar.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail.
A kind of soft foundation pouring pile head waterproof, pile crown waterproof comprises polyurethane waterproof coating 51, waterproof roll 52, sealing compound 53 and waterproofing mortar 54, doing polyurethane waterproof coating enhancement Layer at pile crown 1 surrounding, top and periphery is that 2 ㎜ are thick, expands to periphery 500 ㎜ scopes; Double-sided self-adhesive waterproof coiled materials is that 4 ㎜ are thick, and paving is to pile crown root; Pile crown surrounding seals by sealing compound; Pile crown protrudes bedding plane surrounding and waterproofing mortar is made at top, and waterproofing mortar is thick is 20 ㎜, and proportioning is 1:2.5.
The invention also discloses a kind of soft foundation pouring pile head waterproof construction method, comprise following working procedure:
The first step, base concrete bed course 2 is constructed.Construction process is: substrate equating after excavation of foundation pit → put architecture basics sideline+300 ㎜ control line (consider that brick loose tool build by laying bricks or stones) → install bed course limit mould → follow closely in foundation ditch absolute altitude control height reinforcing rod, 4 meters of spacing in length and breadth → according to construction flowing water section, C20 blinding concrete is built in segmentation, thickness is not less than 150 ㎜, before bracing wire is closed flat concrete surface → final set on absolute altitude control reinforcing rod, receive light processing → cover film, water seasoning.
Second step, one deck pea gravel concreten is built at pile crown 1 surrounding and the top that just expose outside base concrete bed course, looks for round pile body levelling stake top.Construction process is: pile concrete epidermis picks cutter, the loose stone in stake top and reject → do circular mode with three-ply board ribbing hoop, adds 30 ㎜ hassock pieces → get rid of the cotton felt water seasoning of the pea gravel concreten that reinforcing bar subscript goes out the high grade of absolute altitude control line → build → cover outward at pile crown between Mo Nei and pile body.
The 3rd step, making cement mortar levelling layer 6 on bedding plane, according to mat surface planeness and defect situation, concrete cushion 2 is carried out to leveling, mainly concrete cushion 2 faces out-of-flatness of having peeling, dusting, pin nest, crack and flowing water section separated place etc., and lead the foot of a wall portion, the cloudy male trowel circular arc of the well that catchments.Construction process is: cutter cleaning → fault location sprinkle water moistening, trickle mud → the smear thick 1:2 cement mortar screeding of 20 ㎜ → lead the foot of a wall portion, the 50 ㎜ circular arc → compacting maintenances of the cloudy male trowel diameter of the well that catchments are picked in fault location surface.
The 4th step is brushed base treatment agent one time on cement mortar screeding layer 6.
The 5th step, pile crown surrounding, top and periphery 500 ㎜ scopes are done thick polyurethane waterproof coating 51 enhancement Layers of 2 ㎜.Construction process is: 4 cleanings of concrete cushion, clear away the foreign material → 500 ㎜ place setting-outs outside pile body limit such as floating ash, control polyurethane boundary of works area → point three times brushing polyurethane waterproof coatings, the time interval with last all over hand by sticky being advisable not, pile crown gets rid of reinforcing bar place outward and wants emphasis brushing → inspection to have or not omission → be coated with and brush one times polyurethane → evenly shed one deck peastone in stake top bit, constructs in order to stake top waterproofing mortar.
The 6th step, the thick double-sided self-adhesive waterproof coiled materials 52 of large face paving 4 ㎜ of base concrete bed course 2, until engineering pile edge at one's side; Construction process is: base mat aspect cleans out → put paving line at base mat aspect bullet, 1 meter of coiled material fabric width, lap width is that 80mm paving line spacing is 920mm → lead the foot of a wall portion, the negative and positive place of the well that catchments carries out extra play → inspect for acceptance → along the large face waterproof roll of the sticky paving of paving, it between coiled material and bed course, is empty paving, it between coiled material, is self-adhesion overlap joint, the careful compacting of lap-joint → coiled material is met engineering pile place, along pile body circular arc cutting coiled material, make waterproof roll prop up pile body, coiled material and pile body spacing are not more than 20mm → coiled material and pile body periphery polyurethane enhancement Layer will cement.
The 7th step, uses 53 shutoff of Special seal cream between waterproof roll 52 and pile body; Construction process is: waterproof roll 52 and pile body junction are cleaned out → have or not omission along the gap → compacting sealing compound → inspection between pile body border sealing compound shutoff waterproof roll and pile body.
The 8th step, pile crown protrudes 2 surroundings of concrete cushion and top and makees 20 ㎜ 1:2.5 waterproofing mortar 54 one; Construction process is: by match ratio mixing waterproofing mortar → waterproofing mortar construction is cleaned out → carried out in waterproofing mortar 54 constructions place, and smear and flatten → cover cotton felt water seasoning.
The 9th step, does the thick C20 pea gravel concreten of 50 ㎜ topping 4 on 52 layers of waterproof rolls; Construction process is: waterproofing mortar layer check and accept complete and clean out → copy and survey basis end absolute altitude with level gauge, on waterproofing course, make the segmentation of protective layer thickness control ash cake → according to construction flowing water section and build waterproofing protection layer concrete → receipts face and smear flatten → water seasoning.
After soft foundation pouring pile head waterproof construction, just can carry out the construction of agent structure base plate 3.

Claims (10)

1. a soft foundation pouring pile head waterproof, comprise polyurethane waterproof coating (51), waterproof roll (52), sealing compound (53) and waterproofing mortar (54), it is characterized in that, do polyurethane waterproof coating enhancement Layer at pile crown (1) surrounding, top and periphery; Double-sided self-adhesive waterproof coiled materials is to pile crown root; Pile crown surrounding seals by sealing compound; Pile crown protrudes bedding plane surrounding and waterproofing mortar is made at top;
Described polyurethane waterproof coating enhancement Layer is that 2 ㎜ are thick, expands to periphery 500 ㎜ scopes; Described double-sided self-adhesive waterproof coiled materials is that 4 ㎜ are thick, affixes to pile crown root; Described waterproofing mortar is thick is 20 ㎜, and proportioning is 1:2.5.
2. a soft foundation pouring pile head waterproof construction method, is characterized in that, comprises following working procedure:
The first step, base concrete bed course (2) construction;
Second step, builds one deck pea gravel concreten by pile crown (1) surrounding and top, looks for round pile body levelling stake top;
The 3rd step, making cement mortar levelling layer (6) on bedding plane;
The 4th step, above brushes base treatment agent one time at cement mortar screeding layer (6);
The 5th step, pile crown surrounding, top and periphery do polyurethane waterproof coating (51) enhancement Layer;
The 6th step, double-sided self-adhesive waterproof coiled materials (52) is to pile crown root;
The 7th step, pile crown is sealing compound (53) sealing for surrounding;
The 8th step, pile crown protrudes bedding plane surrounding and waterproofing mortar (54) is made together in top;
The 9th step, does pea gravel concreten topping (4) on waterproof roll (52) layer.
3. waterproof construction method according to claim 2, it is characterized in that, in the first step, the construction process of base concrete bed course (2) is: substrate equating after excavation of foundation pit → put architecture basics sideline adds 300 ㎜ control lines → install bed course limit mould → follow closely in foundation ditch absolute altitude control height reinforcing rod, 4 meters of spacing in length and breadth → according to construction flowing water section, C20 blinding concrete is built in segmentation, thickness is not less than 150 ㎜, before bracing wire is closed flat concrete surface → final set on absolute altitude control reinforcing rod, receive light processing → cover film, water seasoning.
4. waterproof construction method according to claim 2, is characterized in that, in second step, the pile body that exposes outside base concrete bed course is looked for to circle, the levelling of stake end face; Construction process is: pile concrete epidermis picks cutter, the loose stone in stake top and reject → do circular mode with three-ply board ribbing hoop, adds 30 ㎜ hassock pieces → get rid of the cotton felt water seasoning of the pea gravel concreten that reinforcing bar subscript goes out the high grade of absolute altitude control line → build → cover outward at pile crown between Mo Nei and pile body.
5. waterproof construction method according to claim 2, it is characterized in that, in the 3rd step cement mortar screeding layer (6) construction, according to mat surface planeness and defect situation, concrete cushion (2) is carried out to leveling, mainly concrete cushion (2) face out-of-flatness of having peeling, dusting, pin nest, crack and flowing water section separated place etc., and lead the foot of a wall portion, the cloudy male trowel circular arc of the well that catchments; Construction process is: cutter cleaning → fault location sprinkle water moistening, trickle mud → the smear thick 1:2 cement mortar screeding of 20 ㎜ → lead the foot of a wall portion, the 50 ㎜ circular arc → compacting maintenances of the cloudy male trowel diameter of the well that catchments are picked in fault location surface.
6. waterproof construction method according to claim 2, is characterized in that, in the 5th step, pile crown surrounding, top and periphery 500 ㎜ scopes are done the thick polyurethane waterproof coating of 2 ㎜ (51) enhancement Layer; Construction process is: the cleaning of concrete cushion (4) face, clear away the foreign material → 500 ㎜ place setting-outs outside pile body limit such as floating ash, control polyurethane boundary of works area → point three times brushing polyurethane waterproof coatings, the time interval with last all over hand by sticky being advisable not, pile crown gets rid of reinforcing bar place outward and wants emphasis brushing → inspection to have or not omission → be coated with and brush one times polyurethane → evenly shed one deck peastone in stake top bit, constructs in order to stake top waterproofing mortar.
7. waterproof construction method according to claim 2, is characterized in that, in the 6th step, the large face paving thick waterproof roll of 4 ㎜ (52) of base concrete bed course (2), until engineering pile edge at one's side; Construction process is: base mat aspect cleans out → put paving line at base mat aspect bullet, 1 meter of coiled material fabric width, lap width is that 80mm paving line spacing is 920mm → lead the foot of a wall portion, the negative and positive place of the well that catchments carries out extra play → inspect for acceptance → along the large face waterproof roll of the sticky paving of paving, it between coiled material and bed course, is empty paving, it between coiled material, is self-adhesion overlap joint, the careful compacting of lap-joint → coiled material is met engineering pile place, along pile body circular arc cutting coiled material, make waterproof roll prop up pile body, coiled material and pile body spacing are not more than 20mm → coiled material and pile body periphery polyurethane enhancement Layer will cement.
8. waterproof construction method according to claim 2, is characterized in that, in the 7th step, uses Special seal cream (53) shutoff between waterproof roll (52) and pile body; Construction process is: waterproof roll (52) and pile body junction are cleaned out → have or not omission along the gap → compacting sealing compound → inspection between pile body border sealing compound shutoff waterproof roll and pile body.
9. waterproof construction method according to claim 2, is characterized in that, in the 8th step, pile crown protrudes concrete cushion (2) face surrounding and 20 ㎜ 1:2.5 waterproofing mortars (54) are made at top; Construction process is: by match ratio mixing waterproofing mortar → waterproofing mortar construction is cleaned out → carried out in waterproofing mortar (54) construction place, and smear and flatten → cover cotton felt water seasoning.
10. waterproof construction method according to claim 2, is characterized in that, in the 9th step, on waterproof roll (52) layer, does 50 ㎜ thick C20 pea gravel concreten topping (4); Construction process is: waterproofing mortar layer check and accept complete and clean out → copy and survey basis end absolute altitude with level gauge, making protective layer thickness control ash cake on waterproof roll (52) layer → build pea gravel concreten topping (4) → receipts face according to the flowing water section segmentation of constructing to smear and flatten → water seasoning.
CN201410415983.5A 2014-08-22 2014-08-22 Construction method for preventing soft soil foundation cast-in-place pile head from being waterproof Expired - Fee Related CN104153400B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410415983.5A CN104153400B (en) 2014-08-22 2014-08-22 Construction method for preventing soft soil foundation cast-in-place pile head from being waterproof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410415983.5A CN104153400B (en) 2014-08-22 2014-08-22 Construction method for preventing soft soil foundation cast-in-place pile head from being waterproof

Publications (2)

Publication Number Publication Date
CN104153400A true CN104153400A (en) 2014-11-19
CN104153400B CN104153400B (en) 2016-03-09

Family

ID=51879014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410415983.5A Expired - Fee Related CN104153400B (en) 2014-08-22 2014-08-22 Construction method for preventing soft soil foundation cast-in-place pile head from being waterproof

Country Status (1)

Country Link
CN (1) CN104153400B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727335A (en) * 2015-02-13 2015-06-24 常熟建工建设集团有限公司 Fast foundation constructing method
CN104947809A (en) * 2015-06-29 2015-09-30 广西金雨伞防水装饰有限公司 Full-seal waterproof system of concrete construction project
CN104975617A (en) * 2015-07-15 2015-10-14 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN105178452A (en) * 2015-06-29 2015-12-23 广西金雨伞防水装饰有限公司 Full-seal waterproof construction method
CN105951893A (en) * 2016-06-27 2016-09-21 中铁第四勘察设计院集团有限公司 Uplift pile head node waterproof structure and construction method thereof
CN106759308A (en) * 2016-11-30 2017-05-31 中国冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN111456108A (en) * 2020-04-11 2020-07-28 广东建兴基础工程有限公司 Waterproof structure of foundation bearing platform and construction method thereof
CN112081146A (en) * 2020-09-03 2020-12-15 江苏凯伦建材股份有限公司 Construction method of polymer self-adhesive film waterproof coiled material capable of being constructed in rainy season
CN112411564A (en) * 2020-11-06 2021-02-26 天津市市政工程设计研究院 Waterproof structure with latticed columns penetrating through bottom plate and construction method of waterproof structure
CN112815153A (en) * 2021-01-04 2021-05-18 江苏凯伦建材股份有限公司 Waterproof treatment method for root of through-wall or floor pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226134A (en) * 1991-09-27 1996-09-03 Maeda Corp Construction method for basement water-barrier wall
CN202718147U (en) * 2012-07-19 2013-02-06 朱奎 Waterproof structure of pile head
CN202809660U (en) * 2012-07-31 2013-03-20 中天建设集团有限公司天津分公司 Waterproof structure for pile head of engineering pile
CN203256816U (en) * 2013-04-08 2013-10-30 中国建筑第七工程局有限公司 Pile foundation bottom plate pile head waterproof structure
CN103572786A (en) * 2013-11-19 2014-02-12 中铁十六局集团北京工程有限公司 Pile head joint waterproof processing device and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226134A (en) * 1991-09-27 1996-09-03 Maeda Corp Construction method for basement water-barrier wall
CN202718147U (en) * 2012-07-19 2013-02-06 朱奎 Waterproof structure of pile head
CN202809660U (en) * 2012-07-31 2013-03-20 中天建设集团有限公司天津分公司 Waterproof structure for pile head of engineering pile
CN203256816U (en) * 2013-04-08 2013-10-30 中国建筑第七工程局有限公司 Pile foundation bottom plate pile head waterproof structure
CN103572786A (en) * 2013-11-19 2014-02-12 中铁十六局集团北京工程有限公司 Pile head joint waterproof processing device and construction method thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727335A (en) * 2015-02-13 2015-06-24 常熟建工建设集团有限公司 Fast foundation constructing method
CN105178452B (en) * 2015-06-29 2018-07-31 广西金雨伞防水装饰有限公司 Hermetically sealed waterproof construction method
CN104947809A (en) * 2015-06-29 2015-09-30 广西金雨伞防水装饰有限公司 Full-seal waterproof system of concrete construction project
CN105178452A (en) * 2015-06-29 2015-12-23 广西金雨伞防水装饰有限公司 Full-seal waterproof construction method
CN104975617A (en) * 2015-07-15 2015-10-14 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN104975617B (en) * 2015-07-15 2017-01-25 郑贤方 Waterproof construction method of basement foundation cast-in-place pile head
CN105951893A (en) * 2016-06-27 2016-09-21 中铁第四勘察设计院集团有限公司 Uplift pile head node waterproof structure and construction method thereof
CN106759308A (en) * 2016-11-30 2017-05-31 中国冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN106759308B (en) * 2016-11-30 2019-04-23 中国一冶集团有限公司 A kind of precast hollow pile head waterproof construction method
CN111456108A (en) * 2020-04-11 2020-07-28 广东建兴基础工程有限公司 Waterproof structure of foundation bearing platform and construction method thereof
CN111456108B (en) * 2020-04-11 2021-09-14 广东建兴基础工程有限公司 Waterproof structure of foundation bearing platform and construction method thereof
CN112081146A (en) * 2020-09-03 2020-12-15 江苏凯伦建材股份有限公司 Construction method of polymer self-adhesive film waterproof coiled material capable of being constructed in rainy season
CN112411564A (en) * 2020-11-06 2021-02-26 天津市市政工程设计研究院 Waterproof structure with latticed columns penetrating through bottom plate and construction method of waterproof structure
CN112815153A (en) * 2021-01-04 2021-05-18 江苏凯伦建材股份有限公司 Waterproof treatment method for root of through-wall or floor pipeline

Also Published As

Publication number Publication date
CN104153400B (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN104153400B (en) Construction method for preventing soft soil foundation cast-in-place pile head from being waterproof
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN101565997A (en) Construction method for large-area irregular floor tile
CN102776897B (en) Wash apron anti-settling anti-cracking construction method and structure
CN202809660U (en) Waterproof structure for pile head of engineering pile
CN202559540U (en) Waterproof plugging structure for outer wall split bolt hole
CN204492025U (en) The waterproof construction of the contour deformation joint of roofing
CN107816138A (en) A kind of construction technology of subsided rest room
CN109184253A (en) A kind of method for repairing and mending of exterior wall leakage
CN108755983A (en) A kind of waterproof technology
CN105201025B (en) Basement waterproofing construction and its construction method
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN204982908U (en) Elevartor shaft deep basal pit seepage prevention structure
CN207775948U (en) Pulling-Resistant Anchor Rod root waterproofing node structure
CN107152012A (en) Sluice construction technique
CN103572786B (en) A kind of pile crown node waterproof treating apparatus and construction method thereof
CN110185277A (en) The restorative procedure of existing building external wall seepage point
CN105178364B (en) Underground building light precipitation well point post-cast strip anti-seepage construction method
CN112942432A (en) Construction method of anti-leakage brick inspection well
CN108385614A (en) A kind of concrete facing board construction method of anti-floating towing force
CN206616676U (en) A kind of toilet floor drain position waterproof construction
CN101586367B (en) Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water
CN109881794A (en) A kind of swimming pool waterproof construction
CN110439016A (en) A kind of pile foundation waterproof construction method
CN115807450A (en) Pile-wall integrated drainage-prevention combined basement exterior wall waterproof construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160309

Termination date: 20160822