CN105912800A - 低层建筑全装配式框架的设计方法 - Google Patents

低层建筑全装配式框架的设计方法 Download PDF

Info

Publication number
CN105912800A
CN105912800A CN201610269122.XA CN201610269122A CN105912800A CN 105912800 A CN105912800 A CN 105912800A CN 201610269122 A CN201610269122 A CN 201610269122A CN 105912800 A CN105912800 A CN 105912800A
Authority
CN
China
Prior art keywords
column
node
joint
bending moment
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610269122.XA
Other languages
English (en)
Other versions
CN105912800B (zh
Inventor
刘红军
胡浩
刘堃
刘亚洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201610269122.XA priority Critical patent/CN105912800B/zh
Publication of CN105912800A publication Critical patent/CN105912800A/zh
Application granted granted Critical
Publication of CN105912800B publication Critical patent/CN105912800B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Architecture (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computer Hardware Design (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开了一种低层建筑全装配式框架的设计计算方法,包括步骤:1、梁柱节点的不同初始刚度值计算模型;2、根据既有荷载和初始刚度值作出梁的弯矩图;3、根据弯矩图计算相应的梁、柱尺寸;4、选择最经济型梁、柱尺寸;5、计算梁柱节点处连接螺栓的数量及位置,使节点初始刚度等于节点的设定初始刚度:6、利用半刚性计算方法,判断在地震荷载下塑性铰出现位置和层间位移角是否满足要求。本发明能快速的计算出满足承载力和地震力要求的最经济的梁柱尺寸及配筋,能很大的提高梁柱框架结构的设计效率。

Description

低层建筑全装配式框架的设计方法
技术领域
本发明涉及建筑技术领域,特别涉及一种梁柱框架的设计方法。
背景技术
传统房屋框架的节点为刚性节点,这种框架结构的设计程序是先根据经验初选构件尺寸,分析结构获得内力。如果需要,可以应用弯矩重分布调整支座和跨中截面弯矩比例。根据计算的内力,校核初选截面是否能满足承载能力极限状态及正常使用极限状态的要求。如果满足,分析结束,否则调整构件尺寸,重新计算内力和进行杆件校核,直到构件尺寸满足结构布置和要求为止。传统设计中节点设计是结构设计过程的最后一步,即根据前期进行计算设计时的假定节点连接形式刚接或铰接进行细部设计。
然而装配式框架的节点为半刚性节点,半刚性连接组合梁柱框架设计是一个迭代和交互的过程,截面尺寸的初选以及节点的构造是对设计的经济性有很大的影响。如果考虑半刚性节点,则会引起一个问题即进行结构受力分析时,需要知道节点的转动刚度和承载能力,而要知道转动刚度和承载能力就需要知道节点的细部构造;然而,节点的细部构造又与其连接构件的截面尺寸有关,而获得连接截面的截面尺寸,又必须事先确定节点的细部构造,这样会陷入循环过程。
发明内容
有鉴于此,本发明提供一种低层建筑全装配式框架的设计方法,以解决传统梁柱框架设计方法不适用于设计具有半刚性节点的装配式梁柱框架的技术问题。
本发明低层建筑全装配式框架的设计方法,包括以下步骤:
第一步:在柱上设计连接梁的第一接头,在梁上设计连接柱的第二接头, 并通过螺栓连接第一接头和第二接头;
第二步:设定梁柱节点的不同初始刚度值;
第三步:根据规定的荷载和不同的初始刚度值作出梁的弯矩图;
第四步:根据弯矩图设定相应的梁、柱尺寸;
第五步:以经济性作为选择判断条件,选择最经济型梁、柱尺寸;
第六步:调整梁柱节点处连接螺栓的数量及位置,使计算的节点初始刚度等于节点的设定初始刚度:
第七步:利用半刚性计算方法,判断在地震荷载下塑性铰出现位置和层间位移角是否满足要求,若满足要求,则设计完成;若不满足,则重复第五至第六七步,直至所选择的梁、柱满足在地震荷载下塑性铰出现位置和层间位移角符合要求。
本发明的有益效果:
本发明低层建筑全装配式框架的设计方法,其先假定初始刚度,由于梁柱节点处仅仅通过半刚性连接,因此通过改变节点处的螺栓数量和位置,即可方便的调节梁柱节点处的刚度值,以使节点刚度与假定值吻合;对应于节点不同的初始刚度,会有不同的梁柱尺寸和配筋与之相匹配,从而在考略经济性的优化设计条件下,能快速的找到满足承载力和地震力要求的最经济的梁柱尺寸及配筋,能很大的提高梁柱框架结构的设计效率。
附图说明
图1为实施例中柱和主梁的第一种连接形式分散状态示意图;
图2为X1=1的力矩图;
图3为X2=1的力矩图;
图4为杆端转角为1时的弯矩图。
具体实施方式
下面结合附图和实施例对本发明作进一步描述。
本实施例低层建筑全装配式框架的设计方法,包括以下步骤:
第一步:在柱上设计连接梁的第一接头,在梁上设计连接柱的第二接头,并通过螺栓连接第一接头和第二接头;
第二步:计算梁柱节点的不同初始刚度值;
第三步:根据规定的荷载和不同的初始刚度值作出梁的弯矩图;
第四步:根据弯矩图设定相应的梁、柱尺寸;本步骤中设定的满足受力要求的梁、柱的尺寸规格有多种;
第五步:以经济性作为选择判断条件,在第四步所设定的梁、柱尺寸中选择最经济型梁、柱尺寸;
第六步:调整梁柱节点处连接螺栓的数量及位置,使计算的节点初始刚度等于节点的设定初始刚度:
第七步:利用半刚性计算方法,判断在地震荷载下塑性铰出现位置和层间位移角是否满足要求,若满足要求,则设计完成;若不满足,则重复第五至第六七步,直至所选择的梁、柱满足在地震荷载下塑性铰出现位置和层间位移角符合要求。
以下为在设计过程中梁的弯矩的具体计算方法:
1、柔度矩阵计算
把梁柱节点看作柔性节点,并记其刚度(节点发生单位转角时需要的弯矩)为:其中EI为梁刚度,L为梁跨度,η为常数;
再通过力法来求解梁端只发生单位转角的弯矩图以及梁两端固接时在集中荷载和均布荷载作用下的弯矩图,其过程如下:
1)作出梁柱装配结构的简化后的静定结构的计算简图,计算简图如图1所示;
2)作出弯矩X1=1的力矩图,如图2所示;
3)作出弯矩X2=1的力矩图,如图3所示;
简支梁情况下,梁左右两端弯矩分别为X1和X2,并作出单位力矩下的梁的弯矩图,求其柔度矩阵系数:
x为沿梁轴向方向坐标。
2、计算杆端单位转角时的弯矩
杆端位移Δ1=0,Δ2=1
解得:
从而得到发生杆端转角为1时的弯矩图,弯矩图具体如图4所示,图中:
i为梁的线刚度
3、均布荷载下梁的杆端弯矩计算
则有方程组:
解得:
q为均布荷载集度值。从而可做出均布荷载下梁两端固接时的弯矩图。
4、集中荷载下梁的杆端弯矩计算
有方程组:
解得:
P为集中荷载值,从而 可做出集中荷载下的弯矩图。
通过上述分析,我们把带有刚性节点的梁看成一个整体,并求得了其发生杆端转角的刚度为:
以及新的弯矩传递系数再用建立分配法计算结构的内力,只不过梁的刚度和传递系数发生了变化而已。
5、弯矩分配
以下仅用弯矩分配法计算即η=4时的弯矩:
此时可算得α=2.02,β=0.69;从而有传递系数C=2.94,其他相应的弯矩分配系数如表一和表二:
表一,恒载弯矩分配(kN·m):
表二,活载弯矩分配(kN·m):
本实施例低层建筑全装配式框架的设计方法,其先假定初始刚度,由于梁柱节点处仅仅通过螺栓连接,因此通过改变节点处的螺栓数量和位置,即可方便的调节梁柱节点处的刚度值,以使节点刚度与假定值吻合;对应于节点不同的初始刚度,会有不同的梁柱尺寸和配筋与之相匹配,从而在考略经济性的优化设计条件下,能快速的找到满足承载力和地震力要求的最经济的梁柱尺寸及配筋,能很大的提高梁柱框架结构的设计效率。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (1)

1.一种低层建筑全装配式框架的设计方法,其特征在于:包括以下步骤:
第一步:在柱上设计连接梁的第一接头,在梁上设计连接柱的第二接头,并通过螺栓连接第一接头和第二接头;
第二步:计算梁柱节点的不同初始刚度值;
第三步:根据规定的荷载和不同的初始刚度值作出梁的弯矩图;
第四步:根据弯矩图设定相应的梁、柱尺寸;
第五步:以经济性作为选择判断条件,选择最经济型梁、柱尺寸;
第六步:调整梁柱节点处连接螺栓的数量及位置,使计算的节点初始刚度等于节点的设定初始刚度:
第七步:利用半刚性计算方法,判断在地震荷载下塑性铰出现位置和层间位移角是否满足要求,若满足要求,则设计完成;若不满足,则重复第五至第六七步,直至所选择的梁、柱满足在地震荷载下塑性铰出现位置和层间位移角符合要求。
CN201610269122.XA 2016-04-27 2016-04-27 低层建筑全装配式框架的设计方法 Expired - Fee Related CN105912800B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610269122.XA CN105912800B (zh) 2016-04-27 2016-04-27 低层建筑全装配式框架的设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610269122.XA CN105912800B (zh) 2016-04-27 2016-04-27 低层建筑全装配式框架的设计方法

Publications (2)

Publication Number Publication Date
CN105912800A true CN105912800A (zh) 2016-08-31
CN105912800B CN105912800B (zh) 2018-12-18

Family

ID=56752889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610269122.XA Expired - Fee Related CN105912800B (zh) 2016-04-27 2016-04-27 低层建筑全装配式框架的设计方法

Country Status (1)

Country Link
CN (1) CN105912800B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210128A (zh) * 2019-06-03 2019-09-06 河北建筑工程学院 一种钢筋混凝土框架结构优化的拟满内力设计方法
CN110485612A (zh) * 2018-05-21 2019-11-22 深圳市建筑设计研究总院有限公司 一种楼屋盖结构的固定方法及固定装置
CN110516271A (zh) * 2018-05-21 2019-11-29 深圳市建筑设计研究总院有限公司 一种钢梁固定方法及固定装置
CN110516268A (zh) * 2018-05-21 2019-11-29 深圳市建筑设计研究总院有限公司 一种框架结构的固定方法及固定装置
CN110705144A (zh) * 2019-09-06 2020-01-17 青岛理工大学 一种螺栓与齿联合传力钢木节点最优布齿率的确定方法
CN112446085A (zh) * 2019-08-14 2021-03-05 深圳市建筑设计研究总院有限公司 一种框架的预内力及其计算方法
CN112541249A (zh) * 2019-09-23 2021-03-23 深圳市建筑设计研究总院有限公司 一种多层框架结构的逐层组装逐层预内力及其计算方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851962A (zh) * 2010-05-26 2010-10-06 厦门合道工程设计集团有限公司 框架结构抗连续倒塌的设计方法
CN102323968A (zh) * 2011-10-26 2012-01-18 陈志勇 古建筑木结构整体结构的有限元建模方法
CN102635160A (zh) * 2012-01-06 2012-08-15 浙江大学 一种半刚性节点初始刚度的组件式获取方法
CN105426599A (zh) * 2015-11-10 2016-03-23 华北电力大学(保定) 一种简化的拉线塔主柱有限元模型的计算方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851962A (zh) * 2010-05-26 2010-10-06 厦门合道工程设计集团有限公司 框架结构抗连续倒塌的设计方法
CN102323968A (zh) * 2011-10-26 2012-01-18 陈志勇 古建筑木结构整体结构的有限元建模方法
CN102635160A (zh) * 2012-01-06 2012-08-15 浙江大学 一种半刚性节点初始刚度的组件式获取方法
CN105426599A (zh) * 2015-11-10 2016-03-23 华北电力大学(保定) 一种简化的拉线塔主柱有限元模型的计算方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘红军 等: ""钢管输电塔环型加肋节点极限承载力研究"", 《工程力学》 *
施刚 等: ""钢结构梁柱半刚性端板连接弯矩-转角全曲线计算方法"", 《工程力学》 *
李正良 等: ""方钢管混凝土分叉柱与钢梁连接节点的抗震性能研究"", 《建筑结构学报》 *
繆俊 等: ""预制装配式部分钢骨混凝土框架梁柱节点有限元分析"", 《大连理工大学学报》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485612A (zh) * 2018-05-21 2019-11-22 深圳市建筑设计研究总院有限公司 一种楼屋盖结构的固定方法及固定装置
CN110516271A (zh) * 2018-05-21 2019-11-29 深圳市建筑设计研究总院有限公司 一种钢梁固定方法及固定装置
CN110516268A (zh) * 2018-05-21 2019-11-29 深圳市建筑设计研究总院有限公司 一种框架结构的固定方法及固定装置
CN110516268B (zh) * 2018-05-21 2023-03-14 深圳市建筑设计研究总院有限公司 一种框架结构的固定方法及固定装置
CN110516271B (zh) * 2018-05-21 2023-03-31 深圳市建筑设计研究总院有限公司 一种钢梁固定方法及固定装置
CN110210128A (zh) * 2019-06-03 2019-09-06 河北建筑工程学院 一种钢筋混凝土框架结构优化的拟满内力设计方法
CN112446085A (zh) * 2019-08-14 2021-03-05 深圳市建筑设计研究总院有限公司 一种框架的预内力及其计算方法
CN110705144A (zh) * 2019-09-06 2020-01-17 青岛理工大学 一种螺栓与齿联合传力钢木节点最优布齿率的确定方法
CN112541249A (zh) * 2019-09-23 2021-03-23 深圳市建筑设计研究总院有限公司 一种多层框架结构的逐层组装逐层预内力及其计算方法

Also Published As

Publication number Publication date
CN105912800B (zh) 2018-12-18

Similar Documents

Publication Publication Date Title
CN105912800A (zh) 低层建筑全装配式框架的设计方法
Truong et al. An efficient method for optimizing space steel frames with semi-rigid joints using practical advanced analysis and the micro-genetic algorithm
Yuan et al. Buckling of axially loaded castellated steel columns
Park et al. Drift control of high‐rise buildings with unit load method
Collins et al. Dynamic relaxation modelling of braced bending active gridshells with rectangular sections
CN110826132B (zh) 一种结构分散振动控制系统设计方法
CN106650130A (zh) 一种大跨度钢框架结构的设计方法
Schling et al. A geometry-based design approach and structural behaviour for an asymptotic curtain wall system
Mohammadnejad et al. Dynamic response analysis of a combined system of framed tubed, shear core and outrigger-belt truss
Park et al. Efficient structural analysis of wall–frame structures
CN108897966B (zh) 基于弹塑性修正的屈曲约束支撑结构的等效弹性分析方法
Zhang et al. The performance of resistance progressive collapse analysis for high-rise frame-shear structure based on opensees
Schling et al. Design and construction of the asymptotic pavilion
CN110704894B (zh) 斜拉桥桥塔地震响应的计算方法
Choi et al. Wind-induced response control model for high-rise buildings based on resizing method
Liu et al. Second-order and advanced analysis of structures allowing for load and construction sequences
Kim et al. An efficient structural analysis of super tall mega frame buildings using a multi-level condensation method
Jouneghani et al. Theoretical formulation for calculating elastic lateral stiffness in a simple steel frame equipped with elliptic brace
Liu et al. Second-order Analysis and design of wall-framed structures allowing for imperfections
Elvin et al. Virtual work optimization of structures with semi-rigid connections: Computational examples
Mirfallah et al. A New Jacobi-based Iterative Method for the Classical Analysis of Structures
Wan et al. Structural behaviour of an asymptotic curtain wall stiffened with lamella couplings
Mosquera et al. A sequential algorithm for minimum weight design of 2-D steel portal frames using Eurocode 3
CN113282995B (zh) 一种自修正的结构分散振动控制系统设计方法
Choi et al. Optimal design of semi-rigid steel frames using practical nonlinear inelastic analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181218

Termination date: 20200427

CF01 Termination of patent right due to non-payment of annual fee