CN105927224A CN201610366837.7A CN201610366837A CN105927224A CN 105927224 A CN105927224 A CN 105927224A CN 201610366837 A CN201610366837 A CN 201610366837A CN 105927224 A CN105927224 A CN 105927224A
Authority
CN
China
Prior art keywords
ore
nugget
cut
filling
gob
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610366837.7A
Other languages
Chinese (zh)
Other versions
CN105927224B (en
Inventor
雷涛
代光俊
叶海旺
张聪瑞
潘俊锋
余波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201610366837.7A priority Critical patent/CN105927224B/en
Publication of CN105927224A publication Critical patent/CN105927224A/en
Application granted granted Critical
Publication of CN105927224B publication Critical patent/CN105927224B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Abstract

The invention discloses a gob-free ore discharging and filling synchronized milling method for a thick ore body. The method includes the steps that the thick ore body is divided into sections, and continuous ore blocks are distributed in the sections in the extending direction; in the cutting and mining preparation processes, gate ways are arranged above and below the sections correspondingly; before back production of the ore blocks, an ore discharge trench and a compensation space are built below the ore blocks through the gate way on the lower portion, and roof cutting is carried out on the upper portions of the ore blocks completely through the gate way on the upper portion, so that a roof cutting space is formed; horizontal flexible isolation layers are laid on the ore blocks with roofs cut, each ore block with the roof cut is disconnected with the adjacent ore blocks on the two sides in the extending direction through weak blasting so that vertical spaces can be formed, and vertical flexible isolation layers are distributed; and spallation of the ore blocks wrapped with the isolation layers is carried out, the ore blocks are discharged evenly through the ore discharge trench, and the horizontal flexible isolation layers are filled with filler. A gob is filled while ore discharging, dynamic management of the gob is achieved, the situation that surrounding rock is largely exposed is avoided, and accordingly no large gob is generated in the mining process; and the adaptability is good, and the application range is wide.

Description

Big thick ore body synchronizes ore drawing filling mining method without goaf
Technical field
The present invention relates to the mining methods of a kind of mine underground exploitation, especially a kind of big thick ore body synchronizes ore drawing filling without goaf Mining methods.
Background technology
It is said that in general, underground mining method can be divided into openstope method, the method for mining by the way of filling, caved stopes three class, although its pipe The mode of reason ground pressure is each variant, but the most unavoidably there will be goaf in exploitation process, when goaf is unfilled or filling Not in time, it is possible to such as a series of disasters such as top board avalanche, ore pillar destruction and surface subsidence occur, greatly threatens mine Safety in production.
At present to big thick ore body, in order to improve production efficiency and reduce cost, it is intended to use the stope of big structural parameters to adopt Ore deposit, basic feature is that back production is highly equal to stage overall height, and onepull amount is big, and, earth's surface the highest to exploitated ore value allows to collapse The ore body fallen is especially suitable.This method has that nugget production capacity is big, and mining preparation work amount is little, and labor productivity is high, and low cost etc. is excellent Point.But, its shortcoming the most clearly: pressed with managing by avalanche country rock bashing, land subsidence etc. can be caused to ask Topic, makes Caving Method with Large Space can only allow the area use of avalanche on earth's surface, limits its range;If staying ore pillar to support goaf, Then can cause a large amount of wastes of Ore;Even if employing afterwards filling, owing to the ore removal time is long, it is also possible to cause because filling is too late Time and press protrusion phenomenon with occurring;Additionally, explosion can cause periphery barren rock to be mixed in the middle of Ore, and when using ore drawing under overlying strata Time, barren rock also being made to be mixed in advance, cause ore dilution rate to rise, if using cut off grade ore drawing, then can cause substantial amounts of Ore losses.
Summary of the invention
Present invention aim at solving conventional mining methods mined-out area hazard and the big problem of ore dilution loss, it is provided that a kind of thick big Ore body synchronizes ore drawing filling mining method without goaf, reduces ore dilution rate, prevents surface subsidence.
For reaching above-mentioned purpose, use technical scheme as follows:
The mining methods of a kind of big thick ore body, comprise the following steps:
Big thick ore body divides the stage, and in the stage, across pitch arranges continuous nugget;Cutting is adopted punctual, each in stage upper and lower Arrange that one is taken into account transport, cuts top, ventilates and the gallery of filling, and during mining, the bottom gallery in this stage is the upper of next stage Portion's gallery;
Before block stoping, construct ore removal moat ditch and compensation space first with bottom gallery in nugget bottom, recycle upper entry pair Nugget top is cut top formation comprehensively and is cut between head space;Laid horizontal flexibility sealing coat cutting above the nugget of top, cut ore deposit, top simultaneously The both sides of block across pitch utilize weak blast to cut off it and form vertical direction spatial with the connection of adjacent nugget, and arrange vertical flexible isolating layer;
To the nugget of parallel medium-length hole blasting forced caving sealing coat parcel under employing, utilize the ore removal uniform ore removal of moat ditch will fill simultaneously Filling packing is on horizontal flexibility sealing coat, along with ore removal process carries out synchronizing filling to avoid goaf to occur.
By such scheme, described flexible isolating layer is asphalt felt or SBS modified asphalt waterproof coiled material.
By such scheme, ore removal moat ditch, cut between head space, opening up of compensation space, vertical direction spatial all surpasses the first two than actual mining Nugget.
In sum, the invention have the advantages that
1) flexible protective layer has isolated Ore and barren rock, reduces ore dilution rate;
2) can success mining and primary excavation ore deposit amount big, mining efficiency is high;
3) overcoat of nugget side when avoiding back production the casting resin of adjacent mining blocks be mixed into Ore, reduce during back production quick-fried simultaneously The broken vibration destruction to neighbouring obturator, improves back production safety;
4) ore drawing simultaneously bashing, it is achieved that goaf dynamically manages, it is to avoid the situation that country rock large area exposes occurs, Make in mining process without large scale mined area appearance;
5) use the mode of filling to press with managing, make full use of industrial waste, it is to avoid surface subsidence, beneficially environmental conservation;
6) can adjust for different mining environments, adaptability is good, applied range.
Accompanying drawing explanation
Fig. 1: big thick ore body of the present invention synchronizes ore drawing filling mining method schematic diagram.
1-bottom gallery, 2-foundation, 3-ore removal moat ditch, 4-Ore, 5-compensation space, 6-rock drilling gallery, 7-undercuts tunnel, 8- Undercut big gun hole, 9-stone to be dug up mine, and 10-cuts between head space, 11-horizontal flexibility sealing coat, 12-upper entry, the vertical flexible isolating of 13- Layer, 14-casting resin.
Detailed description of the invention
Following example explain technical solution of the present invention further, but not as limiting the scope of the invention.
Referring to the drawings shown in 1, the mining methods of a kind of big thick ore body:
Big thick ore body being divided the stage, is illustrated in figure 1 a stage, in the stage, across pitch arranges continuous nugget, in Fig. 1 Nugget a and nugget b and nugget c;It is punctual that cutting is adopted, and respectively arranges that in stage upper and lower one is taken into account transport, cuts top, ventilation With the gallery 1 and 12 of filling, and mining time this stage the upper entry that bottom gallery is the next stage;
Before block stoping, in nugget bottom foundation 2, construct ore removal moat ditch 3 first with bottom gallery 1 and form compensation space 5, Top is cut in nugget top by recycling upper entry 12 comprehensively;Horizontal flexibility sealing coat 11 is laid, simultaneously above the nugget of top being cut Utilized weak blast to cut off the connection of itself and adjacent nugget by the both sides cutting top nugget across pitch, and arrange vertical flexible isolating layer 13 (such as nugget a);
To the nugget a of parallel medium-length hole blasting forced caving sealing coat parcel under employing, utilize the uniform ore removal of ore removal moat ditch 3 simultaneously Casting resin 14 is filled on horizontal flexibility sealing coat 11, along with ore removal process carries out synchronizing filling to avoid goaf to occur.
Specific operation process is as follows: uses shallow blasting to cut top by stage upper entry 12 comprehensively, cuts heights of roofs 3m, is formed What enough rock drilling equipment normally worked cut between head space 10, then dig the tunnel 7 that undercuts, drilling drift 6 in sector undercut big gun Hole 8, forms the compensation space 5 of high 5m after explosion;After being formed Deng compensation space, in cutting head space, chisel extends through compensation space Aperture 165mm lower to parallel medium-length hole;Meanwhile, on closing on, the tier hole of a back production nugget uses approximation presplit blasting Mode carries out rock drilling powder charge, carries out intensive big gun hole and weakens the explosion of powder charge, to form the width vertical space as 1m (i.e. The packing space of vertical flexible isolating layer 13);Lay respectively in cutting between head space 10 and vertical space horizontally and vertically by oil hair The flexible protective layer of the composition such as felt, SBS modified asphalt waterproof coiled material is also fixed against landing, and props up between head space cutting temporarily Protect.Moat ditch and cut between head space, opening up of compensation space, vertical direction spatial all surpasses the first two nugget than actual mining, i.e. along exploitation side To nugget numbered a, b, c, before the complete ore drawing of nugget a, just complete the cutting moat ditch of nugget c, cut top, compensation space, perpendicular To space and lay the work such as sealing coat, simultaneously in the compensation space of nugget c vertical space quick-fried fall Ore wouldn't release completely. Stone 9 to be dug up mine is the ore fraction also not carrying out adopting work such as cutting.

Claims (3)

1. the mining methods of a big thick ore body, it is characterised in that comprise the following steps:
Big thick ore body divides the stage, and in the stage, across pitch arranges continuous nugget;Cutting is adopted punctual, each in stage upper and lower Arrange that one is taken into account transport, cuts top, ventilates and the gallery of filling, and during mining, the bottom gallery in this stage is the upper of next stage Portion's gallery;
Before block stoping, construct ore removal moat ditch and compensation space first with bottom gallery in nugget bottom, recycle upper entry pair Nugget top is cut top formation comprehensively and is cut between head space;Laid horizontal flexibility sealing coat cutting above the nugget of top, cut ore deposit, top simultaneously The both sides of block across pitch utilize weak blast to cut off it and form vertical direction spatial with the connection of adjacent nugget, and arrange vertical flexible isolating layer;
To the nugget of parallel medium-length hole blasting forced caving sealing coat parcel under employing, utilize the ore removal uniform ore removal of moat ditch will fill simultaneously Filling packing is on horizontal flexibility sealing coat, along with ore removal process carries out synchronizing filling to avoid goaf to occur.
2. the mining methods of big thick ore body as claimed in claim 1, it is characterised in that described flexible isolating layer is asphalt felt or SBS Modified asphalt waterproof coiled material.
3. the mining methods of as claimed in claim 1 big thick ore body, it is characterised in that ore removal moat ditch, cut between head space, compensation space, Opening up of vertical direction spatial all surpasses the first two nugget than actual mining.
CN201610366837.7A 2016-05-27 2016-05-27 Big thick ore body is without goaf synchronization ore drawing filling mining method Active CN105927224B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610366837.7A CN105927224B (en) 2016-05-27 2016-05-27 Big thick ore body is without goaf synchronization ore drawing filling mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610366837.7A CN105927224B (en) 2016-05-27 2016-05-27 Big thick ore body is without goaf synchronization ore drawing filling mining method

Publications (2)

Publication Number Publication Date
CN105927224A true CN105927224A (en) 2016-09-07
CN105927224B CN105927224B (en) 2018-01-12

Family

ID=56841258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610366837.7A Active CN105927224B (en) 2016-05-27 2016-05-27 Big thick ore body is without goaf synchronization ore drawing filling mining method

Country Status (1)

Country Link
CN (1) CN105927224B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437717A (en) * 2016-11-21 2017-02-22 武汉理工大学 Vertical deep hole twice ore drawing synchronous filling stage mining method
CN106837412A (en) * 2017-02-28 2017-06-13 山东科技大学 It is a kind of to build the method that bashing is spaced with house refuse clamp dog
CN116446880A (en) * 2023-04-04 2023-07-18 中煤科工开采研究院有限公司 Green mining method and device, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864957A (en) * 2010-05-25 2010-10-20 广西大学 Great ore drawing simultaneous filling non-top column shrinkage mining method
CN103061767A (en) * 2013-01-17 2013-04-24 云南临沧鑫圆锗业股份有限公司 Downward horizontal-slice dry-type filling mining method
CN103742190A (en) * 2014-01-27 2014-04-23 淄博王煤矿业有限公司 Slurry vacuum bag multi-point synchronization filling device and filling technology
CN104533517A (en) * 2015-01-16 2015-04-22 中南大学 High-segmentation upward deep hole ore extraction zero-dead-zone following filling mining method
RU2569708C1 (en) * 2014-10-21 2015-11-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт (государственный технологический университет) (СКГМИ (ГТУ) Working of thick deposits of horizon-pillar system sandstowing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864957A (en) * 2010-05-25 2010-10-20 广西大学 Great ore drawing simultaneous filling non-top column shrinkage mining method
CN103061767A (en) * 2013-01-17 2013-04-24 云南临沧鑫圆锗业股份有限公司 Downward horizontal-slice dry-type filling mining method
CN103742190A (en) * 2014-01-27 2014-04-23 淄博王煤矿业有限公司 Slurry vacuum bag multi-point synchronization filling device and filling technology
RU2569708C1 (en) * 2014-10-21 2015-11-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт (государственный технологический университет) (СКГМИ (ГТУ) Working of thick deposits of horizon-pillar system sandstowing
CN104533517A (en) * 2015-01-16 2015-04-22 中南大学 High-segmentation upward deep hole ore extraction zero-dead-zone following filling mining method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437717A (en) * 2016-11-21 2017-02-22 武汉理工大学 Vertical deep hole twice ore drawing synchronous filling stage mining method
CN106437717B (en) * 2016-11-21 2019-04-26 武汉理工大学 Ore drawing synchronizes packing stage mining codes to vertical long hole twice
CN106837412A (en) * 2017-02-28 2017-06-13 山东科技大学 It is a kind of to build the method that bashing is spaced with house refuse clamp dog
CN106837412B (en) * 2017-02-28 2019-01-11 山东科技大学 A method of building and house refuse clamp dog interval bashing
CN116446880A (en) * 2023-04-04 2023-07-18 中煤科工开采研究院有限公司 Green mining method and device, electronic equipment and storage medium
CN116446880B (en) * 2023-04-04 2023-12-01 中煤科工开采研究院有限公司 Green mining method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN105927224B (en) 2018-01-12

Similar Documents

Publication Publication Date Title
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN107829742B (en) Caving-filling-open stope-caving mining method
CN103306720A (en) Inclined separated layer solid filling coal mining method for super thick coal seam
CN103821558A (en) Coal mine gob filling mining system and gob-side entry retaining filling process
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN105626071A (en) Mining method for gently inclined thin ore body
CN108825237B (en) A kind of special thick coal continuous milling machine divides excavating technology with the layering combined is filled
CN103470261A (en) Method for roadway driving along goaf under original roadway top plate of fully mechanized top coal caving goaf
CN104847355A (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
CN104533517B (en) A kind of high sublevel falls dead zone, ore deposit zero following firms mining codes to deep hole
CN111364997A (en) Upward drift-caving combined mining method
US4265570A (en) Mine roof control
CN107829739A (en) Mining method of steeply inclined thin vein
CN105927224A (en) Gob-free ore discharging and filling synchronized milling method for thick ore body
CN113216963A (en) Stoping method for gallery ore in transition mining by caving method to filling method
CN114427463B (en) Deep deposit downward approach type plate area partition unloading layering advanced pressure relief stoping method
WO2022241972A1 (en) Method for recovering stored ore when transitioning from caving method to filling method
CN112177612B (en) Downward high-layering cemented filling mining method
CN103061767A (en) Downward horizontal-slice dry-type filling mining method
CN110259450B (en) Mining method for inclined-steeply inclined medium-thickness ore body
CN110359910B (en) Fully mechanized caving high-level filling mining method for thick coal seam strips under coal mine railway
US20230030467A1 (en) Method for slope geological disaster treatment and mineral resource recovery
CN112145177A (en) Mining method for improving resource recycling
CN113187481B (en) Filling mining method for centralized grouting caving stoping of overburden rock
CN113530545A (en) Isolated grouting and filling mining method for overlying rock of island working face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination