CN105926886A - Marble laying technological process in building - Google Patents

Marble laying technological process in building Download PDF

Info

Publication number
CN105926886A
CN105926886A CN201610245487.9A CN201610245487A CN105926886A CN 105926886 A CN105926886 A CN 105926886A CN 201610245487 A CN201610245487 A CN 201610245487A CN 105926886 A CN105926886 A CN 105926886A
Authority
CN
China
Prior art keywords
plate
building
marble
examination
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610245487.9A
Other languages
Chinese (zh)
Inventor
方志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Laoshiren Stone Industry Co Ltd
Original Assignee
Anhui Laoshiren Stone Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Laoshiren Stone Industry Co Ltd filed Critical Anhui Laoshiren Stone Industry Co Ltd
Priority to CN201610245487.9A priority Critical patent/CN105926886A/en
Publication of CN105926886A publication Critical patent/CN105926886A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
    • E04F13/144Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass with an outer layer of marble or other natural stone

Abstract

The invention discloses a marble laying technological process in buildings. The technological process comprises the following steps: preparing construction, treating a basic layer, trying to splice, snapping lines, trying to arrange, swabbing, paving, grouting and wiping joints, and waxing. The process makes laying of marble plates clean and beautiful and arranged in order. The process meets use requirements, and has no leakage, corners are smooth and neat, and are consistent in color and lustre.

Description

Marble laying process flow process in a kind of building
Technical field
The present invention relates to stone material field, particularly relate to marble laying process flow process in a kind of building.
Background technology
Marble floor brick has attracted the sight of consumer with magnificent outward appearance and very useful feature.Build with other Building unlike stone material, the marble floor brick texture of each piece is all different, clean mark bending marble, smooth carefully Greasy, beautiful pure and fresh, seem to bring everybody vision grand banquet again and again, be contained in life, room can be set off More elegant and graceful.
Because the problem of technological process causes the laying quality of marble plate to have in traditional marble process of deployment It is short of, is spliced uneven, affected attractive in appearance.
Summary of the invention
It is an object of the invention to the problem above overcoming prior art to exist, it is provided that in a kind of building, marble lays work Process flow, improves the laying quality of marble plate with attractive in appearance.
For realizing above-mentioned technical purpose, reaching above-mentioned technique effect, the present invention is achieved through the following technical solutions:
Marble laying process flow process in a kind of building, described technological process comprises the following steps:
(1) preparation of construction: get out raw material and plant equipment according to construction process requirement, and to building inner edge angle square little progress Row mapping;
(2) base treatment: the foreign material on ground cushion are cleared up, and cleans up with wire brush;
(3) examination is spelled: the marble plate in building is carried out examination and spelled according to pattern, color, texture, and non-entire plate symmetry put After corner location, examination spelling, it is numbered arrangement by both direction and piles up neat;
(4) snap the line: drawing ten word control lines in building, bullet is on concrete cushion, and causes bottom metope, then according to metope Elevation line finds out surface layer absolute altitude, ejects horizontal elevation line on the wall;
(5) examination row: two, both direction upper berth dry sand vertical in building, and combine master drawing and actual size, marble Plate sequences, the relative position at the positions such as verification plate and metope;
(6) swabbing: the dry sand after paving and plate are removed, cleans up, one layer of cement mortar of brush after watering is moistening;
(7) pave: after being infiltrated by plate, dry laying, according to building inner cross control line, respectively spread a line, when spelling according to examination Numbering, pattern and examination row time gap start to pave in ten word control line point of intersection;
(8) seam is wiped in grouting: carries out grouting after plate paves one day and wipes seam, to substantially filling, and by the cement on plate face Slurry is cleaned, and keeps the clean surface, smooth of marble surface;
(9) waxing: wax after plate surface is finally cleared up.
Further, the horizontal elevation line ejected in described snap the line step is consistent with corridor surface layer absolute altitude.
The invention has the beneficial effects as follows:
Present invention process makes the laying of marble plate clean, attractive in appearance, and arrangement in order, meets use requirement, ne-leakage, corner Locating neat smooth, color and luster is consistent.
Detailed description of the invention
Below in conjunction with embodiment, describe the present invention in detail.
Marble laying process flow process in a kind of building, described technological process comprises the following steps:
(1) preparation of construction: get out raw material and plant equipment according to construction process requirement, and to building inner edge angle square little progress Row mapping;
(2) base treatment: the foreign material on ground cushion are cleared up, and cleans up with wire brush;
(3) examination is spelled: the marble plate in building is carried out examination and spelled according to pattern, color, texture, and non-entire plate symmetry put After corner location, examination spelling, it is numbered arrangement by both direction and piles up neat;
(4) snap the line: drawing ten word control lines in building, bullet is on concrete cushion, and causes bottom metope, then according to metope Elevation line finds out surface layer absolute altitude, ejects horizontal elevation line on the wall;
(5) examination row: two, both direction upper berth dry sand vertical in building, and combine master drawing and actual size, marble Plate sequences, the relative position at the positions such as verification plate and metope;
(6) swabbing: the dry sand after paving and plate are removed, cleans up, one layer of cement mortar of brush after watering is moistening;
(7) pave: after being infiltrated by plate, dry laying, according to building inner cross control line, respectively spread a line, when spelling according to examination Numbering, pattern and examination row time gap start to pave in ten word control line point of intersection;
(8) seam is wiped in grouting: carries out grouting after plate paves one day and wipes seam, to substantially filling, and by the cement on plate face Slurry is cleaned, and keeps the clean surface, smooth of marble surface;
(9) waxing: wax after plate surface is finally cleared up.
Wherein, the horizontal elevation line ejected in snap the line step is consistent with corridor surface layer absolute altitude.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description The principle of invention, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, and these become Change and improvement both falls within scope of the claimed invention.

Claims (2)

1. marble laying process flow process in a building, it is characterised in that described technological process comprises the following steps:
(1) preparation of construction: get out raw material and plant equipment according to construction process requirement, and to building inner edge angle square little progress Row mapping;
Base treatment: the foreign material on ground cushion are cleared up, and cleans up with wire brush;
Examination is spelled: the marble plate in building is carried out examination and spelled according to pattern, color, texture, and non-entire plate symmetry be placed on Corner location, is numbered arrangement by both direction after examination spelling and piles up neat;
Snap the line: drawing ten word control lines in building, bullet is on concrete cushion, and causes bottom metope, then according to metope mark Surface layer absolute altitude found out by high line, ejects horizontal elevation line on the wall;
Examination row: two, both direction upper berth dry sand vertical in building, and combine master drawing and actual size, marble plate Sequence, the relative position at the positions such as verification plate and metope;
Swabbing: the dry sand after paving and plate are removed, cleans up, one layer of cement mortar of brush after watering is moistening;
Pave: after being infiltrated by plate, dry laying, according to building inner cross control line, respectively spread a line, when spelling according to examination Gap when numbering, pattern and examination row starts to pave in ten word control line point of intersection;
Seam is wiped in grouting: carries out grouting after plate paves one day and wipes seam, to substantially filling, and is wiped by the cement mortar on plate face Only, the clean surface, smooth of marble surface is kept;
Waxing: wax after plate surface is finally cleared up.
Marble laying process flow process in a kind of building the most according to claim 1, it is characterised in that: described snap the line step The horizontal elevation line of middle ejection is consistent with corridor surface layer absolute altitude.
CN201610245487.9A 2016-04-20 2016-04-20 Marble laying technological process in building Pending CN105926886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610245487.9A CN105926886A (en) 2016-04-20 2016-04-20 Marble laying technological process in building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610245487.9A CN105926886A (en) 2016-04-20 2016-04-20 Marble laying technological process in building

Publications (1)

Publication Number Publication Date
CN105926886A true CN105926886A (en) 2016-09-07

Family

ID=56839184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610245487.9A Pending CN105926886A (en) 2016-04-20 2016-04-20 Marble laying technological process in building

Country Status (1)

Country Link
CN (1) CN105926886A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801504A (en) * 2016-12-30 2017-06-06 苏州麦垛信息科技有限公司 A kind of construction technology of ground tile paving
CN108625252A (en) * 2018-06-25 2018-10-09 成都市市政工程(集团)有限责任公司 Urban road laying construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101565997A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for large-area irregular floor tile
CN102828600A (en) * 2012-09-07 2012-12-19 华鼎建筑装饰工程有限公司 Method for laying floor artificial stones
CN105178559A (en) * 2015-10-08 2015-12-23 哈尔滨世纪天诚装饰工程有限公司 Novel construction method for granite ground

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101565997A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for large-area irregular floor tile
CN102828600A (en) * 2012-09-07 2012-12-19 华鼎建筑装饰工程有限公司 Method for laying floor artificial stones
CN105178559A (en) * 2015-10-08 2015-12-23 哈尔滨世纪天诚装饰工程有限公司 Novel construction method for granite ground

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801504A (en) * 2016-12-30 2017-06-06 苏州麦垛信息科技有限公司 A kind of construction technology of ground tile paving
CN108625252A (en) * 2018-06-25 2018-10-09 成都市市政工程(集团)有限责任公司 Urban road laying construction method

Similar Documents

Publication Publication Date Title
CN102140836B (en) Construction method of large-size floor tile
CN103437521B (en) Inner wall of building plastics external corner bead and inner wall of building negative and positive angle construction method
CN105178559A (en) Novel construction method for granite ground
CN102704635B (en) Paint brushing construction method
CN107152145A (en) A kind of stone material flooring construction method
CN109826396A (en) A kind of construction method of A grades of fire prevention artistic floors
CN103174274A (en) Stone material seamless polishing construction method
CN103375000A (en) Process for constructing waterborne fluorocarbon metal paint on elastic floating-coat nap surface
CN202990369U (en) Water stop device with bathroom threshold stones
CN100560667C (en) Marble paint for building, making method and construction technology thereof
CN106121188A (en) Large area is seamless overall ground and construction method thereof
CN105926886A (en) Marble laying technological process in building
CN108265946A (en) A kind of ceramics painting and calligraphy brick patch block method
CN106049780A (en) Plastering-free construction technique for high-precision brickwork
CN101899899A (en) Construction method of external wall simulation stone-type paint surface layer
CN104234362A (en) Exterior wall tile construction method
CN106869428A (en) A kind of heat insulating reflecting colored mortar construction technology
US20100005733A1 (en) Fractionable Cement Veneer
CN107489255B (en) Large-size stone ground paving structure and construction method
CN204326453U (en) Thick-layer Self-leveling leveling layer structure
CN105155388A (en) Road surface laying method for exposed aggregate finish
CN104032648A (en) Construction technology for spraying silicon PU and PU plastic cement sites
CN201809928U (en) Texture planning module unit for sealing ice flaws
CN102677843A (en) Energy-saving heat insulation imitated facing brick, stone coating material and mould decoration construction method thereof
KR101459992B1 (en) The construction method of floor covering materials that can do diverse expression

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160907

WD01 Invention patent application deemed withdrawn after publication