CN205733670U - A kind of jump ring installs equipment - Google Patents

A kind of jump ring installs equipment Download PDF

Info

Publication number
CN205733670U
CN205733670U CN201620590451.XU CN201620590451U CN205733670U CN 205733670 U CN205733670 U CN 205733670U CN 201620590451 U CN201620590451 U CN 201620590451U CN 205733670 U CN205733670 U CN 205733670U
Authority
CN
China
Prior art keywords
jump ring
pair
wedge shape
jaw
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620590451.XU
Other languages
Chinese (zh)
Inventor
陆辉
骆蓉
赵宝林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osuga Machine Suzhou Co Ltd
Original Assignee
Osuga Machine Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osuga Machine Suzhou Co Ltd filed Critical Osuga Machine Suzhou Co Ltd
Priority to CN201620590451.XU priority Critical patent/CN205733670U/en
Application granted granted Critical
Publication of CN205733670U publication Critical patent/CN205733670U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of jump ring installs equipment, including positioning the tool of upper slide rail, being positioned at the jump ring installation module above tool;Described jump ring is installed module and is included first pair of jaw, a pair wedge shape briquetting, second pair of jaw.A pair wedge shape Slave Block it is movably equipped with on described tool.In operation, the front end of first pair of jaw clamping jump ring, the tail end of second pair of jaw clamping jump ring;The first pair of jaw is about to down jump ring front end and is snapped in slide rail, afterwards, wedge shape briquetting and second pair of jaw are descending, the descending translation being changed into wedge shape Slave Block of wedge shape briquetting, and a pair wedge shape Slave Block transverse shear stress jump ring is from top to bottom installed in slide rail after making jump ring weight reducing.

Description

A kind of jump ring installs equipment
Technical field
This utility model relates to the installation of sliding rail of automobile seat, is specifically related to the installation equipment of jump ring in upper slide rail.
Background technology
Generally known, the seat at car front row can front and back regulate, and described seat slide is arranged on slide rail, wherein, described Slide rail includes the upper slide rail being slidably matched, glidepath, the ball bar that is embedded between slide rail and glidepath, and described upper slide rail is pacified Being contained in the bottom of seat, described glidepath is arranged on the base plate of car.
In conjunction with Fig. 1, Fig. 2, the slide rail a0 in a kind of car front seat front-and-back adjusting device, this slide rail includes glidepath a, Glidepath a sets slide slot;Slide rail b is installed in the slide slot of glidepath.
Described upper slide rail b include main part b1 in an intermediate position and be positioned at main part both sides slide alar part b2, sliding It is inlaid with ball bar c between end face and the end face of glidepath a slide slot of row alar part b2, slides bottom and the glidepath of alar part b2 Ball bar c it is inlaid with between the bottom surface of a slide slot.
Being provided with buckle structure b3 in the main part b1 of described upper slide rail b, described buckle structure includes jump ring d, at jump ring Under elastic-restoring force effect, buckle structure can pin glidepath a and upper slide rail b and occur relative to limit glidepath a and upper slide rail b Slide.Through hole is offered in the bottom of described upper slide rail b, and rod-like piece inserts the actionable jump ring of through hole and releases buckle structure to downslide Rail a and the restriction of upper slide rail b, make glidepath a be in, with upper slide rail b, the state that can relative slide.
Described upper slide rail b is welded with the rivet b4 upper slide rail and seat being located by connecting.
In conjunction with Fig. 2, Fig. 4, the cross section of described upper slide rail b main part b1 is concave shape, in the main part of concave shape Side bottom sets the first card, and the medial wall of the main part in concave shape is offered middle part draw-in groove b11, the main part in concave shape Offer the second card b12 on medial wall, the medial wall of the main part in concave shape is offered end bayonet socket b13, described first card Sheet, middle part draw-in groove, the second card, end bayonet socket are distributed from front to back by upper slide rail length direction.
Such as Fig. 5, described jump ring d is strip, and is bilateral symmetry, and the front end of jump ring is closed, in jump ring Portion is provided with male part d1, and the tail end of jump ring is provided with tail end protuberance d2 prominent laterally in open shape, the tail end of jump ring.Jump ring Front end snaps in the first card, and the male part of jump ring snaps in the draw-in groove of middle part, and in the middle part of jump ring, the part to tail end snaps in the second card In sheet, the tail end protuberance of jump ring snaps in the bayonet socket of end.
Utility model content
This utility model is solved the technical problem that: how to be installed in supreme slide rail by jump ring.
For solving above-mentioned technical problem, this utility model provides following technical scheme: a kind of jump ring installs equipment, including fixed The tool of slide rail on position, it is positioned at the jump ring above tool module is installed;
Described jump ring is installed module and is included lifting assembly, the link block being arranged on lifting assembly, is arranged on connection mode The first lifting assembly on block and a pair wedge shape briquetting and the second link block, first be resiliently mounted on the first lifting assembly To jaw, second pair of jaw being slidably mounted in the second link block, a pair wedge shape briquetting is positioned at the rear of first pair of jaw And it being positioned at the front of second pair of jaw, a pair wedge shape briquetting is symmetrical set;
A pair wedge shape Slave Block it is movably equipped with, the upper cunning that a pair wedge shape Slave Block is located on tool on described tool The left and right sides at the middle part of rail, a pair wedge shape Slave Block elasticity connects, and a pair wedge shape Slave Block is just being positioned at a pair wedge shape briquetting Lower section.
By technique scheme, the operation principle that a kind of jump ring described in the utility model installs equipment is as follows: first to folder The front end of pawl clamping jump ring, the tail end of second pair of jaw clamping jump ring;First lifting assembly driving first is descending to jaw, jump ring Carry out the rotation of certain angle with its tail end for center of rotation, jump ring front end is downward-sloping, and jump ring tail end drives second passively The displacement certain to jaw forward slip, downward-sloping jump ring front end is positioned at the side of slide rail the first card and is against cunning The inside bottom of rail main part;Afterwards, lifting assembly drive connection module is descending, and meanwhile, the first lifting assembly resets, at this During, the descending front end ordering about jump ring of jump ring tail end moves forward certain position, and jump ring front end snaps in the first card, The inclined plane of a pair descending wedge shape briquetting is pressed in the inclined plane of a pair wedge shape Slave Block, and the descending of wedge shape briquetting is changed into wedge The translation of shape Slave Block, the male part in the middle part of a pair wedge shape Slave Block extruding jump ring translated in opposite directions, it is simple to whole jump ring is by upper Putting into the main part that slide rail is concave shape under and, along with continuing traveling downwardly of jump ring, it is driven that described male part leaves a pair wedge shape Block, male part resets and snaps in the middle part draw-in groove of slide rail, and meanwhile, jump ring tail end also resets and snaps in the end of slide rail In portion's bayonet socket, during part to tail end snaps in the second card of upper slide rail in the middle part of jump ring, arrive this, jump ring installation.
Described first lifting assembly includes first pair of jaw lift cylinder being arranged in link block and first pair of jaw The first contiguous block that the piston of lift cylinder fixes connection, the first guide pin bushing being fixed on the first contiguous block, activity are plugged in In one guide pin bushing and be vertically arranged the first guide rod, the first spring being set on the first guide rod, be fixed on the first guide rod bottom First mounting seat, it is fixed on bottom the first mounting seat and offers the first jaw cylinder mounting seat of gathering sill, described first spring Bottom be against in the first mounting seat, the top of the first spring is against on the first contiguous block;Described first pair of jaw includes first Jaw cylinder and the first pair of cleft hand being arranged on the first jaw cylinder, the first jaw cylinder is arranged on the first jaw by spring In the gathering sill of cylinder mounting seat;The bottom of described first mounting seat is provided with the first inner position post, the clamping being plugged in jump ring A pair first outside fix posts in the jump ring left and right sides.As described above, described first mounting seat can be made by relative first contiguous block The elastic telescopic of vertical direction, installs for jump ring and provides elastic pressure into upper slide rail.Described first jaw cylinder is pacified by spring Being contained in the gathering sill of the first jaw cylinder mounting seat, so, under external force, the first jaw cylinder can be made little along gathering sill The movement of amplitude.The pillared inner side at jump ring of described first inner position, the first pillared outside at jump ring of outside fix, with locator card Spring.
The pair of wedge shape briquetting is arranged in link block by wedge shape briquetting contiguous block, the end of wedge shape briquetting contiguous block Portion is provided with jump ring depression bar, and jump ring depression bar is between a pair wedge shape briquetting.As described above, press a pair under a pair wedge shape briquetting During wedge shape Slave Block, press to enter in the middle part of jump ring in upper slide rail under descending jump ring depression bar.
Described second link block includes the be arranged in link block second main contiguous block, is fixed on the second main contiguous block On the second guide pin bushing, activity be plugged in the second guide pin bushing and be vertically arranged the second guide rod, be set on the second guide rod second Spring, it is fixed on the second secondary contiguous block of the second guide rod bottom, is fixed on the second slide rail bottom the second secondary contiguous block;Described The bottom of two springs is against on the second secondary contiguous block, and the top of the second spring is against on the second main contiguous block;Described second to folder The second folder that pawl includes the second pair of jaw mount being slidably mounted on the second slide rail, is arranged on second pair of jaw mount Pawl cylinder, the second pair of cleft hand being arranged on the second jaw cylinder;Described second secondary contiguous block is provided with and is against second pair of jaw Spring-loaded plunger on mounting seat front end face, the second limited block being against on second pair of jaw mount rear end face.As described above, Second secondary contiguous block can make the elastic telescopic of vertical direction by relative second main contiguous block, installs for jump ring and provides elasticity into upper slide rail Pressure.Described spring-loaded plunger translates for jump ring tail end and resets offer condition by a small margin.
Described tool include the tool base plate being fixed on tool lift cylinder piston rod, be arranged on tool base plate for Magnet and the upper slide rail locating dowel of slide rail on location, it is positioned at Magnet and the middle part draw-in groove baffle plate of upper slide rail locating dowel both sides;Described Tool base plate is provided with wedge shape Slave Block slide rail, and a pair wedge shape Slave Block is slidably fitted on wedge shape Slave Block slide rail, wedge shape from Motion block is provided with ejector pin, and the ejector pin on a pair wedge shape Slave Block is oppositely arranged, on the ejector pin on a pair wedge shape Slave Block sheathed one Individual coil tension spring;Described tool base plate is provided with a pair riser, and a pair riser is positioned at the outside of a pair wedge shape Slave Block, a pair wedge Shape Slave Block is positioned at the outside of draw-in groove baffle plate in the middle part of in the of a pair.As described above, original state, the lateral surface of a pair wedge shape Slave Block Being against on riser, the inclined plane of wedge shape Slave Block sets on its outer lateral surface, has between lateral surface and the riser of wedge shape Slave Block One wedge gap;Descending wedge shape briquetting stretches into wedge gap to drive wedge shape Slave Block to translate along wedge shape Slave Block slide rail;One Translating wedge shape Slave Block in opposite directions until a pair ejector pin offsets, described coil tension spring is for a pair wedge shape Slave Block that reset.Described Middle part draw-in groove baffle plate is for gear outside of draw-in groove in the middle part of upper slide rail, and its effect has be prevent middle part draw-in groove from by jump ring being squeezed at two: one Press and deform;Two is that the male part in the middle part of jump ring is played guide effect.
Described lifting assembly is arranged on transverse shifting assembly, and the lower section of transverse shifting assembly is provided with the jump ring of location jump ring Tool, jump ring tool is positioned at the side of the tool of the upper slide rail in location;Jump ring tool includes jump ring tool base plate, is fixed on jump ring and controls Locating piece in the middle part of jump ring front end locating piece on tool base plate, the jump ring that is fixed on jump ring tool base plate, it is fixed on jump ring tool Jump ring tail end locating piece on base plate, in the middle part of jump ring front end locating piece and spring auxiliary positioning block between locating piece, auxiliary Locating piece is provided with a pair auxiliary positioning post, in the middle part of the jump ring front end being positioned on jump ring tool to jump ring between part be fastened on Between a pair auxiliary positioning post;Described jump ring tail end locating piece is provided with three jump ring tail end locating dowels being set up in parallel, jump ring Tail end is fastened in the gap of three jump ring tail end locating dowels arranged side by side.As described above, jump ring is positioned on jump ring tool, Under the driving of lifting assembly, descending jump ring is installed module and is gripped card from jump ring tool by the first jaw and the second jaw Spring, afterwards, transverse shifting Component driver lifting assembly moves to the top of slide rail tool.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings this utility model is described further:
Fig. 1 is the structural representation of the slide rail a0 in car front seat front-and-back adjusting device;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the structural representation that a kind of jump ring of this utility model installs equipment;
Fig. 4 is enlarged drawing at A in Fig. 3;
Fig. 5 is enlarged drawing at B in Fig. 3;
Fig. 6 is the structural representation of tool 10 in Fig. 3;
Fig. 7 is wedge shape Slave Block 11 and the combinative structure schematic diagram of wedge shape briquetting 23 in Fig. 6;
Fig. 8 is to observe jump ring in Fig. 3 from below to install the structural representation of module 20 gained;
Fig. 9 is the structural representation of jump ring tool 40 in Fig. 3;
Figure 10 is that in Fig. 3, jump ring d is installed the work process schematic diagram into upper slide rail b by jump ring installation module 20;
Figure 11 is that in Figure 10, jump ring d has been installed the schematic diagram in upper slide rail b by jump ring installation module 20.
Symbol description in figure:
Slide rail in a0, car front seat front-and-back adjusting device;A, glidepath;B, upper slide rail;B1, main part;b11、 Middle part draw-in groove;B12, the second card;B13, end bayonet socket;B2, slide alar part;B3, buckle structure;B4, rivet;C, ball bar; D, jump ring;D1, male part;D2, tail end protuberance;
10, tool;11, wedge shape Slave Block;12, tool lift cylinder;13, tool base plate;141, Magnet;142, upper slide rail Locating dowel;15, middle part draw-in groove baffle plate;161, wedge shape Slave Block slide rail;162, ejector pin;163, coil tension spring;164, riser;
20, jump ring installs module;21, lifting assembly;22, the first lifting assembly;221, first pair of jaw lift cylinder; 222, the first contiguous block;223, the first guide pin bushing;224, the first spring;225, the first mounting seat;226, the first jaw cylinder is installed Seat;23, wedge shape briquetting;231, jump ring depression bar;24, the second link block;241, the second main contiguous block;242, the second guide pin bushing; 243, the second spring;244, the second secondary contiguous block;25, first pair of jaw;251, first pair of cleft hand;26, second pair of jaw;261、 Second pair of jaw mount;262, second pair of cleft hand;263, spring-loaded plunger;264, the second limited block;27, the first inner position post; 28, the first outside fix post;
30, transverse shifting assembly;
40, jump ring tool;41, jump ring tool base plate;42, jump ring front end locating piece;43, locating piece in the middle part of jump ring;44, card Spring tail end locating piece;440, jump ring tail end locating dowel;45, auxiliary positioning block;450, auxiliary positioning post;451, the first inner position Hole;452, the second outside fix hole.
Detailed description of the invention
In conjunction with Fig. 3, Fig. 6, Fig. 7, Fig. 8, a kind of jump ring installs equipment, including positioning the tool 10 of upper slide rail, being positioned at tool The jump ring of top installs module 20;Described jump ring is installed module and is included lifting assembly 21, the connection mode being arranged on lifting assembly Block, the first lifting assembly 22 being arranged in link block and a pair wedge shape briquetting 23 and the second link block 24, elastic installation First pair of jaw 25 on the first lifting assembly, the second pair of jaw 26 being slidably mounted in the second link block, a pair wedge Shape briquetting is positioned at the rear of first pair of jaw and is positioned at the front of second pair of jaw, and a pair wedge shape briquetting is symmetrical set;Institute State and on tool, be movably equipped with a pair wedge shape Slave Block 11, the middle part of the upper slide rail that a pair wedge shape Slave Block is located on tool The left and right sides, a pair wedge shape Slave Block elasticity connects, and a pair wedge shape Slave Block is positioned at the underface of a pair wedge shape briquetting.
In conjunction with Fig. 3, Fig. 8, jump ring is installed in module 20, and described lifting assembly 21 includes the liter that piston is connected with link block Sending down the abnormal ascending QI cylinder.
Jump ring is installed in module 20, and described first lifting assembly 22 includes the first pair of jaw liter being arranged in link block Sending down the abnormal ascending QI cylinder 221 fix with the piston of first pair of jaw lift cylinder be connected the first contiguous block 222, be fixed on the first contiguous block On the first guide pin bushing 223, activity be plugged in the first guide pin bushing and be vertically arranged the first guide rod, be set on the first guide rod the One spring 224, it is fixed on the first mounting seat 225 of the first guide rod bottom, is fixed on bottom the first mounting seat and offers gathering sill The first jaw cylinder mounting seat 226, the bottom of described first spring is against in the first mounting seat, and the top of the first spring is against On first contiguous block.The bottom of described first mounting seat be provided be plugged in jump ring the first inner position post 27, be clamped in jump ring A pair first outside fix posts 28 of the left and right sides.
Jump ring is installed in module 20, and described first pair of jaw 25 includes the first jaw cylinder and be arranged on the first jaw cylinder On first pair of cleft hand 251, the first jaw cylinder is arranged in the gathering sill of the first jaw cylinder mounting seat by spring.
Jump ring is installed in module 20, and the pair of wedge shape briquetting 23 is arranged on link block by wedge shape briquetting contiguous block On, the bottom of wedge shape briquetting contiguous block is provided with jump ring depression bar 231, and jump ring depression bar is between a pair wedge shape briquetting.
Jump ring is installed in module 20, and described second link block 24 includes the second main contiguous block being arranged in link block 241, in the second guide pin bushing 242 of being fixed on the second main contiguous block, activity are plugged in the second guide pin bushing and second leading of being vertically arranged Bar, the second spring 243 being set on the second guide rod, it is fixed on the second secondary contiguous block 244 of the second guide rod bottom, is fixed on the The second slide rail bottom second mate's contiguous block;The bottom of described second spring is against on the second secondary contiguous block, the top of the second spring It is against on the second main contiguous block.
Jump ring is installed in module 20, and described second pair of jaw 26 includes the second pair of jaw being slidably mounted on the second slide rail Mounting seat 261, the second jaw cylinder being arranged on second pair of jaw mount, the second couple of being arranged on the second jaw cylinder Cleft hand 262;Described second secondary contiguous block be provided be against on second pair of jaw mount front end face spring-loaded plunger 263, be against The second limited block 264 on second pair of jaw mount rear end face.
In conjunction with Fig. 3, Fig. 6, Fig. 7, described tool 10 includes the tool base plate being fixed on tool lift cylinder 12 piston rod 13, it is arranged on tool base plate the Magnet 141 for positioning upper slide rail and upper slide rail locating dowel 142, is positioned at Magnet and upper slide rail The middle part draw-in groove baffle plate 15 of locating dowel both sides.Described tool base plate is provided with wedge shape Slave Block slide rail 161, a pair wedge shape Slave Block 11 are slidably fitted on wedge shape Slave Block slide rail, and wedge shape Slave Block is provided with ejector pin 162, the ejector pin phase on a pair wedge shape Slave Block A sheathed coil tension spring 163 on ejector pin in setting, a pair wedge shape Slave Block;Described tool base plate is provided with a pair riser 164, a pair riser is positioned at the outside of a pair wedge shape Slave Block, and a pair wedge shape Slave Block is positioned in the middle part of in the of a pair outside draw-in groove baffle plate Side.
Such as Fig. 3, described lifting assembly 21 is arranged on transverse shifting assembly 30, and the lower section of transverse shifting assembly is provided with location The jump ring tool 40 of jump ring, jump ring tool is positioned at the side of the tool 10 of the upper slide rail in location.
Described transverse shifting assembly 30 includes that transverse shifting plate, the transverse shifting being fixed on transverse shifting plate are led Rail, the transverse shifting electricity cylinder being fixed on transverse shifting plate, the piston of transverse shifting electricity cylinder and the lifting in lifting assembly 21 The cylinder body of cylinder connects.
Such as Fig. 9, described jump ring tool includes jump ring tool base plate 41, the jump ring front end that is fixed on jump ring tool base plate is fixed Locating piece 43 in the middle part of position block 42, the jump ring that is fixed on jump ring tool base plate, the jump ring tail end being fixed on jump ring tool base plate Locating piece 44, in the middle part of jump ring front end locating piece and spring auxiliary positioning block 45 between locating piece, auxiliary positioning block is provided with A pair auxiliary positioning post 450, in the middle part of the jump ring front end being positioned on jump ring tool to jump ring between part be fastened on a pair auxiliary Between locating dowel;Described jump ring tail end locating piece is provided with three jump ring tail end locating dowels 440 being set up in parallel, jump ring tail end card It is combined in the gap of three jump ring tail end locating dowels arranged side by side.Offer on described auxiliary positioning block and coordinate with the first inner position post 27 The first outside fix hole 452 of coordinating with the first outside fix post 28, the first inner position hole 451.
In practical operation, with reference to Figure 10, Figure 11, a kind of jump ring described in the utility model installs the workflow of equipment such as Under:
First, jump ring is installed module 20 and is positioned at the top of jump ring tool 40, and under the driving of lifting assembly 21, jump ring is installed Module 20 is descending, and first pair of jaw 25 clamps the front end of jump ring, and second pair of jaw 26 clamps the tail end of jump ring;In transverse shifting group Under the driving of part 30, jump ring is installed module 20 and is moved to the surface of tool 10.
Second, upper slide rail is positioned on tool 10, specifically, and the hole on upper slide rail and the upper slide rail locating dowel on tool 142 coordinate, and upper slide rail is adsorbed by Magnet 141, and upper slide rail is in the middle part of a pair between draw-in groove baffle plate 15.
3rd, tool lift cylinder 12 drives tool 10 up, and the first lifting assembly 22 drives first descending to jaw 25, Wedge shape briquetting 23 and the second link block 24 remain stationary as, and make jump ring carry out the rotation of certain angle with its tail end for center of rotation Turning, jump ring front end is downward-sloping, and jump ring tail end drives second passively to second sliding along the second secondary contiguous block 244 of jaw 26 The displacement that rail forward slip is certain, downward-sloping jump ring front end is positioned at the side of slide rail the first card and is against slide rail master The inside bottom of body.
4th, while lifting assembly 21 drive connection module is descending, the first lifting assembly 22 resets, in this process In, jump ring front end is against the inside bottom in slide rail body portion all the time, and the descending front end of jump ring of ordering about of jump ring tail end is to reach Dynamic certain position, jump ring front end is horizontal forward to be snapped in the first card, and the inclined plane of a pair descending wedge shape briquetting 23 is pressed in In the inclined plane of a pair wedge shape Slave Block 11, the descending translation being changed into wedge shape Slave Block of wedge shape briquetting, translated in opposite directions Wedge shape Slave Block 11 is extruded male part d1 in the middle part of jump ring, it is simple to it is concave shape that whole jump ring from top to bottom puts into slide rail Main part b1, meanwhile, in the middle part of jump ring depression bar 231 times pressure jump rings, in make jump ring snap in main part that slide rail is concave shape; Along with continuing traveling downwardly of jump ring, described male part leaves a pair wedge shape Slave Block 11, and male part resets and snaps in slide rail In portion draw-in groove b11, meanwhile, the tail end protuberance d2 of jump ring tail end also resets and snaps in the end bayonet socket b13 of slide rail, card During part to tail end snaps in the second card b12 of upper slide rail in the middle part of spring, arrive this, jump ring installation.
Above content is only better embodiment of the present utility model, for those of ordinary skill in the art, according to this The thought of utility model, the most all will change, and this specification content should not be understood For to restriction of the present utility model.

Claims (6)

1. jump ring installs an equipment, including positioning the tool (10) of upper slide rail, being positioned at the jump ring installation module above tool (20);It is characterized in that:
Described jump ring is installed module and is included lifting assembly (21), the link block that is arranged on lifting assembly, is arranged on connection mode The first lifting assembly (22) and a pair wedge shape briquetting (23) and the second link block (24) on block, it is resiliently mounted on the first lifting First pair of jaw (25) on assembly, the second pair of jaw (26) being slidably mounted in the second link block, a pair wedge shape briquetting Being positioned at the rear of first pair of jaw and be positioned at the front of second pair of jaw, a pair wedge shape briquetting is symmetrical set;
A pair wedge shape Slave Block (11) it is movably equipped with, the upper cunning that a pair wedge shape Slave Block is located on tool on described tool The left and right sides at the middle part of rail, a pair wedge shape Slave Block elasticity connects, and a pair wedge shape Slave Block is just being positioned at a pair wedge shape briquetting Lower section.
2. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described first lifting assembly (22) includes peace The first pair of jaw lift cylinder (221) being contained in link block is fixed with the piston of first pair of jaw lift cylinder and to be connected In first contiguous block (222), the first guide pin bushing (223) being fixed on the first contiguous block, activity are plugged in the first guide pin bushing and vertically The first guide rod arranged, the first spring (224) being set on the first guide rod, the first mounting seat of being fixed on the first guide rod bottom (225), it is fixed on bottom the first mounting seat and offers the first jaw cylinder mounting seat (226) of gathering sill, described first spring Bottom be against in the first mounting seat, the top of the first spring is against on the first contiguous block;
Described first pair of jaw (25) includes the first jaw cylinder and the first pair of cleft hand being arranged on the first jaw cylinder (251), the first jaw cylinder is arranged in the gathering sill of the first jaw cylinder mounting seat by spring;
The bottom of described first mounting seat be provided be plugged in jump ring the first inner position post (27), be clamped in the jump ring left and right sides A pair first outside fix posts (28).
3. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: the pair of wedge shape briquetting (23) passes through wedge Shape briquetting contiguous block is arranged in link block, and the bottom of wedge shape briquetting contiguous block is provided with jump ring depression bar (231), jump ring depression bar position Between a pair wedge shape briquetting.
4. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described second link block (24) includes peace The the second main contiguous block (241) being contained in link block, the second guide pin bushing (242) being fixed on the second main contiguous block, activity are inserted The second guide rod, the second spring (243) being set on the second guide rod that are located in the second guide pin bushing and be vertically arranged, it is fixed on second Second secondary contiguous block (244) of guide rod bottom, it is fixed on the second slide rail bottom the second secondary contiguous block;The end of described second spring End is against on the second secondary contiguous block, and the top of the second spring is against on the second main contiguous block;
Described second pair of jaw (26) includes the second pair of jaw mount (261) being slidably mounted on the second slide rail, is arranged on The second jaw cylinder on second pair of jaw mount, the second pair of cleft hand (262) being arranged on the second jaw cylinder;Described Second mate's contiguous block be provided be against on second pair of jaw mount front end face spring-loaded plunger (263), be against second pair of jaw peace The second limited block (264) on dress base rear end face.
5. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described tool (10) includes being fixed on tool Tool base plate (13) on lift cylinder (12) piston rod, it is arranged on tool base plate the Magnet (141) for positioning upper slide rail With upper slide rail locating dowel (142), be positioned at Magnet and middle part draw-in groove baffle plate (15) of upper slide rail locating dowel both sides;
Described tool base plate is provided with wedge shape Slave Block slide rail (161), a pair wedge shape Slave Block (11) be slidably fitted in wedge shape from On motion block slide rail, wedge shape Slave Block is provided with ejector pin (162), and the ejector pin on a pair wedge shape Slave Block is oppositely arranged, a pair wedge shape A sheathed coil tension spring (163) on ejector pin on Slave Block;Described tool base plate is provided with a pair riser (164), erects for a pair Plate is positioned at the outside of a pair wedge shape Slave Block, and a pair wedge shape Slave Block is positioned at the outside of draw-in groove baffle plate in the middle part of in the of a pair.
6. a kind of jump ring as claimed in claim 1 installs equipment, it is characterised in that: described lifting assembly (21) is arranged on laterally On moving assembly (30), the lower section of transverse shifting assembly is provided with the jump ring tool (40) of location jump ring, and jump ring tool is positioned at location The side of the tool (10) of upper slide rail;
Jump ring tool includes jump ring tool base plate (41), be fixed on jump ring tool base plate jump ring front end locating piece (42), solid The jump ring tail end locating piece be scheduled on locating piece (43) in the middle part of the jump ring on jump ring tool base plate, being fixed on jump ring tool base plate (44), in the middle part of jump ring front end locating piece and spring auxiliary positioning block (45) between locating piece, auxiliary positioning block is provided with one To auxiliary positioning post (450), in the middle part of the jump ring front end being positioned on jump ring tool to jump ring between part be fastened on a pair auxiliary Between locating dowel;Described jump ring tail end locating piece is provided with three jump rings tail end locating dowel (440) being set up in parallel, jump ring tail end It is fastened in the gap of three jump ring tail end locating dowels arranged side by side.
CN201620590451.XU 2016-06-17 2016-06-17 A kind of jump ring installs equipment Expired - Fee Related CN205733670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620590451.XU CN205733670U (en) 2016-06-17 2016-06-17 A kind of jump ring installs equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620590451.XU CN205733670U (en) 2016-06-17 2016-06-17 A kind of jump ring installs equipment

Publications (1)

Publication Number Publication Date
CN205733670U true CN205733670U (en) 2016-11-30

Family

ID=57386940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620590451.XU Expired - Fee Related CN205733670U (en) 2016-06-17 2016-06-17 A kind of jump ring installs equipment

Country Status (1)

Country Link
CN (1) CN205733670U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105921967A (en) * 2016-06-17 2016-09-07 雄华机械(苏州)有限公司 Snap spring installing device
CN108146678A (en) * 2017-12-25 2018-06-12 东莞市益汇知识产权服务有限公司 The positioning of lighter automatic stacking machine moves material device and its positioning moves material technique
CN111376017A (en) * 2020-04-21 2020-07-07 安庆安帝技益精机有限公司 Piston clamp spring feeding and assembling device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105921967A (en) * 2016-06-17 2016-09-07 雄华机械(苏州)有限公司 Snap spring installing device
CN108146678A (en) * 2017-12-25 2018-06-12 东莞市益汇知识产权服务有限公司 The positioning of lighter automatic stacking machine moves material device and its positioning moves material technique
CN108146678B (en) * 2017-12-25 2020-06-05 邵东县莲花打火机制造有限公司 Positioning material moving device of automatic lighter stacking machine and positioning material moving process thereof
CN111376017A (en) * 2020-04-21 2020-07-07 安庆安帝技益精机有限公司 Piston clamp spring feeding and assembling device
CN111376017B (en) * 2020-04-21 2021-05-07 安庆安帝技益精机有限公司 Piston clamp spring feeding and assembling device

Similar Documents

Publication Publication Date Title
CN205733670U (en) A kind of jump ring installs equipment
CN105921981A (en) Installing device for unlocking assembly
CN105921967B (en) A kind of clamp spring installation equipment
CN107877129A (en) The double servo press-loading devices of rubber bushing and pressing method
CN205869942U (en) It installs fully to go up sliding rail set
CN204197308U (en) A kind of flexible apparatus to the assembling of aircraft housing
CN205733669U (en) A kind of jump ring installs the equipment into upper slide rail
CN206509714U (en) Jump ring installed body
CN205631435U (en) Pressing die set
CN205733780U (en) A kind of automobile-used upper slide rail assembly line
CN202097358U (en) Lock panel feeding device
CN202448780U (en) Children safety seat for vehicle
CN204489999U (en) A kind of mobile clamping mechanism
CN205869687U (en) One sheathes slide rail welding equipment in
CN216218564U (en) Contact pin module
CN205834663U (en) A kind of plug-in mounting equipment of slide rail ball bar
CN106002242A (en) Upper sliding rail assembly line
CN205733781U (en) Slide rail assembly line in one
CN105921968A (en) Device for installing snap spring in upper sliding rail
CN205464143U (en) Riveter of measurable work piece thickness
CN105945842A (en) Clamping mechanism
CN203804125U (en) Turn-riveting equipment for automobile seat frameworks
CN105962602A (en) Limiting structure of pipe inside luggage pull rod
CN102989889A (en) Cylindrical member enclosure riveting mold
CN105904197A (en) Sliding rail assembling mechanism located under assistance of magnet

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20170617