CN105926886A - Marble laying technological process in building - Google Patents
Marble laying technological process in building Download PDFInfo
- Publication number
- CN105926886A CN105926886A CN201610245487.9A CN201610245487A CN105926886A CN 105926886 A CN105926886 A CN 105926886A CN 201610245487 A CN201610245487 A CN 201610245487A CN 105926886 A CN105926886 A CN 105926886A
- Authority
- CN
- China
- Prior art keywords
- plate
- building
- marble
- examination
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
- E04F13/144—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass with an outer layer of marble or other natural stone
Abstract
The invention discloses a marble laying technological process in buildings. The technological process comprises the following steps: preparing construction, treating a basic layer, trying to splice, snapping lines, trying to arrange, swabbing, paving, grouting and wiping joints, and waxing. The process makes laying of marble plates clean and beautiful and arranged in order. The process meets use requirements, and has no leakage, corners are smooth and neat, and are consistent in color and lustre.
Description
Technical field
The present invention relates to stone material field, particularly relate to marble laying process flow process in a kind of building.
Background technology
Marble floor brick has attracted the sight of consumer with magnificent outward appearance and very useful feature.Build with other
Building unlike stone material, the marble floor brick texture of each piece is all different, clean mark bending marble, smooth carefully
Greasy, beautiful pure and fresh, seem to bring everybody vision grand banquet again and again, be contained in life, room can be set off
More elegant and graceful.
Because the problem of technological process causes the laying quality of marble plate to have in traditional marble process of deployment
It is short of, is spliced uneven, affected attractive in appearance.
Summary of the invention
It is an object of the invention to the problem above overcoming prior art to exist, it is provided that in a kind of building, marble lays work
Process flow, improves the laying quality of marble plate with attractive in appearance.
For realizing above-mentioned technical purpose, reaching above-mentioned technique effect, the present invention is achieved through the following technical solutions:
Marble laying process flow process in a kind of building, described technological process comprises the following steps:
(1) preparation of construction: get out raw material and plant equipment according to construction process requirement, and to building inner edge angle square little progress
Row mapping;
(2) base treatment: the foreign material on ground cushion are cleared up, and cleans up with wire brush;
(3) examination is spelled: the marble plate in building is carried out examination and spelled according to pattern, color, texture, and non-entire plate symmetry put
After corner location, examination spelling, it is numbered arrangement by both direction and piles up neat;
(4) snap the line: drawing ten word control lines in building, bullet is on concrete cushion, and causes bottom metope, then according to metope
Elevation line finds out surface layer absolute altitude, ejects horizontal elevation line on the wall;
(5) examination row: two, both direction upper berth dry sand vertical in building, and combine master drawing and actual size, marble
Plate sequences, the relative position at the positions such as verification plate and metope;
(6) swabbing: the dry sand after paving and plate are removed, cleans up, one layer of cement mortar of brush after watering is moistening;
(7) pave: after being infiltrated by plate, dry laying, according to building inner cross control line, respectively spread a line, when spelling according to examination
Numbering, pattern and examination row time gap start to pave in ten word control line point of intersection;
(8) seam is wiped in grouting: carries out grouting after plate paves one day and wipes seam, to substantially filling, and by the cement on plate face
Slurry is cleaned, and keeps the clean surface, smooth of marble surface;
(9) waxing: wax after plate surface is finally cleared up.
Further, the horizontal elevation line ejected in described snap the line step is consistent with corridor surface layer absolute altitude.
The invention has the beneficial effects as follows:
Present invention process makes the laying of marble plate clean, attractive in appearance, and arrangement in order, meets use requirement, ne-leakage, corner
Locating neat smooth, color and luster is consistent.
Detailed description of the invention
Below in conjunction with embodiment, describe the present invention in detail.
Marble laying process flow process in a kind of building, described technological process comprises the following steps:
(1) preparation of construction: get out raw material and plant equipment according to construction process requirement, and to building inner edge angle square little progress
Row mapping;
(2) base treatment: the foreign material on ground cushion are cleared up, and cleans up with wire brush;
(3) examination is spelled: the marble plate in building is carried out examination and spelled according to pattern, color, texture, and non-entire plate symmetry put
After corner location, examination spelling, it is numbered arrangement by both direction and piles up neat;
(4) snap the line: drawing ten word control lines in building, bullet is on concrete cushion, and causes bottom metope, then according to metope
Elevation line finds out surface layer absolute altitude, ejects horizontal elevation line on the wall;
(5) examination row: two, both direction upper berth dry sand vertical in building, and combine master drawing and actual size, marble
Plate sequences, the relative position at the positions such as verification plate and metope;
(6) swabbing: the dry sand after paving and plate are removed, cleans up, one layer of cement mortar of brush after watering is moistening;
(7) pave: after being infiltrated by plate, dry laying, according to building inner cross control line, respectively spread a line, when spelling according to examination
Numbering, pattern and examination row time gap start to pave in ten word control line point of intersection;
(8) seam is wiped in grouting: carries out grouting after plate paves one day and wipes seam, to substantially filling, and by the cement on plate face
Slurry is cleaned, and keeps the clean surface, smooth of marble surface;
(9) waxing: wax after plate surface is finally cleared up.
Wherein, the horizontal elevation line ejected in snap the line step is consistent with corridor surface layer absolute altitude.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry
Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description
The principle of invention, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, and these become
Change and improvement both falls within scope of the claimed invention.
Claims (2)
1. marble laying process flow process in a building, it is characterised in that described technological process comprises the following steps:
(1) preparation of construction: get out raw material and plant equipment according to construction process requirement, and to building inner edge angle square little progress
Row mapping;
Base treatment: the foreign material on ground cushion are cleared up, and cleans up with wire brush;
Examination is spelled: the marble plate in building is carried out examination and spelled according to pattern, color, texture, and non-entire plate symmetry be placed on
Corner location, is numbered arrangement by both direction after examination spelling and piles up neat;
Snap the line: drawing ten word control lines in building, bullet is on concrete cushion, and causes bottom metope, then according to metope mark
Surface layer absolute altitude found out by high line, ejects horizontal elevation line on the wall;
Examination row: two, both direction upper berth dry sand vertical in building, and combine master drawing and actual size, marble plate
Sequence, the relative position at the positions such as verification plate and metope;
Swabbing: the dry sand after paving and plate are removed, cleans up, one layer of cement mortar of brush after watering is moistening;
Pave: after being infiltrated by plate, dry laying, according to building inner cross control line, respectively spread a line, when spelling according to examination
Gap when numbering, pattern and examination row starts to pave in ten word control line point of intersection;
Seam is wiped in grouting: carries out grouting after plate paves one day and wipes seam, to substantially filling, and is wiped by the cement mortar on plate face
Only, the clean surface, smooth of marble surface is kept;
Waxing: wax after plate surface is finally cleared up.
Marble laying process flow process in a kind of building the most according to claim 1, it is characterised in that: described snap the line step
The horizontal elevation line of middle ejection is consistent with corridor surface layer absolute altitude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610245487.9A CN105926886A (en) | 2016-04-20 | 2016-04-20 | Marble laying technological process in building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610245487.9A CN105926886A (en) | 2016-04-20 | 2016-04-20 | Marble laying technological process in building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105926886A true CN105926886A (en) | 2016-09-07 |
Family
ID=56839184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610245487.9A Pending CN105926886A (en) | 2016-04-20 | 2016-04-20 | Marble laying technological process in building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926886A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106801504A (en) * | 2016-12-30 | 2017-06-06 | 苏州麦垛信息科技有限公司 | A kind of construction technology of ground tile paving |
CN108625252A (en) * | 2018-06-25 | 2018-10-09 | 成都市市政工程(集团)有限责任公司 | Urban road laying construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101565997A (en) * | 2009-05-25 | 2009-10-28 | 青岛恒生源集团建设有限公司 | Construction method for large-area irregular floor tile |
CN102828600A (en) * | 2012-09-07 | 2012-12-19 | 华鼎建筑装饰工程有限公司 | Method for laying floor artificial stones |
CN105178559A (en) * | 2015-10-08 | 2015-12-23 | 哈尔滨世纪天诚装饰工程有限公司 | Novel construction method for granite ground |
-
2016
- 2016-04-20 CN CN201610245487.9A patent/CN105926886A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101565997A (en) * | 2009-05-25 | 2009-10-28 | 青岛恒生源集团建设有限公司 | Construction method for large-area irregular floor tile |
CN102828600A (en) * | 2012-09-07 | 2012-12-19 | 华鼎建筑装饰工程有限公司 | Method for laying floor artificial stones |
CN105178559A (en) * | 2015-10-08 | 2015-12-23 | 哈尔滨世纪天诚装饰工程有限公司 | Novel construction method for granite ground |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106801504A (en) * | 2016-12-30 | 2017-06-06 | 苏州麦垛信息科技有限公司 | A kind of construction technology of ground tile paving |
CN108625252A (en) * | 2018-06-25 | 2018-10-09 | 成都市市政工程(集团)有限责任公司 | Urban road laying construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102140836B (en) | Construction method of large-size floor tile | |
CN103437521B (en) | Inner wall of building plastics external corner bead and inner wall of building negative and positive angle construction method | |
CN105178559A (en) | Novel construction method for granite ground | |
CN102704635B (en) | Paint brushing construction method | |
CN107152145A (en) | A kind of stone material flooring construction method | |
CN109826396A (en) | A kind of construction method of A grades of fire prevention artistic floors | |
CN103174274A (en) | Stone material seamless polishing construction method | |
CN103375000A (en) | Process for constructing waterborne fluorocarbon metal paint on elastic floating-coat nap surface | |
CN202990369U (en) | Water stop device with bathroom threshold stones | |
CN100560667C (en) | Marble paint for building, making method and construction technology thereof | |
CN106121188A (en) | Large area is seamless overall ground and construction method thereof | |
CN105926886A (en) | Marble laying technological process in building | |
CN108265946A (en) | A kind of ceramics painting and calligraphy brick patch block method | |
CN106049780A (en) | Plastering-free construction technique for high-precision brickwork | |
CN101899899A (en) | Construction method of external wall simulation stone-type paint surface layer | |
CN104234362A (en) | Exterior wall tile construction method | |
CN106869428A (en) | A kind of heat insulating reflecting colored mortar construction technology | |
US20100005733A1 (en) | Fractionable Cement Veneer | |
CN107489255B (en) | Large-size stone ground paving structure and construction method | |
CN204326453U (en) | Thick-layer Self-leveling leveling layer structure | |
CN105155388A (en) | Road surface laying method for exposed aggregate finish | |
CN104032648A (en) | Construction technology for spraying silicon PU and PU plastic cement sites | |
CN201809928U (en) | Texture planning module unit for sealing ice flaws | |
CN102677843A (en) | Energy-saving heat insulation imitated facing brick, stone coating material and mould decoration construction method thereof | |
KR101459992B1 (en) | The construction method of floor covering materials that can do diverse expression |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160907 |
|
WD01 | Invention patent application deemed withdrawn after publication |