CN105921993A - 一种塔类设备更换垫片方法 - Google Patents
一种塔类设备更换垫片方法 Download PDFInfo
- Publication number
- CN105921993A CN105921993A CN201610483726.4A CN201610483726A CN105921993A CN 105921993 A CN105921993 A CN 105921993A CN 201610483726 A CN201610483726 A CN 201610483726A CN 105921993 A CN105921993 A CN 105921993A
- Authority
- CN
- China
- Prior art keywords
- tower
- base
- degree
- steel plate
- hoists
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
- B23P19/04—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for assembling or disassembling parts
- B23P19/08—Machines for placing washers, circlips, or the like on bolts or other members
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种塔类设备更换垫片方法,包括如下步骤:(1)在塔与凝缩器的法兰上分度,标出方向;(2)在塔与凝缩器的法兰间放置塔类设备更换垫片装置,并手动顺时针旋转提升螺杆,使起升件与底座分离并受力;(3)逐步同时提升凝缩器,使凝缩器离开塔顶5~8cm;(4)取出并更换垫片;(5)放下凝缩器;(6)安装法兰间连接螺栓。本发明具有如下优点:能快速安装到法兰间;通过旋转提升螺杆带动起升件,同步提升凝缩器,安全稳定,放下时比吊车平稳,不会损坏已更换上去的新垫片;本发明比用吊车省时少费用,经济效益显著。
Description
技术领域
本发明涉及塔类设备安装与维护,具体地说是一种塔类设备更换垫片方法。
背景技术
目前许多化工厂装置内部的塔类设备安装工程是机电安装工程中很重要的一部分,塔类设备一般位于装置内部,周围环绕管道,塔顶高耸,上面没有吊点,距离小区边界较远,在使用过程中,塔顶的垫片损坏后,一般采用大型吊车加副杆远中心距吊起其凝缩器进行更换,其成本高昂,效率低下。
发明内容
针对现有技术存在的问题,本发明设计了一种塔类设备更换垫片方法,能快速安装设备的法兰间,旋转提升螺杆或液压千斤顶,能快速提升塔顶的凝缩器,完成中间的垫片更换工作。
本发明塔类设备更换垫片方法,包括如下步骤:
1、在塔与凝缩器的法兰上分度,标出0度、170度、270度方向;
2、将塔类设备更换垫片装置按上述分度放置于塔与凝缩器的法兰间,共三个一组,并手动顺时针旋转提升螺杆,使起升件与底座分离并受力;
3、用扳手顺时针旋转提升螺杆,逐步同时提升凝缩器,使凝缩器离开塔顶约5~8cm;
4、从0度至170度中间取出已损坏的垫片并更换上新的垫片;
5、逆时针旋转提升螺杆,放下凝缩器;
6、安装法兰间连接螺栓。
所述塔类设备更换垫片装置,包括底座1、提升螺杆2和起升件3,所述底座1为五面体,底座1的顶面开设丝扣孔,底座1的底面开设方形孔,方形孔大于顶面的投影面积;起升件3为钢板,起升件3与底座1底面的方形孔相适配;所述提升螺杆2一端穿过底座1顶面继而与起升件3转动连接。
塔类设备更换垫片方法,还可以包括如下步骤:
1、在塔与凝缩器的法兰上分度,标出0度、170度、270度方向;
2、将塔类设备更换垫片装置按上述分度放置于塔与凝缩器的法兰间,共三个一组,并手动操作液压千斤顶,使起升件与底座分离并受力;
3、操作液压千斤顶,逐步同时提升凝缩器,使凝缩器离开塔顶约5~8cm;
4、从0度至170度中间取出已损坏的垫片并更换上新的垫片;
5、操作液压千斤顶,放下凝缩器;
6、安装法兰间连接螺栓。
所述塔类设备更换垫片装置,包括底座1、起升件3和液压千斤顶4,所述底座1为五面体,底座1的顶面和底面开孔,底面开孔大于顶面的投影面积;起升件3为上部钢板、中部连接杆和下部钢板首尾相连,两两垂直,上部钢板与下部钢板相平行,且上部钢板与下部钢板位于中部连接杆的两侧;起升件3的下部钢板与底座1底面开孔相适配;液压千斤顶4位于底座1的底面与起升件3的上部钢板之间。
本发明塔类设备更换垫片方法具有如下优点:
1. 能快速安装到法兰间;
2. 通过旋转提升螺杆带动起升件,同步提升凝缩器,安全稳定,放下时比吊车平稳,不会损坏已更换上去的新垫片;
3. 本发明比用吊车省时少费用,经济效益显著。
附图说明
图1为本发明一实施例的整体结构示意图;
图2为图1的使用状态图;
图3为本发明又一实施例的结构示意图;
图4为图3的使用状态图;
图5为本发明的安装位置示意图;
图6为实施例一的工作状态图。
图7为实施例二的工作状态图。
图中,1为底座;2为提升螺杆;3为起升件;4为液压千斤顶;5为塔;6为凝缩器;7为垫片。
具体实施方式
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体的说明。
实施例一
如图1、图2、图5、图6所示,一种塔类设备更换垫片方法,包括如下步骤:
1、首先在塔与凝缩器的法兰上分度,标出0度、170度、270度方向;
2、将塔类设备更换垫片装置按上述分度放置于塔与凝缩器的法兰间,共三个一组,并手动顺时针旋转提升螺杆,使起升件与底座分离并受力;
3、用扳手顺时针旋转提升螺杆,逐步提升凝缩器(最好三人同时操作),使凝缩器离开塔顶约5~8cm;
4、从0度至170度中间取出已损坏的垫片并更换上新的垫片;
5、逆时针旋转提升螺杆,放下凝缩器;
6、安装法兰间连接螺栓。
塔类设备更换垫片装置,包括底座1、提升螺杆2和起升件3,所述底座1为五面体,底座1的顶面开设丝扣孔,底座1的底面开设方形孔,方形孔大于顶面的投影面积;起升件3为钢板,起升件3与底座1底面的方形孔相适配;所述提升螺杆2一端穿过底座1顶面继而与起升件3转动连接。
实施例二
如图3、图4、图7所示,一种塔类设备更换垫片方法,包括如下步骤:
1、首先在塔与凝缩器的法兰上分度,标出0度、170度、270度方向;
2、将塔类设备更换垫片装置按上述分度放置于塔与凝缩器的法兰间,共三个一组,并手动操作液压千斤顶,使起升件与底座分离并受力;
3、操作液压千斤顶,逐步提升凝缩器(最好三人同时操作),使凝缩器离开塔顶约5~8cm;
4、从0度至170度中间取出已损坏的垫片并更换上新的垫片;
5、操作液压千斤顶,放下凝缩器;
6、安装法兰间连接螺栓。
塔类设备更换垫片装置,包括底座1、起升件3和液压千斤顶4,所述底座1为五面体,底座1的顶面和底面开孔,底面开孔大于顶面的投影面积;起升件3为上部钢板、中部连接杆和下部钢板首尾相连,两两垂直,上部钢板与下部钢板相平行,且上部钢板与下部钢板位于中部连接杆的两侧;起升件3的下部钢板与底座1底面开孔相适配;液压千斤顶4位于底座1的底面与起升件3的上部钢板之间。
Claims (4)
1.一种塔类设备更换垫片方法,其特征在于包括如下步骤:
(1)在塔与凝缩器的法兰上分度,标出0度、170度、270度方向;
(2)将塔类设备更换垫片装置按上述分度放置于塔与凝缩器的法兰间,共三个一组,并手动顺时针旋转提升螺杆,使起升件与底座分离并受力;
(3)用扳手顺时针旋转提升螺杆,逐步同时提升凝缩器,使凝缩器离开塔顶5~8cm;
(4)从0度至170度中间取出已损坏的垫片并更换上新的垫片;
(5)逆时针旋转提升螺杆,放下凝缩器;
(6)安装法兰间连接螺栓。
2.如权利要求1所述的方法,其特征在于:所述塔类设备更换垫片装置,包括底座(1)、提升螺杆(2)和起升件(3),所述底座(1)为五面体,底座(1)的顶面开设丝扣孔,底座(1)的底面开设方形孔,方形孔大于顶面的投影面积;起升件(3)为钢板,起升件(3)与底座(1)底面的方形孔相适配;所述提升螺杆(2)一端穿过底座(1)顶面继而与起升件(3)转动连接。
3.一种塔类设备更换垫片方法,其特征在于包括如下步骤:
(1)在塔与凝缩器的法兰上分度,标出0度、170度、270度方向;
(2)将塔类设备更换垫片装置按上述分度放置于塔与凝缩器的法兰间,共三个一组,并手动操作液压千斤顶,使起升件与底座分离并受力;
(3)操作液压千斤顶,逐步同时提升凝缩器,使凝缩器离开塔顶5~8cm;
(4)从0度至170度中间取出已损坏的垫片并更换上新的垫片;
(5)操作液压千斤顶,放下凝缩器;
(6)安装法兰间连接螺栓。
4.如权利要求3所述的方法,其特征在于:所述塔类设备更换垫片装置,包括底座(1)、起升件(3)和液压千斤顶(4),所述底座(1)为五面体,底座(1)的顶面和底面开孔,底面开孔大于顶面的投影面积;起升件(3)为上部钢板、中部连接杆和下部钢板首尾相连,两两垂直,上部钢板与下部钢板相平行,且上部钢板与下部钢板位于中部连接杆的两侧;起升件(3)的下部钢板与底座(1)底面开孔相适配;液压千斤顶(4)位于底座(1)的底面与起升件(3)的上部钢板之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610483726.4A CN105921993B (zh) | 2016-06-28 | 2016-06-28 | 一种塔类设备更换垫片方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610483726.4A CN105921993B (zh) | 2016-06-28 | 2016-06-28 | 一种塔类设备更换垫片方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105921993A true CN105921993A (zh) | 2016-09-07 |
CN105921993B CN105921993B (zh) | 2018-04-10 |
Family
ID=56829957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610483726.4A Active CN105921993B (zh) | 2016-06-28 | 2016-06-28 | 一种塔类设备更换垫片方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105921993B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110865422A (zh) * | 2019-12-10 | 2020-03-06 | 江苏天诺基业生态科技有限公司 | 一种带旋转功能的微气象观测塔 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201224397Y (zh) * | 2008-05-21 | 2009-04-22 | 岑仕伟 | 一种汽车顶举装置 |
CN202639769U (zh) * | 2012-06-11 | 2013-01-02 | 罗琴 | 拆卸立式管汇用的支撑装置 |
CN204624576U (zh) * | 2015-01-19 | 2015-09-09 | 中冶长天国际工程有限责任公司 | 一种圆辊轴端密封装置及具有该密封装置的解析塔装置 |
CN105252255A (zh) * | 2015-09-10 | 2016-01-20 | 葛洲坝机械工业有限公司 | 一种用顶升装置更换浮式起重机回转轴承的方法 |
-
2016
- 2016-06-28 CN CN201610483726.4A patent/CN105921993B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201224397Y (zh) * | 2008-05-21 | 2009-04-22 | 岑仕伟 | 一种汽车顶举装置 |
CN202639769U (zh) * | 2012-06-11 | 2013-01-02 | 罗琴 | 拆卸立式管汇用的支撑装置 |
CN204624576U (zh) * | 2015-01-19 | 2015-09-09 | 中冶长天国际工程有限责任公司 | 一种圆辊轴端密封装置及具有该密封装置的解析塔装置 |
CN105252255A (zh) * | 2015-09-10 | 2016-01-20 | 葛洲坝机械工业有限公司 | 一种用顶升装置更换浮式起重机回转轴承的方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110865422A (zh) * | 2019-12-10 | 2020-03-06 | 江苏天诺基业生态科技有限公司 | 一种带旋转功能的微气象观测塔 |
Also Published As
Publication number | Publication date |
---|---|
CN105921993B (zh) | 2018-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205023214U (zh) | 一种发动机转运托盘 | |
CN103730231A (zh) | 一种变压器顶盖升降装置 | |
CN203531027U (zh) | 采用专用千斤顶作为支撑定位的风机基础环精准校平系统 | |
CN105921993A (zh) | 一种塔类设备更换垫片方法 | |
CN204732751U (zh) | 变压器有载调压开关检修工具 | |
CN205835172U (zh) | 一种塔类设备更换垫片工具 | |
CN211444835U (zh) | 塔式起重机塔身抱瓦安拆装置 | |
CN204525321U (zh) | 液压支架千斤顶辅助拆卸机 | |
CN208814490U (zh) | 一种新型排水沟盖板吊装装置 | |
CN204266603U (zh) | 高强螺栓临时放置装置 | |
CN204198242U (zh) | 一种磨盘吊装装置 | |
CN203746609U (zh) | 一种变压器顶盖升降装置 | |
CN207450771U (zh) | 一种油气回收用罐体支撑结构 | |
CN206280351U (zh) | 一种地脚螺栓 | |
CN202639769U (zh) | 拆卸立式管汇用的支撑装置 | |
CN202142794U (zh) | 变压器油箱拆卸专用工具 | |
CN204530491U (zh) | 一种高墩液压爬模施工架 | |
CN202572321U (zh) | 一种安装压缩机气阀用工具 | |
CN205086887U (zh) | 一种新型热注炉液压支腿 | |
CN109573371A (zh) | 一种油气回收用罐体支撑结构 | |
CN201490602U (zh) | 变压器检修起吊装置 | |
CN109339483A (zh) | 地下油箱拆卸施工方法 | |
CN204474146U (zh) | 一种车轮顶升装置 | |
CN201584670U (zh) | 一种变压器有载调压开关油箱拆卸专用工具 | |
CN104499765B (zh) | 一种架设电力设备支撑架的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |