CN105921967A - Snap spring installing device - Google Patents

Snap spring installing device Download PDF

Info

Publication number
CN105921967A
CN105921967A CN201610430772.8A CN201610430772A CN105921967A CN 105921967 A CN105921967 A CN 105921967A CN 201610430772 A CN201610430772 A CN 201610430772A CN 105921967 A CN105921967 A CN 105921967A
Authority
CN
China
Prior art keywords
pair
jump ring
wedge shape
block
jaw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610430772.8A
Other languages
Chinese (zh)
Other versions
CN105921967B (en
Inventor
陆辉
骆蓉
赵宝林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osuga Machine Suzhou Co Ltd
Original Assignee
Osuga Machine Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osuga Machine Suzhou Co Ltd filed Critical Osuga Machine Suzhou Co Ltd
Priority to CN201610430772.8A priority Critical patent/CN105921967B/en
Publication of CN105921967A publication Critical patent/CN105921967A/en
Application granted granted Critical
Publication of CN105921967B publication Critical patent/CN105921967B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P2700/00Indexing scheme relating to the articles being treated, e.g. manufactured, repaired, assembled, connected or other operations covered in the subgroups
    • B23P2700/50Other automobile vehicle parts, i.e. manufactured in assembly lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Connections Arranged To Contact A Plurality Of Conductors (AREA)
  • Clamps And Clips (AREA)

Abstract

A snap spring installing device comprises a jig positioning an upper slide rail, and a snap spring installing module located above the jig. The snap spring installing module comprises a first pair of clamping claws, a pair of wedge-shaped pressing blocks, and a second pair of clamping claws. The jig is movably provided with a pair of wedge-shaped driven blocks. During operation, the first pair of clamping claws clamp the front end of a snap spring, and the second pair of clamping claws clamp the tail end of the snap spring. The first pair of clamping claws move downwards firstly to clamp the front end of the snap spring into the upper slide rail, then the wedge-shaped pressing blocks and the second pair of clamping claws move downwards, and the downward moving of the wedge-shaped pressing blocks is converted into the horizontal movement of the wedge-shaped driven blocks. The pair of wedge-shaped driven blocks transversely extrude the snap spring so that after the snap spring is compressed, the snap spring can be installed in the upper sliding rail from top to bottom.

Description

A kind of jump ring installs equipment
Technical field
The present invention relates to the installation of sliding rail of automobile seat, be specifically related to the installation equipment of jump ring in upper slide rail.
Background technology
Generally known, the seat at car front row can front and back regulate, and described seat slide is arranged on slide rail, wherein, and institute State upper slide rail that slide rail includes being slidably matched, glidepath, the ball bar that is embedded between slide rail and glidepath, described Upper slide rail is arranged on the bottom of seat, and described glidepath is arranged on the base plate of car.
In conjunction with Fig. 1, Fig. 2, the slide rail a0 in a kind of car front seat front-and-back adjusting device, this slide rail includes glidepath A, glidepath a set slide slot;Slide rail b is installed in the slide slot of glidepath.
Described upper slide rail b include main part b1 in an intermediate position and be positioned at main part both sides slide alar part b2, sliding Be inlaid with ball bar c between end face and the end face of glidepath a slide slot of row alar part b2, slide the bottom of alar part b2 with Ball bar c it is inlaid with between the bottom surface of glidepath a slide slot.
Being provided with buckle structure b3 in the main part b1 of described upper slide rail b, described buckle structure includes jump ring d, at jump ring Elastic-restoring force effect under, buckle structure can pin glidepath a and upper slide rail b to limit glidepath a and upper slide rail b Occur relatively to slide.Through hole is offered in the bottom of described upper slide rail b, and rod-like piece inserts the actionable jump ring of through hole and releases Buckle structure, to glidepath a and the restriction of upper slide rail b, makes glidepath a be in, with upper slide rail b, the shape that can relative slide State.
Described upper slide rail b is welded with the rivet b4 upper slide rail and seat being located by connecting.
In conjunction with Fig. 2, Fig. 4, the cross section of described upper slide rail b main part b1 is concave shape, the main part in concave shape Inside bottom set the first card, the madial wall of the main part in concave shape is offered middle part draw-in groove b11, in concave shape Offer the second card b12 on the madial wall of main part, the madial wall of the main part in concave shape offered end bayonet socket b13, Described first card, middle part draw-in groove, the second card, end bayonet socket are distributed from front to back by upper slide rail length direction.
Such as Fig. 5, described jump ring d is strip, and is bilateral symmetry, and the front end of jump ring is closed, jump ring Middle part is provided with male part d1, and the tail end of jump ring is provided with tail end protuberance d2 prominent laterally in open shape, the tail end of jump ring. The front end of jump ring snaps in the first card, and the male part of jump ring snaps in the draw-in groove of middle part, to the part of tail end in the middle part of jump ring Snapping in the second card, the tail end protuberance of jump ring snaps in the bayonet socket of end.
Summary of the invention
Technical problem solved by the invention: how jump ring is installed in supreme slide rail.
For solving above-mentioned technical problem, the present invention provides following technical scheme: a kind of jump ring installs equipment, including location The tool of upper slide rail, it is positioned at the jump ring above tool module is installed;
Described jump ring is installed module and is included lifting assembly, the link block being arranged on lifting assembly, is arranged on connection mode The first lifting assembly and a pair wedge shape briquetting and the second link block on block, it is resiliently mounted on the first lifting assembly The first pair of jaw, the second pair of jaw being slidably mounted in the second link block, a pair wedge shape briquetting is positioned at first to folder The rear of pawl and be positioned at the front of second pair of jaw, a pair wedge shape briquetting is symmetrical set;
A pair wedge shape Slave Block it is movably equipped with, the upper cunning that a pair wedge shape Slave Block is located on tool on described tool The left and right sides at the middle part of rail, a pair wedge shape Slave Block elasticity connects, and a pair wedge shape Slave Block is positioned at a pair wedge shape briquetting Underface.
By technique scheme, the operation principle that a kind of jump ring of the present invention installs equipment is as follows: first pair of jaw folder Hold the front end of spring, the tail end of second pair of jaw clamping jump ring;First lifting assembly driving first is descending to jaw, card Spring carries out the rotation of certain angle with its tail end for pivot, and jump ring front end is downward-sloping, the passive area of jump ring tail end The displacement that dynamic second pair of jaw forward slip is certain, downward-sloping jump ring front end is positioned at the side of slide rail the first card And it is against the inside bottom in slide rail body portion;Afterwards, lifting assembly drive connection module is descending, meanwhile, and first liter Part of coming down to a lower group resets, and in this course, the descending front end ordering about jump ring of jump ring tail end moves forward certain position, Jump ring front end snaps in the first card, and the inclined plane of a pair descending wedge shape briquetting is pressed in the inclination of a pair wedge shape Slave Block On face, the descending translation being changed into wedge shape Slave Block of wedge shape briquetting, a pair wedge shape Slave Block extruding card translated in opposite directions Male part in the middle part of spring, it is simple to whole jump ring from top to bottom puts into the main part that slide rail is concave shape, along with jump ring Continuing traveling downwardly, described male part leaves a pair wedge shape Slave Block, and male part resets and snaps in the middle part draw-in groove of slide rail, Meanwhile, jump ring tail end also resets and snaps in the end bayonet socket of slide rail, and in the middle part of jump ring, the part to tail end snaps in In second card of upper slide rail, arrive this, jump ring installation.
Described first lifting assembly includes first pair of jaw lift cylinder being arranged in link block and first pair of jaw The first contiguous block that the piston of lift cylinder fixes connection, the first guide pin bushing being fixed on the first contiguous block, activity plug In the first guide pin bushing and be vertically arranged the first guide rod, the first spring being set on the first guide rod, be fixed on first and lead First mounting seat of bar bottom, it is fixed on bottom the first mounting seat and offers the first jaw cylinder mounting seat of gathering sill, The bottom of described first spring is against in the first mounting seat, and the top of the first spring is against on the first contiguous block;Described A pair jaw includes the first jaw cylinder and the first pair of cleft hand being arranged on the first jaw cylinder, and the first jaw cylinder leads to Cross in the gathering sill that spring is arranged on the first jaw cylinder mounting seat;The bottom of described first mounting seat is provided with and is plugged in card The first inner position post in spring, it is clamped in a pair first outside fix posts of the jump ring left and right sides.As described above, described First mounting seat can make the elastic telescopic of vertical direction by relative first contiguous block, and installing for jump ring provides elasticity into upper slide rail Pressure.Described first jaw cylinder is arranged in the gathering sill of the first jaw cylinder mounting seat by spring, so, Under External Force Acting, the first jaw cylinder can make movement by a small margin along gathering sill.Described first inner position is pillared at jump ring Inner side, the pillared outside at jump ring of the first outside fix, to position jump ring.
The pair of wedge shape briquetting is arranged in link block by wedge shape briquetting contiguous block, the end of wedge shape briquetting contiguous block Portion is provided with jump ring depression bar, and jump ring depression bar is between a pair wedge shape briquetting.As described above, under a pair wedge shape briquetting During pressing a pair wedge shape Slave Block, press to enter in the middle part of jump ring in upper slide rail under descending jump ring depression bar.
Described second link block includes the be arranged in link block second main contiguous block, is fixed on the second main contiguous block On the second guide pin bushing, activity be plugged in the second guide pin bushing and be vertically arranged the second guide rod, be set on the second guide rod Second spring, be fixed on the second secondary contiguous block of the second guide rod bottom, to be fixed on second bottom the second secondary contiguous block sliding Rail;The bottom of described second spring is against on the second secondary contiguous block, and the top of the second spring is against on the second main contiguous block; Described second pair of jaw includes the second pair of jaw mount being slidably mounted on the second slide rail, is arranged on second pair of jaw The second jaw cylinder in mounting seat, the second pair of cleft hand being arranged on the second jaw cylinder;Described second secondary contiguous block Be provided be against on second pair of jaw mount front end face spring-loaded plunger, be against on second pair of jaw mount rear end face The second limited block.As described above, the second secondary contiguous block can the relative second main contiguous block elasticity of making vertical direction be stretched Contracting, installs for jump ring and provides elastic pressure into upper slide rail.Described spring-loaded plunger is that jump ring tail end translates and multiple by a small margin Position provides condition.
Described tool include the tool base plate being fixed on tool lift cylinder piston rod, be arranged on tool base plate for Magnet and the upper slide rail locating dowel of slide rail on location, it is positioned at magnet and the middle part draw-in groove baffle plate of upper slide rail locating dowel both sides; Described tool base plate is provided with wedge shape Slave Block slide rail, and a pair wedge shape Slave Block is slidably fitted on wedge shape Slave Block slide rail, Wedge shape Slave Block is provided with ejector pin, and the ejector pin on a pair wedge shape Slave Block is oppositely arranged, the top on a pair wedge shape Slave Block A sheathed coil tension spring on pin;Described tool base plate is provided with a pair riser, and it is driven that a pair riser is positioned at a pair wedge shape The outside of block, a pair wedge shape Slave Block is positioned at the outside of draw-in groove baffle plate in the middle part of in the of a pair.As described above, original state, The lateral surface of a pair wedge shape Slave Block is against on riser, and the inclined plane of wedge shape Slave Block sets on its outer lateral surface, wedge shape from Between lateral surface and the riser of motion block, there is a wedge gap;Descending wedge shape briquetting stretches into wedge gap to drive wedge shape Slave Block translates along wedge shape Slave Block slide rail;A pair wedge shape Slave Block translates until a pair ejector pin offsets in opposite directions, described in stretch Contracting spring is for a pair wedge shape Slave Block that reset.Described middle part draw-in groove baffle plate is used for gear outside of draw-in groove in the middle part of upper slide rail, Its effect has be prevent middle part draw-in groove from by jump ring extruding being deformed at two: one;Two is to play the male part in the middle part of jump ring to lead To effect.
Described lifting assembly is arranged on transverse shifting assembly, and the lower section of transverse shifting assembly is provided with the jump ring of location jump ring Tool, jump ring tool is positioned at the side of the tool of the upper slide rail in location;Jump ring tool includes jump ring tool base plate, is fixed on Locating piece in the middle part of jump ring front end locating piece on jump ring tool base plate, the jump ring being fixed on jump ring tool base plate, fixing Jump ring tail end locating piece on jump ring tool base plate, in the middle part of jump ring front end locating piece and spring auxiliary between locating piece Helping locating piece, auxiliary positioning block to be provided with a pair auxiliary positioning post, the jump ring front end being positioned on jump ring tool is to jump ring Between Zhong Bu, part is fastened between a pair auxiliary positioning post;Described jump ring tail end locating piece is provided with three and is set up in parallel Jump ring tail end locating dowel, jump ring tail end is fastened in the gap of three jump ring tail end locating dowels arranged side by side.State on by Bright, jump ring is positioned on jump ring tool, and under the driving of lifting assembly, descending jump ring installs module by first Jaw and the second jaw grip jump ring from jump ring tool, and afterwards, transverse shifting Component driver lifting assembly moves to The top of slide rail tool.
Accompanying drawing explanation
The present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the slide rail a0 in car front seat front-and-back adjusting device;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the structural representation that a kind of jump ring of the present invention installs equipment;
Fig. 4 is enlarged drawing at A in Fig. 3;
Fig. 5 is enlarged drawing at B in Fig. 3;
Fig. 6 is the structural representation of tool 10 in Fig. 3;
Fig. 7 is wedge shape Slave Block 11 and the combining structure schematic diagram of wedge shape briquetting 23 in Fig. 6;
Fig. 8 is to observe jump ring in Fig. 3 from below to install the structural representation of module 20 gained;
Fig. 9 is the structural representation of jump ring tool 40 in Fig. 3;
Figure 10 is that in Fig. 3, jump ring d is installed the course of work schematic diagram into upper slide rail b by jump ring installation module 20;
Figure 11 is that in Figure 10, jump ring d has been installed the schematic diagram in upper slide rail b by jump ring installation module 20.
Symbol description in figure:
Slide rail in a0, car front seat front-and-back adjusting device;A, glidepath;B, upper slide rail;B1, main part; B11, middle part draw-in groove;B12, the second card;B13, end bayonet socket;B2, slide alar part;B3, buckle structure;b4、 Rivet;C, ball bar;D, jump ring;D1, male part;D2, tail end protuberance;
10, tool;11, wedge shape Slave Block;12, tool lift cylinder;13, tool base plate;141, magnet;142、 Upper slide rail locating dowel;15, middle part draw-in groove baffle plate;161, wedge shape Slave Block slide rail;162, ejector pin;163, flexible bullet Spring;164, riser;
20, jump ring installs module;21, lifting assembly;22, the first lifting assembly;221, first pair of jaw lifting air Cylinder;222, the first contiguous block;223, the first guide pin bushing;224, the first spring;225, the first mounting seat;226, One jaw cylinder mounting seat;23, wedge shape briquetting;231, jump ring depression bar;24, the second link block;241, second Main contiguous block;242, the second guide pin bushing;243, the second spring;244, the second secondary contiguous block;25, first pair of jaw; 251, first pair of cleft hand;26, second pair of jaw;261, second pair of jaw mount;262, second pair of cleft hand;263、 Spring-loaded plunger;264, the second limited block;27, the first inner position post;28, the first outside fix post;
30, transverse shifting assembly;
40, jump ring tool;41, jump ring tool base plate;42, jump ring front end locating piece;43, locating piece in the middle part of jump ring; 44, jump ring tail end locating piece;440, jump ring tail end locating dowel;45, auxiliary positioning block;450, auxiliary positioning post; 451, the first inner position hole;452, the second outside fix hole.
Detailed description of the invention
In conjunction with Fig. 3, Fig. 6, Fig. 7, Fig. 8, a kind of jump ring installs equipment, including positioning the tool 10 of upper slide rail, position Jump ring above tool installs module 20;Described jump ring is installed module and is included lifting assembly 21, is arranged on lifting assembly On link block, the first lifting assembly 22 being arranged in link block and a pair wedge shape briquetting 23 and second connect Module 24, the first pair of jaw 25 being resiliently mounted on the first lifting assembly, it is slidably mounted in the second link block Second pair of jaw 26, a pair wedge shape briquetting is positioned at the rear of first pair of jaw and is positioned at the front of second pair of jaw, a pair Wedge shape briquetting is symmetrical set;A pair wedge shape Slave Block 11, a pair wedge shape Slave Block position it is movably equipped with on described tool In the left and right sides at the middle part of the upper slide rail being positioned on tool, a pair wedge shape Slave Block elasticity connects, a pair wedge shape from Motion block is positioned at the underface of a pair wedge shape briquetting.
In conjunction with Fig. 3, Fig. 8, jump ring is installed in module 20, and described lifting assembly 21 includes that piston is connected with link block Lift cylinder.
Jump ring is installed in module 20, and described first lifting assembly 22 includes the first pair of jaw being arranged in link block Lift cylinder 221 fix with the piston of first pair of jaw lift cylinder be connected the first contiguous block 222, be fixed on first The first guide rod that the first guide pin bushing 223 on contiguous block, activity are plugged in the first guide pin bushing and are vertically arranged, it is set in first The first spring 224 on guide rod, it is fixed on the first mounting seat 225 of the first guide rod bottom, is fixed at the bottom of the first mounting seat Portion and offer the first jaw cylinder mounting seat 226 of gathering sill, the bottom of described first spring is against in the first mounting seat, The top of the first spring is against on the first contiguous block.The bottom of described first mounting seat is provided with first be plugged in jump ring Inner position post 27, it is clamped in a pair first outside fix posts 28 of the jump ring left and right sides.
Jump ring is installed in module 20, and described first pair of jaw 25 includes the first jaw cylinder and be arranged on the first jaw gas First pair of cleft hand 251 on cylinder, the first jaw cylinder is arranged on the gathering sill of the first jaw cylinder mounting seat by spring In.
Jump ring is installed in module 20, and the pair of wedge shape briquetting 23 is arranged on link block by wedge shape briquetting contiguous block On, the bottom of wedge shape briquetting contiguous block is provided with jump ring depression bar 231, and jump ring depression bar is between a pair wedge shape briquetting.
Jump ring is installed in module 20, and described second link block 24 includes the second main connection being arranged in link block In block 241, the second guide pin bushing 242 being fixed on the second main contiguous block, activity are plugged in the second guide pin bushing and be vertically arranged Second guide rod, the second spring 243 being set on the second guide rod, it is fixed on the second secondary contiguous block of the second guide rod bottom 244, the second slide rail bottom the second secondary contiguous block it is fixed on;The bottom of described second spring is against on the second secondary contiguous block, The top of the second spring is against on the second main contiguous block.
Jump ring is installed in module 20, and described second pair of jaw 26 includes being slidably mounted on second on the second slide rail to folder Pawl mounting seat 261, the second jaw cylinder being arranged on second pair of jaw mount, it is arranged on the second jaw cylinder Second pair of cleft hand 262;Described second secondary contiguous block is provided with the spring-loaded plunger being against on second pair of jaw mount front end face 263, the second limited block 264 being against on second pair of jaw mount rear end face.
In conjunction with Fig. 3, Fig. 6, Fig. 7, described tool 10 includes the tool being fixed on tool lift cylinder 12 piston rod Base plate 13, it is arranged on tool base plate the magnet 141 for positioning upper slide rail and upper slide rail locating dowel 142, is positioned at magnetic Iron and the middle part draw-in groove baffle plate 15 of upper slide rail locating dowel both sides.Described tool base plate is provided with wedge shape Slave Block slide rail 161, A pair wedge shape Slave Block 11 is slidably fitted on wedge shape Slave Block slide rail, and wedge shape Slave Block is provided with ejector pin 162, a pair Ejector pin on wedge shape Slave Block is oppositely arranged, a sheathed coil tension spring 163 on the ejector pin on a pair wedge shape Slave Block;Institute Stating tool base plate and be provided with a pair riser 164, a pair riser is positioned at the outside of a pair wedge shape Slave Block, and a pair wedge shape is driven Block is positioned at the outside of draw-in groove baffle plate in the middle part of in the of a pair.
Such as Fig. 3, described lifting assembly 21 is arranged on transverse shifting assembly 30, and the lower section of transverse shifting assembly is provided with The jump ring tool 40 of location jump ring, jump ring tool is positioned at the side of the tool 10 of the upper slide rail in location.
Described transverse shifting assembly 30 includes that transverse shifting plate, the transverse shifting being fixed on transverse shifting plate are led In rail, the transverse shifting electricity cylinder being fixed on transverse shifting plate, the piston of transverse shifting electricity cylinder and lifting assembly 21 The cylinder body of lift cylinder connects.
Such as Fig. 9, described jump ring tool includes jump ring tool base plate 41, the jump ring front end being fixed on jump ring tool base plate Locating piece 43 in the middle part of locating piece 42, the jump ring being fixed on jump ring tool base plate, the card being fixed on jump ring tool base plate Spring tail end locating piece 44, in the middle part of jump ring front end locating piece and spring auxiliary positioning block 45 between locating piece, auxiliary is fixed Position block be provided with a pair auxiliary positioning post 450, in the middle part of the jump ring front end being positioned on jump ring tool to jump ring between part card It is combined between a pair auxiliary positioning post;Described jump ring tail end locating piece is provided with three jump ring tail end location being set up in parallel Post 440, jump ring tail end is fastened in the gap of three jump ring tail end locating dowels arranged side by side.Offer on described auxiliary positioning block The first outside fix hole that the first inner position hole 451 coordinated with the first inner position post 27 coordinates with the first outside fix post 28 452。
In practical operation, with reference to Figure 10, Figure 11, the workflow that a kind of jump ring of the present invention installs equipment is as follows:
First, jump ring is installed module 20 and is positioned at the top of jump ring tool 40, under the driving of lifting assembly 21, jump ring Installing module 20 descending, first pair of jaw 25 clamps the front end of jump ring, and second pair of jaw 26 clamps the tail end of jump ring; Under the driving of transverse shifting assembly 30, jump ring is installed module 20 and is moved to the surface of tool 10.
Second, upper slide rail is positioned on tool 10, specifically, and the hole on upper slide rail and the upper slide rail location on tool Post 142 coordinates, and upper slide rail is adsorbed by magnet 141, and upper slide rail is in the middle part of a pair between draw-in groove baffle plate 15.
3rd, tool lift cylinder 12 drives tool 10 up, and the first lifting assembly 22 drives first to jaw 25 Descending, wedge shape briquetting 23 and the second link block 24 remain stationary as, and make jump ring carry out one with its tail end for pivot Determining the rotation of angle, jump ring front end is downward-sloping, and jump ring tail end drives second to connect jaw 26 along the second pair passively The displacement that the second slide rail forward slip on block 244 is certain, downward-sloping jump ring front end is positioned at slide rail the first card Side and be against the inside bottom in slide rail body portion.
4th, while lifting assembly 21 drive connection module is descending, the first lifting assembly 22 resets, in this mistake Cheng Zhong, jump ring front end is against the inside bottom in slide rail body portion all the time, the descending front end ordering about jump ring of jump ring tail end Moving forward certain position, jump ring front end is horizontal forward to be snapped in the first card, a pair descending wedge shape briquetting 23 Inclined plane is pressed in the inclined plane of a pair wedge shape Slave Block 11, the descending translation being changed into wedge shape Slave Block of wedge shape briquetting, The a pair wedge shape Slave Block 11 translated in opposite directions extrudes male part d1 in the middle part of jump ring, it is simple to whole jump ring is from top to bottom put into Upper slide rail is the main part b1 of concave shape, meanwhile, in the middle part of 231 times pressure jump rings of jump ring depression bar, makes jump ring snap in In slide rail is the main part of concave shape;Along with continuing traveling downwardly of jump ring, described male part leaves a pair wedge shape Slave Block 11, Male part resets and snaps in the middle part draw-in groove b11 of slide rail, and meanwhile, the tail end protuberance d2 of jump ring tail end is also multiple Position and snap in the end bayonet socket b13 of slide rail, in the middle part of jump ring, part to tail end snaps in the second card b12 of upper slide rail In, arrive this, jump ring installation.
Above content is only the better embodiment of the present invention, for those of ordinary skill in the art, according to the present invention Thought, the most all will change, it is right that this specification content should not be construed as The restriction of the present invention.

Claims (6)

1. jump ring installs an equipment, including positioning the tool (10) of upper slide rail, being positioned at the jump ring installation above tool Module (20);It is characterized in that:
Described jump ring installs link block, the company of being arranged on that module includes lifting assembly (21), is arranged on lifting assembly The first lifting assembly (22) on connection module and a pair wedge shape briquetting (23) and the second link block (24), elastic peace The second pair of jaw be contained on the first lifting assembly first pair of jaw (25), being slidably mounted in the second link block (26), a pair wedge shape briquetting is positioned at the rear of first pair of jaw and is positioned at the front of second pair of jaw, a pair wedge shape briquetting It is symmetrical set;
Being movably equipped with a pair wedge shape Slave Block (11) on described tool, a pair wedge shape Slave Block is located on tool The left and right sides at the middle part of upper slide rail, a pair wedge shape Slave Block elasticity connects, and a pair wedge shape Slave Block is positioned at a pair wedge pressure The underface of block.
2. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described first lifting assembly (22) Piston including the first pair of jaw lift cylinder (221) being arranged in link block and first pair of jaw lift cylinder is solid First contiguous block (222) of fixed connection, the first guide pin bushing (223) being fixed on the first contiguous block, activity are plugged in first In guide pin bushing and be vertically arranged the first guide rod, the first spring (224) being set on the first guide rod, be fixed on the first guide rod First mounting seat (225) of bottom, it is fixed on bottom the first mounting seat and offers the first jaw cylinder mounting seat of gathering sill (226), the bottom of described first spring is against in the first mounting seat, and the top of the first spring is against on the first contiguous block;
Described first pair of jaw (25) includes the first jaw cylinder and the first pair of cleft hand being arranged on the first jaw cylinder (251), the first jaw cylinder is arranged in the gathering sill of the first jaw cylinder mounting seat by spring;
The bottom of described first mounting seat be provided be plugged in jump ring the first inner position post (27), be clamped in about jump ring A pair first outside fix posts (28) of both sides.
3. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: the pair of wedge shape briquetting (23) Being arranged in link block by wedge shape briquetting contiguous block, the bottom of wedge shape briquetting contiguous block is provided with jump ring depression bar (231), Jump ring depression bar is between a pair wedge shape briquetting.
4. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described second link block (24) Including the main contiguous block of second be arranged in link block (241), the second guide pin bushing of being fixed on the second main contiguous block (242) the second guide rod that, activity is plugged in the second guide pin bushing and is vertically arranged, the second spring being set on the second guide rod (243), it is fixed on the second secondary contiguous block (244) of the second guide rod bottom, is fixed on second bottom the second secondary contiguous block Slide rail;The bottom of described second spring is against on the second secondary contiguous block, and the top of the second spring is against on the second main contiguous block;
Second pair of jaw mount (261) that described second pair of jaw (26) includes being slidably mounted on the second slide rail, The the second jaw cylinder being arranged on second pair of jaw mount, the second pair of cleft hand being arranged on the second jaw cylinder (262);Described second secondary contiguous block be provided be against on second pair of jaw mount front end face spring-loaded plunger (263), The second limited block (264) being against on second pair of jaw mount rear end face.
5. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described tool (10) includes solid The tool base plate (13) that is scheduled on tool lift cylinder (12) piston rod, it is arranged on tool base plate for positioning upper cunning The magnet (141) of rail and upper slide rail locating dowel (142), it is positioned at the middle part draw-in groove gear of magnet and upper slide rail locating dowel both sides Plate (15);
Described tool base plate is provided with wedge shape Slave Block slide rail (161), and a pair wedge shape Slave Block (11) is slidably fitted in On wedge shape Slave Block slide rail, wedge shape Slave Block is provided with ejector pin (162), and the ejector pin on a pair wedge shape Slave Block is oppositely arranged, A sheathed coil tension spring (163) on ejector pin on a pair wedge shape Slave Block;Described tool base plate is provided with a pair riser (164), a pair riser is positioned at the outside of a pair wedge shape Slave Block, and a pair wedge shape Slave Block is positioned at draw-in groove baffle plate in the middle part of in the of a pair Outside.
6. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described lifting assembly (21) is pacified Being contained on transverse shifting assembly (30), the lower section of transverse shifting assembly is provided with the jump ring tool (40) of location jump ring, card Spring tool is positioned at the side of the tool (10) of the upper slide rail in location;
Jump ring tool includes jump ring tool base plate (41), be fixed on jump ring tool base plate jump ring front end locating piece (42), The jump ring tail end be fixed on locating piece (43) in the middle part of the jump ring on jump ring tool base plate, being fixed on jump ring tool base plate is fixed Position block (44), in the middle part of jump ring front end locating piece and spring auxiliary positioning block (45) between locating piece, auxiliary positioning block Be provided with a pair auxiliary positioning post (450), in the middle part of the jump ring front end being positioned on jump ring tool to jump ring between part engaging Between a pair auxiliary positioning post;Described jump ring tail end locating piece is provided with three jump ring tail end locating dowels being set up in parallel (440) during, jump ring tail end is fastened on the gap of three jump ring tail end locating dowels arranged side by side.
CN201610430772.8A 2016-06-17 2016-06-17 A kind of clamp spring installation equipment Active CN105921967B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610430772.8A CN105921967B (en) 2016-06-17 2016-06-17 A kind of clamp spring installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610430772.8A CN105921967B (en) 2016-06-17 2016-06-17 A kind of clamp spring installation equipment

Publications (2)

Publication Number Publication Date
CN105921967A true CN105921967A (en) 2016-09-07
CN105921967B CN105921967B (en) 2018-09-25

Family

ID=56830566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610430772.8A Active CN105921967B (en) 2016-06-17 2016-06-17 A kind of clamp spring installation equipment

Country Status (1)

Country Link
CN (1) CN105921967B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106425362A (en) * 2016-11-04 2017-02-22 苏州鑫润旺精密机械有限公司 Material moving unit of retaining ring feeding mechanism
CN110091148A (en) * 2019-06-10 2019-08-06 苏州茂特斯自动化设备有限公司 A kind of circlip is carried and installing mechanism
CN110202338A (en) * 2019-07-03 2019-09-06 东莞市益诚自动化设备有限公司 A kind of retaining ring automatic feed mechanism of assembling radiator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203864046U (en) * 2014-05-05 2014-10-08 常州市长丰塑料有限公司 Vertical press machine
CN204248393U (en) * 2014-11-21 2015-04-08 广东鸿图南通压铸有限公司 A kind of circlip press-loading equipment of semi-automation
JP2015080964A (en) * 2013-10-21 2015-04-27 トヨタ車体株式会社 Seat mounting device and seat mounting method
CN204818656U (en) * 2015-07-02 2015-12-02 雄华机械(苏州)有限公司 Erection equipment of jump ring in car seat adjustable device
JP2015223646A (en) * 2014-05-27 2015-12-14 シロキ工業株式会社 Unlocking unit and unlocking method for vehicular seat slide device
CN105397470A (en) * 2015-12-22 2016-03-16 武汉兴中设自动化有限公司 Spring pressing device of car seat
CN205733670U (en) * 2016-06-17 2016-11-30 雄华机械(苏州)有限公司 A kind of jump ring installs equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015080964A (en) * 2013-10-21 2015-04-27 トヨタ車体株式会社 Seat mounting device and seat mounting method
CN203864046U (en) * 2014-05-05 2014-10-08 常州市长丰塑料有限公司 Vertical press machine
JP2015223646A (en) * 2014-05-27 2015-12-14 シロキ工業株式会社 Unlocking unit and unlocking method for vehicular seat slide device
CN204248393U (en) * 2014-11-21 2015-04-08 广东鸿图南通压铸有限公司 A kind of circlip press-loading equipment of semi-automation
CN204818656U (en) * 2015-07-02 2015-12-02 雄华机械(苏州)有限公司 Erection equipment of jump ring in car seat adjustable device
CN105397470A (en) * 2015-12-22 2016-03-16 武汉兴中设自动化有限公司 Spring pressing device of car seat
CN205733670U (en) * 2016-06-17 2016-11-30 雄华机械(苏州)有限公司 A kind of jump ring installs equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106425362A (en) * 2016-11-04 2017-02-22 苏州鑫润旺精密机械有限公司 Material moving unit of retaining ring feeding mechanism
CN106425362B (en) * 2016-11-04 2018-07-06 乐清市通达有线电厂 The shifting material unit of retaining ring feed mechanism
CN110091148A (en) * 2019-06-10 2019-08-06 苏州茂特斯自动化设备有限公司 A kind of circlip is carried and installing mechanism
CN110091148B (en) * 2019-06-10 2024-04-26 苏州茂特斯自动化设备有限公司 Clamp spring carrying and installing mechanism
CN110202338A (en) * 2019-07-03 2019-09-06 东莞市益诚自动化设备有限公司 A kind of retaining ring automatic feed mechanism of assembling radiator

Also Published As

Publication number Publication date
CN105921967B (en) 2018-09-25

Similar Documents

Publication Publication Date Title
CN103962984B (en) The multipoint positioning fixture of plate type part
CN204818687U (en) Slide rail assembly machine
CN105921967A (en) Snap spring installing device
CN105150137B (en) A kind of slide rail fixed jig
CN205733670U (en) A kind of jump ring installs equipment
CN105499959B (en) A kind of automatic compressed steel ball device of camshaft of car engine
CN205303244U (en) Automatic switch plug -in components device in plug -in components equipment
CN105921981A (en) Installing device for unlocking assembly
CN105921968A (en) Device for installing snap spring in upper sliding rail
CN201736002U (en) Positioning installation mechanism for lamp press-fit device
CN205869942U (en) It installs fully to go up sliding rail set
CN106002150B (en) The setting controller feeding device of electronic drain valve control assembly machine
CN205733669U (en) A kind of jump ring installs the equipment into upper slide rail
CN104332801B (en) Pin machine pin pitch device
CN202448780U (en) Children safety seat for vehicle
CN205968106U (en) Crimping device of diaphragm solenoid valve kludge
CN205733776U (en) A kind of equipment for assembling slide rail
CN205834663U (en) A kind of plug-in mounting equipment of slide rail ball bar
CN205464143U (en) Riveter of measurable work piece thickness
CN205968017U (en) Shedding mechanism of diaphragm solenoid valve kludge
CN105945842A (en) Clamping mechanism
CN205834597U (en) A kind of ball bar plugs mechanism
CN205629850U (en) Automobile clutch bumper shock absorber automatic synthesis tilting mechanism
CN205869687U (en) One sheathes slide rail welding equipment in
CN204819269U (en) Tool is fixed to slide rail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant