CN105926951A - 一种全装配式钢结构房屋的结构建造方法 - Google Patents
一种全装配式钢结构房屋的结构建造方法 Download PDFInfo
- Publication number
- CN105926951A CN105926951A CN201610296787.XA CN201610296787A CN105926951A CN 105926951 A CN105926951 A CN 105926951A CN 201610296787 A CN201610296787 A CN 201610296787A CN 105926951 A CN105926951 A CN 105926951A
- Authority
- CN
- China
- Prior art keywords
- house
- type steel
- assembling type
- secondary beam
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Abstract
本发明公开了一种全装配式钢结构房屋的结构建造方法,采用钢结构房屋代替传统的砖石、砖钢筋混凝土结构的房屋,节约了砖块、水泥和砂石的使用,进而节约了土壤和矿山的使用,避免对土壤和自然环境造成破坏,有利于长期的环境保护,同时通过设计房屋的钢结构,修建方便,节约时间,结构装配化程度更高。更利于批量化、标准化加工生产,实现建筑产业的现代化。
Description
技术领域
本发明涉及钢结构技术领域,特别涉及一种全装配式钢结构房屋的结构建造方法。
背景技术
建造的住宅大多是采用砖,而烧砖需要消耗大量的土壤,对土壤破坏严重,土壤属于不可再生资源,治理土壤的消耗的财力远远大于破坏的消耗,因此,从环境保护的长远方向来讲,现在的房屋对生态破坏很严重。此外,现在使用的房屋位置固定,修建时间长,适应性差。目前,虽然提出了钢结构房屋,但是钢结构房屋的整体结构装配化程度也成了主要问题。
因此,有必要设计一种全装配式钢结构房屋的结构建造方法,来解决这些问题。
发明内容
本发明提出的一种全装配式钢结构房屋的结构建造方法,提高了钢结构房屋的结构装配化程度,提高了房屋的环保性。
为了解决上述技术问题,本发明采用技术方案的基本思路是:一种全装配式钢结构房屋的结构建造方法,包括以下步骤:
1)、按规划房屋柱脚位置对柱基放样,施工柱砼并埋设与柱脚相连的地脚螺栓;
2)、按一层房屋楼地面标高反测与各个柱基顶面的高度差进而确定各个柱脚的长度,将柱脚安装在地脚螺栓上;
3)、在柱脚上安装相匹配的专用接头,相邻柱脚之间的专用接头水平方向上安装水平主梁,专用接头的垂直方向安装固定柱;
4)、所述固定柱的顶端安装专用接头,在相邻的专用接头之间安装水平主梁;
5)、在顶层固定柱顶端的专用接头处安装屋面檐口挑出装置,在上层的相对的两个水平主梁上安装屋梁主立柱,在屋梁主立柱上端安装屋脊檩条,再安装与屋脊檩条相连的屋面斜梁,然后安装与屋面斜梁相连的屋面檀条;
6)、上下相邻的两个水平主梁之间安装内墙板固骨架和外墙板固骨架,同时预留门窗安装框架;
7)、安装楼面板,安装内墙面板和外墙面板,在内墙面板和外墙面板之间填充保温隔热材料,并埋设水电系统,安装屋面系统。
进一步的,水平主梁上固定第一辅助次梁,所述第一辅助次梁与水平主梁顶面位于同一水平面,且第一辅助次梁与承重的水平主梁相互垂直。
进一步的,所述第一辅助次梁上安装第二辅助次梁,所述第二辅助次梁与第一辅助次梁顶面位于同一水平面,且第二辅助次梁与第一辅助次梁相互垂直。
进一步的,还包括斜撑,所述斜撑铰接设置在固顶柱与水平主梁相邻的侧面之间,形成空间三角形结构。
进一步的,所述底层的水平主梁侧面安装入户楼梯,所述上、下相邻两层的水平主梁之间设置层间楼梯。
进一步的,所述内墙板固骨架与外墙板固骨架之间设有“H”型连接杆。
进一步的,根据房屋楼层需要,在固定柱顶端的接头上方固定设置另一根固定柱,后重复步骤(4)、(6)和(7)。
本发明的有益效果为:本发明的一种全装配式钢结构房屋的结构建造方法,采用钢结构房屋代替传统的砖石、砖钢筋混凝土结构的房屋,节约了砖块、水泥和砂石的使用,进而节约了土壤和矿山的使用,避免对土壤和自然环境造成破坏,有利于长期的环境保护,同时通过设计房屋的钢结构,修建方便,节约时间,结构装配化程度更高。更利于批量化、标准化加工生产,实现建筑产业的现代化。
具体实施方式
下面对本发明的具体实施方式作进一步说明。在此需要说明的是,对于这些实施方式的说明用于帮助理解本发明,但并不构成对本发明的限定。此外,下面所描述的本发明各个实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互组合。
一种全装配式钢结构房屋的结构建造方法,包括以下步骤:
1)、按规划房屋柱脚位置对柱基放样,施工柱砼并埋设与柱脚相连的地脚螺栓;
2)、按一层房屋楼地面标高反测与各个柱基顶面的高度差进而确定各个柱脚的长度,将柱脚安装在地脚螺栓上;
3)、在柱脚上安装相匹配的专用接头,相邻柱脚之间的专用接头水平方向上安装水平主梁,专用接头的垂直方向安装固定柱;
4)、所述固定柱的顶端安装专用接头,在相邻的专用接头之间安装水平主梁;
5)、在顶层固定柱顶端的专用接头处安装屋面檐口挑出装置,在上层的相对的两个水平主梁上安装屋梁主立柱,在屋梁主立柱上端安装屋脊檩条,再安装与屋脊檩条相连的屋面斜梁,然后安装与屋面斜梁相连的屋面檀条;
6)、上下相邻的两个水平主梁之间安装内墙板固骨架和外墙板固骨架,同时预留门窗安装框架;
7)、安装楼面板,安装内墙面板和外墙面板,在内墙面板和外墙面板之间填充保温隔热材料,并埋设水电系统,安装屋面系统。
水平主梁上固定第一辅助次梁,所述第一辅助次梁与水平主梁顶面位于同一水平面,且第一辅助次梁与承重的水平主梁相互垂直。
所述第一辅助次梁上安装第二辅助次梁,所述第二辅助次梁与第一辅助次梁顶面位于同一水平面,且第二辅助次梁与第一辅助次梁相互垂直。
还包括斜撑,所述斜撑铰接设置在固顶柱与水平主梁相邻的侧面之间。斜撑、固定柱、水平主梁形成空间三角形结构,加强结构的稳定性。
所述底层的水平主梁侧面安装入户楼梯,所述上、下相邻两层的水平主梁之间设置层间楼梯。
所述内墙板固骨架与外墙板固骨架之间设有“H”型连接杆。
根据房屋楼层需要,在固定柱顶端的接头上方固定设置另一根固定柱,后重复步骤(4)、(6)和(7)。
第一辅助次梁和第二辅助次梁形成栅格结构。
固定柱和水平主梁上焊接连接耳,斜撑的两端分别与固定柱及水平主梁上的2个连接耳通过螺栓连接。
底层的水平主梁侧面安装楼梯。
内墙板固骨架与外墙板固骨架之间设有“H”型连接杆。“H”型连接杆提高墙板固骨架和外墙板固骨架结构的稳定,安装内墙面板和外墙面板后,墙体稳定性更好。
安装完屋面系统后即可安装室内外的装饰,房屋安装完成。
如果需要修建多层的楼房,在固定柱顶端的接头上方连接另外一根固定柱,然后在重复步骤(4)、(6)和(7),即可修建好第二层,同理修建第三层、第四层,直至达到需求。
重复以上步骤,直至修建到需要的楼层后,然后进行步骤(5)进行房屋封顶。
整个修建过程不需要用砖块、水泥和砂石,避免对土壤和自然环境造成破坏,有利于长期的环境保护;此外,在修建过程中不用打地基,房屋整体结构也是用钢柱通过螺栓连接形成,修建时间大大缩短,有利于长期的环境保护,同时通过设计房屋的钢结构,修建方便,节约时间,结构装配化程度更高。更利于批量化、标准化加工生产,实现建筑产业的现代化
以上对本发明的实施方式作了详细说明,但本发明不限于所描述的实施方式。对于本领域的技术人员而言,在不脱离本发明原理和精神的情况下,对这些实施方式进行多种变化、修改、替换和变型,仍落入本发明的保护范围内。
Claims (7)
1.一种全装配式钢结构房屋的结构建造方法,其特征在于:包括以下步骤:
1)、按规划房屋柱脚位置对柱基放样,施工柱砼并埋设与柱脚相连的地脚螺栓;
2)、按一层房屋楼地面标高反测与各个柱基顶面的高度差进而确定各个柱脚的长度,将柱脚安装在地脚螺栓上;
3)、在柱脚上安装相匹配的专用接头,相邻柱脚之间的专用接头水平方向上安装水平主梁,专用接头的垂直方向安装固定柱;
4)、所述固定柱的顶端安装专用接头,在相邻的专用接头之间安装水平主梁;
5)、在顶层固定柱顶端的专用接头处安装屋面檐口挑出装置,在上层的相对的两个水平主梁上安装屋梁主立柱,在屋梁主立柱上端安装屋脊檩条,再安装与屋脊檩条相连的屋面斜梁,然后安装与屋面斜梁相连的屋面檀条;
6)、上下相邻的两个水平主梁之间安装内墙板固骨架和外墙板固骨架,同时预留门窗安装框架;
7)、安装楼面板,安装内墙面板和外墙面板,在内墙面板和外墙面板之间填充保温隔热材料,并埋设水电系统,安装屋面系统。
2.根据权利要求1所述的一种全装配式钢结构房屋的结构建造方法,其特征在于:水平主梁上固定第一辅助次梁,所述第一辅助次梁与水平主梁顶面位于同一水平面,且第一辅助次梁与承重的水平主梁相互垂直。
3.根据权利要求2所述的一种全装配式钢结构房屋的结构建造方法,其特征在于:所述第一辅助次梁上安装第二辅助次梁,所述第二辅助次梁与第一辅助次梁顶面位于同一水平面,且第二辅助次梁与第一辅助次梁相互垂直。
4.根据权利要求1所述的一种全装配式钢结构房屋的结构建造方法,其特征在于:还包括斜撑,所述斜撑铰接设置在固顶柱与水平主梁相邻的侧面之间,形成空间三角形结构。
5.根据权利要求1所述的一种全装配式钢结构房屋的结构建造方法,其特征在于:所述底层的水平主梁侧面安装入户楼梯,所述上、下相邻两层的水平主梁之间设置层间楼梯。
6.根据权利要求1所述的一种全装配式钢结构房屋的结构建造方法,其特征在于:所述内墙板固骨架与外墙板固骨架之间设有“H”型连接杆。
7.根据权利要求1所述的一种全装配式钢结构房屋的结构建造方法,其特征在于:根据房屋楼层需要,在固定柱顶端的接头上方固定设置另一根固定柱,后重复步骤(4)、(6)和(7)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610296787.XA CN105926951A (zh) | 2016-05-06 | 2016-05-06 | 一种全装配式钢结构房屋的结构建造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610296787.XA CN105926951A (zh) | 2016-05-06 | 2016-05-06 | 一种全装配式钢结构房屋的结构建造方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105926951A true CN105926951A (zh) | 2016-09-07 |
Family
ID=56834567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610296787.XA Pending CN105926951A (zh) | 2016-05-06 | 2016-05-06 | 一种全装配式钢结构房屋的结构建造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926951A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109826443A (zh) * | 2019-01-30 | 2019-05-31 | 重庆金科建筑设计研究院有限公司 | 装配式建筑模块建造房屋的方法 |
CN113356595A (zh) * | 2021-03-30 | 2021-09-07 | 山西宏厚装配式建筑科技发展有限公司 | 一种钢结构整体安装工艺 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5966890A (en) * | 1998-02-09 | 1999-10-19 | Inman; Michael J. | Building frame structure |
FR2882073A1 (fr) * | 2005-02-17 | 2006-08-18 | Michel Retif | Maison d'habitation d'aspect traditionnel constituee d'une structure metallique et de panneaux en beton arme |
CN101418592A (zh) * | 2008-10-31 | 2009-04-29 | 官木喜 | 组合式轻钢结构房屋及其安装方法 |
CN101440635A (zh) * | 2008-10-31 | 2009-05-27 | 官木喜 | 一层组合式轻钢结构房屋及其安装方法 |
CN203361331U (zh) * | 2013-07-18 | 2013-12-25 | 云南汇丰建设投资集团有限公司 | 钢框架结构标准化民宅或别墅 |
CN205012458U (zh) * | 2015-09-17 | 2016-02-03 | 贵州凯欣产业投资股份有限公司 | 一种简易基础木结构民居 |
CN105317110A (zh) * | 2015-11-06 | 2016-02-10 | 中建钢构有限公司 | 一种集成装配式钢结构建筑 |
-
2016
- 2016-05-06 CN CN201610296787.XA patent/CN105926951A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5966890A (en) * | 1998-02-09 | 1999-10-19 | Inman; Michael J. | Building frame structure |
FR2882073A1 (fr) * | 2005-02-17 | 2006-08-18 | Michel Retif | Maison d'habitation d'aspect traditionnel constituee d'une structure metallique et de panneaux en beton arme |
CN101418592A (zh) * | 2008-10-31 | 2009-04-29 | 官木喜 | 组合式轻钢结构房屋及其安装方法 |
CN101440635A (zh) * | 2008-10-31 | 2009-05-27 | 官木喜 | 一层组合式轻钢结构房屋及其安装方法 |
CN203361331U (zh) * | 2013-07-18 | 2013-12-25 | 云南汇丰建设投资集团有限公司 | 钢框架结构标准化民宅或别墅 |
CN205012458U (zh) * | 2015-09-17 | 2016-02-03 | 贵州凯欣产业投资股份有限公司 | 一种简易基础木结构民居 |
CN105317110A (zh) * | 2015-11-06 | 2016-02-10 | 中建钢构有限公司 | 一种集成装配式钢结构建筑 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109826443A (zh) * | 2019-01-30 | 2019-05-31 | 重庆金科建筑设计研究院有限公司 | 装配式建筑模块建造房屋的方法 |
CN109826443B (zh) * | 2019-01-30 | 2021-04-16 | 高驰国际设计有限公司 | 装配式建筑模块建造房屋的方法 |
CN113356595A (zh) * | 2021-03-30 | 2021-09-07 | 山西宏厚装配式建筑科技发展有限公司 | 一种钢结构整体安装工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587693B (zh) | 一种模块建筑二层别墅及其施工方法 | |
CN103046755B (zh) | 牧区装配式轻钢集成房屋的建造方法 | |
CN103397660B (zh) | 一种地下建筑的装配施工方法 | |
CN204826308U (zh) | 一种预制型钢混凝土剪力墙预拼结构装配式建筑 | |
CN206570920U (zh) | 一种利用alc板设计生产装配式建筑 | |
CN105089178B (zh) | 一种预制型钢混凝土剪力墙预拼结构装配式建筑 | |
CN105421818A (zh) | 嵌入式钢结构装配住宅 | |
CN105971304B (zh) | 一种建筑结构加固改造用外套框架 | |
CN106703201A (zh) | 装配式集成建筑物及其制造方法 | |
CN103343574B (zh) | 一种装配式集成房屋 | |
CN113513041B (zh) | 一种装配式多层平顶大跨无柱地下结构及其明挖施工方法 | |
CN106149868A (zh) | 装配式房屋建筑结构体系及其装配方法 | |
CN2931627Y (zh) | 框架、墙板组合楼房 | |
CN205296893U (zh) | 嵌入式钢结构装配住宅 | |
CN105926951A (zh) | 一种全装配式钢结构房屋的结构建造方法 | |
CN206090815U (zh) | 预制装配式筒体结构公共建筑 | |
CN101886470B (zh) | 清水混凝土密肋梁施工方法 | |
CN103469892B (zh) | 高层模块建筑空间的主次模块单元组合结构及连接方法 | |
CN102561731B (zh) | 一种模块建筑一层别墅及其施工方法 | |
CN109162359A (zh) | 用于施工临建的装配式钢结构模块 | |
CN104594671A (zh) | 高海拔、高烈度震区500kV变电站全装配式主控楼 | |
KR20190030885A (ko) | 한옥과 목조 주택을 조합한 견본주택(모델하우스) 시공 방법 | |
CN204456995U (zh) | 高海拔、高烈度震区500kV变电站全装配式主控楼 | |
CN204456510U (zh) | 一种用于500kV变电站主控楼的抗震型墙体 | |
CN209145011U (zh) | 用于施工临建的装配式钢结构模块 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160907 |
|
RJ01 | Rejection of invention patent application after publication |